Page 1: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

Welcome to the

Right of Way Plan Development

Pre-Qualification Training

1

Page 2: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

Brett A. Shearer, Right of Way Specialist

ODOT Central Office

Worked for ODOT for over 20 years

1987 Attended University of Akron in Drafting and Survey Tech.

1989 Draftsmen in District 3, Production and Survey

1994 Survey Technician in Aerial Engineering

1995 R/W Plan Specialist in the Office of Real Estate

2000 R/W Plan Specialist in the Office of Production

2

Page 3: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

Right of Way Plan DevelopmentPre-Qualification

Instructors: Dave Dicke, ODOT District 2 REA Doug Raters, P.E. ODOT District 8 REA Mike Ware, P.S. ODOT Office of Production Jim Kenyon, P.S. ODOT District 3 SOM John Messmore, P.S. ODOT District 4

3

Page 4: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

Welcome & Introduction

• Sign In Sheet– You MUST sign in each morning in order to receive

your certificate

• Location of Restrooms • Location of Cafeteria and Restaurants • Smoking areas• Some slides will be difficult to read• Please hold Questions to the end of speaker’s presentation

4

Page 5: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

• Right of Way Plan Development Training Manual – Course Agenda– Table of Contents – Biography for each speaker – Power Point Slide show– Appendices– CPD Credits

• R/W Plan Manual Sections 3100, 3200 & 3300– www.dot.state.oh.us/Divisions/ProdMgt/Production/row/Pages/row.aspx

• Quizzes– Will be given after the morning and afternoon sessions– Quizzes must be turned in, to receive your certificate

5

Page 6: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

Objectives of this Course

• Explain the R/W Pre-Qualification Process• Why R/W Plans are necessary• Who are the users of the R/W Plans• Project Development Process (PDP) for R/W Plans• Scope of Services Document & R/W Attachment• Records Research for ODOT R/W Plans• Field Surveying for R/W Plans• Boundary Resolution Related to R/W Plans• Establishing the Existing Road R/W

6

Page 7: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

Objectives of this Course

• R/W Base Map Preparation• Establish & Design the Proposed R/W Limits• Innovative design ideas to save R/W costs• Standard R/W Plan Format• Standard R/W Plan Sheets• R/W Plan Review Process• What happens to the R/W Plans• Quality Control

7

Page 8: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

• Consulting Firms requesting or desiring to maintain prequalification in R/W Plan Development must have on permanent staff:

• Right of Way Plan Designer– Must be under the direct supervision of a P.S. registered in Ohio

• Right of Way Plan Reviewer– MUST be a P.S. registered in Ohio– Responsible for signing and sealing all appropriate R/W

documents

R/W Pre-Qualification Process

8

Page 9: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

• Right of Way Plan Designer and Right of Way Plan Reviewer CANNOT be the same individual on any project.

• The Right of Way Plan Designer can be a P.S. however, the Right of Way Plan Reviewer must also be a P.S. and must be someone other than the Right of Way Designer

R/W Pre-Qualification Process

9

Page 10: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

• R/W Plan Designer Requirements and Responsibility:– Experience in R/W Plan Development on projects comprising

a total of ten (10) or more parcels– Active involvement in R/W Plan Development within the past

five (5) years– Successful completion of this course– Courthouse Research Experience (Road R/W and Deeds)– Experience and knowledge of the ODOT Right of Way Plan

Manual– Experience and knowledge of the ODOT CADD Engineering

Standards Manual

R/W Pre-Qualification Process

10

Page 11: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

• R/W Plan Reviewer Requirements and Responsibility :– Professional Surveyor registered in the State of Ohio

– Two (2) years experience in developing public R/W plans comprising a total of twenty (20) or more parcels

– Active involvement in R/W Plan Development within the past five (5) years

– Successful completion of this course

R/W Pre-Qualification Process

11

Page 12: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

• R/W Plan Reviewer Requirements and Responsibility:– Establishing and Setting Boundary Monumentation

