1 WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia ____________________________________________________________ Proposal Package One (1) Thirty-One (31) Construction Manager: Charles Black Construction Company, Inc. P.O. Box 960 1955 Highway 129 South Cleveland, Georgia 30528 Tel: 706-865-3155 www.charlesblackconstruction.com Owner: Barrow County School System 179 West Athens Street Winder, GA 30680 Architect: Smallwood, Reynolds, Stewart, Stewart & Associates, Inc. 3495 Piedmont Road NE, Building 10, Suite 700 Atlanta, GA 30305 Proposal Documents Advertisement for Proposals General Package Notes Construction Manager’s Special Conditions Proposal Form Description of Proposal Package(s) Project Manual and Specifications as prepared by the Architect, entitled Westside Middle School Addition, Winder, Georgia. Drawings as prepared by the Architect, entitled Westside Middle School Addition. All addenda as issued by the Architect and Construction Manager. General Conditions for the Contract for Construction, AIA Document A201, Current Edition. This document is by reference only. Instructions to Proposers, AIA Document A701, Current Edition. This document is by reference only. ***A THOROUGH REVIEW OF THE PROPOSER PACKAGE DESCRIPTIONS AND PROPOSING DOCUMENTS IS REQUIRED PRIOR TO SUBMITTING PROPOSALS. ***

Upload: others

Post on 04-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

1

WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia

____________________________________________________________

Proposal Package One (1) – Thirty-One (31)

Construction Manager: Charles Black Construction Company, Inc. P.O. Box 960 1955 Highway 129 South Cleveland, Georgia 30528 Tel: 706-865-3155 www.charlesblackconstruction.com Owner: Barrow County School System

179 West Athens Street Winder, GA 30680

Architect: Smallwood, Reynolds, Stewart, Stewart & Associates, Inc. 3495 Piedmont Road NE, Building 10, Suite 700 Atlanta, GA 30305

Proposal Documents

− Advertisement for Proposals

− General Package Notes

− Construction Manager’s Special Conditions

− Proposal Form

− Description of Proposal Package(s)

− Project Manual and Specifications as prepared by the Architect, entitled Westside Middle School Addition, Winder, Georgia.

− Drawings as prepared by the Architect, entitled Westside Middle School Addition.

− All addenda as issued by the Architect and Construction Manager.

− General Conditions for the Contract for Construction, AIA Document A201, Current Edition. This document is by reference only.

− Instructions to Proposers, AIA Document A701, Current Edition. This document is by reference only.

***A THOROUGH REVIEW OF THE PROPOSER PACKAGE DESCRIPTIONS AND PROPOSING DOCUMENTS IS REQUIRED PRIOR TO SUBMITTING PROPOSALS. ***

Page 2: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

2

ADVERTISEMENT FOR PROPOSALS

Proposal Package One (1) through Thirty-One (31)

Project: Westside Middle School Addition Owner: Barrow County School System Architect: Smallwood, Reynolds, Stewart, Stewart & Associates, Inc. CM: Charles Black Construction Company, Inc. Contractors are invited to submit lump sum Proposals for Proposal Package One (1) through Thirty-One (31), Westside Middle School Addition.

Sealed proposals will be received by the Construction Manager until 3:00 p.m., Thursday, July 23, 2020, at the Barrow County School System, 179 West Athens Street Winder, GA 30680 (Room 175). Proposals must be submitted in Duplicate on the Construction Manager’s Proposal Form along with a 5% Bid Bond if required by the Proposal Package. No Faxed or E-Mailed Proposals Accepted. There will be a non-mandatory Open House / Pre-proposal Meeting for all local and interested subcontractors on Wednesday, July 8 from 3 PM to 5 PM at Barrow County School System, 179 West Athens Street, Winder, GA 30680. A thorough review of the proposal package description and proposal documents are required prior to submitting proposals.

The form of agreement will be AIA Document A401, 2007 Edition, between the Construction Manager and the Successful Proposer.

Proposing Documents are available for the COST OF REPRODUCTION from:

AGC Plan Room/Gainesville Whiteprint 312 Bradford Street, NW Gainesville, Georgia 30501 (770) 534-2086

Documents will be available for review at the following locations.

Charles Black Construction Company, Inc. 1955 Highway 129, South Cleveland, Georgia 30528 Dodge Data & Analytics www.construction.com ConstructConnect www.constructconnect.com

***CONTINUED ON NEXT PAGE***

Page 3: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

3

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

ADVERTISEMENT FOR PROPOSALS

INDEX TO PROPOSAL PACKAGES

Proposal Proposal Proposal Pkg Pkg Date Number Name 1. Sitework Previously Awarded 2. Curb/Gutter & Paving Previously Awarded 3. Chain Fences and Gates July 23, 2020 4. Concrete Previously Awarded 5. Structural Steel Previously Awarded 6. Hollow Metal Frames, Hollow Metal Doors, & Hardware Previously Awarded 7. Masonry July 23, 2020 8. Miscellaneous Steel July 23, 2020 9. TPO Roofing July 23, 2020 10. Standing Seam Metal Roofing July 23, 2020 11. Wood & FRP Doors July 23, 2020 12. Installation of Doors & Hardware July 23, 2020 13. Overhead Coiling Doors July 23, 2020 14. Aluminum Storefront / Glass & Glazing July 23, 2020 15. Drywall, Ceilings/EIFS/Acoustical Units July 23, 2020 16. Resilient Flooring, Carpeting, Base & Accessories July 23, 2020 17. Porcelain Tile July 23, 2020 18. Seamless Flooring July 23, 2020 19. Interior & Exterior Painting July 23, 2020 20. Specialties July 23, 2020 21. Visual Display Boards July 23, 2020 22. Metal Lockers July 23, 2020 23. Manufactured & Architectural Casework July 23, 2020 24. Science Casework July 23, 2020 25. Aluminum Canopies July 23, 2020 26. Plumbing July 23, 2020 27. Fire Protection July 23, 2020 28. HVAC July 23, 2020 29. Electrical July 23, 2020 30. Classroom Audio, Safety, & Intercom. System July 23, 2020 31. Landscaping July 23, 2020

*See Proposal Package Description, General Package Notes & Construction Manager’s Special Conditions Prior to Pricing*

Rod Nix, Project Manager Jacob Boyle, Asst. Project Manager Charles Black Construction Company, Inc. Charles Black Construction Company, Inc P.O. Box 960 * 1955 Highway 129 South P.O. Box 960 * 1955 Highway 129 South Cleveland, Georgia 30528 Cleveland, Georgia 30528

*The Construction Manager and Owner reserve the right to reject any and all proposals and to waive technicalities.*

****END OF ADVERTISEMENT FOR PROPOSALS****

Page 4: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

4

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

GENERAL PACKAGE NOTES

- It is the responsibility of the proposers to check for Addenda issued and to include all Addenda in their pricing.

- Specification sections as referenced to in the proposal package descriptions are for the convenience of proposers and in no way eliminates work required under the described package. Prospective proposers shall notify the Construction Manager if inconsistencies or discrepancies are discovered. Clarifications will be made upon written receipt of the Construction Manager prior to Five (5) Days of proposal date.

- Special attention is called to the General Conditions, Supplementary Conditions, General Requirements, General Package Notes and Construction Manager Special Conditions of the Project Manual as these requirements are to be followed for all proposal packages.

- Proposers of all packages shall include the pricing of any alternates affecting their work.

- Any contractor penetrating a partition, floor or other work shall be responsible for the coordination, patching, and fire stopping.

- Proposers certify that in submitting their proposal that they have thoroughly reviewed the contract documents, compared all documents to each other, visited the site, made allowances for the cost of the work and reported any discrepancy prior to submitting their proposal.

- Any contractor who demolishes a surface to install new work shall patch back to the surface’s original condition if no new work is to be installed on that surface. If new work is to be installed on the patched surface, patching is required to adequately receive the new finish.

- Any contractor disturbing any exterior work is responsible for its replacement.

- Bid Bond – Special attention is called to proposal packages requiring Bid Bonds. All Bid Bonds will be in the amount of 5% of proposal and the bonding company shall be a surety company certified on the United States Department of the Treasury's Listing of Approved Sureties (Department Circular 570), and rated no less than "A" by A.M. Best ratings agency and acceptable to the Construction Manager. The form of bond shall be AIA Document A310, Current Edition.

- Payment & Performance Bond – Special attention is called to proposal packages requiring payment and performance bonds. All bonds are 100% Performance and Payment Bonds and the bonding company shall be a surety company certified on the United States Department of the Treasury's Listing of Approved Sureties (Department Circular 570), and rated no less than "A" by A.M. Best ratings agency and acceptable to the Construction Manager. Bonds to be submitted with Seven (7) Days of award of contract.

- Upon submission of proposal, proposers certify that they are skilled in the trade of which they are proposing and will furnish acceptable references for a period of the last Five (5) Years.

- Special attention is called to the fact that this is a FAST TRACK PROJECT.

- Retainage of Ten Percent (10%) will be held on all proposal packages. A reduction in retainage may occur per state law and with consent of the Architect, Construction Manager & the Owner.

- Pay Requests are DUE to the Construction Manager on the 25th of each month.

(General Package Notes Continued on Next Page)

Page 5: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

5

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

GENERAL PACKAGE NOTES CONTINUED

- Change Orders: All change orders will include the cost of the work on site plus a maximum of 7.5% overhead and profit for work performed with change order request and will not be approved without the breakdown. A detailed breakdown shall be submitted.

- All proposals shall include applicable business licenses, permits, impact fees, tie-in fees, and other requirements of the local and state governing authority.

- Any contractor disturbing a grassed or finished site area shall restore the area to its original condition.

- All proposals for the proposal packages shall include competent supervision, material, taxes, installation, permits, fees, cleanup, debris removal and incidental items of cost to perform the work as described in the packages. Although reference is made to the specification sections in the package descriptions, all proposals for the designated packages shall include all Proposal Documents and subsequent addenda.

- All proposal packages shall include fire stopping of their work.

- Any contractor disturbing existing soils shall compact areas back per the Project Specifications – Earthwork.

