Page 1: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

WELCOME FACILITIES MANAGEMENT

101 TRAINING

John Dunnuck VP of Operations

Kenneth Klindt AVP of Facilities Mgmt

Sean Devaney District Director Facilities

College Wide Maintenance

Mike Coval Electrical Manager

Yohannes Asgedom HVACMechanical Mgr

Mike McManigal Facility Mgr DTC

Kenneth Hunt Locksmith Manager

Nathan Sade Facility Mgr SC

Chris Tavares Fleet Manager

Janet Similien Admin Assistant III

Marcus Wilson Facility Mgr NC

Larry Jones Facility Mgr CC

Laura Ozment CW Landscape Mgr

Juanita B Vega Executive Assistant

Aldrin D Lake Admin Assistant III

District Director Environmental Safety amp

Chief Fire Official

Mark Griffin District Director Facilities

Planning amp Capital Budgets

Deborah Czubkowski District Director Facilities Design and

Construction

Patsy Lenox Executive Assistant

Nelson Goris North Campus

Senior Project Manager

Priscila Fort Central Campus

Senior Project Manager

Robert Bellot South Campus

Senior Project Manager

Ana Ovalles Director Facilities

Planning

Jean Griffin Executive Assistant

Tamaris Alvarez Facilities Planner

Jonathan Iglesias CAFM System Administrator

Amanda Williams Senior Analyst

Construction amp Capital Accounts

Ellice Martinez Special Projects Manager

Jacqueline Gonzalez Specialist CAD Operator

bull Dr Judy Schmelzer AVP Business Services and Resource Management bull Zaida Riollano District Director Strategic Sourcing bull Peggy Howse District Director Auxiliary Services bull Anthea Pennant District Director Supplier Relations and Diversity bull Eileen Hunt Contracting Officer bull Jose Hidalgo Contracting Officer

bull Otto Letzelter MEP Structural Building Official bull Sal Giorlando MEP Structural Inspector bull Tom Giorlando MEP Structural Electrical Inspector bull Barbara Camparscone MEP Structural Operations Manager bull Elizabeth Pardee MEP Structural Executive Coordinator

bull Joseph Carriker District Director Campus Safety bull Tim Andrasek Manager Physical Security Technology

ContractorVendor Check-In Procedure Joseph (Joe) Carriker Captain ndash Campus Safety

I Safety Precautions a All contractors and vendors shall be responsible for initiating

maintaining and supervising all safety precautions and programs in connection with performance of their contract with the College

II Construction Projects - Access to your Worksite a The CM superintendent or project manager will be responsible

to provide all sub-contractors and vendors access to the specific project work site

b Contractors should have company IDs State ID and Company Uniform

c The CM Superintendent or Project Manager should request badges from Broward College Project Manager or Facility Manager

III Maintenance and Repair Vendors ndash Access to your Worksite a Check in with your designated person that requested the Work

Order b Regular vendors can get access badges from Broward College

Project Manager or Facility Manager Access badges will be programmed as needed

c Key set pickup scheduled ahead of time Vendor is liable for any lost key sets and core cost for replacement This should be scheduled with Broward College Project Manager or Facility Manager

d Check-in with Campus Safety by contacting 954-201-4357 i Provide contact person who requested work order ii Proper identification should be worn at all times iii Provide length of time you will be on site

IV Parking on Campus a All contractors or vendors must have a company identified vehicle b The college project manager is responsible to inform the contractor to

park in non-designated parking spaces

a Any contractor that needs to park in designated parking spaces must receive authorization from the appropriate Business Deans Office

b No parking on sidewalks grass fire lanes or roadways

V Incident Reporting a 911 shall be called for any assistance that requires emergency

response b 954-201-HELP (4357) shall be called for Campus Safety assistance

ContractorVendor Check-In Procedure Joseph (Joe) Carriker Captain ndash Campus Safety

VI Borrowing Campus Equipment X Equipment Deliveries a All contractors and vendors shall provide their own equipment a Deliveries of equipment and supplies will be coordinated with b Broward College equipment will not be lent out to contractors or campus schedule preferably at non peak times

vendors b Deliveries will be coordinated with the vendor not BC Central receiving

VII Hot Work Permit a All contractors shall acquire the proper hot work permit from the XI Hazardous Materials

College Building Department agency a Chemicals brought onto site must be handled in accordance with OSHA and all other applicable laws

VIII Smoking b MSDS Sheets will be available on site accompanying materials a There is no smoking at Broward College It is a smoke free campus

(including no vaping) XII Broward College Contacts

IX Required Conduct a Proper dress is required including proper safety attire and equipment b Music and radios are prohibited c Proper language is required d Interaction with students and staff shall be kept to a minimum

a Facilities 954-201-6022 b Campus Safety 954-201-4357

HOUSEKEEPING

bull Break at 1010 AM

bull Snacks provided by Panera Bread

bull Cold beverages provided by Broward College Auxiliary Services

bull No food or drinks inside the auditorium

bull Restrooms and water fountains located behind the Auditorium

bull Cell phonersquos ringer off bull BC is a Tobacco Free Workplace

Initiation Planning Occupancy Execute

FACILITIES MANAGEMENT OVERVIEW

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Initiation Planning Occupancy Execute

Project Initiation Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Need amp Funding

Mark Griffin District Director of Facilities Planning and Budget

bull All projects must be on our internal Five Year Capital Plan and any project $2M or greater must be on the Capital Improvement Plan(CIP) submitted to FLDOE

bull Projects may be driven by condition assessment findings

bull Remodel or Renovation projects may be requested by Campus

bull Projects prioritized based availability of funding and review by Senior Administration

Project Numbering

July 30th 2015

Mark Griffin District Director of Facilities Planning and Budget

Ex 1003-C14-010 FIRST 2 DIGIT CAMPUS SITE

00 ndash College Wide

10 ndash Central

Building Number

ldquoCrdquo Construction ldquoMrdquo Maintenance

ldquoPrdquo Planning

Year Project was initiated

Project assigned this year in that building

11 ndash Downtown

12 ndash Weston

14 ndash Cypress

20 ndash North

30 ndash South

31 ndash Miramar West

34 ndash Tiger Tail

35 ndash Pines Center

37 ndash Miramar Town Center

Sub-project

Establish Initial Schedule

Mark Griffin District Director of Facilities Planning and Budget

Based on bull Availability of funding bull Availability of College resources bull Availability of external resources bull Scheduled use of facility if RemodelRenovation bull Estimated duration bull Time lines will be developed based on input from all parties involved

