welcome to hussain mohd. abbas block factory - automatic … · 2019. 12. 15. · ___ pijtwks[ kwu...

36

Upload: others

Post on 15-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

CONCRETE BLOCKS & PAVING TILESwww.hablocks.com

Page 2: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

SINCE 40 YEARS SERVING THE CONSTRUCTION INDUSTRY

www.hablocks.com 02

Page 3: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

Introduction ................................................

Chairman’s message ...............................

Organizational Chart ...............................

Quality Policy ............................................

Quality Control ..........................................

Trade License & Certificates ................

Appreciation & DCLD CeAppreciation & DCLD Certificates .......

Production Process .................................

Pictograms ..................................................

Concrete Blocks (Light weight) .............

Concrete Blocks (Normal weight) ........

Thermal Insulated (Dubai Municipality) .....

Thermal Insulated (ESTIDAMA) ...................

Kerbstones, Heel Kerbs & Wheel Stopper ..............................................

Interlocks-range ..............................................

Project Gallery ..................................................

Major Projects - Dubai Major Projects - Dubai ...................................

Major Projects - Abudhabi ............................

Major Projects - Other Emirates .................

Pavers - Installation Methodology .............

Location Map .....................................................

TABLE OF CONTENTS

05

06

07

08

09

10

11

12 - 13

14

15

16

21 - 25

26 - 29

30 - 31

32

33

34

35

17

18

19

Page 4: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

FULLY AUTOMATIC PLANTCONCRETE BLOCKS & PAVING TILES

www.hablocks.com 04

Page 5: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

Introductionwww.hablocks.com 05

INTRODUCTION

HUSSAIN MOHAMMED ABBAS BLOCK FACTORY LLC, established since 1976 are pioneers in the concrete block industry the foundation stone dates back before 40 years where an enterprise started in the midst of Al Qouz industrial area with manual block plants by egg laying method/process utilizing. Since its foray into the market the factory has grown along with the pace of advancement in thethe block making process swiftly and anchored its position in the Emirate of Dubai as a leading block manufacturer. With all its efforts of value engineering, cost effective solutions it emerged and sustained the construction market jerks thereby getting steered swiftly and remained sustained in the competitive market thereby catering and contributing to the construction market requirements and alsoalso towards infrastructure development of Emirate of Dubai and the whole of UAE.

Product Confidence, trust and world class performance:Being an ISO 9001: 2008 certified company there are well analyzed processes to carryout production of high quality products. We have state of the art manufacturing plants (Automated) imported from Germany. Our products meet all international standards with BS, ASTM and comply with Dubai Municipality standards, Estidama (Abu Dhabi) and green buildings.BeingBeing one of the oldest and trusted name in the industry our products have gained confidence and utmost trust from various spectrum of construction needs be it villa owners for paving/hollow block requirements, reputed contractors, design consultants for thermal and customized light weight blocks, and the list goes on.

Milestone:OnOn May 2013 Factory got awarded from Dubai Municipality where it migrated successfully from conventional block certification system to achieve the Factory Assessment certification system. Since 2013 the certification has been demonstrated by the factory teamwork backed by the management thereby complying with annual audits conducted by Dubai Central Laboratory.

Our Vision:Our Vision: To be the most trusted partner.

Our Mission: To maximize our stake holding in the related industry.

Page 6: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

Chairman’s Messagewww.hablocks.com 06

CHAIRMAN’S MESSAGE

The United Arab Emirates has become a true international example for the tremendous strides it has taken in it’s ongoing development. The growth witnessed is unprecedented in the region, and perhaps all over the world.

As a leading Block manufacturing company in UAE and since its naissance in 1976, Hussain Mohd.Abbas Block Factory has always been a key contributor to UAE construction sector. It proudly associates itself with prestigious and landmark projects in the UAE.

WeWe are committed to having a good partnership, transparency and reliability with our clients. Our clients are fully aware that we have the skills, resources and expertise, and most importantly, the ability to complete their projects to the highest standards on time.

