Wet FGD Materials of Construction

Gregory T. Bielawski Manager, Environmental Aftermarket Services

Page 2: Wet FGD Materials of Construction - WPCAwpca.info/pdf/presentations/Orlando_Dec2008/4-Wet FGD Materials of... · Wet FGD Materials of Construction Gregory T. Bielawski Manager, Environmental

© 2008 Babcock & Wilcox Power Generation Group, Inc. All rights reserved. .2© 2008 Babcock & Wilcox Power Generation Group, Inc. All rights reserved. .2

• Inlet fluework and dampers

• Inlet wet/dry interface• Recirculation tank• Spray zone & spray

headers• Mist eliminator and

outlet flues

Wet FGD Absorber Zones

Page 3: Wet FGD Materials of Construction - WPCAwpca.info/pdf/presentations/Orlando_Dec2008/4-Wet FGD Materials of... · Wet FGD Materials of Construction Gregory T. Bielawski Manager, Environmental

© 2008 Babcock & Wilcox Power Generation Group, Inc. All rights reserved. .3© 2008 Babcock & Wilcox Power Generation Group, Inc. All rights reserved. .3

Inlet Fluework and DampersAbsorber inlet gas temperature (typically 300°F)

is well above the acid dew point

• Exotic materials not required

Materials can be:

• Unlined ASTM A36 carbon steel or A242 corten steel for flue, and damper frame and blade.

• Damper seals can be 300 series stainless

Page 4: Wet FGD Materials of Construction - WPCAwpca.info/pdf/presentations/Orlando_Dec2008/4-Wet FGD Materials of... · Wet FGD Materials of Construction Gregory T. Bielawski Manager, Environmental

B&W Spray TowerAbsorberwith Tray

Inlet Zone

© 2008 Babcock & Wilcox Power Generation Group, Inc. All rights reserved. .4

Page 5: Wet FGD Materials of Construction - WPCAwpca.info/pdf/presentations/Orlando_Dec2008/4-Wet FGD Materials of... · Wet FGD Materials of Construction Gregory T. Bielawski Manager, Environmental

© 2008 Babcock & Wilcox Power Generation Group, Inc. All rights reserved. .5© 2008 Babcock & Wilcox Power Generation Group, Inc. All rights reserved. .5

Inlet Wet/Dry InterfaceThis interface is exposed to both the incoming dry hot flue gas, and the absorber slurry sprays.

Due to evaporation, concentration of chloride ions in excess of 100,000 ppm is possible beneath any deposits in this area due to concentration cells.

Material choices for this area include:

•High temperature flake-filled vinyl ester or epoxy linings, or

•High chrome-nickel-molybdenum alloys (solid, clad or wallpapered)

Page 6: Wet FGD Materials of Construction - WPCAwpca.info/pdf/presentations/Orlando_Dec2008/4-Wet FGD Materials of... · Wet FGD Materials of Construction Gregory T. Bielawski Manager, Environmental

© 2008 Babcock & Wilcox Power Generation Group, Inc. All rights reserved. .6

B&W Absorber Gas Inlet with Tray

Page 7: Wet FGD Materials of Construction - WPCAwpca.info/pdf/presentations/Orlando_Dec2008/4-Wet FGD Materials of... · Wet FGD Materials of Construction Gregory T. Bielawski Manager, Environmental

7

B&W Spray TowerAbsorberwith Tray

RecirculationTank

© 2008 Babcock & Wilcox Power Generation Group, Inc. All rights reserved.

Page 8: Wet FGD Materials of Construction - WPCAwpca.info/pdf/presentations/Orlando_Dec2008/4-Wet FGD Materials of... · Wet FGD Materials of Construction Gregory T. Bielawski Manager, Environmental

© 2008 Babcock & Wilcox Power Generation Group, Inc. All rights reserved. .8© 2008 Babcock & Wilcox Power Generation Group, Inc. All rights reserved. .8

Recirculation TankIntegral to the WFGD tower structure•Tank is exposed to the same corrosion-inducing environment as the spray zone

In addition to corrosion concerns, abrasive wear must also be considered for:

•The floor, from solids “sweeping” action due to agitator-induced and recirculation pump suction-induced currents

•Pump suction nozzles themselves

Page 9: Wet FGD Materials of Construction - WPCAwpca.info/pdf/presentations/Orlando_Dec2008/4-Wet FGD Materials of... · Wet FGD Materials of Construction Gregory T. Bielawski Manager, Environmental

9

B&W Spray TowerAbsorberwith Tray

Spray Zone

© 2008 Babcock & Wilcox Power Generation Group, Inc. All rights reserved.

Page 10: Wet FGD Materials of Construction - WPCAwpca.info/pdf/presentations/Orlando_Dec2008/4-Wet FGD Materials of... · Wet FGD Materials of Construction Gregory T. Bielawski Manager, Environmental

Absorber Spray ZoneMultiple levels of headers with spray nozzles are used to

provide complete cross-sectional coverage• Overlapping coverage is necessary to avoid any untreated

flue gas circumventing slurry spray contact.• Slurry spray impingement (i.e. abrasion) against the shell,

other headers/supports can occur.