Surveys

Mark Griffin District Director of Facilities Planning and Budget

bull Infrastructure Topographical and Boundary Survey

bull Standards developed apply to all survey work

bull Master survey must be updated for all work performed

bull Data collected supports GIS mapping of infrastructure

bull Facilitates location of utilities and provides condition assessment data

North Campus ndash Keith and Associates

Central Campus ndash Stoner and Associates

South Campus ndash Craven Thompson and Associates

State Required Forms Mark Griffin District Director of Facilities Planning and Budget

Required submittals to FDOE

httpwwwfldoeorgfinanceedual-facilitiesrequirements-for-plan-review-of-constrstml

A board which undertakes the construction remodeling renovation lease or lease-purchase of any educational plant or ancillary facility or day labor project regardless of cost or fund source shall develop policy and procedures for the review of contract and construction documents as outlined in Section 101338 FS permanent archival of plans and submission of project data as requested to the Department pursuant to sect 101350 FS

For all projects over $300000 the following forms shall be submitted to the Office of Educational Facilities for their files

bull OEF Form 110A - Project Implementation Information bull OEF Form 110B - Certificate Of Occupancy bull OEF Form 208 - Letter Of Transmittal bull OEF Form 208A - Facility Space ChartNet And Gross Square Footage bull OEF Form 209 - Certificate Of Final Inspection bull OEF Form 220 - Building Permit Application bull Construction Documents (Phase III) bull Etchellip

State Required Forms Mark Griffin District Director of Facilities Planning and Budget

Required Forms httpspublic2fldoeorgEFISRegistrationRegisteraspx

You must have a Broward College email address (Contingent Worker)

Initiation Planning Occupancy Execute

Project Planning Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Identify Stakeholders Ana Ovalles Director of Facilities Planning

Broward College end users bull Involve upper-management for input of College-wide goals bull Value end-user needs for particulars storage privacy needs and

future requests bull Refer back to Interior and Design Standards bull Request sign-off from Deans and Presidents involved

Scope bull Determine scope based on feedback from Facilities Team bull Always going back to what budget allows

BC Resources bull Coordination and plan review with the following BC personnel

Electrical HVAC Access Control CCTV Landscape Services AV Fire IT Locksmith and others BC PLANNING

Schematic Design Ana Ovalles Director of Facilities Planning

Schematic Design according to approved budget

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

Develop FFampE plan

Tamaris Alvarez Facilities Planner

FFampE coordination

Building 98 Relocation of FFampE Building 98 Equipment

FFampE INSTALL Automotive-Marine

Relocation of existing equipment

bull Planning coordinates with internal BC staff

bull Equipment layout based on approved equipment list

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Electrical amp network installation for furniture

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Equipment List

Tamaris Alvarez Facilities Planner

Furniture Fixture amp Equipment Placement

Engineering Lab Installation of new Powered Workstations bull Dimension of equipment (PC size Monitor size All in one) bull Future electrical needs from end users bull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

bull No need for two shelves bull Shelve will need to hold up to 75 lbs bull Depth for shelve = 18rsquorsquo min bull Distance between work-surface and

shelve = 15rsquorsquo min bull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelve bull Work-surface height = 34rsquorsquo (top) bull Strip 5 duplex + 1 data

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Finishes selection bull Implement standard colors for College-wide renovations and new construction Minimize

maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Project Turnover Tamaris Alvarez Facilities Planner

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

Ellice Martinez Special Projects Manager

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos Responsibilities BCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directory bull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Initiation Planning Occupancy Execute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

Deborah Czubkowski District Director of Design and Construction

Continuing Services Architects bull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendors bull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquos Surveyors Roofers

Engineers Mechanical

Electrical AV

Access Control Etc

BC Design and Construction Standards Deborah Czubkowski District Director of Design and Construction

1 Go to Browardedu

2

COMMUNITY PUBLIC

3

FACILITIES MANAGEMENT

4 STANDARDS

Broward College Design and Construction Standards

Page 3 Conformance Statement

Design Professional Responsibilities

Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditions bull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination

Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design 2 Review BC Design and

Construction Standards 3 Provide Conformance

Statement 4 Coordination with BC

Resources a Information Technology b Locksmith c Electrical and Plumbing d Mechanical e Landscape f Fire Protection g Audio Visual h Access Control i Security j Interior Design

5 Estimate of Probable Cost 6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan 3 SiteworkCivil Work 4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents 100 Design Documents

1 Written summary statement of comments included in the

1 Written summary statement of comments included in the

60 submittal 90 submittal 2

3

4

One set of structural calculations Written statement of BC Fire Marshal approval status Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for

2

3

4

Final landscape material type quantity and spacing approval by BC Landscape Manager Final drainage district approvals and SFWM approvals as applicable Final Approval from BC Fire Marshal

normal and emergency power

5

6

Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) Responsibilities

Deborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

All changes must be approved by Senior Project Manager

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre Construction CMs Responsibilities

Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phase o Preliminary cost estimates o Review of Design Documents o Review Preliminary Schedules o Preliminary Site Evaluations

bull Bid Process o Bid Advertisement o Bid Documents o Pre Bid Meetings o BC SPM to be present at Bid Opening

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 2: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

John Dunnuck VP of Operations

Kenneth Klindt AVP of Facilities Mgmt

Sean Devaney District Director Facilities

College Wide Maintenance

Mike Coval Electrical Manager

Yohannes Asgedom HVACMechanical Mgr

Mike McManigal Facility Mgr DTC

Kenneth Hunt Locksmith Manager

Nathan Sade Facility Mgr SC

Chris Tavares Fleet Manager

Janet Similien Admin Assistant III

Marcus Wilson Facility Mgr NC

Larry Jones Facility Mgr CC

Laura Ozment CW Landscape Mgr

Juanita B Vega Executive Assistant

Aldrin D Lake Admin Assistant III

District Director Environmental Safety amp

Chief Fire Official

Mark Griffin District Director Facilities

Planning amp Capital Budgets

Deborah Czubkowski District Director Facilities Design and

Construction

Patsy Lenox Executive Assistant

Nelson Goris North Campus

Senior Project Manager

Priscila Fort Central Campus

Senior Project Manager

Robert Bellot South Campus

Senior Project Manager

Ana Ovalles Director Facilities

Planning

Jean Griffin Executive Assistant

Tamaris Alvarez Facilities Planner

Jonathan Iglesias CAFM System Administrator

Amanda Williams Senior Analyst

Construction amp Capital Accounts

Ellice Martinez Special Projects Manager

Jacqueline Gonzalez Specialist CAD Operator

bull Dr Judy Schmelzer AVP Business Services and Resource Management bull Zaida Riollano District Director Strategic Sourcing bull Peggy Howse District Director Auxiliary Services bull Anthea Pennant District Director Supplier Relations and Diversity bull Eileen Hunt Contracting Officer bull Jose Hidalgo Contracting Officer

bull Otto Letzelter MEP Structural Building Official bull Sal Giorlando MEP Structural Inspector bull Tom Giorlando MEP Structural Electrical Inspector bull Barbara Camparscone MEP Structural Operations Manager bull Elizabeth Pardee MEP Structural Executive Coordinator

bull Joseph Carriker District Director Campus Safety bull Tim Andrasek Manager Physical Security Technology

