what is ie & activities of ie in medlar apparels ltd

44
Presentation on What is IE & Activities of IE in Medlar Apparels Ltd. Prepared by, Imdadul Haque Likhon (Sr. IE) Mahibur Rahman (IE) KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Upload: mahibur-rahman

Post on 21-Apr-2017

370 views

Category:

Engineering


2 download

TRANSCRIPT

Page 1: What is IE & Activities of IE in Medlar Apparels Ltd

Presentation onWhat is IE & Activities of IE in Medlar Apparels Ltd.

Prepared by,Imdadul Haque Likhon (Sr. IE)

Mahibur Rahman (IE)

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Page 2: What is IE & Activities of IE in Medlar Apparels Ltd

Industrial Engineering Department

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Page 3: What is IE & Activities of IE in Medlar Apparels Ltd

History of Industrial Engineering

Henley was the first practioner of IE. He was a farmer who make simple observations about farming methods and ways of improving them.

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Page 4: What is IE & Activities of IE in Medlar Apparels Ltd

WHAT IS IE

Industrial Engineering is a branch of engineering which deals with optimization of complex process or systems. It is concerned with the development, improvement, implementation and evaluation of integrated manufacturing system of people, money, knowledge, information, equipment, energy, materials with the principles and methods of engineering design to specify, predict and evaluate the results to be obtained from such system and process.

Page 5: What is IE & Activities of IE in Medlar Apparels Ltd

Present Situation of Manufacturer

Price

Cost

BEP

Profit Loss

Today I am here

Page 6: What is IE & Activities of IE in Medlar Apparels Ltd

NECESSITY OF IE DEPARTMENT IN GARMENTS SECTOR

1. Enhancing productivity2. Process standardization3. Operation analysis4. Workplace design5. Work measurement/Set up standard time of each

process6. Proper utilization of man machine & materials7. Calculating efficiency8. Man Machine planning

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Page 7: What is IE & Activities of IE in Medlar Apparels Ltd

Uses of Industrial Engineering

1. Analyses and improve the existing systems for higher productivity.2. Issue Standard times (SMV) for each operations 3. Garment cost of manufacture [CM] calculation based on standard times.4. Production planning and control (PPC).5. Control & reduce manpower through proper line balancing & increase the efficiency of the line.

6. Control over time (OT pie chart ).7. Set up target and monitor to achieve in the lines.

8. Evaluate Operator Skills during the recruitment, grading, new style feeding.

12. Make reports, about factory status, Monthly, Daily ….

9. Improve operator sewing skills as well as perfect handling. 10. Analyze and update key productivity indicators (KPI).

13. Implement & maintain new systems14. Output step up through work place engineering.

11. Work out & maintain proper incentive schemes

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEERKEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Page 8: What is IE & Activities of IE in Medlar Apparels Ltd

PRESENT ACTIVITIES OF IE IN MEDLAR

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

1. Process standardize2. Evaluating correct SMV3. Thread consumption of different style4. Making bulletin & layout5. Making efficiency report6. Daily target setup7. Method & Motion study8. Making skill inventory & grading9. Daily line balancing by capacity study and SMV10. Bottleneck process monitoring & line balancing11. Recording non productive time12. Style wise machine planning and rented m/c

monitoring 13. Increase operator capacity by one hour capacity study14. Skill wise manpower recruiting

Page 9: What is IE & Activities of IE in Medlar Apparels Ltd

PRESENT ACTIVITIES OF IE IN MEDLAR

16. Daily all types of material tracking17. Size set monitoring18. Attend PP meeting18. Follow up PP meeting comments to ensure quality19. CAD efficiency follow up

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Page 10: What is IE & Activities of IE in Medlar Apparels Ltd

Daily Man-Machine StatusBy using this man-machine status we can calculate total running machine; idle m/c; present O/P, H/P & I/M; rented m/c; lended m/c; absenteeism%; uses O/P+I/M to H/P number of the day.

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Page 11: What is IE & Activities of IE in Medlar Apparels Ltd

Daily Line TargetWe give the line target considering day manpower & other factor.