Health,Health, Safety, Quality and the Environment are among the most important concerns of our company and we follow strict safety regimes as well as quality procedures and strives to continuously improve its performance. We at Hussain Mohd.Abbas Block Factory take pride in our achievements which we attribute to the dedication of our staff, whose exceptional skills and expertise are the key value of our company’s success. Thanks to our loyal team of workers & professionals, we have succeeded in proving that we can deliver on our promises, we can rise to the challenge and excel in our performance to the satisfaction of our clients.

ItIt has been a very challenging journey from the start of our company in 1976 until today. Our major challenge today is to sustain the growth we generated till date. We are proud of our past and we have an active present and we look forward to a promising future.

Hussain Mohd. AbbasChairman

Page 7: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

Organizational Chartwww.hablocks.com 07

ORGANIZATIONAL CHART

Page 8: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

www.hablocks.com 08

Hussain Mohammed Abbas Block Factory is committed to manufacture high quality of concrete products efficiently and competitively.

We are committed to comply with all regulatory and statutory requirements and develop employees to utilize capabilities to the full extent by fostering a spirit of innovation with empowerment.

HMA is committed to continual improvement in all aspects of Quality Management Systems to provide a product assurance backed by quality standards at each step in order to achieve customer satisfaction and keep up with our long years of trust and confidence.

The system of measuring the effectiveness of the Quality Management System thru internal audit is being implemented.

Regular Management Review Meeting (MRM) is being conducted to ensure the effectiveness of the factory’s Quality Management System.

There is a system in place to identify the root cause and provision of corrective and preventive actions (CAPA), whenever there is deviation from our set quality objectives.

Page 9: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

www.hablocks.com 09

RAW MATERIAL CONTROL Aggregates Routine material checks are carried out by physical inspection as well as by sieve analysis of all aggregates. Once in every three months, material samples are sent to independent laboratories for sieve analysis (grading), salt content, sulphate, chlorides and specific gravity tests.

MANUFACTURING PROCESS TheThe Manufacturing process is carried by using state of the art German machines to ensure high quality of products are produced at a high output rate and the entire process is minutely controlled in the central control room, 24x7, process checks as below.

Constant monitoring moisture content in mix.

Monitoring Texture, dimension & heights.

Monitoring Curing time.

Routine plant checks as per machine manuals.

Regular maintenance with qualified technicians. Regular maintenance with qualified technicians.

Monitoring wet weights.

CURING METHODOLOGY Our Blocks & Pavers are cured by using the state-of-the art hydration heat and vapor curing system, allowing blocks to cure in their moisture.

ThisThis unique system, unlike conventional steam curing, allows the factory to produce blocks of higher strength and at substantial faster production speeds. The curing chambers are purpose built to account for the heat transfer to concrete elements by maintaining the required humidity. The curing systems allow the plant to run in a closed loop. Moisture curing commences immediately after a chamber is filled totally with the wet product; and de polarizing of the sealed chambers cannot be open prematurely thus preventing the product to be removed before its curing time. The system is pre-programmed to ensure that chambers are opened at the exact pre specified timetime (usually after 8 hours) when product is cured to the prerequisite period. The products once removed from the curing chambers is kept in the yard for natural curing for roughly 48 hours, to gain optimum curing levels.

FINISHED PRODUCT CHECKS Finished products are tested in internal laboratory on a daily basis to comply with BS, ASTM, DM and ESTIDAMA (Abudhabi) standards.

Cement :

Water :

Pigments :

Calibration of weighing scale :

Mandatory submission of test certificates by the supplier against each delivery coming from cement factory.

Water analysis tests carried out every three months, which is sourced from DEWA.

Company relies on technical data provided by supplier, and in compliance with BS1014-1975 (1986) Standards.

The process of weighing scale calibration is done by Third party accredited with Dubai Municipality.