ContractorVendor Check-In Procedure Joseph (Joe) Carriker Captain ndash Campus Safety

I Safety Precautions a All contractors and vendors shall be responsible for initiating

maintaining and supervising all safety precautions and programs in connection with performance of their contract with the College

II Construction Projects - Access to your Worksite a The CM superintendent or project manager will be responsible

to provide all sub-contractors and vendors access to the specific project work site

b Contractors should have company IDs State ID and Company Uniform

c The CM Superintendent or Project Manager should request badges from Broward College Project Manager or Facility Manager

III Maintenance and Repair Vendors ndash Access to your Worksite a Check in with your designated person that requested the Work

Order b Regular vendors can get access badges from Broward College

Project Manager or Facility Manager Access badges will be programmed as needed

c Key set pickup scheduled ahead of time Vendor is liable for any lost key sets and core cost for replacement This should be scheduled with Broward College Project Manager or Facility Manager

d Check-in with Campus Safety by contacting 954-201-4357 i Provide contact person who requested work order ii Proper identification should be worn at all times iii Provide length of time you will be on site

IV Parking on Campus a All contractors or vendors must have a company identified vehicle b The college project manager is responsible to inform the contractor to

park in non-designated parking spaces

a Any contractor that needs to park in designated parking spaces must receive authorization from the appropriate Business Deans Office

b No parking on sidewalks grass fire lanes or roadways

V Incident Reporting a 911 shall be called for any assistance that requires emergency

response b 954-201-HELP (4357) shall be called for Campus Safety assistance

ContractorVendor Check-In Procedure Joseph (Joe) Carriker Captain ndash Campus Safety

VI Borrowing Campus Equipment X Equipment Deliveries a All contractors and vendors shall provide their own equipment a Deliveries of equipment and supplies will be coordinated with b Broward College equipment will not be lent out to contractors or campus schedule preferably at non peak times

vendors b Deliveries will be coordinated with the vendor not BC Central receiving

VII Hot Work Permit a All contractors shall acquire the proper hot work permit from the XI Hazardous Materials

College Building Department agency a Chemicals brought onto site must be handled in accordance with OSHA and all other applicable laws

VIII Smoking b MSDS Sheets will be available on site accompanying materials a There is no smoking at Broward College It is a smoke free campus

(including no vaping) XII Broward College Contacts

IX Required Conduct a Proper dress is required including proper safety attire and equipment b Music and radios are prohibited c Proper language is required d Interaction with students and staff shall be kept to a minimum

a Facilities 954-201-6022 b Campus Safety 954-201-4357

HOUSEKEEPING

bull Break at 1010 AM

bull Snacks provided by Panera Bread

bull Cold beverages provided by Broward College Auxiliary Services

bull No food or drinks inside the auditorium

bull Restrooms and water fountains located behind the Auditorium

bull Cell phonersquos ringer off bull BC is a Tobacco Free Workplace

Initiation Planning Occupancy Execute

FACILITIES MANAGEMENT OVERVIEW

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Initiation Planning Occupancy Execute

Project Initiation Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Need amp Funding

Mark Griffin District Director of Facilities Planning and Budget

bull All projects must be on our internal Five Year Capital Plan and any project $2M or greater must be on the Capital Improvement Plan(CIP) submitted to FLDOE

bull Projects may be driven by condition assessment findings

bull Remodel or Renovation projects may be requested by Campus

bull Projects prioritized based availability of funding and review by Senior Administration

Project Numbering

July 30th 2015

Mark Griffin District Director of Facilities Planning and Budget

Ex 1003-C14-010 FIRST 2 DIGIT CAMPUS SITE

00 ndash College Wide

10 ndash Central

Building Number

ldquoCrdquo Construction ldquoMrdquo Maintenance

ldquoPrdquo Planning

Year Project was initiated

Project assigned this year in that building

11 ndash Downtown

12 ndash Weston

14 ndash Cypress

20 ndash North

30 ndash South

31 ndash Miramar West

34 ndash Tiger Tail

35 ndash Pines Center

37 ndash Miramar Town Center

Sub-project

Establish Initial Schedule

Mark Griffin District Director of Facilities Planning and Budget

Based on bull Availability of funding bull Availability of College resources bull Availability of external resources bull Scheduled use of facility if RemodelRenovation bull Estimated duration bull Time lines will be developed based on input from all parties involved

Surveys

Mark Griffin District Director of Facilities Planning and Budget

bull Infrastructure Topographical and Boundary Survey

bull Standards developed apply to all survey work

bull Master survey must be updated for all work performed

bull Data collected supports GIS mapping of infrastructure

bull Facilitates location of utilities and provides condition assessment data

North Campus ndash Keith and Associates

Central Campus ndash Stoner and Associates

South Campus ndash Craven Thompson and Associates

State Required Forms Mark Griffin District Director of Facilities Planning and Budget

Required submittals to FDOE

httpwwwfldoeorgfinanceedual-facilitiesrequirements-for-plan-review-of-constrstml

A board which undertakes the construction remodeling renovation lease or lease-purchase of any educational plant or ancillary facility or day labor project regardless of cost or fund source shall develop policy and procedures for the review of contract and construction documents as outlined in Section 101338 FS permanent archival of plans and submission of project data as requested to the Department pursuant to sect 101350 FS

For all projects over $300000 the following forms shall be submitted to the Office of Educational Facilities for their files

bull OEF Form 110A - Project Implementation Information bull OEF Form 110B - Certificate Of Occupancy bull OEF Form 208 - Letter Of Transmittal bull OEF Form 208A - Facility Space ChartNet And Gross Square Footage bull OEF Form 209 - Certificate Of Final Inspection bull OEF Form 220 - Building Permit Application bull Construction Documents (Phase III) bull Etchellip