- All proposal packages shall include progressive clean up and debris removal from the site daily, along with final clean up.

- The existing campus and buildings shall be kept operational at all times.

- There will be no contact with students. This includes verbal or physical contact. Any person having contact will be expelled from the site immediately and for the duration of the project.

- PROPOSERS MAY PROPOSE ON ONLY ONE PACKAGE PER PROPOSAL FORM. Any additional proposals must be for a separate package, on a separate proposal form and sealed in a separate envelope, and must comply with the proposal package description.

- Must not interrupt school activities and utilities.

- Trade contractors shall provide on site supervisor acceptable to the Construction Manager. This on site supervisor is the only person the Construction Manager’s Job Superintendent will give instructions to and coordinate all the work on this project. This site supervisor must be on site at all times while work is being performed by his staff and/or his subcontractors. This site supervisor must be able to speak and understand English language fluently. The Trade Contractor’s Supervisor cannot be replaced without the consent of the Construction Manager.

- Completion Date: See Schedule of Work.

(General Package Notes Continued on Next Page)

Page 6: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

6

GENERAL PACKAGE NOTES CONTINUED

- NO FAXED PROPOSALS: It shall be sealed proposals only.

- PROPOSERS NOTE: WHEN ORDERING PLAN DRAWINGS AND/OR SPECIFICATION SECTIONS, IT IS YOUR RESPONSIBILITY TO REVIEW THE CONTRACT DOCUMENTS AND SELECT THE REQUIRED DRAWING PAGE NUMBERS AND/OR SPECIFICATION SECTIONS YOU NEED.

- ALL PROPOSERS AGREE THAT TIME IS OF THE ESSENCE.

****END OF GENERAL PACKAGE NOTES****

Page 7: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

7

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

CONSTRUCTION MANAGER’S SPECIAL CONDITIONS

Proposers understand that this is a fast track, team oriented project where time is of the essence and agree to adhere to the Construction Manager’s Progress Schedule as developed at On-Site Meetings. Proposers agree to the following:

- In the event of a tie proposal, the Owner elects to award the subcontract to the local subcontractor. Should the tie be between multiple local subcontractors or multiple non-local subcontractors, then in that event, the Owner elects to award the subcontract via the “lot” method. (Coin Toss) Please note that the term “local” is herein defined as being located within the same County as the Owner.

- Report any discrepancy in documents immediately to the Construction Manager.

- Utilize a project team approach.

- Submit shop drawings and submittals within Thirty (30) Days of contract award, unless noted otherwise.

- Execute subcontracts and provide certificates of insurance and payment and performance bond within Three (3) Days of contract award.

- Begin work on site within Five (5) Days of Notice to Proceed.

- Submit all closeout documents within Ten (10) Days of Substantial Completion. Subcontractor will be subject to liquidated damages at a minimum rate of $3,500.00 per day beginning day thirty-one (31) after date of Substantial Completion

- All punch out items must be completed within thirty (30) days of Substantial Completion. Subcontractor will be subject to liquidated damages at a minimum rate of $3,500.00 per day beginning day thirty-one (31) after date of Substantial Completion.

- Attend weekly or bi-weekly on site progress meetings with the Proposer’s Project Manager and Job Foreman as scheduled by the Construction Manager.

- Furnish Twenty-Four (24) Hour telephone numbers for Proposer’s Project Manager and Job Foreman in case of emergency.

- Advise and Consult with Construction Manager regarding the availability of materials, cost analysis, scheduling, and value engineering.

- Develop and maintain a safety program as well as follow the safety program of the Construction Manager.

- Provide Construction Manager with MSDS Data as well as your Safety Plan within Five (5) Days of Contract Award. Must be provided prior to personnel being onsite.

- Provide a Drug-Free and Alcohol Free Work Place.

- In the event OSHA or other inspecting authority levies a fine against Construction Manager due to violation(s) of a subcontractor, the subcontractor in violation of codes and regulations shall be responsible for the fine levied against the Construction Manager.

(Construction Manager’s Special Conditions Continued on Next Page)

Page 8: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

8

CONSTRUCTION MANAGER’S SPECIAL CONDITIONS CONTINUED

- Upon written notice from the Construction Manager’s Project Manager, Subcontractor shall work six days a week 10 hours a day. This will be enforced if project gets behind schedule and will be enforced until Construction Manager deems the project back on schedule. No change order will be approved from subcontractor for additional labor or overtime hours.

- Abide by all laws, ordinances, codes, and schedule inspections through Local Inspection Department and the Architect/Engineer.

**Note: New Special Conditions regarding Safety above**

- Furnish all insurance as required by law, the Project Manual, Proposal Documents and per the following:

Workman’s Compensation/Employer’s Liability $ 100,000.00 (Statutory) Commercial & Comprehensive General Liability$1,000,000.00 (Each Occurrence) Products and Completed Operations Coverage shall be maintained for at least One (1) Year following Final Payment in the amount per the specifications. Comprehensive Automobile Liability Insurance$ 500,000.00 Bodily Injury and Property Damage $ 500,000.00 (Each Occurrence)

- Proposer must participate in a federal work authorization program in accordance with the applicability provisions and deadlines established in O.C.G.A. 13-10-91 and upon contract award, must execute a Subcontractor’s Affidavit verifing compliance. Affidavit shall be provided by Construction Manager. A copy is available upon request.

- Pay Requests – Pay request are to be submitted on the Construction Manager’s form no later than the 25th of each month along with an approved schedule of values.

- Change Orders – All change orders will include the cost of the work on site plus a maximum of 7.5% overhead and profit for work performed. A detailed breakdown shall be submitted with all change order request.

- Alternates – Please see exhibit “A” showing all alternates on this project. Contractor must fill out Alternate Pricing Form on relevant alternates that affect scope of work.

** PROPOSERS AGREE THAT TIME IS OF THE ESSENCE. **

Page 9: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

9

EXHIBIT “A”

WESTSIDE MIDDLE SCHOOL ADDITION ALTERNATES

Alternate # 1 – Owner preferred alternate to install Schlage Cylinders.

Alternate # 2 – For ALL doors not specified to receive continuous hinges, furnish and install continuous

hinges in lieu of hinges shown in hardware schedule.

Alternate # 3 – Remove Hollow Metal exterior doors at all exterior openings. Furnish frame and

hardware only. To include the following door openings: 701A, 701B, 730.3B, 730D, 733A, 734A,

750A, 750B, 751A, 751B.

Alternate # 4 – Remove all scope of work as shown on the plans and described in the specifications for

the new concessions building.

Alternate #5 – Provide New Monument as Indicated on the Drawings

Alternate #6 – Remove and Replace Existing Monument Sign

Alternate #7 – Provide and Install Stainless Steel Handrails in lieu of Galvanized Handrails

Alternate #8 – Provide FRP doors at all exterior openings.

Alternate #9 – Furnish VCT Floors in all Corridors in lieu of Porcelain Tile

Alternate #10 – Furnish Black Vinyl Fence in lieu of Galvanized Fence

Alternate #11 – Remove the existing fence around the detention pond on Matthews School Road with new

Black Vinyl Fence.

Alternate #12 – Owner Preferred Alternate for Cook Exhaust Fans (Acme, Aerovent, Breidart, Broan, Delhi,

Greenheck or Penn listed as approved equals in base bid)

Alternate #13 – Owner Preferred Alternate for iVu Controls

Alternate #14 – Owner Preferred Alternate for Edwards Fire Alarm System

Alternate #15 – Owner Preferred Alternate for Daiken VRF

Alternate #16 – Owner Preferred Alternate for Rinnai Water Heater

Alternate #17 – Furnish New Emergency Generator

***Continued on Next Page***

Page 10: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

10

EXHIBIT “A”

WESTSIDE MIDDLE SCHOOL ADDITION ALTERNATES

(Continued)

Alternate #18: Furnish Impact Resistant Gypsum Board up to 8’-0” Above Finish Floor in lieu of 4’-0” Above

Finish Floor in Base Bid.

Alternate #19:

Alternate #20:

Alternate #21:

Alternate #22:

Alternate #23:

Alternate #24:

Alternate #25:

Alternate #26:

Alternate #27:

Alternate #28:

Alternate #29:

Alternate #30:

Alternate #31:

Alternate #32:

Alternate #33:

Alternate #34:

Page 11: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

11

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

SCHEDULE OF WORK

The construction phase involves completing the WESTSIDE MIDDLE SCHOOL ADDITION per the Construction Manager’s schedule.

Project Completion date for the project is June 4, 2021. All subcontractors including final clean up must be completed on or before this date.

** PROPOSERS AGREE THAT TIME IS OF THE ESSENCE. **

Page 12: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

12

NO FAXED OR EMAILED PROPOSALS ACCEPTED ___________________________________________________________

PROPOSAL FORM

WESTSIDE MIDDLE SCHOOL ADDITION WINDER, GEORGIA

Proposal Package Number: ______________________________

Proposal Package Description: ___________________________ Proposal Date: ________________________________________

Contractor: ___________________________________

Address: ___________________________________

___________________________________

Office: ___________________________________

Mobile: ___________________________________

Federal I.D. #: __________________________________

Charles Black Construction Company, Inc. P.O. Box 960 Cleveland, Georgia 30528 Base Proposal The undersigned agrees, having familiarized themselves with the local conditions affecting the cost of the work, visiting the site and carefully examining the proposal documents to furnish all labor, materials, equipment and services to execute Proposal Package Number _____ for the stipulated sum of ____________________________ __________________________________ Dollars ($_________________________) Alternates (If Applicable) **See Alternate Proposal Form Attached** Time Proposers agree to have all work completed per the schedule of work. Proposal Time Limitations It is understood that this proposal is subject to acceptance and may not be withdrawn for a period of Thirty (30) Days from Proposal Date.