– Investigating and Establishing Property Lines

– Check and Verify Accuracy of Computations, Plans and Legal Descriptions, Insuring Items are Correct, Current, Complete and Conform to County Requirements & Manuals

– Evaluate Overall R/W Plan and Legal Descriptions for Quality and Consistency with Construction Plans

R/W Pre-Qualification Process

12

Page 13: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

• Submittal Requirements– Submit Resumes of R/W Plan Designer and Reviewer

• Summarizing their experience• Listing all the R/W projects they have worked on and• Highlighting their direct responsibilities

– Submit approved/completed right of way plans prepared by the Designer and checked by the Reviewer current within past 5 years (Initial Submittal Only)

– Submit county approved (or recorded) legal descriptions prepared, signed and sealed by the Reviewer current within past 5 years (Initial Submittal Only)

Firms requesting Prequalification

13

Page 14: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

Things to keep in mind when applying

• R/W Plan Development includes the performance of:– Deed/property rights research (Courthouse, Engineer’s Office)– The practice of Boundary Surveys– The practice of Topographic Surveys– Computation of both Existing and Proposed Road R/W– Preparation of R/W Plans based on ODOT or similar standards– Preparation of Legal Descriptions following both

• ODOT standards• County recording and conveyance requirements

– Closure reports for each description

14

Page 15: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

• Submit application/resume/approved plans to:Dan Krajcovic

ODOT Office of Consultant Services

1980 West Broad Street, 1st Floor

Columbus, Ohio 43323

15

Page 16: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

• Getting prequalified if you DO NOT have ODOT R/W Plan experience?– Submit any road right of way plans prepared in the past

five (5) years. (highlight this work)– OR– Submit any subdivision plats prepared in the past five

(5) years that include road right of way work/dedicated road right of way (highlight this work)

– OR– Submit any LPA roadway work in the past five (5)

years that involved the establishment of road right of way and property lines (highlight this work)

• These plans will be taken into consideration

16

Page 17: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

Question and Answer Session

17

Page 18: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

David T. Dicke Real Estate AdministratorODOT D-2 Bowling Green

Bio: BS The Ohio State University Real Estate and Urban Development 1975. 30 years with ODOT

R/W appraisal/review, acquisition agent, project manager, project and plan compliance reviewer.

Licensed General appraiser, realtor, and consultant.

18

Page 19: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

My presentation will:

• Outline a brief history of Eminent Domain• Discuss the current E.D. issues• Relate those cases to ODOT and you• Identify why your role is so important• Identify those who depend on your work

19

Page 20: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

History-Real Estate and Eminent Domain

• Webster: The right of a government to take or control property for public use

• First Recorded Case - 871 B.C. Naboth’s vineyard• Early Colonies – trading with the Indians• American Revolution- army needing food and

shelter• State, County, highway programs up to the 1950’s• Eisenhower’s Federal Highway program 1953

20

Page 21: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

History of Federal Condemnation Law

• History of Federal Condemnation Law

leading to the current Uniform Act.– US Constitution Ratified: 1788– First 10 Amendments Passed: 1789

5th Amendment U.S. Constitution

“No person shall be held to answer for a capital, or otherwise infamous crime, …nor be deprived of life, liberty, or property, Without due process of law; nor shall private property be taken for public use without just compensation.”

21

Page 22: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

Federal Laws & Regulations

• Uniform Relocation Assistance & Real Property Acquisition Policies Act introduced in 1970 as a result of Hearings by Congressman Blatnick

• Brings uniformity to a series of fragmented laws on acquisition

• Stop abuse perpetuated by unscrupulous people and practices begun in development of interstate system

22

Page 23: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

Uniform Act passed by US Congress 1/2/71. The law is called the Uniform Relocation and Real Property Acquisition Policies Act.