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Page 12: What is IE & Activities of IE in Medlar Apparels Ltd

Daily & Monthly Efficiency Report

To identify the line/floor/factory performance it one of the core report. About this report, we will discuss in below:

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Page 13: What is IE & Activities of IE in Medlar Apparels Ltd

Efficiency FormulaTo calculating efficiency: 1) Efficiency % = Produced minutes x 100

Utilized minutes

Produced minutes = Qty. produced x time allowed per unit (Output) (SMV)

Utilized minutes = Manpower x worked minutes

2) Performance % = Achieved production x 100 Target production(100%)

Page 14: What is IE & Activities of IE in Medlar Apparels Ltd

Efficiency Example Line- 1

* SMV of Garment = 16 minutes* No of workers in line = 60* Working hours = 9 * Line Output = 1000 Pcs

Output (1000) x SMV (16)_____ %No of workers(60) X Working Minutes (540)

Line Efficiency = 49%

Line- 2* SMV of Garment = 16

minutes* No of workers in line = 80* Working hours = 10* Line Output = 1300 Pcs

Output (1300) x SMV (16)_____ %No of workers(80) X Working Minutes

(600)

Line Efficiency = 43%

THEREFORE: LINE 1 IS MORE PRODUCTIVE THAN LINE 2, ALTHOUGH LINE 2’S PRODUCTION IS HIGHER

Page 15: What is IE & Activities of IE in Medlar Apparels Ltd

Example for Calculating SMVObservations:

Observed Cycle Time= 0.80 Minute Performance Rating = 80%

Calculations: Find Basic Time = 0.80 X 0.80

0.64 Minute Decide Allowances = Personal & Fatigue (P&F)- 12%

(Machine Contingencies) - 9% Add allowances and calculate SMV

0.64 + 21% = 0.81 MinuteTherefore TGT/hr : 74 Pcs

Page 16: What is IE & Activities of IE in Medlar Apparels Ltd

Key Productivity Indicators (KPI) Man- Machine, Direct-Indirect ratio Absenteeism, Migration, Late come, Lost time percentage Output pcs per man hour, Pcs Per machine, Monthly TTL output Efficiency, Performance Rejection, Defect percentage Cut to ship, Receive to ship ratio Normal hour to OT hour percentage Marker efficiency Overhead cost Total salary cost, O.T cost Cost per minute (CPM), earn per minute (EPM), CM value/mint Overall productivity

Page 17: What is IE & Activities of IE in Medlar Apparels Ltd

SMV BANKSMV Bank consists of SMV of individual operator as well as individual process which helps to calculate SMV of a complete garment.

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Page 18: What is IE & Activities of IE in Medlar Apparels Ltd

Operation BreakdownFrom operation breakdown we can identify total process-wise number of m/c, efficiency-base target, operator allocation, SMV of that style before input the sewing line. It’s also helps to do proper planning.

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Page 19: What is IE & Activities of IE in Medlar Apparels Ltd

Line Feeding Time StatusThis indicates the time duration of a sewing line from 1st input to 1st output of production.

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Page 20: What is IE & Activities of IE in Medlar Apparels Ltd

Capacity Study & Line BalancingWe calculate the capacity of the operator to balance the line, to get optimum production from the line & overall to increase the profitability from sewing line.

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Page 21: What is IE & Activities of IE in Medlar Apparels Ltd

Operator Job CardThis helps day to day follow-up the operator performance.

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Page 22: What is IE & Activities of IE in Medlar Apparels Ltd

Bottleneck StudyTo get the hidden production from the operator sometimes we study the operator for 1 hour. This study is called bottleneck study.

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Page 23: What is IE & Activities of IE in Medlar Apparels Ltd

Q.I Recruitment Test

We take a written test to get the Quality Inspector. A quality full Q.I can help you to get a quality full product.

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Page 24: What is IE & Activities of IE in Medlar Apparels Ltd

Daily & Monthly DHU Report

DHU means Defects Hundred Per Unit. To know the unit-wise defect%, it is so much helpful. It is also buyer requirement.

