wellesley station second exits/entrances and easier access ... · park and to ossington station) on...
TRANSCRIPT
![Page 1: Wellesley Station Second Exits/Entrances and Easier Access ... · Park and to Ossington Station) on the north side of Wellesley Street outside of the main station entrance. • For](https://reader035.vdocuments.us/reader035/viewer/2022062607/6022e60ff711f03e225cb99d/html5/thumbnails/1.jpg)
1Wellesley Station Second Exits/Entrances and Easier Access – Construction UpdateDecember 2017
Wellesley Station Second Exits/Entrances and Easier Access – Construction UpdateDecember 2017
![Page 2: Wellesley Station Second Exits/Entrances and Easier Access ... · Park and to Ossington Station) on the north side of Wellesley Street outside of the main station entrance. • For](https://reader035.vdocuments.us/reader035/viewer/2022062607/6022e60ff711f03e225cb99d/html5/thumbnails/2.jpg)
2Wellesley Station Second Exits/Entrances and Easier Access – Construction UpdateDecember 2017
Improvements coming to Wellesley Station17 Dundonald Street
Conceptual drawing of 17 Dundonald Street with Wellesley Station Second Exit and Automatic Entrance (staircase access only) integration after construction is complete.
![Page 3: Wellesley Station Second Exits/Entrances and Easier Access ... · Park and to Ossington Station) on the north side of Wellesley Street outside of the main station entrance. • For](https://reader035.vdocuments.us/reader035/viewer/2022062607/6022e60ff711f03e225cb99d/html5/thumbnails/3.jpg)
3Wellesley Station Second Exits/Entrances and Easier Access – Construction UpdateDecember 2017
Improvements coming to Wellesley Station
Conceptual drawing of 587 Yonge Street with Wellesley Station Second Exit and Automatic Entrance (staircase access only) integration after construction is complete.
587 Yonge Street
![Page 4: Wellesley Station Second Exits/Entrances and Easier Access ... · Park and to Ossington Station) on the north side of Wellesley Street outside of the main station entrance. • For](https://reader035.vdocuments.us/reader035/viewer/2022062607/6022e60ff711f03e225cb99d/html5/thumbnails/4.jpg)
4Wellesley Station Second Exits/Entrances and Easier Access – Construction UpdateDecember 2017
Second Exits – Background• Most subway stations have more than one exit.
• All new TTC stations are built with at least two exits.
• 2002 Fire and Life Safety Assessment Study identified 14 priority stations needing a second exit.
• TTC program retrofits existing stations to provide an additional exit out in case of emergency and to improve customer convenience.
![Page 5: Wellesley Station Second Exits/Entrances and Easier Access ... · Park and to Ossington Station) on the north side of Wellesley Street outside of the main station entrance. • For](https://reader035.vdocuments.us/reader035/viewer/2022062607/6022e60ff711f03e225cb99d/html5/thumbnails/5.jpg)
5Wellesley Station Second Exits/Entrances and Easier Access – Construction UpdateDecember 2017
What are Second Exits?Second exits serve three functions:• As a primary exit if the main exit is blocked in an emergency.• As an additional exit in an emergency.• As a convenience to customers.
Castle Frank Second Exit Dufferin Station Second Exit
![Page 6: Wellesley Station Second Exits/Entrances and Easier Access ... · Park and to Ossington Station) on the north side of Wellesley Street outside of the main station entrance. • For](https://reader035.vdocuments.us/reader035/viewer/2022062607/6022e60ff711f03e225cb99d/html5/thumbnails/6.jpg)
6Wellesley Station Second Exits/Entrances and Easier Access – Construction UpdateDecember 2017
Second Exits – ConsiderationsEffective second exits must provide: • A fast way out of the station. • Convenience to encourage day-to-day use and familiarity in
an emergency. • Integration into the neighbourhood.
Woodbine Station Second Exit
![Page 7: Wellesley Station Second Exits/Entrances and Easier Access ... · Park and to Ossington Station) on the north side of Wellesley Street outside of the main station entrance. • For](https://reader035.vdocuments.us/reader035/viewer/2022062607/6022e60ff711f03e225cb99d/html5/thumbnails/7.jpg)
7Wellesley Station Second Exits/Entrances and Easier Access – Construction UpdateDecember 2017
Status of Second Exit ProgramProjects: • Broadview – complete • Castle Frank – complete • Dufferin – complete • Pape – complete • Woodbine – complete • Coxwell – complete in 2018 • Wellesley – exit/entrance is under construction, underground
connection is complete • Chester – location confirmed; design complete • Donlands – location confirmed; design consultation underway
To be planned: • Greenwood, College, Dundas, Dundas West, Museum, Summerhill
![Page 8: Wellesley Station Second Exits/Entrances and Easier Access ... · Park and to Ossington Station) on the north side of Wellesley Street outside of the main station entrance. • For](https://reader035.vdocuments.us/reader035/viewer/2022062607/6022e60ff711f03e225cb99d/html5/thumbnails/8.jpg)
8Wellesley Station Second Exits/Entrances and Easier Access – Construction UpdateDecember 2017
Wellesley Station Second Exits/Entrances Construction update
• Wellesley Station will be getting two second exits/automatic entrances to improve customer safety and convenience.