Code of Federal Regulations 49 CFR 24. subpart B for Real Property Acquisition and Part C for General Relocation Requirements.

The codes amplify the Uniform Act and give more direction to an agency for carrying out the law.

State Governments must establish lead agencies. ORC 163.01 – 163.62 Ohio Administrative Code create

State law and policy. And the Governor named ODOT to be the lead agency.

Section 19, Article I, Ohio Constitution“…When taken … for the purpose of making or

repairing roads, which shall be open to the public, without charge, a compensation shall be made to the owner, in money…”

23

Page 24: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

Federal policy transfers monitoring and compliance responsibility to the State and thus to ODOT as Lead Agency.

ODOT has created a manual of the procedures to design for and to acquire right of way as the lead agency. This manual has been reviewed and approved by ODOT legal counsel and the Federal Highway administration. The manual is now the lead agency's official approved procedure. This manual is an ever changing document that must, by Federal policy and State law, be updated regularly.

This manual shall be followed by any agency, acquiring for highway purposes, having the power of eminent domain. Regardless of the funding source of the project. ODOT is convinced, based on the current laws and codes, that as lead agency, ODOT P&P must be followed.

Unless the acquiring agency has created their own procedure that has been approved by ODOT, and FHWA where federal funds are involved in any phase of the project.

24

Page 25: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

TodayLand acquisition by eminent domain is most often thought of in terms relating to highway projects.

However recent public forum trials have focused on its use for new development of private or semi

private commercial enterprise.

Kelo v. New London US Supreme Court rulingCity of Norwood v. Horney Ohio Supreme Court

seemingly opposing rulings on similar facts

25

Page 26: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

Kelo v. City of New London

26

Page 27: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

Kelo v. City of New London• Application to facts

– “City of New London is endeavoring to coordinate a variety of commercial, residential, and recreational uses of land, with the hope that they will form a whole greater than the sum of its parts.”

• Holding– “Given the comprehensive character of the plan, the

thorough deliberation that preceded its adoption, and the limited scope of our review…to resolve the challenges of the individual owners, not on a piecemeal basis, but rather in light of the entire plan. Because, that plan unquestionably serves a public purpose, the takings challenged here satisfy the public use requirement of the Fifth Amendment.”

27

Page 28: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

Kelo v. City of New London

“We emphasize that nothing in our opinion precludes any State from placing further restrictions on its exercise of the takings power.”

28

Page 29: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

Kennedy, concurring – “A court confronted with a plausible accusation of impermissible favoritism to private parties should treat the objection as a serious one and review the record to see if it has merit.”29

Page 30: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

“…the government's pursuit of a public purpose will often benefit individual private parties…We cannot say that public ownership is the sole method of promoting the public purposes of community redevelopment projects.” See, Midkiff, Monsanto, Berman 30

Page 31: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

In OHIOCity of Norwood v. Horney

• In 2002 the developer sought to redevelop 12 acre area of residential homes into retail stores and office space (i.e., “Rookwood Exchange”) adjacent to existing shopping, retail, and business center (i.e., Rookwood Commons, Rookwood Pavilion and Rookwood Tower); developer was successful in acquiring all but five properties

• Aug. 2003, City passed ordinance to appropriate remaining homes as area was “deteriorating” as term was defined within City Code

31

Page 32: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

City of Norwood v. Horney

32

Page 33: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

City of Norwood v. Horney

• “Although economic factors may be considered in determining whether private property may be appropriated, the fact that the appropriation would provide an economic benefit to the government and community, standing alone, does not satisfy the public-use requirement of Section 19, Article I of the Ohio Constitution.” Norwood v. Horney, 110 Ohio St.3d 353

But recall Kelo: “…the government's pursuit of a public purpose will often benefit individual private parties…We cannot say that public ownership is the sole method of promoting the public purposes of community redevelopment projects.” 33

Page 34: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

The outcome in Norwood

• Objecting home owners had moved out. The Gambles were the last to move on 2-2-05.