Page 10: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

Trade License & Certificateswww.hablocks.com 10

TRADE LICENSE & CERTIFICATES

Page 11: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

Appreciation & DCLD Certificateswww.hablocks.com 11

APPRECIATION & DCLD CERTIFICATES

Page 12: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

Production Processwww.hablocks.com 12

PRODUCTION PROCESS

Page 13: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

Production Processwww.hablocks.com 13

Page 14: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

Pictogramswww.hablocks.com 14

PICTOGRAMS

Interlocking Segmental pavers with spacer nibs to ensure that each paving stone cannot move independently when laid. This feature enables the pavers to resist sheer and transverse loads.

Plain Smooth The feature on this texture is smooth with the use of fine special aggregates presenting The feature on this texture is smooth with the use of fine special aggregates presenting aesthetic smooth appearance as also softer for pedestrians with less abrasion.

Plain Granular The granular look presents a more natural finish with the selection of graded granular aggregates with a rough surface texture .The antiskid pavers with excellent abrasion properties are ideal for driveways.

Exposed Surface TheThe process by which fine graded aggregates are used and surface etched under high pressure to present a texture of Mother Nature in all its splendor in colors most naturally on the face surface.

Fire Resistance Primarily stands for the duration for which masonry blocks resist to fire as per specifications. The inherent thermal mass acts as a heat storage. Fire rating is turning to be a mandatory requirement.

Sound ResistSound ResistancePrimarily deals with the values concerned with sound insulation in order to provide reasonable resistance to sound waves and less transmission of noise and acoustic performance.

UV ResistancePrimarily deals with Ultra violet rays' and its resistance in masonry blocks to partially block such rays which are harmful and can cause damage to health.

Page 15: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

Concrete blocks - Light weightwww.hablocks.com 15

MASONRY CONCRETE BLOCKS - LIGHT WEIGHT

400X300X200

400X250X200

400X200X200

400X150X200

400X100X200

390X190X190

390X140X190390X140X190

390X90X190

16-20

14-19

12-15

09-12

07-09

12-14

09-1209-12

07-09

666-833

700-950

750-937

750-1000

875-1125

852-995

867-1156867-1156

1050-1350

LH30

LH25

LH20

LH15

LH10

LH19

LH14LH14

LH09

SIZE(mm)(LXWXH)

WEIGHT(KG)

DENSITY(KG/m3)** CODE

HOLLOW BLOCKS

400X300X200

400X250X200

400X200X200

400X150X200

400X100X200

390X190X190

390X140X190390X140X190

390X90X190

31-39

22-32

18-25

15-17

11-13

18-20

15-1715-17

11-13

1291-1625

1100-1600

1125-1562

1250-1416

1375-1625

1278-1420

1445-16381445-1638

1650-1950

LS30

LS25

LS20

LS15

LS10

LS19

LS14LS14

LS09

SOLID BLOCKS

420/380X150X200

420/380X180X200

420/380X200X200

420/380X250X200

420/380X300X200

420/380X350X200

07-09

07-09

08-10

10-12

12-15

14-16

583-750

486-625

500-625

500-700

500-625

500-572

LF15

LF18

LF20

LF25

LF30

LF35

HOURDI BLOCKS

“U” BLOCKS

400X200X200 12-14 750-875 LU20

Compressive Strength - 3.2 N/mm2

Compressive Strength - 3.2 N/mm2 and 5 N/mm2

Compressive Strength - 5 N/mm2

Compressive Strength - 3.2 N/mm2

*The above weight and densities are taken on an average basis.*As per consultant requirements, sizes and densities can be customized to suit project requirements.