• TTC is coordinating with local developers to build integrated second exits and automatic entrances within the new condominium developments at 17 Dundonald Street and at 587 Yonge Street.
• The underground tunnel connection (located underneath Dundonald Street connecting the second exits to Wellesley Station) was completed by TTC in Fall 2016.
• The completion date and official opening of these second entrances/exits is dependent on the condominium construction. Closer to this time, TTC construction crews will return to install the PRESTO fare line equipment, other electrical/communication systems and the station finishes.
![Page 9: Wellesley Station Second Exits/Entrances and Easier Access ... · Park and to Ossington Station) on the north side of Wellesley Street outside of the main station entrance. • For](https://reader035.vdocuments.us/reader035/viewer/2022062607/6022e60ff711f03e225cb99d/html5/thumbnails/9.jpg)
9Wellesley Station Second Exits/Entrances and Easier Access – Construction UpdateDecember 2017
Underground tunnel connection Dundonald Street (during construction)
Wellesley Station Second Exits/Entrances Construction update
Aerial photo of construction on Dundonald Street (Spring, 2016).
![Page 10: Wellesley Station Second Exits/Entrances and Easier Access ... · Park and to Ossington Station) on the north side of Wellesley Street outside of the main station entrance. • For](https://reader035.vdocuments.us/reader035/viewer/2022062607/6022e60ff711f03e225cb99d/html5/thumbnails/10.jpg)
10Wellesley Station Second Exits/Entrances and Easier Access – Construction UpdateDecember 2017
Underground tunnel connection on Dundonald Street (completed/restored Fall 2016)
Wellesley Station Second Exits/Entrances Construction update
![Page 11: Wellesley Station Second Exits/Entrances and Easier Access ... · Park and to Ossington Station) on the north side of Wellesley Street outside of the main station entrance. • For](https://reader035.vdocuments.us/reader035/viewer/2022062607/6022e60ff711f03e225cb99d/html5/thumbnails/11.jpg)
11Wellesley Station Second Exits/Entrances and Easier Access – Construction UpdateDecember 2017
Easier Access – Program Wide• Committed to making all stations
accessible.
• Working with the Advisory Committee on Accessible Transit (ACAT) on effective design.
• Station upgrades include elevators, sliding doors, fare gates, accessible ramps and wayfinding features that will improve mobility.
![Page 12: Wellesley Station Second Exits/Entrances and Easier Access ... · Park and to Ossington Station) on the north side of Wellesley Street outside of the main station entrance. • For](https://reader035.vdocuments.us/reader035/viewer/2022062607/6022e60ff711f03e225cb99d/html5/thumbnails/12.jpg)
12Wellesley Station Second Exits/Entrances and Easier Access – Construction UpdateDecember 2017
ACAT Overview• Toronto citizens who advise the TTC on difficulties faced by
people with disabilities and seniors. • Recommends the elimination of barriers to accessible public transit in the
city of Toronto.• ACAT consists of 15 volunteer committee members who are appointed by the
TTC Board.
ACAT’s Role• Represents the needs and concerns of persons with disabilities and seniors who use
public transit services provided by the TTC.• Advises the TTC on the provision of accessible public transit.• Advises the TTC on necessary policy issues for services, which pertain to the interests
of persons with disabilities and seniors.• Supports TTC staff in consulting, educating, and advising persons with disabilities,
seniors, and the community at large. • Subcommittees: Design Review, Service Planning, Communications,
Wheel-Trans Operations.• Advises TTC on priority and plans for Easier Access projects.
Advisory Committee on Accessible Transit (ACAT)
![Page 13: Wellesley Station Second Exits/Entrances and Easier Access ... · Park and to Ossington Station) on the north side of Wellesley Street outside of the main station entrance. • For](https://reader035.vdocuments.us/reader035/viewer/2022062607/6022e60ff711f03e225cb99d/html5/thumbnails/13.jpg)
13Wellesley Station Second Exits/Entrances and Easier Access – Construction UpdateDecember 2017
Easier Access project background• 37 stations are now accessible
• Stations under construction as of 2017: – Coxwell, Dupont, St Patrick, Royal York.
• Woodbine Station was the latest station to become accessible in September 2017. Coxwell Station is next.