Page 1 of 8

Page 13: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

13

Proposal Form

Contract Execution Upon notification of acceptance of this proposal, the undersigned agrees to execute, within Three (3) Days, the specified contract and to provide Payment and Performance Bond if applicable. Addenda The undersigned acknowledges receipt of addendum (addenda):

Addendum Number _____________ dated ________________

Addendum Number _____________ dated ________________

Addendum Number _____________ dated ________________

Addendum Number _____________ dated ________________

Addendum Number _____________ dated ________________

Submitted By:

Contractor: ___________________________________

By: ___________________________________

Print Name: ___________________________________

Title: ___________________________________

E-Mail: ___________________________________

SUBMIT IN DUPLICATE, ALONG WITH BID BOND (IF REQUIRED), IN A SEALED ENVELOPE MARKED AS FOLLOWS: PROPOSAL PROPOSAL PACKAGE NUMBER: ______________________________________ PROPOSAL PACKAGE DESCRIPTION: _________________________________ WESTSIDE MIDDLE SCHOOL ADDITION Be sure the proposers name and address also appear on the envelope and deliver to: Barrow County School System 179 West Athens Street, Room 175 Winder, GA 30680

Page 2 of 8

Page 14: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

14

Charles Black Construction Company, Inc. Unit Price Form

Westside Middle School Addition

Must be submitted with Work Packages #1, #2, #3, #4, #22 & #25

Description Cost Unit

A. SITE WORK/EARTHWORK

1. Haul in fill and compact suitable fill from off site. /CY

2. Mass Removal of unsuitable soil and waste on site. /CY

3. Mass Removal of unsuitable soil and waste off site /CY

4. Replacement of mass soil removed above; including backfill & compaction; on-site borrow; structural fill. /CY

5. Replacement of mass soil removed above; including backfill & compaction; off-site borrow; structural fill. /CY

6. Replacement of mass soil removed above; including backfill and compaction; off-site borrow; #3 stone base course fill

TON

7. Replacement of mass soil removed above; including backfill and compaction; off-site borrow; #57 stone base course fill

TON

8. Trench removal of unsuitable soil and waste on site. /CY

9. Replacement of soil removed from trench above; including backfill and compaction; on-site borrow; structural fill.

/CY

10. Replacement of soil removed from trench above, including backfill & compaction; off-site borrow; structural fill

/CY

11. Replacement of soil removed from trench above; Including backfill and compaction; off-site borrow; #57 stone

TON

12. Replacement of soil removed from above; excluding backfill and compaction; on-site borrow;

structural fill. (Backfill and Compaction In Base Bid)

/CY

B. ROCK EXCAVATION

13. Mass excavation of rock; waste on-site. /CY

14. Mass excavation of rock; waste off-site. /CY

15. Replacement of rock removed above; including backfill and compaction; on-site borrow; structural fill /CY

16. Replacement of rock removed above, including backfill & compaction, off-site borrow; structural fill /CY

17. Trench excavation rock; waste on-site. /CY

18. Trench excavation rock; waste off-site. /CY

19. Replacement of rock removed above; including backfill and compaction; on-site borrow; structural fill. /CY

20. Replacement of rock removed above, including backfill & compaction, off-site borrow; structural fill. /CY

21. Perform rock boring as required for utility Installation. /LF

Page 3 of 8

Page 15: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

15

Charles Black Construction Company, Inc. Unit Price Form

Westside Middle School Addition Continued

C. ASPHALT REPLACEMENT

22. Include removal and replacement of asphalt binder (in place measurement). /SY

23. Removal and replacement of damaged curb & gutter (in place measurement).

24.

/LF

24. Furnish and install stone graded aggregate base.

Ton

25. Furnish and install rip rap (50 lbs)

Ton

26. Furnish and install type C silt fence

/LF

27. Dewatering trench consisting of 36”W x 12” D cross section lined with “mirafi” filter fabric filled with PVC

piping backfilled and compacted as per Earthwork Specifications.

/LF

28. Furnish and install for duration of project temporary chain link fence

/LF

29. Furnish and install manufacturer approved moisture mitigation at areas to receive epoxy resinous floors

/SF

30. Stripping of cultivated soils and wasted onsite

/CY

31. Replace cultivated soils with structural fill; onsite borrow pit /CY

32. Furnish and install walk pads at roof /SF

33. Furnish and install additional 1” conduit /LF

Page 4 of 8

Page 16: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

16

Alternate Pricing Form

Alternate # 1 Add / Deduct $_______________________________ Alternate # 2 Add / Deduct $_______________________________ Alternate # 3 Add / Deduct $_______________________________ Alternate # 4 Add / Deduct $_______________________________ Alternate # 5 Add / Deduct $_______________________________ Alternate # 6 Add / Deduct $_______________________________ Alternate # 7 Add / Deduct $_______________________________ Alternate # 8 Add / Deduct $_______________________________ Alternate # 9 Add / Deduct $_______________________________ Alternate # 10 Add / Deduct $_______________________________ Alternate # 11 Add / Deduct $_______________________________ Alternate # 12 Add / Deduct $_______________________________ Alternate # 13 Add / Deduct $_______________________________ Alternate # 14 Add / Deduct $_______________________________ Alternate # 15 Add / Deduct $_______________________________ Alternate # 16 Add / Deduct $_______________________________ Alternate # 17 Add / Deduct $_______________________________ Alternate # 18 Add / Deduct $_______________________________ Alternate # 19 Add / Deduct $_______________________________ Alternate # 20 Add / Deduct $_______________________________ Alternate # 21 Add / Deduct $_______________________________

***Continued on Next Page*** Page 5 of 8

Page 17: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

17

Alternate Pricing Form (Continued) Alternate # 22 Add / Deduct $_______________________________ Alternate # 23 Add / Deduct $_______________________________ Alternate # 24 Add / Deduct $_______________________________ Alternate # 25 Add / Deduct $_______________________________ Alternate # 26 Add / Deduct $_______________________________ Alternate # 27 Add / Deduct $_______________________________ Alternate # 28 Add / Deduct $_______________________________ Alternate # 29 Add / Deduct $_______________________________ Alternate # 30 Add / Deduct $_______________________________ Alternate # 31 Add / Deduct $_______________________________ Alternate # 32 Add / Deduct $_______________________________ Alternate # 33 Add / Deduct $_______________________________ Alternate # 34 Add / Deduct $_______________________________

Page 6 of 8

Page 18: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

18

EXHIBIT “A”

WESTSIDE MIDDLE SCHOOL ADDITION ALTERNATES

Alternate # 1 – Owner preferred alternate to install Schlage Cylinders.

Alternate # 2 – For ALL doors not specified to receive continuous hinges, furnish and install continuous

hinges in lieu of hinges shown in hardware schedule.

Alternate # 3 – Remove Hollow Metal exterior doors at all exterior openings. Furnish frame and

hardware only. To include the following door openings: 701A, 701B, 730.3B, 730D, 733A, 734A,

750A, 750B, 751A, 751B.

Alternate # 4 – Remove all scope of work as shown on the plans and described in the specifications for

the new concessions building.

Alternate #5:

Alternate #6:

Alternate #7:

Alternate #8:

Alternate #9:

Alternate #10:

Alternate #11:

Alternate #12:

Alternate #13:

Alternate #14:

Alternate #15:

Alternate #16:

Alternate #17:

Page 7 of 8

Page 19: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

19

EXHIBIT “A”

WESTSIDE MIDDLE SCHOOL ADDITION ALTERNATES

(Continued)

Alternate #18:

Alternate #19:

Alternate #20:

Alternate #21:

Alternate #22:

Alternate #23:

Alternate #24:

Alternate #25:

Alternate #26:

Alternate #27:

Alternate #28:

Alternate #29:

Alternate #30:

Alternate #31:

Alternate #32:

Alternate #33:

Alternate #34:

Page 8 of 8

Page 20: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

20

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION

1 SITEWORK

Provide supervision, layout and engineering, shop drawings, labor, material, equipment and other incidental items of cost to complete ALL SITEWORK as shown on the Civil (C) Drawings and Proposal Documents, including but not limited to, the following:

- 5% Bid Bond Required - (See CM’s General Package Notes) - 100% Payment and Performance Bond Required (See CM’s General Package Notes) - NOTE: Proposals will be received and opened at the office of the Construction Manager,

Charles Black Construction Company, Inc. 1955 Highway 129 South Cleveland, GA 30528. - Site preparation, clear and grub, site clearing, demolition and tree protection. Dispose of

debris offsite. - No burning will be allowed onsite. - All Earthwork, Grading, Including Finish Grading, to Sub-grade and Finished Contours - Subgrade to be ±.1 foot. - All final backfill and finish grading. - Storm Drains (Storm Sewage System) including structures, tops, and rip rap. Storm Sewer

testing if required. - Traffic Control – if required. - Layout, Engineering and Staking All to Complete is included in this Package. - Staking of all building corners as well as two independent benchmarks at the locations

agreed upon with the Construction Manager. - Erosion Control, Soil Stabilization, Slope Protection and their Maintenance until

stabilization and acceptance by the Construction Manager. - This package includes all work required to abide by the requirements of the Manual for Erosion

and Sediment Control in Georgia - Temporary and Permanent Grassing to all disturbed areas and its maintenance until

acceptance - Construction Entrance and Exit and Maintenance until acceptance - Be sure to visit the site to verify existing elevation and topo prior to proposal - Progressive clean-up and final clean up. - Maintain access to the site and building pad at all times - Lawns and Grasses - Monitoring will be conducted by a certified firm and paid for by the Construction

Manager/Owner. The successful proposer for this Proposal Package will be responsible for erosion control maintenance and Best Management Practices (BMP’s) until accepted by the Construction Manager and signed off on by EOR. The successful proposer will be responsible for site stabilization and should install stabilization measures as soon as possible as shown on drawings.

(Proposal Package One (1) - Sitework - Continued on next page)

Page 21: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

21

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION

1 SITEWORK (Continued)

- Any fines levied due to lack of erosion control maintenance will be the responsibility of the successful proposer for Proposal Package Number One (1) – Sitework.

- Extra payments for rock is only for “Blast Rock” as described in the Specifications. Rip rock is included in the base proposal.

- Building Pad and associated roads Completion Date is Forty-five (45) days from Notice to Proceed.

- Rock Removal (If applicable). - Fine grade all parking areas to receive base. - The Construction Manager or Owner will pay for special testing by an

independent company to which the Owner, Construction Manager and Architect have no objection.