LH - Light Weight Hollow Blocks LS - Light Weight Solid Block

LF – Light Weight Filler Block LU – Light Weight ‘U’ Block

Page 16: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

Concrete blocks - Normal weightwww.hablocks.com 16

MASONRY CONCRETE BLOCKS - NORMAL WEIGHT

400X300X200

400X250X200

400X200X200

400X150X200

400X100X200

390X190X190

390X140X190390X140X190

390X90X190

34

28

23

19

14

22

1818

13

1416

1400

1437

1584

1750

1562

17351735

1950

HB30

HB25

HB20

HB15

HB10

HB19

HB14HB14

HB09

SIZE(mm)(LXWXH)

WEIGHT(KG)

DENSITY(KG/m3)** CODE

HOLLOW BLOCKS

400X300X200

400X250X200

400X200X200

400X150X200

400X100X200

390X190X190

390X140X190390X140X190

390X90X190

54

45

36

27

18

32

2222

15

2250

2250

2250

2250

2250

2272

21202120

2250

SB30

SB25

SB20

SB15

SB10

SB19

SB14SB14

SB09

SOLID BLOCKS

420/380X150X200

420/380X180X200

420/380X200X200

420/380X250X200

420/380X300X200

420/380X350X200

14

16

19

22

25

29

1166

1111

1187

1100

1041

1035

FB15

FB18

FB20

FB25

FB30

FB35

HOURDI BLOCKS

“U” BLOCKS

400X200X200 23 1437 U200

Compressive Strength - 7.5 N/mm2 and 12.5 N/mm2

Compressive Strength - 12.5 N/mm2

Compressive Strength - 5 N/mm2

Compressive Strength - 7.5 N/mm2

HB - Hollow SB - Solid Block FB - Filler Block

Page 17: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

Thermal Insulated (Sandwich)www.hablocks.com 17

THERMAL INSULATED (SANDWICH)DUBAI MUNICIPALITY

NORMAL WEIGHT BLOCKS TECHNICAL PROPERTIES

BLOCK SIZE (mm) (LXWXH)

WEIGHT OF THE BLOCK (KG)

OVEN DRIED BLOCK DENSITY (KG/m3)

U-VALUE (WATT/M2 OK)

POLYSTYRENE THICKNESS (mm)

POLYSTYRENE DENSITY (KG/m3)

POLYSTYRENE TYPE POLYSTYRENE TYPE

NO. OF BLOCKS PER m2

AVG. COMP. STR.(N/mm2)

400 x 150 x 200

17

1416

0.52

60

25

Expanded / Extruded Expanded / Extruded

12.5

7.5

400 x 250 x 200

27

1350

0.49

60

400 x 300 x 200

33

1375

0.486

60

400 x 350 x 200

36

1286

0.48

75

LIGHT WEIGHT BLOCKS TECHNICAL PROPERTIES

BLOCK SIZE (mm) (LXWXH)

WEIGHT OF THE BLOCK (KG)

OVEN DRIED BLOCK DENSITY (KG/m3)

U-VALUE (WATT/m2 OK)

POLYSTYRENE THICKNESS (mm)

POLYSTYRENE DENSITY (KG/m3)

POLYSTYRENE TYPE POLYSTYRENE TYPE

NO. OF BLOCKS PER m2

AVG. COMP. STR.(N/mm2)

400 x 200 x 200

12 - 15

750 - 938

0.48

60

25

Expanded / Extruded Expanded / Extruded

12.5

3.2

400 x 250 x 200

16 - 21

800 - 1050

0.46

60

400 x 200 x 200

22

1375

0.5

60

400 x 300 x 200

15 - 19

625 - 792

0.42

60

400 x 350 x 200

19 - 22

678 - 785

0.40

75

Page 18: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

Thermal Insulated (Sandwich)www.hablocks.com 18

THERMAL INSULATED (SANDWICH)ESTIDAMA - APPROVED SUPPLIER FROM URBAN PLANNING COUNCIL - ABUDHABI

NORMAL WEIGHT BLOCKS TECHNICAL PROPERTIES

BLOCK SIZE (mm) (LXWXH)

WEIGHT OF THE BLOCK (KG)

