well rehabilitation solutions presentation - geoquip water solutions ltd

67
geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146 *(EMAIL) [email protected] 8(WEBSITE) www.geoquipwatersolutions.com Well Rehabilitation Solutions Presentation

Upload: geoquip-water-solutions-ltd-ipswich-suffolk-uk

Post on 02-Jul-2015

781 views

Category:

Environment


4 download

DESCRIPTION

Mineral contamination can seriously affect the performance of wells and boreholes. The most common types of contamination are iron bacteria and iron oxide encrustation, calcium carbonate and manganese oxide contamination. Possible reasons for contamination include presence of bacteria or minerals before a bore is drilled, contaminated water used during the drilling process or changes in the chemistry of the groundwater, all of which provide an environment in which bacteria and mineralisation can become established. Whatever the cause these residues will eventually affect nearly everyone who sources water from aquifers. Operational problems caused by mineral clogging include reduction in the yield and hydraulic efficiency of the borehole, deterioration of water quality, motor burn out of the submersible pump, and encrustation on the pump, column and screen. As a result the energy costs of pumping increase, due to increased drawdown, and maintenance costs increase due to greater equipment wear and tear and borehole rehabilitation costs. Geoquip Water Solutions has been developing a borehole maintenance programme for the last ten years and the programme, which incorporates the BoreSaver range of treatments, has achieved notable successes globally in the management of iron oxide, iron bacteria and other mineral problems. The goal of the BoreSaver borehole maintenance programme is to return borehole production to as close to the original drilled capacity as possible and to help maintain a continual, problem-free water supply. The programme includes a downhole CCTV camera survey, bespoke software that analyses the survey results and the available water quality data and BoreSaver, a range of approved borehole rehabilitation treatments that are now used in more than fourteen countries worldwide. BoreSaver treats water supply systems contaminated with iron bacteria, iron oxide, manganese oxide and calcium carbonate deposits. The treatments completely remove the deposits that build up and cause blockages in wells, pipes, pumps and any other water related equipment. Developed to achieve maximum flow capacity, the BoreSaver range also improves water supply quality and extends the working life of pumping equipment and associated plant. BoreSaver’s low environmental impact makes it an attractive solution for organisations intent on maintaining their responsibilities to the wider public. Mike Deed from Geoquip Water Solutions said, “An key component of the BoreSaver programme is about educating users in the importance of being proactive and maintaining their water supply system on a regular basis. We encourage people to view their water supply system as they would their car, which, if regularly serviced, will give them trouble-free motoring and won’t break down. Similarly, with a water supply system, the operation of the pumps and associated equipment, the specific capacity and quality of the water will be optimised if the system is regu

TRANSCRIPT

Page 1: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected] 8(WEBSITE) www.geoquipwatersolutions.com

Well Rehabilitation Solutions

Presentation

Page 2: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Iron Oxides

Carbonates & Scales

Manganese

Iron Related Bacteria

Sulphur Reducing &

Oxidising Bacteria

Areas of Specialty

Page 3: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Potable Water Wells

Pipelines

Geothermal Open Loop Systems

Irrigation

Construction Dewatering

Remediation

Hydraulic Barrier’s

Applications

“It’s an engineering problem !“

“Get the treatment to where the problem is and it will solve it.”

Page 4: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Biofouling

Iron Oxide

Iron Bacteria

Iron Reducing Bacteria

Iron Algae

Iron Related Bacteria

Iron Oxide Clogging

Targeting

Page 5: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Page 6: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

When you pull a pump, send a camera down…

Page 7: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Transport cart Custom 2 - wheeled unit for ultimate mobility

10’ surplus Cable Allows remote viewing in extreme weather

Powered reel Adjustable speed powered winchwith 300 m (1,000 ft.) of Kevlar reinforced coaxial cable

Video Monitor7” LCD colour monitorwith sun shield

Depth CounterDigital on-screen depth counterto tenths of feet or meters

Portable Camera Control Unit

Compact package with hard case and

locking mechanism for the monitor and all control functions

Digital Video Recorder 12v recorder to document thesurvey

Portable Power Supply12v Battery with chargerand digital volt meter

Note: Tri-lights not included in standard package.

High Intensity Lighting/Dual Camera System50 super bright, water-clear LEDs allows high resolution photos in wells up to 50cm in diameter Dual wide angle cameras, one down view, one side view, with remote switching and continuous 3600rotation

R-CAM 1000 Downhole Camera

Page 8: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Vision can be a great tool !