• All stations will be made accessible by 2025.
![Page 14: Wellesley Station Second Exits/Entrances and Easier Access ... · Park and to Ossington Station) on the north side of Wellesley Street outside of the main station entrance. • For](https://reader035.vdocuments.us/reader035/viewer/2022062607/6022e60ff711f03e225cb99d/html5/thumbnails/14.jpg)
14Wellesley Station Second Exits/Entrances and Easier Access – Construction UpdateDecember 2017
Easier Access Improvements at Wellesley Station
Barrier-free path to all levels of the station, including installation of:
• Two elevators to access southbound and northbound platforms.
• Improved signage including wayfinding.
• Security cameras along accessible path.
![Page 15: Wellesley Station Second Exits/Entrances and Easier Access ... · Park and to Ossington Station) on the north side of Wellesley Street outside of the main station entrance. • For](https://reader035.vdocuments.us/reader035/viewer/2022062607/6022e60ff711f03e225cb99d/html5/thumbnails/15.jpg)
15Wellesley Station Second Exits/Entrances and Easier Access – Construction UpdateDecember 2017
Wellesley Station Easier Access schedule • Easier Access construction to begin in
Q1 2018.
• Construction will be staged in the bus loop.
• In Spring, the bus loop will be closed for approximately eight months.
• Equipment and hoarding will be in place in the bus loop throughout the project.
• Easier Access project construction is scheduled to be complete in late 2020.
![Page 16: Wellesley Station Second Exits/Entrances and Easier Access ... · Park and to Ossington Station) on the north side of Wellesley Street outside of the main station entrance. • For](https://reader035.vdocuments.us/reader035/viewer/2022062607/6022e60ff711f03e225cb99d/html5/thumbnails/16.jpg)
16Wellesley Station Second Exits/Entrances and Easier Access – Construction UpdateDecember 2017
Elevator cross section image
Platform
Wellesley Street – Street Level
Southbound Train Northbound Train
Elevator E2Elevator E1
![Page 17: Wellesley Station Second Exits/Entrances and Easier Access ... · Park and to Ossington Station) on the north side of Wellesley Street outside of the main station entrance. • For](https://reader035.vdocuments.us/reader035/viewer/2022062607/6022e60ff711f03e225cb99d/html5/thumbnails/17.jpg)
17Wellesley Station Second Exits/Entrances and Easier Access – Construction UpdateDecember 2017
Wellesley Station – street level
YONGE STREET
![Page 18: Wellesley Station Second Exits/Entrances and Easier Access ... · Park and to Ossington Station) on the north side of Wellesley Street outside of the main station entrance. • For](https://reader035.vdocuments.us/reader035/viewer/2022062607/6022e60ff711f03e225cb99d/html5/thumbnails/18.jpg)
18Wellesley Station Second Exits/Entrances and Easier Access – Construction UpdateDecember 2017
Wellesley Station – platform level
![Page 19: Wellesley Station Second Exits/Entrances and Easier Access ... · Park and to Ossington Station) on the north side of Wellesley Street outside of the main station entrance. • For](https://reader035.vdocuments.us/reader035/viewer/2022062607/6022e60ff711f03e225cb99d/html5/thumbnails/19.jpg)
19Wellesley Station Second Exits/Entrances and Easier Access – Construction UpdateDecember 2017
Elevator rendering at street level (E2)
![Page 20: Wellesley Station Second Exits/Entrances and Easier Access ... · Park and to Ossington Station) on the north side of Wellesley Street outside of the main station entrance. • For](https://reader035.vdocuments.us/reader035/viewer/2022062607/6022e60ff711f03e225cb99d/html5/thumbnails/20.jpg)
20Wellesley Station Second Exits/Entrances and Easier Access – Construction UpdateDecember 2017
Elevator rendering at platform level (E2)
![Page 21: Wellesley Station Second Exits/Entrances and Easier Access ... · Park and to Ossington Station) on the north side of Wellesley Street outside of the main station entrance. • For](https://reader035.vdocuments.us/reader035/viewer/2022062607/6022e60ff711f03e225cb99d/html5/thumbnails/21.jpg)
21Wellesley Station Second Exits/Entrances and Easier Access – Construction UpdateDecember 2017
Wellesley Station bus loop
![Page 22: Wellesley Station Second Exits/Entrances and Easier Access ... · Park and to Ossington Station) on the north side of Wellesley Street outside of the main station entrance. • For](https://reader035.vdocuments.us/reader035/viewer/2022062607/6022e60ff711f03e225cb99d/html5/thumbnails/22.jpg)
22Wellesley Station Second Exits/Entrances and Easier Access – Construction UpdateDecember 2017
Pedestrian and cycling safety overview• Through-traffic, TTC bus and subway service will be
maintained in all directions on Wellesley Street East with some lane reductions.