• As a result of the Ohio Supreme Court ruling, their keys were returned 7-2006

• 8-2008 Owners have sold all parcels to the developer for his plan at very high prices.

• Spring 2009 construction to begin

34

Page 35: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

The Power Of Eminent Domain Is Immense

• Agencies are often perceived as abusing their power when using it.

• There is a blatant public dislike of eminent domain evidenced by these recent high profile trials.

• Governmental Agencies Must:– Deal honestly and openly and follow procedures with

equality.

35

Page 36: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

Kelo v. City of New London

“We emphasize that nothing in our opinion precludes any State from placing further restrictions on its exercise of the takings power.” Justice Kennedy.

This statement has been the catalyst for states to examine their current policy and laws regarding the use of eminent domain on all levels.

Ohio Legislature created a Task Force to study the issues. From that SB7 was enacted 10-10-2007 changing ORC section 163.

36

Page 37: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

What does all this have to do with me and this class?

• A policy and procedure is in place for ODOT projects from inception to project completion. That policy continues to change and be updated as a result of various reasons.

• This P&P includes the preparation of r/w plans. • When r/w is needed your plan becomes the foundation to

which the acquisition process is built. Eminent domain may be used to conclude the process.

• The accuracy and considered concept of the plan is essential or the acquisition process may fail.

• As eminent domain remains a focal public issue the need for the accuracy of the plan and concept is amplified.

37

Page 38: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

Users of R/W Plans• Title Agents• Appraisers and Reviewers• Acquisition Agents• Relocation Agents• Property Owners• Attorneys• Surveyors

38

Page 39: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

Users of R/W Plans• Real Estate Agents• Future Right of Way Plan Designers• County Auditors• County Engineers• City Engineers/Service Directors• Assistant Attorney General Attorneys

39

Page 40: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

R/W parcel Costs Are Increasing!

• FY 2000 1843 Parcels; $65M = $ 35,270 / Each• FY 2005 637 Parcels; $61.6M = $120,465 / Each• FY 2006 1661 Parcels; $71.8M = $ 43,240 / Each

D-2 HEN/LUC 24estimate: 275 parcels: $33.5 M = $121,800 / EachFY 2007 1497 Parcels; $69.6M = $46,800/ EachFY 2008 1428 Parcels; $71.0M = $59,700/ Each

This doesn’t include labor, overhead, legal, env. test removal, razing which could add from 7K to 12K

Per parcel or another $10.0M to $17.0M per year.

40

Page 41: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

Other Data

• Appropriations– Prior to 1998 - 12% Appropriated, 2% to trial– To date up to 16% Appropriated, +/-3% to trial– Out Source acquired up to 20% Appropriated– Many LPA projects are managed by less experienced

staff which can lead to higher costs more appropriation cases and increased public mistrust.

41

Page 42: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

Why Are Costs So High?

• Projects in urban settings as we redesign old roads• Publicity of Kelo, Norwood and other E.D. cases • Sophisticated sellers / owners / lawyers• Sophisticated appraisals, noting negative effects• Property owners appraisers don’t always use the

same rules in preparing reports. And are not subject to review prior to becoming evidence.

• Zoning issues - Locals not as cooperative• Access management designed into plans• Mistrust of Government & Its Agents• Outsourced Projects - Profit Motive

42

Page 43: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

How To Reduce Costs

• Early Involvement of R/W Professionals – During conceptual design seek r/w input– Follow P&P Manual, get guidance on questions ASAP– Plan for avoidance-Consider in early budgets– Involve locals early Re: Restrictions

• Set Realistic Time Lines• Start Acquisition ASAP - IT TAKES TIME!

43

Page 44: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

WHY?

• Costs are staggering which is impacting ODOT’s budget and ability to deliver projects

• If we don’t, as leaders in the industry, Legislation and court rulings will change our process, increase costs, which reduces funds available to build improvements for the taxpayers we serve.

