well check list_qa

26
Page 1 of 26 Pages CORPORATE ASSURANCE & QC Well: ALL SERVICES Revision Date 19 July 2022 Revision Number: 1.0 Originator: Martin Doig Item Desription Resonsibility Response Photo Comments 2.0 HEALTH, SAFETY & ENVIRONMENT 2.1 2.2 3.0 DRILLING UNIT 6-5/8" Landing String 3.1 9.0 inch Drill Collars FOR ALL HOLE SECTIONS BY PROGRAM 3.2 3.3 Check BOP stack and cavities 3.4 Check ram block elastomers "T" Card System for drilling location Updated Emergency Contact Details Indicated as range 2 and 2,000m present T/Jnt OD/ID = 8.5"/ 4" All necessary casing handling and running equipment ELASTOMERS TO BE SUITABLE FOR DRILLLING FLUIDS PROPOSED

Upload: jovyan25

Post on 24-Sep-2015

5 views

Category:

Documents


3 download

DESCRIPTION

well checklist

TRANSCRIPT

Drilling Supt Lundin Sudan

TJ-03A Q-A CHECK LISTCORPORATE ASSURANCE & QCWell:ALL SERVICESRevision Date22 May 2015Revision Number:1.0Originator:Martin DoigItemDesriptionResonsibilityResponsePhotoCommentsCompleted2.0HEALTH, SAFETY & ENVIRONMENT2.1"T" Card System for drilling location2.2Updated Emergency Contact Details3.0DRILLING UNIT6-5/8" Landing StringIndicated as range 2 and 2,000m presentT/Jnt OD/ID = 8.5"/ 4"3.19.0 inch Drill CollarsFOR ALL HOLE SECTIONS BY PROGRAM3.2All necessary casing handling and running equipment3.3Check BOP stack and cavities3.4Check ram block elastomersELASTOMERS TO BE SUITABLE FOR DRILLLING FLUIDS PROPOSED3.5ALL RAMS TO BE CHECKED3.6Check Kill Line Check Valve3.7Rig site communications3.8Cellar casing drain ball valves3.9Mud engineers shack3.10Elvatoros & Links3.11Third party contractor accommodationCurrently esimated at 243.12TUBULAR INSPECTION REPORT [THIRD PARTY]3.13Drilling Unit Grounding (Earth)To confirm quality of grounding3.14Mud System Level Control Hand WinchCheck serviceability of hand winches and "U"Tubes3.15Mixing HoppersCheck location of mixing hoppers. Mixing hoppers are to be hard piped.3.17Rotating MixersCheck Oil Seals in gearboxes3.18Pit #1 Shale Shaker Installation3.19Pit #1 SCE3.20Bell Nipple Flowline JetsJetting lines need to be installed in mud flowline and connected to low pressure mud system and the washdown systemPOLLUTION PANS3.21Centrifuge3.22Chemical TanksBIG BAG HANDLING EQUIP3.23Slush Pump Suction StrainersSlush Pump Fluid End3.24Pressure GaugesAll pressure gauges to be inspected and checked. Replace units that are not working3.25Rig Instrumentation3.26Computer - Rig Instrumentation3.27Rig Instrumentation - Pit Sensors3.28Rig Instrumentation - Pit Sensors3.29Mud Cleaners??????3.30Make-up Water LinesSolid piping with shut-off and isolation valves incorporated. No hoses to be used!!3.31Vacuum DegasserCheck on installation3.32De-Sander3.33De-Silter3.34Wilden PumpProvide an air operated pump with all the necessary suction and discharges hoses and air drive hoses3.35Rig Engine Controls3.36Rig Power Unit3.37Mud Tank ValvesFill mud system with water and check whether valves are leaking3.38Equalizing Skimmers3.39Reserve Tank mixing System3.40Mixing Tank Roof3.41Mud Tank Layout3.42Mixing/Suction Tank Pumps3.43Reserve Tank Mixing Pump3.44TransferTank Pumps3.45No. 1 Tank Pumps3.46Reserve & Mixing TankRequires hard piped hopper discharge line3.47Flowline Rate Sensor3.48Standpipe Pressure Sensor3.49Torque Sensor3.50Choke Manifold/Well head Pressure Sensor3.51Drilling Line3.52Standpipe Connection for Casing Circulating Fill-up tool3.53Mud Storage Off Ground3.54Wellhead AdaptorMud Logging Sensor Out puts

&RPage &P of &N Pages

Sheet1