Page 9: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Full Rig Clean Method Summary

Pull up the pump – Take some samples from the pump or rising

main if you can.

Page 10: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Ultra C with Iron Oxide IKL Pro with Iron Oxide

Do a Quick Test…

Page 11: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Borehole Treatment

using

Page 12: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Pump test

‘A Benchmark’

Camera Survey

Page 13: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Cable rig

Cable rig tool

Page 14: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Cleaning Rigs

Brush & Surge Set

Page 15: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Brushes

BoreSaver Added

Page 16: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Purging

Final Camera Survey

Page 17: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Other Treatment Methods

• Pump in well

• Airlift or Any Re-development technique

• Other form of agitation

Page 18: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Chemical SelectionSo how do we select the Right Chemical?

Typically, no single chemical type will address all encrustation and bio

fouling removal, suspension, dispersal, and repression needs.

Blended method treatments permit more effective removal of multiple

problems, or treat a single difficult problem more effectively (Smith,

1995; Alford and Cullimore, 1999).

Page 19: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

(Smith, 1995; Alford and

Cullimore, 1999)

Page 20: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

A. England - Regulation 31 of The Water Supply (Water Quality) Regulations 2000 (Statutory

Instruments 2000 No 3184) – http://www.dwi.gov.uk/stakeholders/regulations/ws_wqregs2000.pdf

B. Wales – Regulation 31 of The Water Supply (Water Quality) Regulations 2001 (Welsh Statutory

Instrument 2001 No 3911 (W.323) – http://www.opsi.gov.uk/legislation/wales/wsi2001/20013911.htm

C. Scotland – Regulation 27 of The Water Supply (Water Quality) (Scotland) Regulations 2001 –

http://www.opsi.gov.uk/legislation/scotland/ssi2001/20010207.htm

D. Northern Ireland – Regulation 30 of The Water Supply (Water Quality) (Amendment) Regulations)

(Northern Ireland) 2009 (Statutory Rules of Northern Ireland 2009 No.246) –

http://www.opsi.gov.uk/sr/sr2009/nisr_20090246_en_1

E. US - NSF International for BoreSaver Ultra C

ApprovalsFor all products

Page 21: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Compare

0%

20%

40%

60%

80%

100%

120%

BoreSaver UltraC

Sulphuric acid Hydrochloric acid Glycolic acid

Iron Oxide Dissolved (averaged)

Page 22: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

0%

20%

40%

60%

80%

100%

120%

BoreSaver Ultra C citric acid sulfamic acid hydrochloric acid

Iron Oxide Dissolved (averaged)

Page 23: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Water Test Comparison

Page 24: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Hydrochloric Acid

Owner: Local Government Body

Client: Water Bore Redevelopers

Product: BoreSaver Ultra C

Well: Fibreglass 90 ‘ deep

Date: 2007

Page 25: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

200.00

220.00

240.00

260.00

280.00

300.00

320.00

340.00

360.00

Untreated HCl & Surge PTS

Local Government ReserveChemical Comparison SC Results

Page 26: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

ChlorinationChlorine is a fantastic tool for disinfecting wells with

coliforms and other assorted nasty's.

For removing organic iron clogging it is useless.

Iron Oxide is already oxidized

Why, because chlorine is an oxidizing agent

The iron oxide is already oxidized, so what's the point

of pouring chlorine down the hole to remove the iron

oxide?

Yes it will kill some bugs but its well recognized that

iron bacteria are highly resistant to chlorinating

solutions.

Page 27: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Glycolic Acid

Testing as well as client feedback suggests products which are predominantly

glycolic acid suffers from a serious lack of power and performance …

So lets have a look at a range of recent field experiences with glycolic acid and

BoreSaver.

Page 28: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Page 29: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Page 30: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Page 31: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Coal Mine Comparisons

Proprietary Glycolic Blend BoreSaver Ultra C

Page 32: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Coal Mine Comparisons

Proprietary Glycolic Blend BoreSaver Ultra C

Page 33: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Coal Mine Comparisons

Proprietary Glycolic Blend BoreSaver Ultra C

Page 34: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

AUS Government

Research Facility

Well details;

367 feet deep

16 inch diameter

Hardness 500 ppm

Page 35: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Page 36: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

0

2

4

6

8

10

12

Traditional

Improved

meg

a l

iters

/day

Glycolic vs Ultra C

Comparisons

64% Improvement

Page 37: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Page 38: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Deer Park Ranch

Iron-Related Bacteria on last year’s pump is left to fester and rust near the well.