• $ for $ - Money saved on reducing the need for R/W acquisitions can be spent on more projects!

44

Page 45: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

How Do You Feel About Eminent Domain? “E.D and Me”

• Who’s bought real estate in the last 10 years• Who sold to State or other Government under the

threat of eminent domain?• ODOT-Buys like everyone else Except that as the seller you have no choice but to

sell.

Audience participation: Can you Relate?

45

Page 46: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

Who’s Bought that Favorite Car Maybe a Little Red Corvette!

46

Page 47: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

You cut the best deal, you drive it proudly. You park it and come back to find the window smashed, the stereo stolen or even worse someone has

“Keyed” the flawless paint.

Has this happened to you?

47

Page 48: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

What Happens When It Gets Keyed?

48

Page 49: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

What Happens When It Gets Keyed?

• Sets off emotions– Angry– Frustrated– Not happy with settlement

• Eminent Domain sets off similar emotions

49

Page 50: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

Your plan is the beginning of a complex processLets get it right for those who follow….Your plan may someday be a Supreme Court case.

50

Page 51: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

51

Page 52: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

Doug Raters, P.E. Real Estate AdministratorODOT D-8 Lebanon

1987 grad- Univ. of Cincinnati, BS- Civil Engineering1987-1988 EIT program- ODOT1990- Design Engineer in Dist.8 Real Estate Section1992- Became Registered Professional Engineer- State of Ohio 1997- Became District 8 Real Estate AdministratorFeb-2007: Completed 20th year with ODOT

52

Page 53: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

ODOT’s Project Development ProcessPDP

• Objectives• 3 Project Levels• Steps within the Levels• Corresponding Right of Way Activities

and Section 1400 Location and Design Manual

53

Page 54: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

Project Development Process

Objectives: • Increase communication among disciplines.• Systematic documentation to eliminate duplication of

efforts. • Early participation from all disciplines.• Better manage scope, schedule and budget.• Improve plan quality.

54

Page 55: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

PDP - Three Project Levels• Major Project Level - 14 Steps MIS, corridor type projects, complex design work,

large amounts of ROW, New highway on new location. (Typically EIS, EA or higher level CE projects.)

• Minor Project Level – 10 Steps Bridge replacements, resurfacing (with drainage),

and safety projects. Projects may include ROW, utility relocations. (Typically lower level CE’s.)

• Minimal Project Level – 5 Steps

(No Right of Way plans involved)(Exempt projects)

55

Page 56: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

(PDP Process Major Project)

56

Page 57: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

Section 1400 of L&D Manual

57

Page 58: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

PDP Steps/Section 1400 of L&D Manual

58

Page 59: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

PDP Steps/Section 1400 of L&D Manual

• Obtain survey data and aerial mapping• Develop new/existing alignments to

avoid/minimize red flags.• Research centerline of Right of Way

59

Page 60: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

PDP Steps/Section 1400 of L&D Manual

• Find existing centerline/R/W monuments• Establish centerline of ex. Right of Way• Evaluate access that may produce LL par.• Determine conceptual construction limits.• Obtain tax map/ownership data.• Determine types/existing R/W limits• Identify possible total takes and

relocations.

MAJOR

MINOR60

Page 61: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

PDP Steps/Section 1400 of L&D Manual

• Finalize construction limits.• Determine proposed R/W lines, easement

or deed, channel, temps, etc.• Contact property owners for UG items• Reevaluate total takes/relocations, etc.

MAJOR

MINOR

61

Page 62: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

PDP Steps/Section 1400 of L&D Manual

• Determine if MOT will require additional right of way.

• Identify removal items in prop. R/W.• Refine const. limits.• Conduct title and deed research.• Determine: property line locations,

proposed R/W lines, encroachments, and total take, commercial and residential relocations.