- Contractor to include all outside domestic water to within five feet of buildings. Water lines are to be capped off, marked and protected.

- Contractor to include all exterior sanitary sewer and structures to within five feet of buildings. Sewer lines are to be capped off, marked and protected.

- Contractor to include all fire lines. Fire lines are to terminate at one foot above finish floor.

- Include in base proposal 400 cubic yards of mass rock removal and placed on site (in place measurement) (Item # 13 on Unit Price Form)

- Include in base proposal 150 cubic yards of trench rock and place on site (in place measurement) (Item # 10 on Unit Price Form)

- Include in base proposal 500 cubic yards of unsuitable soils and placed on site (in place measurement) (Item # 2 on Unit Price Form)

- Include in base proposal 500 cubic yards of suitable soils borrowed from on site (in place measurement) (Item # 4 on Unit Price Form)

- Include in base proposal 200 tons of #57 stone in excess of what may be shown on drawings (in place measurement using weight tickets) (Item # 7 on Unit Price Form)

- Include in base proposal 200 tons of GAB stone in excess of what may be shown on drawings (in place measurement using weight tickets) (Item # 24 on Unit Price Form)

(Proposal Package One (1) - Sitework - Continued on next page)

Page 22: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

22

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION

1 SITEWORK (Continued) - Include in base proposal 100 tons of # 3 stone in excess of what may be shown

on drawings (in place measurement using weight tickets) (Item #6 on Unit Price Form)

- In place measurement will be used on all of these allowances. Weight tickets will be required on all stone. Testing company will verify mass rock, trench rock, unsuitable soils and suitable soils.

- Unused portions of these allowances will be credited back to the owner by credit change order at the unit price on the Unit Price Form.

- Please be sure to include a completed Unit Price Form with your proposal form. - As-Builts and hydrology study to be included in scope of work. - Topsoil will not be imported on this project. Onsite topsoil must be stockpiled

and screened prior to final placement. - Rainwater as shown on drawings included in this scope of work to within five

feet to building. Plumbing Contractor to tie in from five feet out. - If balancing excess materials on site, it must be wasted on site as directed by

the Construction Manager. - Contractor to include all work shown on demolition and removal plan. - All demolition items must be taken to a state approved site for disposal. - Contractor is responsible for coordinating relocation of existing gas line. Gas

line will be relocated by City of Winder and will be no additional charge based on email dated 04/28/20 to Mike Breedlove from Roger Wilhelm, Utilities Director, City of Winder.

- Include all sodding as shown on drawings as either 6’ sod strip or DS4 on final phase plan of ES & PC plans.

- All areas to receive sod must pay close attention to Section 029200 in the project manual.

- All areas to receive sod must also be rock hound prior to sod being installed. - Contractor is required to remove all silt fence and other BMP’s once site has

reached final stability per ES & PC final phase plan. - Contractor should maintain temporary and permanent grass unti l accepted by

Owner/Construction Manager. Grass should be cut every two weeks during growing season.

- Contractor to include in base bid three (3) pulls of 30 cyd dumpster at $400.00 per pull for total allowance of $1,200.00.

(Proposal Package One (1) - Sitework - Continued on next page)

Page 23: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

23

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition PROPOSAL PROPOSAL PKG PKG NUMBER DESCRIPTION 1 SITEWORK (Continued)

Refer to Applicable Specification Sections: 310001 – Site Preparation 310002 – Site Work Demolition 311000 – Site Cleaning and Grubbing 312200 – Earthwork 312500 – Erosion, Sediment & Pollution Controls 321200 – Flexible Paving 321313 – Concrete – Sitework 329000 – Planting 329200 – Turf & Grasses 329705 – Site Cleaning 331100 – Water Distribution – Site 333000 – Sanitary Sewer 334000 – Storm Drainage 334600 – Site Sub-Drainage

NOTE: THIS PACKAGE REQUIRES A 5% BID BOND AND SUBSEQUENT 100% PAYMENT AND

PERFORMANCE BONDS. (SEE CM’S GENERAL PACKAGE NOTES.)

Page 24: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

24

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION 2 CURB/GUTTERS & PAVING

Provide supervision, layout and engineering, shop drawings, labor, material, equipment and other incidental items of cost to complete ALL CURB, GUTTERS and PAVING as shown on the Civil (C) Drawings and Proposal Documents, including but not limited to, the following:

- 5% Bid Bond Required. (See Construction Manager’s General Package Notes) - 100% Payment & Performance Bond Required (See Construction Manager’s

General Package Notes) - NOTE: Proposals will be received and opened at the office of the Construction Manager,

Charles Black Construction Company, Inc. 1955 Highway 129 South Cleveland, GA 30528. - Coordination of paving with the work of the sitework contractor, who is responsible for

cutting paving areas including curbs and gutter to ± 1 foot. It is the intent of this scope of work to receive these areas from sitework contractor and install scope of work with no involvement from any others.

- Fine grade and proof roll of subgrade in the presence of third party testing company prior to installing gravel base.

- Construction manager will guarantee sub-grade to be ± .1 foot. - Asphalt paving, base. - Striping (Pavement Markings) - Traffic and Handicap Signage and Signals - Concrete curb and gutter, flumes, throats and tops. - Layout, engineering and all staking to complete this package. - Curbs and gutters, structures, tops and asphalt binder to be installed immediately upon

completion of grading and asphalt topping to be installed at the end of the project. - Be sure to visit the site to verify existing elevation and topo prior to proposal. - Progressive clean-up and final clean up. - Maintain access to the site and building pad at all times. - Cleaning (washing and sweeping) of asphalt binder to make ready to receive topping

shall be included in this scope of work.

(Proposal Package Two (2) – Curb/Gutters & Paving Continued on Next Page)

Page 25: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

25

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION 2 CURB/GUTTERS & PAVING (Continued)

- Contractor to include 1,000 sq. yards of binder repair at areas damaged by construction

before topping is installed. Testing Company will verify quantities. Construction Manager will identify areas to be replaced. Indicate the unit pricing on the Unit Price Form. This pricing will be used for pricing purposes if quantities do not meet or they exceed base proposal. (Item # 22 on the Unit Price Form)

- Contractor to include in base proposal 150’ linear feet of replacement curb. Contractor will be responsible for removal and replacement of curb identified by Construction Manager prior to final topping being installed. Indicate unit pricing on Unit Price Form. This pricing will be used for pricing purposes if quantities do not meet or exceed base proposal quantities. (Item # 23 on Unit Price Form).

- Contractor to include in base bid 150 tons of GAB placed in areas that testing company requires remediation (Item # 24 on unit price form)

- Contractor to include in base bid 150 tons of surge stone placed in areas that testing company requires remediation. (Item # 25 on unit price form)

- Contractor to include in base bid one pull of a 20 cyd dumpster at 400.00 per pull for a total allowance of $400.00.

- Include all mountable curb shown on drawings. - Furnish and Install concrete wheel stops as shown.

Refer to Specification Sections: 312200 – Earthwork 321200 – Flexible Paving 321313 – Concrete Sitework

Note: This package requires a 5% Bid Bond and subsequent 100% Payment & Performance Bonds. (See CM’s General Package Notes).

Page 26: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

26

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION 3 FENCES AND GATES

Provide and install all chain link fencing as shown on the contract documents

- NOTE: Proposals will be received and opened at the office of the Construction Manager, Charles Black Construction Company, Inc. 1955 Highway 129 South Cleveland, GA 30528.

- Include all chain link fencing if shown on Civil/Architectural Drawings. - Include all chain link gates per plans including security gates and post as shown on civil

plans. - Progressive and final clean-up. - All coring for setting post is included in this scope of work. - Include haul off and disposal of debris. - Provide unit pricing on Unit Price Form. - Include an allowance in base proposal for 4,000 linear feet of temporary fence for

duration of project. Unit price will be used for pricing purposes if quantities do not meet or they exceed base proposal. Unused allowance will be returned to owner by credit change order. (Item #27 on Unit Price Form)

- Temporary fence must be installed in a manner in which withstands normal construction activity along with normal weather conditions (winds & rains)

- Security gates as shown on Civil Plans including 6” steel pipe post. - See Alternates

Refer to Specification Sections: 323113 – Chain-Link Fences and Gates

Page 27: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

27

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION 4 CONCRETE

Provide supervision, layout and engineering, shop drawings, labor, material, equipment and other incidental items of cost to complete all concrete work, including but not limited to the following:

- 5% Bid Bond Required. (See Construction Manager’s General Package Notes) - 100% Payment & Performance Bond Required (See Construction Manager’s

General Package Notes) - NOTE: Proposals will be received and opened at the office of the Construction Manager,

Charles Black Construction Company, Inc. 1955 Highway 129 South Cleveland, GA 30528. - Proposer must provide certification that it is an active corporation and registered

with the Georgia Secretary of State and has been for the past five (5) years. - Proposer must provide certificate of completed bonded jobs of similar size and

nature within the past five (5) years. - All backfill, including subsurface drainage backfill. - All concrete work including reinforcement (Rebar and Wire Mesh). - Furnish, receive, unload, inventory, layout and install all rebar associated with this

scope of work. - Furnish and install orange safety caps at all rebar per OSHA requirements. - Batter board and Layout. - Layout and Engineering. - Termite Control. - Portland Cement concrete paving with reinforcement. - All site concrete including concrete walks, walkways, ramps, pads, retaining walls and

steps with reinforcement and accessories. Curb and Gutters by Others. - All expansion joint materials and caulking of exterior concrete, if required. - All cast-in-place concrete including shop drawings, testing, excavation, backfill,

placement, formwork, reinforcement and accessories. Existing sub-grade to be within ± .2 foot.

- All preparation including gravel fill, insulation, vapor barrier/waterproofing associated with all concrete work.

- Foundation drainage system with gravel, if shown. - Perimeter Insulation. - Aggregate Materials (including stone and under slab). - Include all work from subgrade to finish floor. - All testing will be by others.