State Required Forms Mark Griffin District Director of Facilities Planning and Budget

Required Forms httpspublic2fldoeorgEFISRegistrationRegisteraspx

You must have a Broward College email address (Contingent Worker)

Initiation Planning Occupancy Execute

Project Planning Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Identify Stakeholders Ana Ovalles Director of Facilities Planning

Broward College end users bull Involve upper-management for input of College-wide goals bull Value end-user needs for particulars storage privacy needs and

future requests bull Refer back to Interior and Design Standards bull Request sign-off from Deans and Presidents involved

Scope bull Determine scope based on feedback from Facilities Team bull Always going back to what budget allows

BC Resources bull Coordination and plan review with the following BC personnel

Electrical HVAC Access Control CCTV Landscape Services AV Fire IT Locksmith and others BC PLANNING

Schematic Design Ana Ovalles Director of Facilities Planning

Schematic Design according to approved budget

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

Develop FFampE plan

Tamaris Alvarez Facilities Planner

FFampE coordination

Building 98 Relocation of FFampE Building 98 Equipment

FFampE INSTALL Automotive-Marine

Relocation of existing equipment

bull Planning coordinates with internal BC staff

bull Equipment layout based on approved equipment list

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Electrical amp network installation for furniture

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Equipment List

Tamaris Alvarez Facilities Planner

Furniture Fixture amp Equipment Placement

Engineering Lab Installation of new Powered Workstations bull Dimension of equipment (PC size Monitor size All in one) bull Future electrical needs from end users bull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

bull No need for two shelves bull Shelve will need to hold up to 75 lbs bull Depth for shelve = 18rsquorsquo min bull Distance between work-surface and

shelve = 15rsquorsquo min bull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelve bull Work-surface height = 34rsquorsquo (top) bull Strip 5 duplex + 1 data

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Finishes selection bull Implement standard colors for College-wide renovations and new construction Minimize

maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Project Turnover Tamaris Alvarez Facilities Planner

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

Ellice Martinez Special Projects Manager

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos Responsibilities BCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directory bull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Initiation Planning Occupancy Execute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

Deborah Czubkowski District Director of Design and Construction

Continuing Services Architects bull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendors bull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquos Surveyors Roofers

Engineers Mechanical

Electrical AV

Access Control Etc

BC Design and Construction Standards Deborah Czubkowski District Director of Design and Construction

1 Go to Browardedu

2

COMMUNITY PUBLIC

3

FACILITIES MANAGEMENT

4 STANDARDS

Broward College Design and Construction Standards

Page 3 Conformance Statement

Design Professional Responsibilities

Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditions bull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination

Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design 2 Review BC Design and

Construction Standards 3 Provide Conformance

Statement 4 Coordination with BC

Resources a Information Technology b Locksmith c Electrical and Plumbing d Mechanical e Landscape f Fire Protection g Audio Visual h Access Control i Security j Interior Design

5 Estimate of Probable Cost 6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan 3 SiteworkCivil Work 4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents 100 Design Documents

1 Written summary statement of comments included in the

1 Written summary statement of comments included in the

60 submittal 90 submittal 2

3

4

One set of structural calculations Written statement of BC Fire Marshal approval status Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for

2

3

4

Final landscape material type quantity and spacing approval by BC Landscape Manager Final drainage district approvals and SFWM approvals as applicable Final Approval from BC Fire Marshal

normal and emergency power

5

6

Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) Responsibilities

Deborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

All changes must be approved by Senior Project Manager

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre Construction CMs Responsibilities

Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phase o Preliminary cost estimates o Review of Design Documents o Review Preliminary Schedules o Preliminary Site Evaluations

bull Bid Process o Bid Advertisement o Bid Documents o Pre Bid Meetings o BC SPM to be present at Bid Opening

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 3: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

bull Dr Judy Schmelzer AVP Business Services and Resource Management bull Zaida Riollano District Director Strategic Sourcing bull Peggy Howse District Director Auxiliary Services bull Anthea Pennant District Director Supplier Relations and Diversity bull Eileen Hunt Contracting Officer bull Jose Hidalgo Contracting Officer

bull Otto Letzelter MEP Structural Building Official bull Sal Giorlando MEP Structural Inspector bull Tom Giorlando MEP Structural Electrical Inspector bull Barbara Camparscone MEP Structural Operations Manager bull Elizabeth Pardee MEP Structural Executive Coordinator

bull Joseph Carriker District Director Campus Safety bull Tim Andrasek Manager Physical Security Technology

ContractorVendor Check-In Procedure Joseph (Joe) Carriker Captain ndash Campus Safety

I Safety Precautions a All contractors and vendors shall be responsible for initiating

maintaining and supervising all safety precautions and programs in connection with performance of their contract with the College

II Construction Projects - Access to your Worksite a The CM superintendent or project manager will be responsible

to provide all sub-contractors and vendors access to the specific project work site

b Contractors should have company IDs State ID and Company Uniform

c The CM Superintendent or Project Manager should request badges from Broward College Project Manager or Facility Manager

III Maintenance and Repair Vendors ndash Access to your Worksite a Check in with your designated person that requested the Work

Order b Regular vendors can get access badges from Broward College

Project Manager or Facility Manager Access badges will be programmed as needed

c Key set pickup scheduled ahead of time Vendor is liable for any lost key sets and core cost for replacement This should be scheduled with Broward College Project Manager or Facility Manager

d Check-in with Campus Safety by contacting 954-201-4357 i Provide contact person who requested work order ii Proper identification should be worn at all times iii Provide length of time you will be on site

IV Parking on Campus a All contractors or vendors must have a company identified vehicle b The college project manager is responsible to inform the contractor to

park in non-designated parking spaces

a Any contractor that needs to park in designated parking spaces must receive authorization from the appropriate Business Deans Office

b No parking on sidewalks grass fire lanes or roadways

V Incident Reporting a 911 shall be called for any assistance that requires emergency

response b 954-201-HELP (4357) shall be called for Campus Safety assistance

ContractorVendor Check-In Procedure Joseph (Joe) Carriker Captain ndash Campus Safety