MAJOR

MINOR62

Page 63: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

PDP Steps/Section 1400 of L&D Manual

MAJOR

MINOR

63

Page 64: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

PDP Steps/Section 1400 of L&D Manual

MAJOR

MINOR 64

Page 65: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

Project Development Process—Scope of Services (SOS)

Pre-scope Meeting: • ODOT District meeting with all pertinent internal personnel.

• Specifically define project scope using PDP.

SOS Meeting:• Includes consultants and subs.• ALL ODOT disciplines.• Redefine project requirements to finalize scope.• Q & A and clarification.• Project Schedule.

65

Page 66: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

Sample Scope Document

(Major)

66

Page 67: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

Sample Scope Document

(Major)

67

Page 68: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

Sample Scope Document

(Major)

68

Page 69: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

Sample Scope Document (Major)

69

Page 70: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

Sample Scope document (Major)

70

Page 71: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

Sample Scope document (Major)

71

Page 72: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

Sample Scope Document

(Minor)

72

Page 73: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

Sample Scope Document (Minor)

73

Page 74: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

ODOT’s Project Development

Process

Right-of-Way issues not covered in the Manual

(highlighted in BLACK)

• RIGHT OF WAY ATTACHMENT

• EXTENT OF FIELD SURVEYS - ADDITIONAL REQUIREMENTS:• Right of way lines and property lines shall be located based on requirements

specified in Chapter 4733-37 of the Ohio Revised Administrative Code (Board Rules) governed by regulations outlined in Chapter 4733, Ohio Revised Code (Regulation Laws) and in accordance with any special requirements of the county(s) in which the project is located.

• All topographic features (refer to Section 3108.5, of the Real Estate Policies and Procedures Manual) within 100 feet either side of the proposed right of way shall be accurately located and identified.

• Underground facilities, to include, but not limited to, storage tanks, septic tanks/systems, leach beds, utilities, including service lines in accordance with Section 153.64 ORC) drain pipes and exposed field tiles shall be located and identified as to the size and type.

• The consultant shall complete and submit an RE-75 Utility Reporting Form to the District Production Administrator at the time of filing for LG & T approval.

• Special attention shall be given to any commercial/industrial property having underground storage tanks in current use or which may have previously utilized underground storage tanks, e.g. service stations, print shops, dry cleaners, etc., to identify any potential environmental concerns.

• The above described topographic features, utilities (See Utility Section, Scope of Services), underground facilities and special attention items shall be shown on the preliminary Right of Way plan submittal.

Included as an attachment to every scope involving R/W is the Right-of-way attachment.

74

Page 75: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

ODOT’s Project Development

Process

Right-of-Way issues not covered in the Manual

• If authorized, staking/flagging of the proposed permanent/temporary Right of Way for appraisal/negotiation shall be done by the Consultant upon the request and instruction of the District Real Estate Administrator. The Consultant will then have ten (10) working days after the request to perform the work and certify, in writing, the work complete to the District. When performing this work, the consultant shall set wood hubs and lathe stakes every 250 feet and/or change in direction in the proposed Right of Way, marked with permanent marker, by station and type (WD, Temp, CH, etc.) with separate color flagging for each type.

Included as an attachment to every scope involving R/W is the Right-of-way attachment.

75

Page 76: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

ODOT’s Project Development

Process

Right-of-Way issues not covered in the Manual

(highlighted in BLACK)

• The consultant shall utilize property ownership data for Right of Way plan development based on a search of county records (See Title Report) conducted no more than six (6) months prior to the preliminary Right of Way plan submittal. The Consultant shall submit copies to the District Real Estate Office of each property owner’s record deed transferring title to that owner with the preliminary Right of Way plan (Stage 2 Review). In cases where partial title interest is conveyed, copies of any supplemental documents required to delineate property lines and title shall also be submitted. A report, if needed, identifying any title defects encountered for the affected parcels should be included with the deed copies. This submittal should also include all applicable tax maps and Auditor cards.