(Proposal Package Four (4) – Concrete Continued on Next Page)

Page 28: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

28

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION 4 CONCRETE (Continued)

- Sheet membrane waterproofing and fluid applied waterproofing, if shown. - Isolation at steel columns. - Installation of items embedded in concrete. - Install anchor bolts and grout columns. - Progressive Clean-Up and Final Clean-Up. - Provide truncated domes at all handicap ramps if shown. - Install all bollards (steel bollards will be furnished by others). - Provide and install dock bumpers, if shown. - Provide rebar shop drawings for all rebar in the concrete scope within - Interior and exterior MEP equipment pads and housekeeping pads required by contract

documents. Please note that some of these equipment pads may not show up on the drawings. Coordinate size and layout with trade contractor.

- Furnish light towers for concrete pours as needed. - Include moving soils generated from footing excavation, to a location on site designated

by the Construction Manager. Spreading and compacting of these soils to project standards is included in this scope of work.

- Saw control joints. - All slabs, regardless of finish, shall be within 1/8” in 10’-0” of the lines - Items # 8, 11, and 25 of attached Unit Price Form must have a dollar value and be

submitted with proposal. - Include in base proposal 100 cubic yards of trench rock at $85 per cubic yard removal,

wasted on site. (Unit Price Form # 25) (In place measurement) - Include in base proposal 50 cubic yards of unsuitable soils at trench at $14 per cubic

yard, wasted onsite (Unit Price Form item # 8) (In place measurement) - Include in base proposal 100 tons of # 57 stone backfill at $28 per ton for areas where

unsuitable soils or rock is removed from footing area (Unit Price Form item # 11) (In place measurement using weight tickets)

- Unused portions of these allowances will be credited back to the Owner by credit change order at the unit price on the Unit Price Form.

(Proposal Package Four (4) – Concrete Continued on Next Page)

Page 29: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

29

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION 4 CONCRETE (Continued)

- Furnish, install, and maintain temporary roads to allow access for concrete and pump

trucks. - All concrete conveying is included in this scope of work. - Install door stops mounted to concrete. Door stops to be provided by Hardware

contractor if shown. Twenty-One (21) Days of award of contract (i.e. walls, footings, and slabs)

- Contractor to furnish and install all CMU foundation block and grout below FFE, including but not limited to rebar.

- Contractor to allow in base bid $8,000.00 for temporary road to access buildings. - Contractor to include in base bid 15 pulls of 20 cyd dumpster at $400.00 per pull for a

total allowance in base bid of $6,000.00.

Refer to Specification Sections: 033000 – Cast-in-Place Concrete 321313 – Concrete Sitework 312200 – Earthwork 021200 – Earthwork

Note: This package requires a 5% Bid Bond and subsequent 100% Payment &

Performance Bonds. (See CM’s General Package Notes).

Page 30: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

30

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION 5 STRUCTRUAL STEEL

Provide supervision, material, labor, equipment and other incidental items of cost to complete the following:

- 5% Bid Bond Required. (See Construction Manager’s General Package Notes) - 100% Payment & Performance Bond Required (See Construction Manager’s

General Package Notes) - NOTE: Proposals will be received and opened at the office of the Construction Manager,

Charles Black Construction Company, Inc. 1955 Highway 129 South Cleveland, GA 30528. - Anchor Bolt Shop drawings to be submitted within Twenty-One (21) Days of Contract

Award. - All other shop drawings to be submitted for each building within Thirty (30) Days after

the return of approved anchor bolt drawings. - All items delivered, erected and including sales tax. - Structural Steel - Steel Joist and Joist Girders. - Steel Deck. - Metal Fabrications. - Loose pieces, including but not limited to, plates, grate at elevator, lintels, and pipe

bollards. Bollards embedded in concrete to be installed by others. - Any piece to be welded in place is the responsibility of this package not including weld

on ties. - Furnish and install all wall bracing as soon as possible. Coordinate this work with other

trades. - Furnish and install all angle used to attach cold metal formed soffits if shown.

(Proposal Package Five (5) – Structural Steel Continued on Next Page)

Page 31: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

31

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION 5 STRUCTURAL STEEL (Continued)

- All materials are to be delivered within Ten (10) Weeks after return of shop drawings for each respective building.

- No time extensions will be allowed for re-submittals. - Furnish and install all weldable rebar as shown on Architectural and Structural

Drawings. - Roof Ladders. - Furnish all Anchor Bolts, installation by others. - Furnish and install all safety cable and accessories per OSHA requirements. - Set leveling nuts on all anchor bolts. - HVAC contractor to provide size and location of roof openings. - Punch beams for wood nailers and masonry anchors at top of masonry walls - Touch painting of steel primer as needed - All clips and fasteners to complete this scope of work. - Progressive clean up on daily basis – including debris removal and disposal. - Phase all deliveries by buildings or areas as required by the Construction Manager. - Contractor to include in base bid four (4) pulls of 30 cyd dumpster at $400.00 per pull for

a total allowance of $1,200.00 in base bid.

Refer to Specification Sections: 051200 – Structural Steel 052100 – Steel Joist and Girders 053050 – Metal Roof Deck 053100 – Steel Decking

Note: This package requires a 5% Bid Bond and subsequent 100% Payment &

Performance Bonds. (See CM’s General Package Notes).

Page 32: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

32

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION 6 Hollow Metal Frames, Hollow Metal Doors and Hardware

Furnish material only, delivered and including sales tax, equipment & other incidental items of cost for the HOLLOW METAL FRAMES, DOORS and HARDWARE including the following:

- NOTE: Proposals will be received and opened at the office of the Construction Manager,

Charles Black Construction Company, Inc. 1955 Highway 129 South Cleveland, GA 30528. - Hollow Metal Doors and Frames to include mortar box covers/shields to eliminate mortar

and concrete from the strike and silencers - Shop Drawings & Submittals within Thirty (30) Days of Contract Award. - Verify from Architect window stop location on shop drawings - Bottom of frames to have two spreader bars - Hollow Metal and Frames - Finish Hardware - Key Cabinet (provide a commercial Key Cabinet acceptable to Construction Manager). - Representative to be present to receive, unload and inventory door hardware. - Coordinate with other trades. - Review wall details for jamb depths. - Furnish and install, including hardware for aluminum doors. Templates to be provided to

aluminum door supplier for the hardware prep. - Add cost to base proposal to provide the low voltage hook up from the power supply to

the electronic hardware on the door. Electrician to provide conduit to electronic hardware. - Progressive and daily clean up. - Hardware supplier is responsible for coordination of all items the Owner will be providing

directly. - Coordinate access controls installation detail with Owner

(Proposal Package Six (6) – Hollow Metal Frames, Hollow Metal Doors and Hardware continued on Next Page)

Page 33: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

33

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition Proposal Package Descriptions PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION 6 Hollow Metal Frames, Hollow Metal Doors, and Hardware (Continued)

- All thresholds must be filled with sealant prior to installation. - Install per manufacturer’s recommendations, approved shop drawings, and contract

documents. - Mount a key cabinet with keys labeled, installed and organized. (Key cabinet provided

by others.) - Organize, tag and maintain keys and turn over with key receipt at completion. - Contractor to include in base bid one (1) pull of 30 cyd dumpster at $400.00 for a total

allowance of $400.00. - See Alternate # 1 – Owner preferred alternate to install Schlage cylinders.

Refer to Specification Sections: 081113 Hollow Metal Doors & Frames 087100 – Door Hardware

Page 34: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

34

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION

7 MASONRY

Provide layout, supervision, labor, materials, equipment and other incidental items of cost to complete all masonry work, including but not limited to, the following:

- 5% Bid Bond Required. (See Construction Manager’s General Package Notes) - 100% Payment & Performance Bond Required (See Construction Manager’s General

Package Notes) - NOTE: Proposals will be received and opened at Barrow County School System 179 Athens

Street, Winder, Georgia 30680. - Concrete Unit Masonry (Concrete Block, CMU) and all accessories. - CMU reinforcement including wall reinforcement, brick ties and enforcing steel (Rebar). - Concrete grout at CMU – All filled cells and reinforcing. - Brick Unit Masonry – All brickwork including accessories. - Reinforced Unit Masonry. - Insulation or Foam in Masonry Walls. Including spray on foam insulation at all exterior walls - Installation of items embedded in masonry, including steel lintels and shelf angles. - Caulking of masonry, control joints and exterior of hollow metal. Control joints are to be

installed at the corner of every window, but not to exceed a spacing of more than 40’-0”. - Thru-wall flashing and weeps. - Spray foam cavity wall insulation and all cavity wall accessories. Including, but not limited

to, mortar break, flashing, wrap flashing around wood, weeps, and mortar net. - Flashing installed in masonry. - Unloading and installation of hollow metal frames built into masonry. - Openings for all devices installed in masonry. - Fire stopping of all walls that key to the deck. - All units cleaned, rubbed, pointed and ready to receive finishes. - Brick cleaning. - Provide and install wood nailers around all openings as shown on drawings. - Furnish and install prefinished metal X-JT cover with continuous cleat. - Furnish and install ice and water shield where applicable. - Furnish and install total flash thru wall flashing. - Furnish and install fry reglet “sm” surface metal reglet and counter flashing with 2” wide

metal hold on downwind clips. - Furnish and install all sill flashing. - All above roof flashing must be approved by Construction Manager and Architect prior to

cover up. If covered up without inspection and approval, Contractor will be responsible for tearing off finish product so inspection can be performed and reinstall with no additional charge to Construction Manager or Owner.

(Proposal Package Seven (7) – Masonry Continued on Next Page)

Page 35: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

35

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION

7 MASONRY (Continued)

- Cut outs for fire extinguisher cabinets and other accessories are included. - Drill and install all dowels at slabs as required. - All types of masonry fill including sand, concrete, insulation, etc. - Furnish and install all concrete caps at CMU wall if applicable. - Locker bases including concrete fill. - Progressive clean up on daily basis – including debris removal and disposal. - Contractor to include in base bid twenty (20) pulls of 30 cyd dumpster at $400.00 per pull for

a total allowance of $8,000.00 in base bid. - See Alternates

Refer to Specification Sections: 040500 – Mortar and Masonry Grout 042100 – Brick Unit Masonry 042201 – Concrete Unit Masonry 076000 – Flashing and Sheet Metal 079200 – Caulking and Sealants

Note: This package requires a 5% Bid Bond and subsequent 100% Payment &

Performance Bonds. (See CM’s General Package Notes).