VI Borrowing Campus Equipment X Equipment Deliveries a All contractors and vendors shall provide their own equipment a Deliveries of equipment and supplies will be coordinated with b Broward College equipment will not be lent out to contractors or campus schedule preferably at non peak times

vendors b Deliveries will be coordinated with the vendor not BC Central receiving

VII Hot Work Permit a All contractors shall acquire the proper hot work permit from the XI Hazardous Materials

College Building Department agency a Chemicals brought onto site must be handled in accordance with OSHA and all other applicable laws

VIII Smoking b MSDS Sheets will be available on site accompanying materials a There is no smoking at Broward College It is a smoke free campus

(including no vaping) XII Broward College Contacts

IX Required Conduct a Proper dress is required including proper safety attire and equipment b Music and radios are prohibited c Proper language is required d Interaction with students and staff shall be kept to a minimum

a Facilities 954-201-6022 b Campus Safety 954-201-4357

HOUSEKEEPING

bull Break at 1010 AM

bull Snacks provided by Panera Bread

bull Cold beverages provided by Broward College Auxiliary Services

bull No food or drinks inside the auditorium

bull Restrooms and water fountains located behind the Auditorium

bull Cell phonersquos ringer off bull BC is a Tobacco Free Workplace

Initiation Planning Occupancy Execute

FACILITIES MANAGEMENT OVERVIEW

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Initiation Planning Occupancy Execute

Project Initiation Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Need amp Funding

Mark Griffin District Director of Facilities Planning and Budget

bull All projects must be on our internal Five Year Capital Plan and any project $2M or greater must be on the Capital Improvement Plan(CIP) submitted to FLDOE

bull Projects may be driven by condition assessment findings

bull Remodel or Renovation projects may be requested by Campus

bull Projects prioritized based availability of funding and review by Senior Administration

Project Numbering

July 30th 2015

Mark Griffin District Director of Facilities Planning and Budget

Ex 1003-C14-010 FIRST 2 DIGIT CAMPUS SITE

00 ndash College Wide

10 ndash Central

Building Number

ldquoCrdquo Construction ldquoMrdquo Maintenance

ldquoPrdquo Planning

Year Project was initiated

Project assigned this year in that building

11 ndash Downtown

12 ndash Weston

14 ndash Cypress

20 ndash North

30 ndash South

31 ndash Miramar West

34 ndash Tiger Tail

35 ndash Pines Center

37 ndash Miramar Town Center

Sub-project

Establish Initial Schedule

Mark Griffin District Director of Facilities Planning and Budget

Based on bull Availability of funding bull Availability of College resources bull Availability of external resources bull Scheduled use of facility if RemodelRenovation bull Estimated duration bull Time lines will be developed based on input from all parties involved

Surveys

Mark Griffin District Director of Facilities Planning and Budget

bull Infrastructure Topographical and Boundary Survey

bull Standards developed apply to all survey work

bull Master survey must be updated for all work performed

bull Data collected supports GIS mapping of infrastructure

bull Facilitates location of utilities and provides condition assessment data

North Campus ndash Keith and Associates

Central Campus ndash Stoner and Associates

South Campus ndash Craven Thompson and Associates

State Required Forms Mark Griffin District Director of Facilities Planning and Budget

Required submittals to FDOE

httpwwwfldoeorgfinanceedual-facilitiesrequirements-for-plan-review-of-constrstml

A board which undertakes the construction remodeling renovation lease or lease-purchase of any educational plant or ancillary facility or day labor project regardless of cost or fund source shall develop policy and procedures for the review of contract and construction documents as outlined in Section 101338 FS permanent archival of plans and submission of project data as requested to the Department pursuant to sect 101350 FS

For all projects over $300000 the following forms shall be submitted to the Office of Educational Facilities for their files

bull OEF Form 110A - Project Implementation Information bull OEF Form 110B - Certificate Of Occupancy bull OEF Form 208 - Letter Of Transmittal bull OEF Form 208A - Facility Space ChartNet And Gross Square Footage bull OEF Form 209 - Certificate Of Final Inspection bull OEF Form 220 - Building Permit Application bull Construction Documents (Phase III) bull Etchellip

State Required Forms Mark Griffin District Director of Facilities Planning and Budget

Required Forms httpspublic2fldoeorgEFISRegistrationRegisteraspx

You must have a Broward College email address (Contingent Worker)

Initiation Planning Occupancy Execute

Project Planning Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Identify Stakeholders Ana Ovalles Director of Facilities Planning

Broward College end users bull Involve upper-management for input of College-wide goals bull Value end-user needs for particulars storage privacy needs and

future requests bull Refer back to Interior and Design Standards bull Request sign-off from Deans and Presidents involved

Scope bull Determine scope based on feedback from Facilities Team bull Always going back to what budget allows

BC Resources bull Coordination and plan review with the following BC personnel

Electrical HVAC Access Control CCTV Landscape Services AV Fire IT Locksmith and others BC PLANNING

Schematic Design Ana Ovalles Director of Facilities Planning

Schematic Design according to approved budget

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

Develop FFampE plan

Tamaris Alvarez Facilities Planner

FFampE coordination

Building 98 Relocation of FFampE Building 98 Equipment

FFampE INSTALL Automotive-Marine

Relocation of existing equipment

bull Planning coordinates with internal BC staff

bull Equipment layout based on approved equipment list

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Electrical amp network installation for furniture

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Equipment List

Tamaris Alvarez Facilities Planner

Furniture Fixture amp Equipment Placement

Engineering Lab Installation of new Powered Workstations bull Dimension of equipment (PC size Monitor size All in one) bull Future electrical needs from end users bull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

bull No need for two shelves bull Shelve will need to hold up to 75 lbs bull Depth for shelve = 18rsquorsquo min bull Distance between work-surface and

shelve = 15rsquorsquo min bull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelve bull Work-surface height = 34rsquorsquo (top) bull Strip 5 duplex + 1 data

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Finishes selection bull Implement standard colors for College-wide renovations and new construction Minimize

maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Project Turnover Tamaris Alvarez Facilities Planner

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

Ellice Martinez Special Projects Manager

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos Responsibilities BCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directory bull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Initiation Planning Occupancy Execute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

Deborah Czubkowski District Director of Design and Construction

Continuing Services Architects bull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendors bull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquos Surveyors Roofers

Engineers Mechanical

Electrical AV

Access Control Etc

BC Design and Construction Standards Deborah Czubkowski District Director of Design and Construction