OVEN DRIED BLOCK DENSITY (KG/m3)

U-VALUE (WATT/M2 OK)

POLYSTYRENE THICKNESS (mm)

POLYSTYRENE DENSITY (KG/m3)

THERMAL CONDUCTIVITY OF POLYSTYRENETHERMAL CONDUCTIVITY OF POLYSTYRENE

POLYSTYRENE TYPE

NO. OF BLOCKS PER m2

AVG. COMP. STR.(N/mm2)

400 x 200 x 200

22

1375

0.5

60

27 - 30 ( Min - Max)

0.0357 Wa0.0357 Watt / m2 k

Expanded

12.5

7.5

400 x 250 x 200

23

1150

0.3

110

400 x 300 x 200

23

958

0.210

160

LIGHT WEIGHT BLOCKS TECHNICAL PROPERTIES

BLOCK SIZE (mm) (LXWXH)

WEIGHT OF THE BLOCK (KG)

OVEN DRIED BLOCK DENSITY (KG/m3)

U-VALUE (WATT/m2 OK)

POLYSTYRENE THICKNESS (mm)

POLYSTYRENE DENSITY (KG/m3)

THERMAL CONDUCTIVITY OF POLYSTYRENETHERMAL CONDUCTIVITY OF POLYSTYRENE

POLYSTYRENE TYPE

NO. OF BLOCKS PER m2

AVG. COMP. STR.(N/mm2)

400 x 200 x 200

12 - 15

750 - 938

0.48

60

27 - 30 ( Min - Max)

0.0357 Wa0.0357 Watt / m2 k

Expanded

12.5

3.2

400 x 250 x 200

16 - 21

800 - 1050

0.27

110

400 x 300 x 200

15 - 19

625 - 792

0.19

160

Page 19: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

Kerbstones - Heel Kerbs & Wheel Stopperwww.hablocks.com 19

KERBSTONES, HEEL KERBS & WHEEL STOPPER

Page 20: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

QUALITY CONCRETE BLOCKS& PAVING TILES

www.hablocks.com 20

Page 21: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

Interlocks-range...www.hablocks.com 21

INTERLOCKS-range...

RECTANGULAR

Page 22: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

Interlocks-range...www.hablocks.com 22

INTERLOCKS-range...

UNI BLOCK

SQUARE

Page 23: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

Interlocks-range...www.hablocks.com 23

INTERLOCKS-range...BEHATON

Page 24: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

Interlocks-range...www.hablocks.com 24

INTERLOCKS-range...MONACO

TEGULA PLUS

Page 25: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

Interlocks-range...www.hablocks.com 25

INTERLOCKS-range...AVENUE

LA PLAZA

Page 26: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

Project Gallerywww.hablocks.com 26

02

03

04

Page 27: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

Project Gallerywww.hablocks.com 27

01. NAKHEEL MALL-PALM JUMEIRAH

02. VILLAS AT JUMEIRAH VILLAGE

03. BLUE WATER ISLAND WHARF RETAIL

04. KHALIFA PORT

05. VILLAS AT TECOM INVESTMENTS

06. ADNOC HEADQUARTERS

PROJECT GALLERY

01

05 06

Page 28: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

Project Gallerywww.hablocks.com 28

01

02 03

Page 29: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

Project Gallerywww.hablocks.com 29

04

05

06

01. GEMS INTERNATIONAL SCHOOL

02. MADINAT JUMEIRAH

03. BVLGARI HOTEL & RESIDENCE, DUBAI

04. JUMEIRAH BEACH RESIDENCE

05. SOFITEL HOTEL

06. MAFRAQ HOSPITAL

Page 30: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

Major Projects Dubaiwww.hablocks.com 30

MAJOR PROJECTS - DUBAI

PROJECT CLIENT / CONSULTANT CONTRACTOR

Nakheel Mall-Palm Jumeriah

Al Maktoum International Airport, Passenger Terminal Building

Blue Water Island Wharf Retail

Bvlgari Hotel & Residence, Dubai

Clubhouse At AKOYA by DAMAC

Daman Project, at DIFC. Daman Project, at DIFC.