• Sidewalks and bike lanes will be maintained with detours in place.
• During construction, cyclists will share the westbound curb lane with buses only and will not have to merge with regular traffic.
• The closest alternative bike lane is on Gerrard Street East, connected to Wellesley Street at Sherbourne Street.
![Page 23: Wellesley Station Second Exits/Entrances and Easier Access ... · Park and to Ossington Station) on the north side of Wellesley Street outside of the main station entrance. • For](https://reader035.vdocuments.us/reader035/viewer/2022062607/6022e60ff711f03e225cb99d/html5/thumbnails/23.jpg)
23Wellesley Station Second Exits/Entrances and Easier Access – Construction UpdateDecember 2017
Transit overviewWhen the bus loop is closed:
• Board westbound 94 Wellesley buses (to Queen’s Park and to Ossington Station) on the north side of Wellesley Street outside of the main station entrance.
• For safety reasons, TTC riders will cross Wellesley Street at the traffic signals at the Yonge Street intersection to the south side of Wellesley Street to board eastbound 94 Wellesley buses to Castle Frank Station.
![Page 24: Wellesley Station Second Exits/Entrances and Easier Access ... · Park and to Ossington Station) on the north side of Wellesley Street outside of the main station entrance. • For](https://reader035.vdocuments.us/reader035/viewer/2022062607/6022e60ff711f03e225cb99d/html5/thumbnails/24.jpg)
24Wellesley Station Second Exits/Entrances and Easier Access – Construction UpdateDecember 2017
Wellesley Station bus loop closure plan
Yong
e S
tree
t
Wellesley Street East
Bus
loop
closed for construction
Eastbound9494
Westbound94 94
WellesleyStation
94
94
Pedestrian route
Temporary stop
Existing stop
![Page 25: Wellesley Station Second Exits/Entrances and Easier Access ... · Park and to Ossington Station) on the north side of Wellesley Street outside of the main station entrance. • For](https://reader035.vdocuments.us/reader035/viewer/2022062607/6022e60ff711f03e225cb99d/html5/thumbnails/25.jpg)
25Wellesley Station Second Exits/Entrances and Easier Access – Construction UpdateDecember 2017
Bike lane changes to improve safety during construction
Wellesley Station
Wellesley Street EastRemove existingpavement markings
Remove bicycle parking andreplace with temporary bus shelterRemove waste/recycling bin
Remove existingpavement markings
Existing shared bike lane
Match existingpavement markings
Maintain existingpavement markings
Relocate existing “reserved lane ends”sign to existing light standard
Existing light standard
Bike lane
Yong
e S
tree
t
Existing lanes/edge of pavement
Re-aligned vehicle traffic
Temporary bus stop shared withonly bicycles
Legend
Temporary lanes
Bus stop at Yonge St. temporarily relocated to the station entrance during construction, eliminating any bicycles passing stopped buses on the left
Dedicated bicycle lane shiftedeast to accommodate sharedlane with temporary bus stop
During construction bicycles will no longer have to share this area with regular traffic, only with theoccasional bus
This is similar to how other bus stops are setup within bicycle lanes, such as the example below on Wellesley at Sherbourne
![Page 26: Wellesley Station Second Exits/Entrances and Easier Access ... · Park and to Ossington Station) on the north side of Wellesley Street outside of the main station entrance. • For](https://reader035.vdocuments.us/reader035/viewer/2022062607/6022e60ff711f03e225cb99d/html5/thumbnails/26.jpg)
26Wellesley Station Second Exits/Entrances and Easier Access – Construction UpdateDecember 2017
Temporary 94B Wellesley bus looping during construction
WellesleyStation
Signal controlled turn
Unsignalized left turn
Temporary bus stop location
Temporary turnaround route
The 94B Wellesley buses will continue past Wellesley Station westbound and will turn northwards on Queens Park Crescent and loop counter-clockwise before turning back eastbound onto Wellesley Street. During construction the round trip will take approximately 10 additional minutes.
Temporary bus looping of 94B
![Page 27: Wellesley Station Second Exits/Entrances and Easier Access ... · Park and to Ossington Station) on the north side of Wellesley Street outside of the main station entrance. • For](https://reader035.vdocuments.us/reader035/viewer/2022062607/6022e60ff711f03e225cb99d/html5/thumbnails/27.jpg)
27Wellesley Station Second Exits/Entrances and Easier Access – Construction UpdateDecember 2017
Public art update
Low-relief sculptural mosaic, architecturally integrated into interior curved convex wall.
• TTC Board approved the public art concept.
• Gisele Amantea’s low-relief sculptural mosaic will be installed once the Easier Access project is completed.