Page 39: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Disconnect the

pump outlet pipe.

Pump Cycle Clean Method

Add the cleaning

product to the well.

Page 40: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Run the pump

between 4 & 8 hours.

Ultra C is working

when water turns

GREEN.

Page 41: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Next day pump

and reconnect

outlet pipe.

Page 42: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Pre-treatment 11-2-2011

The pump and cable with the slimy IRB on them.

Page 43: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

BoreSaver Post Treatment

16-2-2011

We moved the black tape above to show the color of the pipes when they

went in the hole. The picture on the right shows what the pump looked like

when it came out.

Page 44: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

This is what the pump looks like at

the four hour recycle test, almost all

the iron in the impellers has been

removed but its not until you hit the

8 hour mark that you start to get

more complete results.

Page 45: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Page 46: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Each well is surveyed

at the start.

Each well is removed

and cleaned.

Page 47: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

0

20,000

40,000

60,000

80,000

100,000

120,000

Expected Yield (m3) 2008 Yield (m3)

Yield Comparison Actual vs Target - South 2008

Page 48: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Cooljarloo Production Well ReportSouth well field

2008

Pump NumberTarget

Flow (L/s)

Avg

Weekly

Flow (L/s)

Variation

(L/s)

Expected

Yield (m3)

Actual Yield

(m3)

Yield

Change

(m3)

Flow

Variation

(%)

CPB 01 21.5 18.8 -3 13,003 11364 -1,639 -13%

CPB 27 11 9.9 -1 6,653 6012 -641 -10%

CPB 29 11 6.2 -5 6,653 3754 -2,899 -44%

CPB 33 10.5 6.5 -4 6,350 3956 -2,394 -38%

CPB 34 8.7 4.1 -5 5,262 2458 -2,804 -53%

CPB 37 14.3 9.1 -5 8,649 5492 -3,157 -36%

CPB 38 11.5 7.3 -4 6,955 4397 -2,558 -37%

CPB 39 25 22.9 -2 15,120 13830 -1,290 -9%

CPB 40 21.8 16.6 -5 13,185 10030 -3,155 -24%

CPB 41 21.7 33.1 11 13,124 20037 6,913 53%

CPB 42 5.5 6.6 1 3,326 3970 644 19%

CPB 43 24.7 0.0 -25 14,939 0 -14,939 -100%

Totals 187 141 -46 113,219 85,300 -27,919 -25%

Page 49: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Cooljarloo Production Well ReportSOUTH Well Field

2008 2011

Pump

Number

Target

Flow

(L/s)

Flow

L/s

Variatio

n

(L/s)

Expecte

d Yield

(m3)

2008

Yield

(m3)

Yield

Chang

e (m3)

Yield

Variatio

n (%)

Plann

ed

Flow

(L/s)

Flow

L/s

Variatio

n (L/s)

Yield

(m3)Yield +/- Discharge point

CPB 01 21.5 18.8 -3 13,003 11364 -1,639 -13% 21.5 18.6 -2.9 7557 -3807GR5H

/Concentrator

CPB 27 11 9.9 -1 6,653 6012 -641 -10% 8 8.6 0.6 4691 -1321south mine transfer

tank

CPB 29 11 6.2 -5 6,653 3754 -2,899 -44% 11 17.1 6.1 9015 5261south mine transfer

tank

CPB 33 10.5 6.5 -4 6,350 3956 -2,394 -38% 10.5 18.7 8.2 13756 9800 Dredge Pond

CPB 34 8.7 4.1 -5 5,262 2458 -2,804 -53% 8.7 13.3 4.6 3651 1193 Concentrator

CPB 37 14.3 9.1 -5 8,649 5492 -3,157 -36% 14.3 20.7 6.4 10512 5020GR5H /

Concentrator

CPB 38 11.5 7.3 -4 6,955 4397 -2,558 -37% 11.5 13.4 1.9 7965 3568GR5H /

Concentrator

CPB 39 25 22.9 -2 15,120 13830 -1,290 -9% 25 28 3.0 11999 -1831GR5H /

Concentrator

CPB 40 21.8 16.6 -5 13,185 10030 -3,155 -24% 21.8 17.3 -4.5 9658 -372south mine transfer

tank

CPB 41 21.7 33.1 11 13,124 20037 6,913 53% 21.7 31.06 9.4 14572 -5465south mine transfer

