welcome maac infra pvt. ltd.. contents brief introduction details of electrical works executed...
TRANSCRIPT
WELCOMEWELCOME
MAAC INFRA PVT. LTD.
CONTENTS
• Brief Introduction• Details of electrical works executed • Current Commitments • Organisation Structure • Details of Tools & Plants • Working Methodology • Financial Parameters • Quality & Safety policy• Competitive Edge MIPL
MAAC INFRA PVT. LTD.ELECTRO-MECHANICAL DIVISION
COMPANY PROFILE
MAAC INFRA: Shaping the Future
Vision
MAAC INFRA to become a key player in MEP Contracts.
Mission
To generate pool of intelligent professionals in respective areas of operation to offer multifold business modules in Construction industry.
Quality policy
To offer the Services which are technology driven, system supported & of international standards.
We foster an open culture that recognises, values and welcomes diversity in our people- visible and invisible
Whom We Serve Architects Interior Decorators Hotels Universities Builders Electrical Consultants Project Management Companies Hospitals Defence Airport Railways Telecommunication Companies Developers Infrastructure Companies
A Robust Community of Partners
Our Esteemed Clients
BRIEF OVERVIEW MAAC INFRA E&M DIVISION
►Having acquired strong presence in the field of Electrical Bus Trunking, Car parking management, Addressable Fire Alarm System. A separate SBU is formed to provide MEP services solutions under one roof in 2010.
►Proven track record in execution of large & complex projects in record time by the core team of professionals who are on board now.
►Team of Dedicated & Experienced Staff from various disciplines of engineering.
Maac Infra-Capabilities
The depth & breadth of the Maac Infra portfolio reflects our diverse capabilities & areas of expertise. Our In-house expertise in Electrical, Plumbing & Fire Fighting ,HVAC helps us to identify key challenges, find solutions early in the preconstruction process.
We provide high level of commitment to each and every client. As a Turnkey MEP agency, we shall be : ► Keeping project on track
► Delivering value in every phase
► Meeting project deadlines
► Protecting your investment
► Expertise you can count on
Maac Infra (E&M) Offers Solutions For -
►DG sets, Power Transformers, Switchboards, Relay & Control Panels etc.
►Overhead and Underground electrical networks.
►Indoor and outdoor Illumination works
►Public address, Communication system, Security System, Fire Alarm, Computer network.
►Bus trunking systems.
►Car parking management
►Basement ventilation system
PRESTIGIOUS E&M WORKS
PRESTIGIOUS E&M PROJECTS
• M/s Cadbury India Ltd, Baddi 56 lacs
• Alpha One, Ahmedabad 284 lacs
• M/s World Trade Park, Jaipur 750 lacs
• M/s Purvanchal Developer 250 lacs
• M/s Ginger Hotel-Chennai 150 lacs
• M/s Dream City- Khanna –Township 380 lacs
• M/s Ilbs Hospital Vasant Kunj 350 lacs
• Adani Belvedere Club –Ahmedabad 280 lacs
• Gokul Dham Township-Ahmedabad 410 lacs
• Uppal Hotel –Delhi 210 lacs
WORLD TRADE PARK JAIPUR
World Trade Park - Jaipur
SCOPE OF WORK –
•Internal electrification work.•Bus trunking system.•Car parking management.•Basement Ventilation.
Alpha One Mall - Amritsar
SCOPE OF WORK –
•Car parking management•Ventilation System
Alpha One Mall - Ahmedabad
SCOPE OF WORK –
•Car parking management.•Bus trunking system.•Basement ventilation.
DMRC IT PARK – NEW DELHI
SCOPE OF WORK –
•Substation equipment.•Supply and installation of DG sets, LT panels.•Bus trunking system.•Internal electrification work•Fire-fighting works.
ORGANISATION STRUCTURE & LIST OF TECHNICAL PERSONNELS
HEAD OFFICE
GURGAONA-319A,
SOUTH CITY – 1,UNITECH
GURGAON-122001HARYANAMUMBAI
401, PATEL INDUSTRIAL ESTATE,
Opp FAME ADLAB MULTIPLEXOFF ANDHERI LINK ROAD,
ANDHERI WEST-400053
CHENNAINo.66,
JOSHIER STREET,FIRST FLOOR,
NUGAMBAKKAM,CHENNAI-600034
NOIDAB 43, ALPHA 1
GREATER NOIDAUTTAR PRADESH
OFFICES
OFFICE
NEW DELHI132/14,
ONKAR NAGAR-B,TRI NAGAR,
NEW DELHI-110035.