1 Go to Browardedu

2

COMMUNITY PUBLIC

3

FACILITIES MANAGEMENT

4 STANDARDS

Broward College Design and Construction Standards

Page 3 Conformance Statement

Design Professional Responsibilities

Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditions bull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination

Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design 2 Review BC Design and

Construction Standards 3 Provide Conformance

Statement 4 Coordination with BC

Resources a Information Technology b Locksmith c Electrical and Plumbing d Mechanical e Landscape f Fire Protection g Audio Visual h Access Control i Security j Interior Design

5 Estimate of Probable Cost 6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan 3 SiteworkCivil Work 4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents 100 Design Documents

1 Written summary statement of comments included in the

1 Written summary statement of comments included in the

60 submittal 90 submittal 2

3

4

One set of structural calculations Written statement of BC Fire Marshal approval status Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for

2

3

4

Final landscape material type quantity and spacing approval by BC Landscape Manager Final drainage district approvals and SFWM approvals as applicable Final Approval from BC Fire Marshal

normal and emergency power

5

6

Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) Responsibilities

Deborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

All changes must be approved by Senior Project Manager

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre Construction CMs Responsibilities

Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phase o Preliminary cost estimates o Review of Design Documents o Review Preliminary Schedules o Preliminary Site Evaluations

bull Bid Process o Bid Advertisement o Bid Documents o Pre Bid Meetings o BC SPM to be present at Bid Opening

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 4: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

ContractorVendor Check-In Procedure Joseph (Joe) Carriker Captain ndash Campus Safety

I Safety Precautions a All contractors and vendors shall be responsible for initiating

maintaining and supervising all safety precautions and programs in connection with performance of their contract with the College

II Construction Projects - Access to your Worksite a The CM superintendent or project manager will be responsible

to provide all sub-contractors and vendors access to the specific project work site

b Contractors should have company IDs State ID and Company Uniform

c The CM Superintendent or Project Manager should request badges from Broward College Project Manager or Facility Manager

III Maintenance and Repair Vendors ndash Access to your Worksite a Check in with your designated person that requested the Work

Order b Regular vendors can get access badges from Broward College

Project Manager or Facility Manager Access badges will be programmed as needed

c Key set pickup scheduled ahead of time Vendor is liable for any lost key sets and core cost for replacement This should be scheduled with Broward College Project Manager or Facility Manager

d Check-in with Campus Safety by contacting 954-201-4357 i Provide contact person who requested work order ii Proper identification should be worn at all times iii Provide length of time you will be on site

IV Parking on Campus a All contractors or vendors must have a company identified vehicle b The college project manager is responsible to inform the contractor to

park in non-designated parking spaces

a Any contractor that needs to park in designated parking spaces must receive authorization from the appropriate Business Deans Office

b No parking on sidewalks grass fire lanes or roadways

V Incident Reporting a 911 shall be called for any assistance that requires emergency

response b 954-201-HELP (4357) shall be called for Campus Safety assistance

ContractorVendor Check-In Procedure Joseph (Joe) Carriker Captain ndash Campus Safety

VI Borrowing Campus Equipment X Equipment Deliveries a All contractors and vendors shall provide their own equipment a Deliveries of equipment and supplies will be coordinated with b Broward College equipment will not be lent out to contractors or campus schedule preferably at non peak times

vendors b Deliveries will be coordinated with the vendor not BC Central receiving

VII Hot Work Permit a All contractors shall acquire the proper hot work permit from the XI Hazardous Materials

College Building Department agency a Chemicals brought onto site must be handled in accordance with OSHA and all other applicable laws

VIII Smoking b MSDS Sheets will be available on site accompanying materials a There is no smoking at Broward College It is a smoke free campus

(including no vaping) XII Broward College Contacts

IX Required Conduct a Proper dress is required including proper safety attire and equipment b Music and radios are prohibited c Proper language is required d Interaction with students and staff shall be kept to a minimum

a Facilities 954-201-6022 b Campus Safety 954-201-4357

HOUSEKEEPING

bull Break at 1010 AM

bull Snacks provided by Panera Bread

bull Cold beverages provided by Broward College Auxiliary Services

bull No food or drinks inside the auditorium

bull Restrooms and water fountains located behind the Auditorium

bull Cell phonersquos ringer off bull BC is a Tobacco Free Workplace

Initiation Planning Occupancy Execute

FACILITIES MANAGEMENT OVERVIEW

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Initiation Planning Occupancy Execute

Project Initiation Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Need amp Funding

Mark Griffin District Director of Facilities Planning and Budget

bull All projects must be on our internal Five Year Capital Plan and any project $2M or greater must be on the Capital Improvement Plan(CIP) submitted to FLDOE

bull Projects may be driven by condition assessment findings

bull Remodel or Renovation projects may be requested by Campus

bull Projects prioritized based availability of funding and review by Senior Administration

Project Numbering

July 30th 2015

Mark Griffin District Director of Facilities Planning and Budget

Ex 1003-C14-010 FIRST 2 DIGIT CAMPUS SITE

00 ndash College Wide

10 ndash Central

Building Number

ldquoCrdquo Construction ldquoMrdquo Maintenance

ldquoPrdquo Planning

Year Project was initiated

Project assigned this year in that building

11 ndash Downtown

12 ndash Weston

14 ndash Cypress

20 ndash North

30 ndash South

31 ndash Miramar West

34 ndash Tiger Tail

35 ndash Pines Center

37 ndash Miramar Town Center

Sub-project

Establish Initial Schedule

Mark Griffin District Director of Facilities Planning and Budget

Based on bull Availability of funding bull Availability of College resources bull Availability of external resources bull Scheduled use of facility if RemodelRenovation bull Estimated duration bull Time lines will be developed based on input from all parties involved

Surveys

Mark Griffin District Director of Facilities Planning and Budget

bull Infrastructure Topographical and Boundary Survey

bull Standards developed apply to all survey work

bull Master survey must be updated for all work performed

bull Data collected supports GIS mapping of infrastructure

bull Facilitates location of utilities and provides condition assessment data

North Campus ndash Keith and Associates

Central Campus ndash Stoner and Associates

South Campus ndash Craven Thompson and Associates

State Required Forms Mark Griffin District Director of Facilities Planning and Budget

Required submittals to FDOE

httpwwwfldoeorgfinanceedual-facilitiesrequirements-for-plan-review-of-constrstml

A board which undertakes the construction remodeling renovation lease or lease-purchase of any educational plant or ancillary facility or day labor project regardless of cost or fund source shall develop policy and procedures for the review of contract and construction documents as outlined in Section 101338 FS permanent archival of plans and submission of project data as requested to the Department pursuant to sect 101350 FS