164 Villas at TECOM investment

The City Hospital Dubai Healthcare City

DWC, Multi-Tenant Facility, (Aero Space Supply Chain)

DEWA MMD Power Station, Jebel Ali

PJ – 4016/2 - Addition To Dubai Special SpoDubai Special Sports Club

Al Tadawi Hospital, Al Garhoud Dubai

Hatta Community Center

Employees Facility Building At Transportation Department, Um Ramool

DB-81-1190 Residential & Commercial Bldg, Plot No. 346-707 Business Bay

Gems Wellington Academy Gems Wellington Academy Al Khail Phase 3 Dubai

Al Maktoum Hospital Redevelopment Project

Lincoln Academy-Al Barsha-2

RSP Architects Interior Design

DAEP/ Dar Al Handasah

MERAAS / MIRAGE/ WSP

Meraas Development L.L.C/ WSP

DEC Dynamic Engineering ConsultantsEngineering Consultants

Arif & Bintoak

Khatib & Alami

Cansult Limited

Global Engineering Consultant

Al Turath Consultant

Dubai MunicipaliDubai Municipality/ Gulf Engineering

Al Tadawi/ Shandagha Architects & Engineering

Dubai Municipality

DM New Arch Eng

Al Ajmi Engineering Al Ajmi Engineering Consultants

National Engineering Bureau

Al Wasl/ Kling Consultant

Al Burj Eng. Consultant

UNEC/ACTCO

ALEC

ALEC

ALEC

Seidco Gen. Contracting Co LLC

Oger Dubai I Habtoor leighton

Condor Construction CoCondor Construction Co

Al Ahamadia Aktor LLC.

City Diamond Contracting L.L.C

Gulf Turrets Llc

Zahrat Al Safa Contracting LLC

Zahrat Al Safa Contracting LLC

Zahrat Al Safa Contracting LLC

Topline Gulf ContTopline Gulf Contracting LLC

UNEC

Chicago Maint. & Const. Co.LLC

Shapoorji Pallonji Mideast LLC

Chicago Maint. & Const. Co.LLC

Page 31: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

Major Projects Dubaiwww.hablocks.com 31

MAJOR PROJECTS - DUBAI

PROJECT CLIENT / CONSULTANT CONTRACTOR

10 Villas at At Al Jumeirah For M/S Sharaf Investment

Emirates Honing Oil Field Steel Factory, Dubai Industrial City

The One Hotel, Jumeriah Vilalge Circle

Gems International School –Ph2 Al Khail Dubai Ph2 Al Khail Dubai

Arabian Ranches, Phase 4A&4B Neighborhood Town Houses, 638 Villas

DSO Villa Complex Phase 1

3b+G+5+Roof Commercial Building, Plot No: A-013-006, Media City

P481 FZ- South G+6 Staff AP481 FZ- South G+6 Staff Accommodation PHASE 1 plot No. S 21102.

Anantara Palm Jumeirah & Tiara Residences

Dragon Mart Hotel.

Gulf Community Villas, Akoya By Damac

Jewel Of The Creek Development

G+M Labour AG+M Labour Accommodation DIP Dubai for Hotpack Packaging

Dubai Abattoir Al Quoz

32 Villa- At Hatta

AKOYA (G+7) Buildings

Al Farren & Partners

Capital Engineering Consultancy

First Homes Ltd / Norr Architechts And Eng.

National Engineering National Engineering Bureau

Arenco

Arenco

CV Tec Consulting Engineers

Bel — Yoahah

Dar Al Handasah Dar Al Handasah

Dar Al Handasah

AECOM

Kling Consult Gmbh

Chawla Architectural & Consulting Engineers

Arch Dome

Dubai MunicipaliDubai Municipality

AECOM Middle East Limited

Khoory-Hill Building & Contracting LLC

Al Shamandy Construction L.L.C.