JAIPUR381, INDIRA BAZAR,
JAIPUR-302001RAJASTHAN
CHANDIGARHSCO No. 89,
INDUSTRIAL AREA PHASE-2,CHANDIGARH
KUALA LAMPURNo. 82-1-2,
JALAN 8/62A,BANDAR MENJALARA,
KEPONG,
52200 KUALA LAMPUR.
Board of Directors
GM Purchase
Managerpurchase
Manager Accounts
AGM Design
Tendering
Quality
Site Manager
Project Manager
Application Engineer
Project Coordinator
Engineer
AutocadDesigner
Director Corporate Finance
GM Finance
Company Secretary
Banking
Corporate
GM Marketing
ORGANISATION CHARTMAAC INFRA PVT. LTD.
Purchase Engineer
HR/Admin
Director Marketing & Business Development
Director OperationsDirector
Admin/Purchases
Team Leader
Mktg MgrSales
Manager
TOOLS & PLANTS
S.No. DESCRIPTION QTY
MECANICAL EQUIPMENT
1 Crane for lifting heavy electrical equipment Hired Basis
3 Industrial Vacuum Cleaner Lot
6 Table Grinder 1
7 Surface grinder 2
8 Pipe bending Machine 4
9 Bench Vice 8
10 PipeVice 2
11 Thread Cutting Dies 8
13 Pedestal Drills 1
14 Hammer Drills 3
17 Cable Crimping tools Hydraulic 1
18 Cable Crimping tools Manual 2
19 Angle Cutters 1
20 Wire Pulling M/C 5
21 Chase Cutting M/C 5
22 Mobile / Fixed Aluminum Ladders 5
23 Torque Wench 1
24 Electrical & Mechanical Tools Lot
25 Allenkey set 3
26 Tong Testers Digital Meter 4
27 Relay Testing Kit (Primary & Secondary injection) 1
28 Lux Meter 1
29 Energy Meter 1
30 Tacho Meter 1
31 M. Volt drop Meter 1
32 Safety belts & Helmets Lot
33 Fire buckets & Extinguisher Lot
ELECTRICAL EQUIPMENT
1 Diesel Generators 63/125 KVA 1
2 Continuity Tester (Multimeter) 10
3 Multimeter - Digital 2
4 Clip on ammeter, Multirange 5
9 Electrician Hand Tools Lot
TESTING EQUIPMENT
1 High Voltage Testing set Hired Basis
2 Transformer oil Testing kit Hired Basis
3 Relay Testing kit for Primary injection Hired Basis
4 Relay testing kit for secondary injection Hired Basis
5 Insulation resistance tester (LV) 2
6 Insulation resistance tester (HV) 1
7 Earth resistance tester 1
8 Phase sequence meter 1
11 Power Tools Lot
12 Hand Tools Lot
13 Hipot test kit Hired Basis
WORK SCHEDULE
WORKING METHODOLOGY
EXECUTION METHODOLOGY FOR INTERNAL ELECTRIFICATION F.A, P.A, CCTV, TEL. & BMS WORK
ApprovedDrawing
Marking Drilling OfBase Saddle
Fixing of Conduit
Thread on Conduit
Cutting of Conduit as per requirement
Fixing of Accessories
Fixing of Earth Wire
Fixing of DB/Pull Box
Installation of Lighting Fixtures
Switch/Socket Wiring
EXECUTION METHODOLOGY FOR CABLE TRAYS, CABLE LAYING, RACEWAYS, BUS DUCT & BUS TRUNKING
Marking 0f Route
Fasten Marking Drilling Fixing of Fasteners
AlignmentInstallation of Trays Fixing of Hangers
Exact size of Bends, Cross ways
Fixing of BendsFixing of Earth Strips
Test of Drum Shifting of Drum
(Quality Check) Measurement of Cable
Touch up on Hangers
Start laying of Cable
Measurement/Test Of Cable (Quality Check)
Cut of cable
Gland Hold Fixing of GlandMeasurement of Core length (Quality Check)
Quality Check Cute of lengthTesting of Cable
Tag Fixing ClimpingTighten Terminal Task Complete
EXECUTION METHODOLOGY FOR HIGH SIDE EQUIPMENTS
Delivery
Erection
Order to Vendor For TRS/HT Panel
Drawing & DataSheet Submission
ApprovalFrom Owner
Mfg. Inspection& Testing
Order to Vendor For LT/PLC/BC
Drawing & DataSheet Submission
ApprovalFrom Owner
Mfg. Inspection& Testing
Submission of S/S Layout Drgs
Approval Of DrgSubmission Drawing to client
Approval of Drgs
ConstructionOf S/S bld.
