Project objectives
• To improve the productivity and sustainability of land use systems in the Nyando, Yala, and Nzoia river basins through adoption of an integrated ecosystem management approach
i) Support on- and off-farm conservation strategies
ii) improve the capacity of local communities and institutions to identify, formulate and implement integrated management activities
![Page 3: Western Kenya Integrated Ecosystem Management Project](https://reader034.vdocuments.us/reader034/viewer/2022051018/56649f575503460f94c7bd1e/html5/thumbnails/3.jpg)
Project sites
• The project is implemented in 10 blocks - measuring 10 km x 10 km
• Activities are on-going in 2 blocks, Lower Nyando and Lower Yala.
• Sensitization has been completed for the remaining blocks
• Baseline information has been collected for Yala and Nzoia basins and Lower and Middle Nyando.
![Page 4: Western Kenya Integrated Ecosystem Management Project](https://reader034.vdocuments.us/reader034/viewer/2022051018/56649f575503460f94c7bd1e/html5/thumbnails/4.jpg)
![Page 5: Western Kenya Integrated Ecosystem Management Project](https://reader034.vdocuments.us/reader034/viewer/2022051018/56649f575503460f94c7bd1e/html5/thumbnails/5.jpg)
![Page 6: Western Kenya Integrated Ecosystem Management Project](https://reader034.vdocuments.us/reader034/viewer/2022051018/56649f575503460f94c7bd1e/html5/thumbnails/6.jpg)
![Page 7: Western Kenya Integrated Ecosystem Management Project](https://reader034.vdocuments.us/reader034/viewer/2022051018/56649f575503460f94c7bd1e/html5/thumbnails/7.jpg)
![Page 8: Western Kenya Integrated Ecosystem Management Project](https://reader034.vdocuments.us/reader034/viewer/2022051018/56649f575503460f94c7bd1e/html5/thumbnails/8.jpg)
Current activities
• Community mobilization and empowering (KARI)• Tree nurseries on-farm & in the communities (10
nurseries in Lower Nyando & Yala – KARI & ICRAF )• Survey on biophysical parameters (On-going in
Middle Nyando - ICRAF)• Survey on socio-economic issues (On-going in
Upper Nyando - ICRAF)• Tree-screening trials (45 trials in Lower Nyando
and 110 in Lower Yala- ICRAF)• Woodlots• Rehabilitation of degraded areas (Lower Nyando:
Kowala 1 & 2, Kalacha, Kokoto - ICRAF)• Rehabilitation of ponds & dams (KARI)
![Page 9: Western Kenya Integrated Ecosystem Management Project](https://reader034.vdocuments.us/reader034/viewer/2022051018/56649f575503460f94c7bd1e/html5/thumbnails/9.jpg)
Kowala Environmental Rehabilitation group
![Page 10: Western Kenya Integrated Ecosystem Management Project](https://reader034.vdocuments.us/reader034/viewer/2022051018/56649f575503460f94c7bd1e/html5/thumbnails/10.jpg)
Current activities - Kowala
• Rehabilitation of a degraded area – this site was launched late 2006
• 10,000 tree seedlings have been planted this year
• Various activities for restoration of nutrient depleted soils
• Supporting nursery establishment & management
• Second group has been formed and an second degraded area identified
![Page 11: Western Kenya Integrated Ecosystem Management Project](https://reader034.vdocuments.us/reader034/viewer/2022051018/56649f575503460f94c7bd1e/html5/thumbnails/11.jpg)
Kokoto Rehabilitation site
![Page 12: Western Kenya Integrated Ecosystem Management Project](https://reader034.vdocuments.us/reader034/viewer/2022051018/56649f575503460f94c7bd1e/html5/thumbnails/12.jpg)
Kokoto Rehabilitation site
![Page 13: Western Kenya Integrated Ecosystem Management Project](https://reader034.vdocuments.us/reader034/viewer/2022051018/56649f575503460f94c7bd1e/html5/thumbnails/13.jpg)
Current activities - Kokoto
• Rehabilitation of a degraded area – this site was launched late 2006
• 8,000 tree seedlings have been planted this year –
• Individual nursery with a farmer – promotion of indigenous species: Croton spp., Acacia spp., Grevillea spp. etc
• FOKO received funding for nursery establishment & de-silting of the dam
![Page 14: Western Kenya Integrated Ecosystem Management Project](https://reader034.vdocuments.us/reader034/viewer/2022051018/56649f575503460f94c7bd1e/html5/thumbnails/14.jpg)
Current activities - Kalacha
• Rehabilitation of a degraded area – this is the oldest rehabilitation site of the project
• 10,000 tree seedlings have been planted this year
• Soil cover has increased from less than 20% to more than 80%
• Harvesting grass for livestock
![Page 15: Western Kenya Integrated Ecosystem Management Project](https://reader034.vdocuments.us/reader034/viewer/2022051018/56649f575503460f94c7bd1e/html5/thumbnails/15.jpg)
Results so far
• In-depth baseline survey completed – biophysical and socio economic
• Rehabilitation of severely degraded areas
• Establishment of screening trials for indigenous trees on farmers’ fields
• Engagement of the local communities in these activities
• Promotion of indigenous trees for rehabilitation – more than 30,000 tree seedlings planted this year
![Page 16: Western Kenya Integrated Ecosystem Management Project](https://reader034.vdocuments.us/reader034/viewer/2022051018/56649f575503460f94c7bd1e/html5/thumbnails/16.jpg)
• Very high survival rate of tree seedlings planted (more than 80%)
• Soil cover has increased from less than 20% to more than 80% for the degraded areas