For all projects over $300000 the following forms shall be submitted to the Office of Educational Facilities for their files

bull OEF Form 110A - Project Implementation Information bull OEF Form 110B - Certificate Of Occupancy bull OEF Form 208 - Letter Of Transmittal bull OEF Form 208A - Facility Space ChartNet And Gross Square Footage bull OEF Form 209 - Certificate Of Final Inspection bull OEF Form 220 - Building Permit Application bull Construction Documents (Phase III) bull Etchellip

State Required Forms Mark Griffin District Director of Facilities Planning and Budget

Required Forms httpspublic2fldoeorgEFISRegistrationRegisteraspx

You must have a Broward College email address (Contingent Worker)

Initiation Planning Occupancy Execute

Project Planning Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Identify Stakeholders Ana Ovalles Director of Facilities Planning

Broward College end users bull Involve upper-management for input of College-wide goals bull Value end-user needs for particulars storage privacy needs and

future requests bull Refer back to Interior and Design Standards bull Request sign-off from Deans and Presidents involved

Scope bull Determine scope based on feedback from Facilities Team bull Always going back to what budget allows

BC Resources bull Coordination and plan review with the following BC personnel

Electrical HVAC Access Control CCTV Landscape Services AV Fire IT Locksmith and others BC PLANNING

Schematic Design Ana Ovalles Director of Facilities Planning

Schematic Design according to approved budget

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

Develop FFampE plan

Tamaris Alvarez Facilities Planner

FFampE coordination

Building 98 Relocation of FFampE Building 98 Equipment

FFampE INSTALL Automotive-Marine

Relocation of existing equipment

bull Planning coordinates with internal BC staff

bull Equipment layout based on approved equipment list

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Electrical amp network installation for furniture

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Equipment List

Tamaris Alvarez Facilities Planner

Furniture Fixture amp Equipment Placement

Engineering Lab Installation of new Powered Workstations bull Dimension of equipment (PC size Monitor size All in one) bull Future electrical needs from end users bull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

bull No need for two shelves bull Shelve will need to hold up to 75 lbs bull Depth for shelve = 18rsquorsquo min bull Distance between work-surface and

shelve = 15rsquorsquo min bull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelve bull Work-surface height = 34rsquorsquo (top) bull Strip 5 duplex + 1 data

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Finishes selection bull Implement standard colors for College-wide renovations and new construction Minimize

maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Project Turnover Tamaris Alvarez Facilities Planner

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

Ellice Martinez Special Projects Manager

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos Responsibilities BCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directory bull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Initiation Planning Occupancy Execute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

Deborah Czubkowski District Director of Design and Construction

Continuing Services Architects bull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendors bull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquos Surveyors Roofers

Engineers Mechanical

Electrical AV

Access Control Etc

BC Design and Construction Standards Deborah Czubkowski District Director of Design and Construction

1 Go to Browardedu

2

COMMUNITY PUBLIC

3

FACILITIES MANAGEMENT

4 STANDARDS

Broward College Design and Construction Standards

Page 3 Conformance Statement

Design Professional Responsibilities

Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditions bull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination

Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design 2 Review BC Design and

Construction Standards 3 Provide Conformance

Statement 4 Coordination with BC

Resources a Information Technology b Locksmith c Electrical and Plumbing d Mechanical e Landscape f Fire Protection g Audio Visual h Access Control i Security j Interior Design

5 Estimate of Probable Cost 6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan 3 SiteworkCivil Work 4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents 100 Design Documents

1 Written summary statement of comments included in the

1 Written summary statement of comments included in the

60 submittal 90 submittal 2

3

4

One set of structural calculations Written statement of BC Fire Marshal approval status Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for

2

3

4

Final landscape material type quantity and spacing approval by BC Landscape Manager Final drainage district approvals and SFWM approvals as applicable Final Approval from BC Fire Marshal

normal and emergency power

5

6

Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) Responsibilities

Deborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

All changes must be approved by Senior Project Manager

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre Construction CMs Responsibilities

Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phase o Preliminary cost estimates o Review of Design Documents o Review Preliminary Schedules o Preliminary Site Evaluations

bull Bid Process o Bid Advertisement o Bid Documents o Pre Bid Meetings o BC SPM to be present at Bid Opening

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 5: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

ContractorVendor Check-In Procedure Joseph (Joe) Carriker Captain ndash Campus Safety

VI Borrowing Campus Equipment X Equipment Deliveries a All contractors and vendors shall provide their own equipment a Deliveries of equipment and supplies will be coordinated with b Broward College equipment will not be lent out to contractors or campus schedule preferably at non peak times

vendors b Deliveries will be coordinated with the vendor not BC Central receiving

VII Hot Work Permit a All contractors shall acquire the proper hot work permit from the XI Hazardous Materials

College Building Department agency a Chemicals brought onto site must be handled in accordance with OSHA and all other applicable laws

VIII Smoking b MSDS Sheets will be available on site accompanying materials a There is no smoking at Broward College It is a smoke free campus

(including no vaping) XII Broward College Contacts

IX Required Conduct a Proper dress is required including proper safety attire and equipment b Music and radios are prohibited c Proper language is required d Interaction with students and staff shall be kept to a minimum

a Facilities 954-201-6022 b Campus Safety 954-201-4357

HOUSEKEEPING

bull Break at 1010 AM

bull Snacks provided by Panera Bread

bull Cold beverages provided by Broward College Auxiliary Services

bull No food or drinks inside the auditorium

bull Restrooms and water fountains located behind the Auditorium

bull Cell phonersquos ringer off bull BC is a Tobacco Free Workplace

Initiation Planning Occupancy Execute

FACILITIES MANAGEMENT OVERVIEW

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Initiation Planning Occupancy Execute

Project Initiation Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Need amp Funding

Mark Griffin District Director of Facilities Planning and Budget

bull All projects must be on our internal Five Year Capital Plan and any project $2M or greater must be on the Capital Improvement Plan(CIP) submitted to FLDOE

bull Projects may be driven by condition assessment findings

bull Remodel or Renovation projects may be requested by Campus

bull Projects prioritized based availability of funding and review by Senior Administration