Precommissloning Test
Inspection of Electrical Inspector
Approval of HT System
Testing and Commissioning
Supply of Power
Power from SEB
EXECUTION METHODOLOGY FOR DG SET & ALLIED EQUIPMENTS
Delivery
Erection
Order to DG Set Drawing & DataSheet Submission
ApprovalFrom Owner
Mfg. Inspection& Testing
Order to Vendor For LT/PLC/BC
Drawing & DataSheet Submission
ApprovalFrom Owner
Mfg. Inspection& Testing
Submission of S/S Layout Drgs
Final Testing
Drawing & DataSheet Submission
ApprovalFrom Owner
Mfg. Inspection& Testing
Precommissloning Test
Supply of Power
EXECUTION METHODOLOGY FOR DG SET & ALLIED EQUIPMENTS
Fuel Yard Drg. And data
Sheet SubmissionApproval fromPMC/Owner
Sub. & approval Of Drg. From appropriate authority
Construction as per approved Drawing
Order for equipment
Manufacturing
Inspection and Testing
Delivery Erection
Approval fromAppropriate Authority
Commissioning and submissionof completion report
Fuel to DG Set
EXECUTION METHODOLOGY FOR EXTERNAL ELECTRIFICATION
Approval of Drawing Approval of Pole/Fixture from PMC/ Owner
Order to Vendor
Manufacturing of Pole
Pole FoundationInstallation of Pole
Earthing and Cabling Laying
Installation of Fixture Pole
Final Painting of pole
TerminationTesting
SAFETY
Safety is a critical component of Quality.
We believe safety is essential to the completion of a quality project.
Safety is our top priority.
We have no tolerance for any practice that does not promote safety at work.
We have worked hard at developing a safety culture.
Our goal is tough: we want to eliminate all accidents from project site workplaces.
Our positive approach to safety has enabled us to grow.
Our commitment to safety is an important part of our vision.
SAFETY MANAGEMENT
We consider safety as no accident.
We constantly work at it with hands-on training. Proactive safety management keeps our job site injury-free.
Safety Record
Thanks to the efforts of our safety conscious employees, we hold the best safety records .
Management Commitment to Safety
We are committed to maintaining a safe and healthful working environment.
We pledge our best efforts to work together safely to achieve this goal.
We regularly communicate our goal to all employees.
Our Programme
Our Safety Program includes:
Employee Orientation
Project Safety Plan
Emergency and Communication Plan
Safety Inspections
Safety Committee Meetings
Safety Philosophy
All injuries can be prevented.
Management and every individual is responsible for preventing injuries.
Working safely is a condition of employment.
All operating exposures can be safeguarded.
Training employees to work safely is essential.
Prevention of personal injuries is good business.
Safety Department
We have qualified, experienced, committed and result focused safety engineers.
Safety Statement
Safety comes first at Maac Infra Pvt. Ltd. Always we think it, plan for it, make it happen.
QUALITY ASSURANCE
• 1.PROCESS CONTROL- Drawing & Technical Specification, Construction Methodology,Quality Assurance Plan,Resource based planning etc.
• 2.PROCUREMENT CONTROL- Vendor evaluation & Registration, Specification for Work order,Qualification of Procured items .
• 3.MATERIALS CONTROL- Material receipt, QA/QC verification,Storage,Non conforming material segregation storage,Issue of materials,Stores Register.
• 4.INSPECTION & TEST CONTROL- Quality Assurance Plan,Calibration of measuring Equipments,Inspection Records,Statistical Analysis.
• 5.NON-CONFORMANCE CONTROL- Preventive & Corrective Action.
Quality assurance system may be visualized as a series of inter-related controls which are exercised to achieve the desired quality Objectives. They are:-
• 6.DESIGN CONTROL- Basic Design,Process Design
• 7.DOCUMENT CONTROL- Controlled copy,Distribution,Old copy Disposition.
• 8.RECORD CONTROL- Document identification,Storage ,Retrieval, Maintenance,Permanent & Temporary records.
• 9.TRAINING CONTROL- In-House Training,Institutional Training.
• 10.QUALITY SYSTEM AUDIT- Audit by Internal Quality Auditors
Quality assurance system may be visualized as a series of inter-related controls which are exercised to achieve the desired quality Objectives. They are:-
Our Commitment
To act as problem-solvers and innovators that assist senior decision-makers
to realize their corporate objectives.
To deliver outstanding value, to exceed expectations and to build long-term
business relationships.
MAAC INFRA bring the managerial and technical experience needed to
collaborate with your team from problem definition to solution
implementation..
We are the trusted advisor of choice, partnering with government and commercial
industries to achieve best business value in dynamic environments characterized by
business, organizational, and technical change.
Thank you!Contact
Us:MAAC INFRA PVT.LTD.A 319A SOUTH CITY-1
UNITECH GURGAON
HARYANA-122001, INDIA
Email: [email protected]