Material selections for impingement areas include:• Solid stainless steel or alloy• Rubber lining• Abrasion-resistant flake-filled resin coating• Ceramic tile lining

© 2008 Babcock & Wilcox Power Generation Group, Inc. All rights reserved. .10

Page 11: Wet FGD Materials of Construction - WPCAwpca.info/pdf/presentations/Orlando_Dec2008/4-Wet FGD Materials of... · Wet FGD Materials of Construction Gregory T. Bielawski Manager, Environmental

© 2008 Babcock & Wilcox Power Generation Group, Inc. All rights reserved. .11

Spray Headers & Nozzles: Full Coverage

Page 12: Wet FGD Materials of Construction - WPCAwpca.info/pdf/presentations/Orlando_Dec2008/4-Wet FGD Materials of... · Wet FGD Materials of Construction Gregory T. Bielawski Manager, Environmental

12© 2008 Babcock & Wilcox Power Generation Group, Inc. All rights reserved.

In a Wet FGD Absorber: A Very Heavy Rainstorm !

100 L/G (gal/1000 ft3 of flue gas) in a Wet FGD absorber operating at a typical 12 foot per second superficial gas velocity is equivalent to 6929 inches per hour !

Imagine the heaviest rainstorm you have experienced, which might be 6 inches of rain per hour.

Page 13: Wet FGD Materials of Construction - WPCAwpca.info/pdf/presentations/Orlando_Dec2008/4-Wet FGD Materials of... · Wet FGD Materials of Construction Gregory T. Bielawski Manager, Environmental

13© 2008 Babcock & Wilcox Power Generation Group, Inc. All rights reserved.

Alloy Spray Headers

Page 14: Wet FGD Materials of Construction - WPCAwpca.info/pdf/presentations/Orlando_Dec2008/4-Wet FGD Materials of... · Wet FGD Materials of Construction Gregory T. Bielawski Manager, Environmental

© 2008 Babcock & Wilcox Power Generation Group, Inc. All rights reserved. .14© 2008 Babcock & Wilcox Power Generation Group, Inc. All rights reserved. .14

FRP Spray Headers

Page 15: Wet FGD Materials of Construction - WPCAwpca.info/pdf/presentations/Orlando_Dec2008/4-Wet FGD Materials of... · Wet FGD Materials of Construction Gregory T. Bielawski Manager, Environmental

15© 2008 Babcock & Wilcox Power Generation Group, Inc. All rights reserved.

Taiwan Power Unit 5 – One-year Inspection

FRP Spray Headers & Tray

Page 16: Wet FGD Materials of Construction - WPCAwpca.info/pdf/presentations/Orlando_Dec2008/4-Wet FGD Materials of... · Wet FGD Materials of Construction Gregory T. Bielawski Manager, Environmental

16

Trays Stay Clean

With Forced Oxidation, all types of FGD systems today operate scale-free

B&W Absorber Tray

© 2008 Babcock & Wilcox Power Generation Group, Inc. All rights reserved.

Page 17: Wet FGD Materials of Construction - WPCAwpca.info/pdf/presentations/Orlando_Dec2008/4-Wet FGD Materials of... · Wet FGD Materials of Construction Gregory T. Bielawski Manager, Environmental

17

Absorber TowerMist Eliminators

B&W AbsorberTower

© 2008 Babcock & Wilcox Power Generation Group, Inc. All rights reserved.

Page 18: Wet FGD Materials of Construction - WPCAwpca.info/pdf/presentations/Orlando_Dec2008/4-Wet FGD Materials of... · Wet FGD Materials of Construction Gregory T. Bielawski Manager, Environmental

© 2008 Babcock & Wilcox Power Generation Group, Inc. All rights reserved. .18© 2008 Babcock & Wilcox Power Generation Group, Inc. All rights reserved. .18

Mist Eliminator and Outlet Hood Zones

Key concern is corrosive attack by sulfurous and sulfuric acid, resulting from the combination of wash water with the residual SO2 and SO3 in the clean gas.

Typically the same materials used for the absorber’s recirculation tank and spray zone are used for the mist eliminator and outlet zones, even though the environments are vastly different.

Few problems have been reported with this “in kind” materials use approach due to the dilution effect from the high moisture, especially with condensation at the cooler shell surface.

Page 19: Wet FGD Materials of Construction - WPCAwpca.info/pdf/presentations/Orlando_Dec2008/4-Wet FGD Materials of... · Wet FGD Materials of Construction Gregory T. Bielawski Manager, Environmental

Top of Level of Mist Eliminators w/ Wash Header

© 2008 Babcock & Wilcox Power Generation Group, Inc. All rights reserved. .19