Page 36: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

36

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION 8 MISCELLANEOUS STEEL

Provide supervision, material, labor, equipment and other incidental items of cost to complete the following:

- NOTE: Proposals will be received and opened at Barrow County School System 179 West

Athens Street, Winder, Georgia 30680. - All shop drawings to be submitted within Thirty (30) Days of contract award. - All items delivered and installed, including sales tax. - Metal Fabrications. - Metal Stairs. - Metal Railings and all Handrails. - Loose pieces, including but not limited to, plates, lintels, and pipe bollards. Bollards

embedded in concrete to be installed by others. - Furnish and install all site handrails. Provide any concrete coring required for

installation of handrails. - Furnish and install all wall bracing as soon as possible. Coordinate this work with other

trades. - Furnish and install all angle used to attach cold metal formed soffits. - All materials are to be delivered within Six (6) Weeks after return of shop drawings for

each respective building. - No time extensions will be allowed for re-submittals. - Roof Ladders - Roof Curbs. HVAC contractor to provide size and location of roof openings. - Provide, layout, and install welded masonry ties. Contractor to include coordination with

masonry subcontractor regarding layout. - Touch painting of steel primer as needed - All clips and fasteners to complete this scope of work. - Progressive clean up on daily basis – including debris removal and disposal. - See Alternates

- Refer to Specification Sections:

051200 – Structural Steel Framing 052100 – Steel Joist Framing 053100 – Steel Decking 054000 – Cold-Formed Metal Framing 055000 – Metal Fabrications

Page 37: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

37

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION 9 TPO Roofing

Provide supervision, material, labor, equipment and other incidental items of cost to complete the following:

- 5% Bid Bond Required. (See Construction Manager’s General Package Notes) - 100% Payment & Performance Bond Required (See Construction Manager’s

General Package Notes) - NOTE: Proposals will be received and opened at Barrow County School System 179 West

Athens Street, Winder, Georgia 30680. - Furnish and install all TPO Roofing. - Furnish and install pre-finished metals (Flashing, coping, gutters, downspouts, etc) which touches

any part of this roof system or is required to provide a watertight roofing system. - Furnish and install all roofing insulation. - Furnish and install all roof nailers. - Provide all blocking or carpentry work above the deck which touches any part of the roof

system including copings, expansion joints, transitions and flashings. - Miscellaneous roof carpentry as necessary for roofing. - Coordinate walk pads with all rooftop equipment as shown - Include roof hatch as shown - Testing and inspections will be performed by Others. - Contractor to coordinate with the manufacturer regarding when manufacturer

inspections are required in order to comply with the warranty requirements. - No standing water on roof will be allowed. - Allow $10,000 allowance in base bid to be used for walk pads coordinated with Owner’s

Representative. Provide unit cost per square foot for walk pads. Unused allowance will be credited back to Owner by credit change order at the unit price on the Unit Price Form. (Item # 32 Unit Price Form).

- Contractor to include an allowance for replacement of 100LF of existing gutters on the existing Westside Middle School. Provide unit cost per lf on the proposal form, including labor and material. Unused allowance will be credited back to Owner by credit change order at the unit price included on the proposal form.

- Proposer to list roofing manufacturer included in base proposal on proposal form.

(Proposal Package Nine (9) – Roofing Continued on Next Page)

Page 38: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

38

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION 9 TPO Roofing (Continued)

- Progressive clean up on daily basis – including debris removal and disposal. - Contractor to include in base bid twenty (10) pulls of 30 cyd dumpster at $400.00 per pull for

a total allowance of $4,000.00 in base bid. - See Alternates

Refer to Specification Sections: 061000 – Rough Carpentry 072100 – Building Insulation 075324 – Mechanically Attached Single Ply Roof Membrane System 076000 – Flashing and Sheet Metal 077100 – Prefabricated Roof Specialties 078400 – Fire and Smoke Protection 079200 – Caulking and Sealants

Note: This package requires a 5% Bid Bond and subsequent 100% Payment & Performance Bonds. (See CM’s General Package Notes).

Page 39: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

39

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION 10 Standing Seam Metal Roofing

Provide supervision, material, labor, equipment and other incidental items of cost to complete the following:

- NOTE: Proposals will be received and opened at Barrow County School System 179 West

Athens Street, Winder, Georgia 30680. - Furnish and install all Standing Seam Metal Roofing. - Provide all work from the plywood sheathing to the finished metal roofing. - Furnish and install pre-finished metals (Flashing, coping, gutters, downspouts, etc) which touches

any part of this roof system or is required to provide a watertight roofing system. - Provide membrane underlayment ice and water shield. - Provide all miscellaneous accessories for complete installation. All accessories shall be

furnished by roofing system manufacturer or by an approved manufacturer which will not effect the warranty of the roof system.

- Furnish and install all roofing insulation for this roof system. - Provide all blocking or carpentry work above the deck which touches any part of the roof

system including copings, expansion joints, transitions and flashings. - Miscellaneous roof carpentry as necessary for roofing. - Furnish and install all metal soffit panels, where indicated. - See Alternates

Refer to Specification Sections: 061000 – Rough Carpentry 072100 – Building Insulation 075324 – Mechanically Attached Single Ply Roof Membrane System 076000 – Flashing and Sheet Metal 076113 – Standing Seam Metal Roofing 077100 – Prefabricated Roof Specialties 079200 – Caulking and Sealants

Page 40: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

40

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION 10 Wood & FRP Doors

Furnish material only, delivered and including sales tax, equipment & other incidental items of cost for the Wood & FRP Doors including the following:

- NOTE: Proposals will be received and opened at Barrow County School System 179 West

Athens Street, Winder, Georgia 30680. - Shop Drawings & Submittals within Thirty (30) Days of Contract Award. - Verify from Architect window stop location on shop drawings - Wood Doors - Fiberglass-Reinforced Polyester Doors - Doors to be factory machined, ready for installation including all trim kits and cutouts of

openings. - Representative to be present along with door installer to receive, unload and inventory

doors. - Coordinate with other trades. - Wood doors to be factory finished on all 6 sides per specifications. - Progressive and daily clean up. - All thresholds must be filled with sealant prior to installation. - Install per manufacturer’s recommendations, approved shop drawings, and contract

documents. - Assure tops and bottoms of wood doors are sealed prior to installation. - Cutting of doors to fit openings is included in this scope of work. Resealing of wood - See Alternates

Refer to Specification Sections:

Page 41: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

41

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION 11 OVERHEAD COILING DOORS

Provide supervision, labor, materials, equipment and other incidental items of cost to provide and install all Overhead Coiling Doors and Coiling Counter Doors.

- NOTE: Proposals will be received and opened at Barrow County School System 179 West

Athens Street, Winder, Georgia 30680 - Coiling Counter Doors - Overhead Coiling Doors - Provide Shop drawings and submittals within Thirty (30) Days of Contract Award. - Coordinate openings with Division 8 and Division 9. - Cleanup daily including debris removal and disposal off site.

Refer to Specification Sections:

Page 42: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

42

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION 12 ALUMINUM STOREFRONT / GLASS & GLAZING Provide supervision, labor, material, equipment, and other incidental items of cost to

complete the following:

- NOTE: Proposals will be received and opened at Barrow County School System 179 West Athens Street, Winder, Georgia 30680

- Aluminum entrances and storefronts and all windows. - All glass and glazing. - Include all sill flashing. - Caulking of the interior and exterior of the aluminum where the system joins other

materials. - Provide and install all flashing and trim touching this work. - Proposal Package # 9 will provide and install hardware for Aluminum Storefront doors. - Proposal Package # 9 to provide templates for hardware prep. Coordinate scope of

work with Proposal Package # 9 Hollow Metal Frames, Doors, Hardware and Installation.

- Coordinate locks with hardware. - Shall drill all window stop screws when they interfere with concrete at masonry.

Refer to Specification Sections:

Page 43: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

43

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION 13 DRYWALL, CEILINGS/EIFS/ACOUSTICAL UNITS

Provide supervision, labor, material, equipment and other incidental items of cost for the following:

- 5% Bid Bond Required. (See Construction Manager’s General Package Notes) - 100% Payment & Performance Bond Required (See Construction Manager’s

General Package Notes) - NOTE: Proposals will be received and opened at Barrow County School System 179 West

Athens Street, Winder, GA 30680 - Must provide an onsite site supervisor acceptable to the Construction Manager. This

onsite supervisor is the only person the Construction Manager’s Job Superintendent will give instructions to and coordinate all work on this project. The Trade Contractor’s supervisor cannot be replaced without consent of the Construction Manager. The Trade Contractor’s supervisor must be onsite at all times when work from the scope of Proposal Package # 12 is being performed.

- Cold-formed metal framing (and accessories). - Batt insulation, sound blankets and fireproofing insulation - Prefinished metal flashings joining this work. - Gypsum Board and Metal Framing - Gypsum Board Assemblies - Polymer-Based Exterior Insulation and Finish System (EIFS) - Acoustical Ceiling System. - Reinforced Drywall – Abuse resistant Type X; BPB shall be used for areas from

finish floor to 8’0 AFF. Type X gypsum wall board can be used for areas above 8’0 AFF

- All gypsum wall board must be installed with wall boards running in a horizontal manner. Gypsum wall board cannot be installed vertically in rooms where ceiling heights are 9’-0” AFF or greater.

- Include any sealing, firesafing, and/or fire caulking at top of rated masonry wall as well as at top of gypsum board partitions. Excluding sealing of pipes, conduits and ductwork or other items covered by Mechanical, Cabling, Fire Protection, and Electrical.

