welcome e - cribe...biomass success story nwt • 2007 the government of the nwt decided to go into...
TRANSCRIPT
© V
iessm
ann W
erk
e
Welcome
Andreas Wintzer Viessmann
© V
iessm
ann W
erk
e
2.5 Billion dollars
Viessmann Group
turnover in 2011
Company foundation of the
Viessmann family enterprise
for heating equipment
Employed workforce today
12.500
Production companies in
11 countries
120 Countries with sale
activities
and distribution partners
The Company Key Facts to 100 Years Viessmann
© V
iessm
ann W
erk
e
1980 – Canadian operations started in
Waterloo, ON
2001 - West coast sales office in Langley, BC
North American Headquarters
Waterloo, Ontario Canada
VIESSMANN - NORTH AMERICA
Celebrated
In 2010
30 yrs in
Canada
© V
iessm
ann W
erk
e
Burning wood releases the same amount of CO2 as it absorbed
for it’s growth, and as it would release if it would be left to rot.
Biomass is CO2 Neutral
© V
iessm
ann W
erk
e
Biomass supports regional sustainability
Biomass fuel is usually harvested in close proximity to the boiler plants
Biomass fuel is a new value stream for the struggling forest industry - creates jobs
Money spent on wood fuel is a direct investment into the local economy
© V
iessm
ann W
erk
e
VIESSMANN - NORTH AMERICA
© V
iessm
ann W
erk
e
Biomass district heating building
© V
iessm
ann W
erk
e
City of Enderby interior BC
© V
iessm
ann W
erk
e
Boiler House
Pyrot 540 kw
Fuel: Chips
Back-Up: GAS
Fink
Machine
85 kw
CNC
45 kw
Marvin’s
Mechanical
20 kw
Cedar
Solution
60 kw
Enderby
Autobody
35 kw
ENFAB
90 kw
Park View
Place
120 kw
Tony’s Tire
35 kw Edwin D.
15 kw
Royal Inn
15 kw (DHW)
Pool
80 kw
(Summer
only)
Biomass district heating Client and piping layout
© V
iessm
ann W
erk
e
• 8 Clients 2012
• 10 Clients 2014,
• 12 Clients Late 2016
• More clients are waiting to connect as his sold heating cost
to Natural Gas GJ pricing
• 1.5 km of District Supply Line
• Plate heat exchanger in every unit with BTU reading
• Viessmann Vitocrossal 200 Back-up installed 2014 • 10 operational hours in 2.5 years
• all load is covered from Biomass boiler
Biomass district heating Enderby BC
© V
iessm
ann W
erk
e
- 950 metres of new district lines
- No Internal Redundancy Heating Systems
Biomass district heating
Splatsin First Nation Conference Facility
© V
iessm
ann W
erk
e
• Residential Green Living Project
• Downtown Quebec City
• Over 840 apartments
• 7000 m2 office/commercial space
• 450 m3 pellet storage
• Stores 6 weeks of fuel
Biomass district heating 4 x 1.25 MW Biomass system with access to natural gas
© V
iessm
ann W
erk
e
Biomass boiler room below living space
Biomass district heating
© V
iessm
ann W
erk
e
Camrose County Reeve Don Gregorwich stands among willows that help
treat wastewater while also providing a renewable fuel source for the
biomass boiler
Sustainable Wood Energy Project – Camrose County, AB
Viessmann Energy Station
A total of 17,600 willows of
various types were planted at
the wastewater treatment site.
As these trees mature, they
are harvested, dried and
processed as wood chip fuel
© V
iessm
ann W
erk
e
Viessmann Energy Station for Camrose County
By retrofitting the Administration Camrose County has reduced its
annual CO2 emissions by approximately 148 tonnes
Producing their own biomass fuel out of willows ( local work )
© V
iessm
ann W
erk
e
Biomass success story NWT
• 2007 the Government of the NWT decided to go into the
direction of Biomass heat with Pellets to reduce oil usage
• Over the last 10 years more than 20 installations to heat
government buildings with biomass heat
• Replacing of 2,000,000 Liter of oil with in Canada produced
pellets
© V
iessm
ann W
erk
e
Biomass success story NWT
• Latest installation for new built Hospital in Yellowknife
• Operational in 2018
© V
iessm
ann W
erk
e
Bluenose Academy – Lunenburg, NS
attained LEED® Gold certification in 2015 with Solar / Biomass heat
Annual CO2 reductions: 550.5 tons
Biomass 1.8 MMBTU with Backup Oil 1.8 MMBTU
Operational since January 2012
© V
iessm
ann W
erk
e
Advantage Viessmann
Pressure vessel code requires ASME for all pressurized systems above 15 psi
CRN number in every province and territory
ASME H Stamp holder with 30 or 60 psi
CSA approval for all components no field approval necessary
Installation Manuals French / English
Local in Ontario
HTS engineering in Ottawa, Sudbury, Toronto, London, Hamilton, Kitchener
Local in Waterloo
Office with Biomass Engineering, Technician, Logistics and Sales Manager
Sales Representative in every province
Tender documents in English
Spare parts from Stock inventory
© V
iessm
ann W
erk
e
Viessmann Canada
Open invitation to every one
Commercial / residential training centre for biomass technology
Training on live fired equipment
Pyrotec 390
Vitoligno 300 C
Fuel pellet / wood chips
© V
iessm
ann W
erk
e
Thank You
Questions?