tank

CPB 42 5.5 6.6 1 3,326 3970 644 19% 5.5 10.7 5.2 6203 2233GR5H /

Concentrator

CPB 43 24.7 0.0 -25 14,939 0 -14,939 -100% 0 0 0.0 0 0south mine transfer

tank

Totals 187 141 -46 113,219 85,300 -27,919 -25% 160 197 38 99579 14279

Page 50: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

75,000

80,000

85,000

90,000

95,000

100,000

2008 2011

2008 -2011 Yield Comparison - South

Page 51: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

North Well Field

2008 2011

Pump Number

Targe

t Flow

(L/s)

Calc

Avg

Weekly

Flow

(L/s)

Variat

ion

(L/s)

Expecte

d Yield

(m3)

Actual

Yield

(m3)

Yield

Change

(m3)

Flow

variation

Calc

Avg

Weekly

Flow

(L/s)

7 day

yield

(m3)

yield

comparison

Flow

Variation

Discharge

pointCOMMENTS

CPB 15 0 0.0 0 0 0 0 0% 0.0 0 0 0%North mine

bore tank

Off for

environmenta

l reasons

CPB 30 0 0.0 0 0 0 0 0% 3.1 1882 1882 0%North mine

bore tank

CPB 31 0 0.0 0 0 0 0 0% 0.0 0 0 0%North mine

bore tank

Off for

environmenta

l reasons

CPB 32 5 7.9 3 3,024 4807 1,783 59% 0.0 1323 -3484 28%Concentrato

r

North mine

not using it

CPB 35 10 13.8 4 6,048 8351 2,303 38% 15.9 9601 1250 115%North mine

bore tank

CPB 36 20 16.6 -3 12,096 10065 -2,031 -17% 0.0 5477 -4588 54%North mine

bore tank

intermittent

use only

CPB 44 26.4 0.0 -26 15,967 28 -15,939 -100% 0.0 14486 14458 51737%North mine

bore tank

intermittent

use only

CPB 45 7.5 6.5 -1 4,536 3958 -578 -13% 8.6 5205 1247 131%North mine

bore tank

CPB 46 13 0.0 -13 7,862 0 -7,862 -100% 0.0 0 0 0%North mine

bore tank

Off for

environmenta

l reasons

Totals 82 45 -37 49,533 27,209 -22,324 -45% 28 37974 10765 140%

Page 52: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

2008 2011

North Well Field Comparison m3/week

Page 53: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Ultimate Iron

Oxide

Page 54: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Water Corporation M 570

Page 55: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Clogged Gravel Pack

Page 56: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Cleaned Gravel Pack

Page 57: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

0

50

100

150

200

250

300

UntreatedPhase 2

Phase 4

59

183218

252282

Water Corporation M 570

Page 58: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Water Corporation M 570

378% Increase

in Specific Capacity

(SC)

Page 59: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

How Long?

Page 60: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

0.00

50.00

100.00

150.00

200.00

250.00

300.00

350.00

400.00

G150 2008

Specific Capacity 2008

Page 61: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

0.00

50.00

100.00

150.00

200.00

250.00

300.00

350.00

UntreatedPTS 1

PTS 2PTS 3

G150 2009

Page 62: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

0.00

50.00

100.00

150.00

200.00

250.00

300.00

350.00

400.00

Untreated PTS 1 PTS 2 PTS 3

Specific Capacity 2008

Specific Capacity 2009

Page 63: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

0

5

10

15

20

25

30

Std. rehab. 1008 hrs PTS rehab. 4032 hours

Oxide On Pump

mm oxide

Page 64: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

0

500

1000

1500

2000

2500

3000

3500

4000

4500

Std. rehabilitation PTS rehabilitation

G150 Service Interval

Std. rehabilitation

PTS rehabilitation

Page 65: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Conclusion• More Water

• Lower Maintenance Costs

• Maximise Time Between Cleans

• Proactive not Reactive

The right chemistry with the right

methods give spectacular results!

Page 66: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Visit our BoreSaver International site

www.wellrehabilitationsolutions.com

Page 67: Well Rehabilitation Solutions Presentation - Geoquip Water Solutions Ltd

geoquip water solutions limited ((Tel) +44(0)1473 462046 ((Fax) +44(0)1473 462146

*(EMAIL) [email protected]

8(WEBSITE) www.geoquipwatersolutions.com

Thank you