(Proposal Package Thirteen (13) – Drywall, Ceilings/EFIS/Acoustical Units Continued on Next Page)

Page 44: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

44

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION 13 DRYWALL, CEILINGS/EIFS/ACOUSTICAL UNITS (Continued)

- Include angle and firesafing at top of smoke tight walls, if required. - Include stenciling of all fire and smoke walls (at masonry and gypsum board). Stickers will not be allowed. - Coordinate with other trades. - Clean up daily including debris removal and disposal off site. - Include attic stock if required. - Suspended Gypsum Board Ceilings. - All Blocking Required for This Work. - Provide and Install Access Doors and Frames - Prefinished Metal Louvers and Vents, if shown. - Continuous Vent Strip, if shown. - Caulking and sealants touching this work. - Install door frames in metal stud walls. Unload, store and install door frames. - Shop drawings are required within Thirty (30) Days of contract award. - Exterior Gypsum Board for ceilings and soffits. - Brace interior walls as required if shown with cold-formed metal framing. - Exterior Gypsum Board Assemblies. - Wall Sheathing excluding parapet sheathing. - Acoustical Ceiling Clouds if shown - See Alternates

Refer to Specification Sections:

Note: This package requires a 5% Bid Bond and subsequent 100% Payment & Performance Bonds. (See CM’s General Package Notes).

Page 45: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

45

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION 14 RESILIENT FLOORING, CARPETING, BASE & ACCESSORIES

Provide supervision, labor, materials, equipment, and other incidental items of cost to provide all resilient tile flooring, carpet tile, base, and all accessories including but not limited to the following:

- NOTE: Proposals will be received and opened at Barrow County School System, 179 West

Athens Street, Winder, Georgia 30680. - Resilient Tile Flooring - Resilient Wall Base and Accessories - Carpet and all accessories - Colors selected from manufacturer’s full color range. - Floor prep (expansion joints and control joints refer to structural drawing) - Provide transitions, colors to be selected by Architect. - Include attic stock if required. - Daily cleanup and debris removal with disposal off site. - Allow in base bid 1,000 lbs of floor patch at $2.00 per lb. for a total allowance of $2,000

for labor and materials to install. Quantities to be verified by Construction Manager’s onsite Superintendent.

- See Alternates Refer to Specification Sections:

Page 46: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

46

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION 15 PORCELAIN TILE Provide supervision, labor, materials, equipment and other incidental items of cost to

provide all tile work, including, but not limited to, the following:

- NOTE: Proposals will be received and opened at Barrow County School System 179 West Athens Street, Winder, Georgia 30680.

- Ceramic Floor/Wall Tile - Quarry Tile - Stone Thresholds - Crack Isolation Membrane as shown. - Transition Accessories to Adjoining Finishes. - Cleaning and Protecting - All tile must come from same lot number. - All accessories, including sealants. - Window stools as shown and shall have 3/8 radius on all exposed corners, formed and ground. - Setting bed will be required at areas of depressed slabs, see drawings for areas affected. - Elastometric waterproofing membrane. - Furnish and install Precast Terrazzo treads and risers as shown. - Furnish and install Terrazzo sealer as described in project manual. - Include all floor preparation, including scraping of mortar, cleaning and patching prior to

work. Major debris removal and patching by others. - Coordinate floor drains with Plumbing Contractor - Include attic stock. - Daily clean up, debris removal and disposal off site. - See Alternates

Refer to Specification Sections:

Page 47: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

47

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION

16 SEAMLESS FLOORING

Provide supervision, labor, materials, equipment and other incidental items of cost to

complete the installation of all Trowel Applied Seamless Flooring.

- Slab preparation.

- Daily clean up, debris removal and dispose off site.

- Include allowance in Base Proposal for moisture mitigation on ALL areas to receive epoxy resinous flooring. Also include unit price per square foot on Unit Price Form. (Item # 28 on Unit Price Form)

- Unused portion of this allowance will be credited back to the Owner by way of credit change order at the unit price on the Unit Price Form. This allowance will only be used with approval from Construction Manager and Owner.

Refer to Specification Sections:

Page 48: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

48

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION 17 INTERIOR/EXTERIOR PAINTING Provide supervision, labor, materials, equipment and other incidental items of cost to

provide all painting, interior cosmetic caulking.

- NOTE: Proposals will be received and opened at Barrow County School System 179 West Athens Street, Winder, Georgia 30680.

- Interior Cosmetic Caulking (Hollow Metal, Corners, etc.) - Contractor is responsible for all cosmetic caulking. Pay close attention to exposed structures. Structural and other components penetrating the dry wall at these locations will need cosmetic caulking. - Contractor will be responsible for immediately upon arrival of Hollow Metal Doors and Frames to come out to job site and prime door frames two feet up from sill (inside and out) as specified under painting. This is in addition to shop prime coat. - Provide attic stock as described in project manual. - Contractor to furnish and install chemical-hardener finish on all interior concrete floors

not scheduled to receive floor finish. Refer to Spec Section Building Concrete / Chemical-Hardener Finish in project manual.

- Include painting of all exposed structures (i.e. storage rooms that have no ceilings) piping and ductwork including ductwork where it can be seen through the ceiling openings. This includes but not limited to any piping located on exterior of building and roofs.

- Include caulking of all corners and al all change of materials which contact a painted surface, interior and exterior.

- Caulk all fire extinguisher cabinets. - Point up and block fill prior to First Coat. - Protect all non-painted surfaces. - Each coat of paint will need to be inspected by Architect/Engineer before any additional

coasts can be applied. Construction Manager’s Superintendent must approve proceeding with additional coats. Any coat installed prior to approval by Architect, Engineer, and/or Construction Manager will not be considered a coat.

- Daily clean up, debris removal and disposal off site. - Wash out tools and equipment at approved location by Construction Manager. Paint

cannot be washed out in storm sewer system. - Seal wood doors top & bottom prior to installation. - All Exterior painting.

(Proposal Package Seventeen (17) – Interior/Exterior Painting Continued on Next Page)

Page 49: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

49

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition Proposal Package Descriptions PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION 17 INTERIOR/EXTERIOR PAINTING (Continued)

- Application of finish paint to any surface will indicate the painter’s acceptance of the surface as properly prepared for finish paint. Upon the finish coat being applied, any additional all preparation (i.e. patching and rubbing of block, sanding and cleaning of surfaces) and any additional painting required to gain final acceptance from the Owner and Architect will become the responsibility of the painting contractor. Note: Exceptions are to be made for wall damage created by other trades.

- Painting of gas lines is included in this scope - See Alternates

Refer to Specification Sections:

Page 50: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

50

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION 18 SPECIALTIES

Furnish, delivered and installed, including sales tax, the following specialties:

- NOTE: Proposals will be received and opened at Barrow County School System 179 West Athens Street, Winder, Georgia 30680.

- Fire extinguishers, cabinets and accessories. - Flagpoles as required, including sales tax and freight to job site. (Installed by others.) - Signage for entire project. (Interior & Exterior) - Toilet Compartments - Metal lockers - All toilet accessories - Hand dryers – Coordinate power requirements with Electrical subcontractor.

Refer to Specification Sections:

Page 51: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

51

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION

19 VISUAL DISPLAY BOARDS

Furnish, delivered and installed including sales tax, Visual Display Boards.

- NOTE: Proposals will be received and opened at Barrow County School System 179 West Athens Street, Winder, Georgia 30680.

- Marker Boards - Tack Boards

Refer to Specification Sections: 101000 – Visual Display Board

Page 52: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

52

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION 20 MANUFACTURED AND ARCHITECTURAL CASEWORK

Furnish, delivered and installed, including sales tax, the manufactured and architectural casework as shown on the drawings, and per the specifications.

- NOTE: Proposals will be received and opened at Barrow County School System 179 West Athens Street, Winder, Georgia 30680.

- Colors to be selected from the manufacturer’s full range of colors. - Shop drawings required within Thirty (30) Day of contract award. - Plastic-Laminate Faced Manufactured Casework as shown on drawings. - Plastic-Laminate Faced Custom Casework as shown on drawings. - Plastic-Laminated Faced Manufactured Countertops as shown on drawings. - Interior Trim if shown. - All rough carpentry work to install this scope of work including blocking. - Include cut outs for sinks provided by others. - Furnish and install all caulking touching millwork. - Daily Clean Up, debris removal and disposal off site.

Refer to Specification Sections:

Page 53: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

53

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION

21 SCIENCE CASEWORK

Furnish, delivered and installed, including sales tax, the laboratory casework as shown on the drawings, and per the specifications

- NOTE: Proposals will be received and opened at Barrow County School System 179 West Athens Street, Winder, Georgia 30680.

- Provide and install complete laboratory casework systems as shown on drawings. - Coordinate with other trades. - Shop drawings required within Thirty (30) Days of contract award. - Daily Clean Up, debris removal and disposal off site. - See Alternates

Refer to Specification Sections:

Page 54: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

54

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION 22 ALUMINUM CANOPIES

Furnish and install, including sales tax, the Aluminum Canopies as shown on the Drawings. Submit shop drawings within Thirty (30) Days of contract award.

- NOTE: Proposals will be received and opened at Barrow County School System 179 West Athens Street, Winder, Georgia 30680.

- All fastening and sealing to wall surface is included in this scope.

- Watertight connections at building.

- Daily clean up, debris removal and disposal off site.