• • In addition, no more than fifteen (15) days prior to submission of the final

Right of Way tracings, the property ownership data shall be checked and verified. Copies of the deeds for any new ownership transactions that impact the project shall be submitted to the District Real Estate Office. An in-depth field review of the project should also be conducted within this fifteen (15) day period to assure that no topographic features; structures and/or utilities have been changed or omitted. The Right of Way plan and descriptions should be revised to accurately reflect the above information. The submittal letter should contain the actual dates that the ownership data and topography were checked and verified.

• • The Consultant shall submit with the Final Right of Way review plan the

Coordinate Geometry Data for all alignment(s) points and parcel corner points in a comma delimitated ASCII file format (Pt. No., North, East) along with a copy of the plan with the point numbers identified to the location they represent.

• After ODOT’s review and approval, the Consultant shall be responsible for obtaining the final approval of the centerline survey plat from the appropriate County official(s). The Consultant shall then be responsible for recording the approved centerline plat (including providing the recording fee) in the appropriate County(s) office. The approval and recording shall take place before the submission of the final Right of Way tracings. The original recording plat must then be submitted to the District with the final R/W tracings.

Included as an attachment to every scope involving R/W is the Right-of-way attachment.

76

Page 77: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

John Messmore, P.S. ODOT District 4John has been with ODOT for 6 years and this is the 6th year as a presenter for the Right of Way Pre-Qualification course. John obtain a B.S. in Surveying and Mapping from the University of Akron in 1999. He started his own surveying firm in 2000 and has been a part-time instructor of the surveying courses at the University of Akron.

77

Page 78: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

Records Research - Section 3104

Existing Right of Way• History of Ohio Roads• County/Township Roads• Inter County Highways

(ICH)• State Highways

Deed Research/Investigation• OAC 4733-37• Misc. Public Records• Zoning Regulations

If Scoped – ODOT Title Report• What is it?• Who can prepare?• Who benefits?• Are there limitations?

78

Page 79: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

• Establishing Existing Road Right of Way History of Ohio Roads

• Establishment Board of County Commissioners Statutory Dedication Common-Law Dedication Statutory Appropriation – Eminent Domain Prescriptive Easement – Similar to Adverse Possession

(only easement rights pass)

County and Township Roads Early Procedure for Road Establishment

• Land Holders Petition the County Commissioners• County Commissioners made order for laying out road

Currently governed by ORC 5533

79

Page 80: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

GENERAL LAWS OF THE STATE OF OHIO RELATING TO THE WIDTH OF COUNTY ROADS

Vol. II, page 210

It shall be the duty of said Commissioner to order the said road to be opened a necessary width, not exceeding sixty-six feet, and made in respects convenient for the passage of travelers and cause a record therefore to be made which thenceforth shall be deemed a public road. February 17, 1804

Vol. XIV, page 226

They (the Commissioners) shall order such road to be opened a necessary which not exceeding sixty feet and made in other respects convenient for the passage of travelers and carriages and cause a record thereof to be made, which road thenceforth shall be deemed a public highway. February 16, 1816

See Appendix C in the Manual for a complete list

80

Page 81: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

• History of Ohio Roads (Continued) Special circumstances to be aware of

• Roads were often built in sections rather than their entire length as might be indicated today (possibly creating different R/W widths)

• Road names change• County Commissioners have the legal authority to change, alter

and vacate roads• Roads relocated but R/W never vacated

81

Page 82: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

• History of Ohio Roads (Continued) Inter County Highway System (I.C.H.)

• The Department of Highways was created in 1904, later became Ohio Department of Transportation.

Object and purpose of the Department was to instruct, assist and co-operate in the building and improvement of PUBLIC ROADS. State Routes as we know them did not exist at this time

• In 1911 the State legislature created the Inter County Highway System(I.C.H.)