China Railway 18th Bureau Group LLC

Chicago Maint. & Const. Co. LLC

Arabtec

AArabtec

City Creek Construction LLC

Al Sahel Contracting Co.

Arabtec

Kele Contracting

Trojan Gen. Contracting LLC

Habtoor Leighton Group

Al Faisaliyah ContAl Faisaliyah Contracting LLC

Al Turath Al Aseel ContractingAnd Elec. Mech L.L.C

Al Turath Al Aseel ContractingAnd Elec. Mech L.L.C

Seidco Gen. Contracting Co LLC

Page 32: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

Major Projects Abu dhabiwww.hablocks.com 32

MAJOR PROJECTS - ABU DHABI

PROJECT CLIENT / CONSULTANT CONTRACTOR

Al Maryah Central, Abu Dhabi

Yas Island Zone K, Abu Dhabi

Shah Gas Development Program.

ADNOC New Corporate HQ

Abu Dhabi Future Schools

Ruwais 4th NGL Train

Ruwais Housing Complex Expansion Ruwais Housing Complex Expansion Phase Ill BACHELOR FLATS-PACKAGE 13.

ADNOC New Corporate HQ Underground Car Park

Const of PI Staff Accommodation Al Maqta Bridge Area - Project N05998.

Ruwais Housing Complex RHC Design & Ruwais Housing Complex RHC Design & Build of Accommodation Units at Ruwais

Innovation Centre for Borouge.

Construction of 785 villas Ghayathi City

Zayed University Campus.

Southern Sun Hotel.

Construction of Palace at Ruwais Complex. at Ruwais Complex.

St.Regis Hotels & Resorts.

Al Mafraq Hospital, Abu Dhabi.

RT3-C13, AI Reem Island.

AD018101 ADNIC

AECOM

W.S. ATKINS

ADGAS

ADNOC

Dewan Architects &Engineers

GASCO GASCO

ADNOC

ADNOC

ADNOC

ADNOC

ADNOC

Musanada

Aecom Aecom

Aedas

Arch Group

Aurecon

Burt Hill

Chan & Rakan - Rakan

Dar Al Handasah.

Brookfield Multiplex Constructions L.L.C

Trojan Gen. Contracting LLC

Ascon.

Six Construct

Al Faraa Group

Petrofac - ACC JV Petrofac - ACC JV

AL Jaber Building LLC.

Arabtec

SK Engg & Cont Co.

System Construct

Ascon.

Dhabi Contracting

Habtoor MurHabtoor Murray Roberts.

China State Constr. Engg. Corp.

Ascon

Habtoor Murray Roberts

Habtoor Murray Roberts

SK Engg & Cont Co,

Al Faraa Group

Page 33: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

Major Projects - Other Emirateswww.hablocks.com 33

MAJOR PROJECTS - ABU DHABI

PROJECT CLIENT / CONSULTANT CONTRACTOR

62 Villas At Al Barshi, Sharjah

CMW Military Project at Maliha, Sharjah

Rashid Al Owais Engineering Consultants

Commander Of Military Works

Intermass Engineering & Contracting Co.

Intermass Engineering & Contracting Co.

SHARJAH

PROJECT CLIENT / CONSULTANT CONTRACTOR

Al Ain Technical School, Al Ain General Contracting Shapoorji Pallonji Mideast LLC

AL AIN

PROJECT CLIENT / CONSULTANT CONTRACTOR

Premier Inn, Capital Center, Abu Dhabi.

Premier Intl Hotel (PLOT P6-C1) Abu Dhabi International Airport.

