wellcom ceiling work quotation.revised

2
EMILIANO BONITA CONSTRUCTION & ENGINEERING SERVICES phone: 0922 6790 402 email: ebco Date : 2-Apr-2014 To : __________________________ AREA MANAGER WELLCOM TELECOM SUPERMARKET PROJECT TITLE : Ceiling Restoration of Wellcom at Cyberzone, SM City Cebu Detailed Scope of Works : 1. Fixing and alignment of tee-runners 2. Measuringthe accurate dimension of ceiling frames 3. Pull out of damaged and stained acoustic boards 4. Checking and clearing of combustible and non-combustible items above ceiling 5. Replacement of missing and damaged boards 6. Diposal of used and damaged acoustic boards 7. Turn over of ceiling works I. MATERIAL COST Item no Breakdown charges Description Qty Unit Cost / U 1 Mobilization 2 days 1,050.00 2 Mineral acoustic board 15 piece 925.00 3 Hauling charges 4 pax 350.00 4 Landfill fee 1 lot 1,500.00 5 Others ( safety materials and etc) II. MATERIAL PRICE III. LABOR COST IV. VAT 12% (MATERIAL & LABOR COST) V. SUB-TOTAL VI. MARK-UP / PROFIT VIII. TOTAL CONTRACT PRICE Estimated Work Duration : 3 days Terms and Conditions : 60% downpayment,40% to follow after completion Respectfully yours, Engr. Bernard Fario Project Engineer Conforme _____________ The world does revolve around us… We pick the coordinate system. Emiliano Bonita Construction & Engineering Services F.B. Cabahug Street Mandaue City, Cebu, Philippines

Upload: jayson-cartagena-jueco

Post on 25-Nov-2015

17 views

Category:

Documents


0 download

DESCRIPTION

WELLCOM Ceiling Work Quotation.revised

TRANSCRIPT

wellcomEMILIANO BONITACONSTRUCTION& ENGINEERINGSERVICESphone: 0922 6790 402 email: [email protected]:2-Apr-2014To:__________________________AREA MANAGERWELLCOM TELECOM SUPERMARKETPROJECT TITLE : Ceiling Restoration of Wellcom at Cyberzone, SM City CebuDetailed Scope of Works :1. Fixing and alignment of tee-runners2. Measuringthe accurate dimension of ceiling frames3. Pull out of damaged and stained acoustic boards4. Checking and clearing of combustible and non-combustible items above ceiling5. Replacement of missing and damaged boards6. Diposal of used and damaged acoustic boards7. Turn over of ceiling worksI.MATERIAL COST18,125.00Item noBreakdown charges DescriptionQtyUnitCost / UTotal1Mobilization2days1,050.002,100.002Mineral acoustic board15piece925.0013,875.003Hauling charges4pax350.001,400.004Landfill fee1lot1,500.001,500.005Others ( safety materials and etc)750.00II.MATERIAL PRICE18,125.00III.LABOR COST6,343.75IV.VAT 12% (MATERIAL & LABOR COST)2,936.25V.SUB-TOTAL27,405.00VI.MARK-UP / PROFIT5,481.00VIII.TOTAL CONTRACT PRICE32,886.00Estimated Work Duration : 3 daysTerms and Conditions : 60% downpayment,40% to follow after completionRespectfully yours,Engr. Bernard FarioProject EngineerConforme_________________________The world does revolve around us We pick the coordinate system.Emiliano Bonita Construction & Engineering Services F.B. Cabahug StreetMandaue City, Cebu, Philippines