Refer to Specification Section:

Page 55: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

55

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION

23 PLUMBING

Provide supervision, labor, equipment and other incidental items of cost for a complete interior and exterior plumbing system, including, but not limited to the following:

- 5% Bid Bond Required. (See Construction Manager’s General Package - Notes) - 100% Payment & Performance Bond Required (See Construction Manager’s - General Package Notes) - NOTE: Proposals will be received and opened at Barrow County School System 179 West Athens

Street, Winder, Georgia 30680. - All interior plumbing including final connections to equipment supplied by others. - All work as shown on the Plumbing Drawings. - Outside domestic water, from five feet outside the buildings. - Gas Lines. Painting of gas lines by others. - Include tie-ins of all work. - Include final connections to all equipment. - Rainwater, including boots for downspout tie-in. See Architectural and Civil

Drawings. - Rainwater tied into new or existing structures. Structures to be cored to receiving piping by

sitework contractor. - All submittals within Thirty (30) Days of contract award. - Temporary water to building. - All roof drains to the storm drainage structures. - Refer to the Civil Drawings as well as the Plumbing. - Provide all flashing for this work including lead flashing. - All sanitary sewer and structures including lead flashing. - Include all grates and floor troughs if shown. - Potable Water Systems - Sanitary Sewer System from five feet outside of buildings. - Penetration Firestopping as required for this scope of work. - Caulk and grout all fixtures. - Daily Clean up, debris removal and disposal off site including dumpster rental and dump fees. - Include 100 cubic yards of trench rock wasted off site at unit price of $85 per cubic yard (in

place measurement). Unit Price Form # 18. (In place measurement) - Include 100 cubic yards of suitable backfill at $14 per cubic yard where unsuitable materials

is removed. Unit Price Form # 9. (In place measurement) - Include 100 cubic yards of unsuitable soils at unit price of $14 per cubic yard at trench,

wasted onsite. - Include 50 tons of #57 stone at $28 per ton for backfill areas where unsuitable soils and

rock is removed. (In place measurement using weight tickets) - Unused portions of these allowances will be credited back to the Owner in the form of a credit change order at the unit price and on unit price form. - Items # 9, #11 & #18 must be filled out on Unit Price Form and submitted with Proposal

Form. (Proposal Package Twenty-Three (23) – Plumbing Continued on Next Page)

Page 56: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

56

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION

23 PLUMBING (Continued)

- Provide two frost proof hydrants at locations directed by the Construction Manager and hook up temporary water. - Hook up temporary water and sanitary to Construction job trailer. - All ditch lines must be re-compacted to project design specifications. - Any cost incurred by Construction Manager for retesting compaction due to installation of this scope of work, will be the responsibility of this work package. - Include rainwater piping to connect to storm sewer at 5’ outside of building, including but not limited to boots, adapters and clean outs. - See Alternates

Refer to Specification Sections:

Note: This package requires a 5% Bid Bond and subsequent 100% Payment & Performance Bonds. (See CM’s General Package Notes).

Page 57: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

57

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION

24 FIRE PROTECTION Provide the complete fire protection-sprinkler system, beginning one foot above finished

floor.

- 5% Bid Bond Required. (See Construction Manager’s General Package Notes) - 100% Payment & Performance Bond Required (See Construction Manager’s

General Package Notes) - NOTE: Proposals will be received and opened at Barrow County School System 179 West

Athens Street, Winder, Georgia 30680. - All submittals within Thirty (30) Days of contract award CAD files will be not be

promised for shop drawings. - Complete fire protection system from one foot above finished floor. - Penetration Firestop System for this scope of work. - Daily clean up, debris removal and disposal off site. Dumpster rental and dump fees

included in this package.

Refer to Specification Sections:

Note: This package requires a 5% Bid Bond and subsequent 100% Payment &

Performance Bonds. (See CM’s General Package Notes).

Page 58: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

58

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION 25 HVAC Provide the complete HVAC System as specified in Division 23 – Heating Ventilating

and Air Conditioning as shown on the Mechanical Drawings.

- 5% Bid Bond Required. (See Construction Manager’s General Package Notes) - 100% Payment & Performance Bond Required (See Construction Manager’s

General Package Notes) - NOTE: Proposals will be received and opened at Barrow County School System 179 West

Athens Street, Winder, Georgia 30680. - Provide curb drawings and locations within Twenty-One (21) Days of

contract award. - All submittals within Thirty (30) Days of contract award. - Test and Balance Included in scope by HVAC Contractor. - Automatic temperature controls and Energy Management System. - Daily clean up, debris removal and disposal off site. Dumpster rental and fees included

in this work package. - See Alternates

Refer to Specification Sections:

Note: This package requires a 5% Bid Bond and subsequent 100% Payment & Performance Bonds. (See CM’s General Package Notes).

Page 59: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

59

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION 26 ELECTRICAL

Provide the complete electrical system as specified in Division 26 – Electrical and as shown on the Electrical Drawings. Provide temporary lighting per O.S.H.A. and adequate for finish work. Lights not to exceed 20 foot intervals. Temporary lights must be maintained on a daily basis with bulbs replaced as needed. Additional temporary lighting must be added at Construction Managers direction if they feel there is not enough lighting for finish work. Provide temporary power at locations not to exceed 100-foot intervals at each floor level.

- 5% Bid Bond Required. (See Construction Manager’s General Package Notes) - 100% Payment & Performance Bond Required (See Construction Manager’s

General Package Notes) - NOTE: Proposals will be received and opened at Barrow County School System 179 West

Athens Street, Winder, Georgia 30680. - Provide and install all systems specified in 161000 – Electrical. - Provide and install a Complete Fire Alarm System. - Penetration Firestop System for this scope of work. - Daily clean up, debris removal and disposal off site. Dumpster rental and dump fees

included in this scope of work. - Data cabling to be blue wire. - Security cabling to be white wire. - EMS communication loop cabling to be yellow wire. - Provide and install all conduits and outlet boxes for low voltage. - Include 100 cubic yards of trench rock at $85 per cubic yard removal wasted offsite (in

place measurement) item # 18 on Unit Price Form. - Include 100 cubic yards of replacement soil at $14 per cubic yard removed from trench;

including backfill and compaction (in place measurement) item # 9 on Unit Price Form. - Include 30 tons # 57 stone at $28 per ton for replacement of soils removed from trench,

including backfill and compaction, item # 11 on Unit Price Form. - Items # 9, # 11, and # 18 on the Unit Price Form must be filled out and submitted with

this bid. - Include in base bid an additional 1500 linear foot of 1” conduit and 30 rough-in boxes for

future data changes. Please provide unit price for 1” conduit on Item # 33 on Unit Price Form.

Page 60: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

60

(Proposal Package Twenty-Six (26) – Electrical Continued on Next Page)

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION 26 ELECTRICAL (Continued)

- Unused portions of these allowances will be credited back to the Owner on the form of a

credit change order at the unit prices on the Unit Price Form. - Coordinate with Elevator work package for all power requirements. - Coordinate electrified hardware requirements and rough-in with the Construction

Manager, owner and Hardware subcontractor. - Electrical contractor must have a representative from their company on site at all times

when Masonry contractor is onsite laying CMU. - Provide, install and paint all backboards (fire-rated – See Spec 061000) as required. - Owner requested items below that must be accounted for in base proposal form.

An addendum will be issued to address these items, however make sure they are accounted for in your base proposal.

- No conduits or penetrations should have sharp edges – bushings or other protective mechanisms should be installed.

- Each data location should have a 1” conduit run from data location to hallway above ceiling on the same floor.

- In multiple locations, an interactive flat panel TV will be mounted on the wall. In those locations, we will need:

- An electrical outlet in a recessed box installed behind the TV - A recessed data/video gang box also installed behind the TV, 1.5” conduit

stubbed up to above ceiling in room (not out to hall). Exact height for these two recessed boxes should be discussed with owner at time of installation of boxes and is currently to be determined.

- A standard height (20”?) gang box for video/data, 1.5” conduit stubbed up to above ceiling in room (not out to hall) marked in red on prints.

(Proposal Package Twenty-Six (26) – Electrical Continued on Next Page)

Page 61: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

61

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION 29 ELECTRICAL (Continued)

- The MDF should have four 20-amp circuits for network equipment, located where the data racks are to be installed, backed by generator.

- The IDFs should have two 20-amp circuits for network equipment, located where the data rack is to be installed, backed by generator.

- Would like a card reader at each MDF and IDF for entry. Please install appropriate infrastructure.

- Cable tray – ITS vendor will install cable tray in hallways to support network cabling plant. It is critical that a completely uninterrupted pathway is available in all halls for the cable tray. Need 12” of clearance from cable tray to any other

- No other cabling can be installed in the data cable tray. - It is particularly critical that fire cabling be kept away from the network cabling.

Opposite walls would be ideal. - Where other cabling must cross network cable tray, crossing needs to be at 90

degrees and should maintain as much separation (12” again ideal) as possible. We cannot have any parallel runs of cabling to the data cabling of any length.

- Physical infrastructure should not interrupt pathway of cable tray – HVAC units, ductwork, plumbing, other conduits, etc. Cable tray needs to be a straight continuous pathway.

- Where penetrations through walls are required, a 4” sleeve with bushings should be provided at same level as cable tray. This sleeve must be dedicated to data cabling only. Any other penetrations near this should maintain 12” clearance from data cabling penetration.

(Proposal Package Twenty-Six (26) – Electrical Continued on Next Page)

Page 62: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

62

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION 26 ELECTRICAL (Continued)

- Two 4” penetrations with sleeves with bushings should be provided at cable tray level

into MDF from hallway. - One 4” penetration with sleeve with bushings should be provided at cable tray level into

IDFs from hallway.

Refer to Specification Sections:

Note: This package requires a 5% Bid Bond and subsequent 100% Payment &

Performance Bonds. (See CM’s General Package Notes).

Page 63: WESTSIDE MIDDLE SCHOOL ADDITION Winder, Georgia Proposal ... › wp-content › uploads › 2… · There will be a non-mandatory Open House / Pre-proposal Meeting for all local and

63

CM: Charles Black Construction Company, Inc. PROJECT: Westside Middle School Addition

Proposal Package Descriptions

PROPOSAL PROPOSAL PKG PKG NO. DESCRIPTION 27 Classroom Audio, Safety, & Intercommunication System

Furnish and install a complete Classroom Audio, Safety and Intercommunication System as specified in Section 167100 of Project Manuals and as shown in the drawings.

- 5% Bid Bond Required. (See Construction Manager’s General Package Notes) - 100% Payment & Performance Bond Required (See Construction Manager’s

General Package Notes) - NOTE: Proposals will be received and opened at Barrow County School System 179 West

Athens Street, Winder, Georgia 30680. - Contractor to include in base bid 5 total classroom camera systems, including license fee,

in this proposal, as attic stock. - See Alternates

Refer to Specification Sections:

Note: This package requires a 5% Bid Bond and subsequent 100% Payment & Performance Bonds. (See CM’s General Package Notes).

* * * END OF PROPOSAL PACKAGE DESCRIPTIONS * * *