All counties were required to create accurate roadway maps Maps were submitted to the State Highway Commissioner Highway Commissioner selected county roads that connected

to adjoining county roads to create “as near as practicable continuous” Inter County Highway System

82

Page 83: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

• History of Ohio Roads (Continued) Inter County Highway System (I.C.H.)

• Counties made improvements to the roads selected by the Highway Commissioner under the supervision of the Department of Highways

• State paid Counties for improvements, then took over maintenance and Right of Way of former County Roads

• County Commissioners certified to the State the width of the Right of Way. This information is usually on the cover sheet for the I.C.H. plans

• Some County Commissioners’ Journals will contain information from public meetings concerning I.C.H. Routes and the Right of Way obtained or verified by the County Surveyor/Engineer

83

Page 84: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

We the commissioners of Wayne County hereby approve these plans and certify that the right-of-way 60 feet wide is available for the construction of the above road.

84

Page 85: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

• History of Ohio Roads (Continued) Other sources for establishing existing R/W limits and

widths• Existing Right of Way Plan (the latest) (may be a combination of

several plans)• Old Construction Plans (1940’s and earlier) R/W in plan• Online Plats

85

Page 86: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

86

Page 87: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

87

Page 88: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

88

Page 89: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

BRO-62-31.64(M) Year 2000

89

Page 90: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

BRO-62-31.64(M) Year 2000

Area of S.R 62 from 1926 Plans

90

Page 91: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

• Deed Research/Investigation

OAC 4733-37• Current Ownership Deeds

Check for full ownership, possibly more than one owner Quit Claim Deeds Court Documents / Clerk of Courts

• Recorded Easements Oil, Gas and Coal rights Utilities rights Ingress and Egress rights

91

Page 92: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

• Deed Research/Investigation (Continued)

Misc. Public Records Government Surveys Private surveys Recorded Subdivisions Tax Maps, Auditors Parcel Numbers Health Department (Septic Systems and Wells) ODNR Oil and Gas Well Logs

92

Page 93: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

• Deed Research/Investigation (Continued)

Zoning Information• Local or County Zoning Boards

Zoning Classification Set Back Information

• Some deeds may also contain restrictions on the property they describe

• Recorded Subdivision Plats often have restriction on the plat or recorded as a separate document

• Condominium and/or home owner associations restrictions

93

Page 94: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

ODOT Title Reports• What is it?

• The ODOT title report provides evidence supporting the ownership of the legal description being acquired for the highway project. This evidence is assembled in a title report and the documentation supporting this evidence is attached to the title report.

• The evidence supporting the interrelationship of ownership and legal description is inserted into the Title Report [form RE 46] and the Title Chain [form RE 46-1]. Also attached to these forms is the appropriate documentation (mortgages, easements, taxes, leases, mineral rights, liens and encumbrances) that supports what was stated by the title agent in the Title Report and Title Chain.

94

Page 95: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

ODOT Title Reports (Continued)• Who Can Prepare?

Consultants performing any type of title function must be pre qualified with the Ohio Department of Transportation:

Go to: http://www.dot.state.oh.us/real/http://www.dot.state.oh.us/real/

R/W Consultant Services List of Pre Qualified Consultants

• Title Reports must meet the requirements of Section 5100 of ODOT’s Real Estate Manual.

95

Page 96: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

ODOT Title Reports (Continued)

• What Are The Benefits? Accurate and updated ownership names. Verification of recorded easements, their location and

effect on taking. Saves time at the beginning of acquisition process.

96

Page 97: Welcome to the Right of Way Plan Development Pre-Qualification Training 1

Ohio Depar t ment of Tr anspor t at ion – R/W P l an Devel opment

ODOT Title Reports (Continued)

• What Are The Limitations? Root title (42 year) may not satisfy OAC 4733-37 Title for taking (parcel) only. May not include entire

contiguous ownership. Permanent parcel number(s) given for takings (parcels)

only. No determination if auditor’s area excludes P.R.O. Unrecorded easements not determined. Plat restrictions not identified.

97