Low Cost Houses at Sila & Gayathi

Watani Residential Development

Abu Dhabi Golf Club Resort Hotel

Eastern Mangrooves Eastern Mangrooves

Arzanah Medical Complex

Khalifa Port & Industrial Zone

Telecommunication Regulatory Authority Office Building

Al Gharbia Hospitals

Al Ain Convention Centre (Wedding Hall)

Dewan Architects & Engineers.

Dewan Architects & Engineers.

Euro Studios

Evan Architects

Grec Architects LLC.

Hyder Consulting Hyder Consulting

HDP ( Overseas ) Ltd.

International BECHTEL CO.

Kling Consultant.

Seha - WMR Projects

Shankland Cox.

Al Mazrouei Bowyer Building LLC. (AMBB)

Bam International

Ascon

CGC Cont Co.

Brookfield Multiplex

Brookfield MultiplexBrookfield Multiplex

Habtoor Leighton

Hyundai / Ed Zublin

Parkway International Cont.

Ascon

Al Faraa Group

Page 34: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

Pavers - Installation Methodologywww.hablocks.com 34

PAVERS - INSTALLATION METHODOLOGY

Prepare level and compact soil to receive base material

Lay sub-base material, level and compact

Lay 50mm sand bedding over base

Lay paving block to selected pattern over sand bedding

Compact paving block using plate compactor.

SpreadSpread dune sand over paving blocks and then compact with plate compactor

Brush the extra sand and clean surfaces

All procedures to be adopted as per project specifications and under supervision and consultation with concerned Engineers and Consultants

DISCLAIMER

COLOUR: Due to the phenomenon of different curing, slight colour and shade variations may occur in individual coloured concrete products. Site conditions, seasonal manufacture or naturally occurring variations in the aggregates used, can also cause variations. This is generally considered to enhance the natural stone effect and the colours will invariably weather in time.

EFFLORESCENCE: All concrete products may undergo the temporary phenomenon of efflorescence. This is not detrimental to the product performance in any way and HMA Blocks cannot be held accountable for its occurrence. This will generally stabilize over a period of time.

ORDERING:ORDERING: In this context it is suggested during laying the pavers, the tiles to be ordered as a total batch and drawn from several bundles at the same time to avoid any colour variation. Choice of colours should be made from actual material rather than the colour photographs herein.

WEATHERING: Just as a natural stone, the appearance of concrete products will weather and change, especially after a period of time exposed to the environmental elements.

SHRINKAGE:SHRINKAGE: Hussain Mohd Abbas Block Factory pavers are manufactured to capture the authenticity of natural stone and as such fissures may occur on larger individual tile as an effect of natural shrinkage. This does not alter the product durability.

LIABILITY:LIABILITY: Liability in respect of any statements, conditions, warranties and representations made on behalf of Hussain Mohd Abbas Block Factory cannot accept any responsibility for any loss, damage or injury sustained as a result of following it. We will not take any responsibility or liability in respect of products being used for any purposes other than those for which they were intended for by the manufacturers. Due to our continuous evolution of product design and improvement, our range is subject to change without prior notice. Customers should check whether information is up to date.

NOTE:NOTE: Should a product reach you in an unsatisfactory condition, and other than a naturally occurring one as described above, the defect would have to be apparent prior to laying. Any deviations and defects to be informed and notified to the supplier, allowing time for the rejected product to be replaced. lfthe complaint is raised after laying the product, no responsibility will be accepted for any relaying or removing costs.

Page 35: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

Location Mapwww.hablocks.com 35

LOCATION MAP

Page 36: Welcome to Hussain Mohd. Abbas Block Factory - Automatic … · 2019. 12. 15. · ___ pijtwks[ kwu 1v\zwl]k\qwv 16

CALL USTel : +971 4 3472214Tel : +971 4 3472349Tel : +971 4 3472756Fax: +971 4 3472992

MAIL [email protected]

WEBSITEwww.hablocks.com

LOCATIONHussain Mohd. Abbas Block Factory LLCP.O. Box 931, Al Quoz 1, Dubai, U.A.E