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Page 25: What is IE & Activities of IE in Medlar Apparels Ltd

Skill MatrixSkill matrix is used to know the skill of an operator.

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Page 26: What is IE & Activities of IE in Medlar Apparels Ltd

Worker Evaluation

We also evaluate workers’ performance

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Page 27: What is IE & Activities of IE in Medlar Apparels Ltd

Cut Panel Check StatusTo know the wastage fabric% in cutting department we use cut panel check status.

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Page 28: What is IE & Activities of IE in Medlar Apparels Ltd

Learning CurveTo know the pick time of a line this is important one.

Let,1st Input:01/15/2015, 08:00 AM

1st Output: 01/17/2015, 08:00 AM

Feeding Time: 16 hrs.

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Page 29: What is IE & Activities of IE in Medlar Apparels Ltd

Data Analysis We analyze the line performance by using modern graphical view. It’s also one step of motivation.

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Page 30: What is IE & Activities of IE in Medlar Apparels Ltd

Skill Test Report of New O/P, I/M Skill test of new operator & iron-man is perform by us.

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Page 31: What is IE & Activities of IE in Medlar Apparels Ltd

Thread Consumption

We calculate the thread consumption of different style.

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Page 32: What is IE & Activities of IE in Medlar Apparels Ltd

NPT Time Follow-upFor smooth production we follow-up the Non-Productive Time (NPT) of the line.

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Page 33: What is IE & Activities of IE in Medlar Apparels Ltd

Daily Oil Releasing M/C Status

To identify the oil releasing m/c we prepare a report on daily-basis.

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Page 34: What is IE & Activities of IE in Medlar Apparels Ltd

Operator Training & Counselling

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Page 35: What is IE & Activities of IE in Medlar Apparels Ltd

Backward Planning Follow-upTo ensure time line feeding we follow-up the backward planning of the sewing line.

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Page 36: What is IE & Activities of IE in Medlar Apparels Ltd

Helper MinimizationWe have a project to reduce the helper number from different style.

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Page 37: What is IE & Activities of IE in Medlar Apparels Ltd

Root Cause AnalysisWe use fishbone diagram to solve & preventive action plan for different defect/ problem.

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Page 38: What is IE & Activities of IE in Medlar Apparels Ltd

Factory Performance Overview We present the factory performance overview.

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Page 39: What is IE & Activities of IE in Medlar Apparels Ltd

IE NOTICE BOARD*IE Notice Board is updated with daily & monthly status of sewing floor.*The Hourly Production Board consists hourly sewing production.

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Page 40: What is IE & Activities of IE in Medlar Apparels Ltd

FUTURE PLAN OF IE IN MEDLAR

1. Implementing new layout of finishing department

2. Calculating cutting SMV3. Preparing fabric wastage report4. Increasing marker efficiency by adding

another CAD package5. Preparing Gantt Chart

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Page 41: What is IE & Activities of IE in Medlar Apparels Ltd

FUTURE PLAN OF IE IN MEDLAR

06.CPM (Cost Per Minute) calculation07.Per SMV Value08.SMV-wise CM calculation09.Implementation of Lean Manufacturing10.Six Sigma Practice11.5-S Implementation in different section

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Page 42: What is IE & Activities of IE in Medlar Apparels Ltd

Appendix SMV=Basic Time+(Basic Time*Allowance)

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Efficiency=(Earn Minute/Available Minute)*100 Earn Minute= Produced Qty.*SMVAvailable Minute= Work Hour*No. of Manpower

Target=(60/SMV)*Present Manpower*Efficiency

Factory Capacity=(Work Minutes/SMV)*Total Worker*Working Day*Efficiency

Page 43: What is IE & Activities of IE in Medlar Apparels Ltd

Appendix CPM=(Total Overhead Cost of the Month/No. of

SMV Earners*Work Minute )*Efficiency

KEEP CALM AND LOVE AN INDUSTRIAL ENGINEER

Factory Capacity=(Work Minutes/SMV)*Total Worker*Working Day*Efficiency

Page 44: What is IE & Activities of IE in Medlar Apparels Ltd