Project Numbering

July 30th 2015

Mark Griffin District Director of Facilities Planning and Budget

Ex 1003-C14-010 FIRST 2 DIGIT CAMPUS SITE

00 ndash College Wide

10 ndash Central

Building Number

ldquoCrdquo Construction ldquoMrdquo Maintenance

ldquoPrdquo Planning

Year Project was initiated

Project assigned this year in that building

11 ndash Downtown

12 ndash Weston

14 ndash Cypress

20 ndash North

30 ndash South

31 ndash Miramar West

34 ndash Tiger Tail

35 ndash Pines Center

37 ndash Miramar Town Center

Sub-project

Establish Initial Schedule

Mark Griffin District Director of Facilities Planning and Budget

Based on bull Availability of funding bull Availability of College resources bull Availability of external resources bull Scheduled use of facility if RemodelRenovation bull Estimated duration bull Time lines will be developed based on input from all parties involved

Surveys

Mark Griffin District Director of Facilities Planning and Budget

bull Infrastructure Topographical and Boundary Survey

bull Standards developed apply to all survey work

bull Master survey must be updated for all work performed

bull Data collected supports GIS mapping of infrastructure

bull Facilitates location of utilities and provides condition assessment data

North Campus ndash Keith and Associates

Central Campus ndash Stoner and Associates

South Campus ndash Craven Thompson and Associates

State Required Forms Mark Griffin District Director of Facilities Planning and Budget

Required submittals to FDOE

httpwwwfldoeorgfinanceedual-facilitiesrequirements-for-plan-review-of-constrstml

A board which undertakes the construction remodeling renovation lease or lease-purchase of any educational plant or ancillary facility or day labor project regardless of cost or fund source shall develop policy and procedures for the review of contract and construction documents as outlined in Section 101338 FS permanent archival of plans and submission of project data as requested to the Department pursuant to sect 101350 FS

For all projects over $300000 the following forms shall be submitted to the Office of Educational Facilities for their files

bull OEF Form 110A - Project Implementation Information bull OEF Form 110B - Certificate Of Occupancy bull OEF Form 208 - Letter Of Transmittal bull OEF Form 208A - Facility Space ChartNet And Gross Square Footage bull OEF Form 209 - Certificate Of Final Inspection bull OEF Form 220 - Building Permit Application bull Construction Documents (Phase III) bull Etchellip

State Required Forms Mark Griffin District Director of Facilities Planning and Budget

Required Forms httpspublic2fldoeorgEFISRegistrationRegisteraspx

You must have a Broward College email address (Contingent Worker)

Initiation Planning Occupancy Execute

Project Planning Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Identify Stakeholders Ana Ovalles Director of Facilities Planning

Broward College end users bull Involve upper-management for input of College-wide goals bull Value end-user needs for particulars storage privacy needs and

future requests bull Refer back to Interior and Design Standards bull Request sign-off from Deans and Presidents involved

Scope bull Determine scope based on feedback from Facilities Team bull Always going back to what budget allows

BC Resources bull Coordination and plan review with the following BC personnel

Electrical HVAC Access Control CCTV Landscape Services AV Fire IT Locksmith and others BC PLANNING

Schematic Design Ana Ovalles Director of Facilities Planning

Schematic Design according to approved budget

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

Develop FFampE plan

Tamaris Alvarez Facilities Planner

FFampE coordination

Building 98 Relocation of FFampE Building 98 Equipment

FFampE INSTALL Automotive-Marine

Relocation of existing equipment

bull Planning coordinates with internal BC staff

bull Equipment layout based on approved equipment list

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Electrical amp network installation for furniture

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Equipment List

Tamaris Alvarez Facilities Planner

Furniture Fixture amp Equipment Placement

Engineering Lab Installation of new Powered Workstations bull Dimension of equipment (PC size Monitor size All in one) bull Future electrical needs from end users bull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

bull No need for two shelves bull Shelve will need to hold up to 75 lbs bull Depth for shelve = 18rsquorsquo min bull Distance between work-surface and

shelve = 15rsquorsquo min bull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelve bull Work-surface height = 34rsquorsquo (top) bull Strip 5 duplex + 1 data

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Finishes selection bull Implement standard colors for College-wide renovations and new construction Minimize

maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Project Turnover Tamaris Alvarez Facilities Planner

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

Ellice Martinez Special Projects Manager

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos Responsibilities BCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directory bull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Initiation Planning Occupancy Execute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

Deborah Czubkowski District Director of Design and Construction

Continuing Services Architects bull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendors bull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquos Surveyors Roofers

Engineers Mechanical

Electrical AV

Access Control Etc

BC Design and Construction Standards Deborah Czubkowski District Director of Design and Construction

1 Go to Browardedu

2

COMMUNITY PUBLIC

3

FACILITIES MANAGEMENT

4 STANDARDS

Broward College Design and Construction Standards

Page 3 Conformance Statement

Design Professional Responsibilities

Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditions bull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination

Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design 2 Review BC Design and

Construction Standards 3 Provide Conformance

Statement 4 Coordination with BC

Resources a Information Technology b Locksmith c Electrical and Plumbing d Mechanical e Landscape f Fire Protection g Audio Visual h Access Control i Security j Interior Design

5 Estimate of Probable Cost 6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan 3 SiteworkCivil Work 4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents 100 Design Documents

1 Written summary statement of comments included in the

1 Written summary statement of comments included in the

60 submittal 90 submittal 2

3

4

One set of structural calculations Written statement of BC Fire Marshal approval status Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for

2

3

4

Final landscape material type quantity and spacing approval by BC Landscape Manager Final drainage district approvals and SFWM approvals as applicable Final Approval from BC Fire Marshal

normal and emergency power

5

6

Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) Responsibilities

Deborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

All changes must be approved by Senior Project Manager

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre Construction CMs Responsibilities

Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phase o Preliminary cost estimates o Review of Design Documents o Review Preliminary Schedules o Preliminary Site Evaluations

bull Bid Process o Bid Advertisement o Bid Documents o Pre Bid Meetings o BC SPM to be present at Bid Opening

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 6: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

HOUSEKEEPING

bull Break at 1010 AM

bull Snacks provided by Panera Bread

bull Cold beverages provided by Broward College Auxiliary Services

bull No food or drinks inside the auditorium

bull Restrooms and water fountains located behind the Auditorium

bull Cell phonersquos ringer off bull BC is a Tobacco Free Workplace

Initiation Planning Occupancy Execute

FACILITIES MANAGEMENT OVERVIEW

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Initiation Planning Occupancy Execute

Project Initiation Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Need amp Funding

Mark Griffin District Director of Facilities Planning and Budget

bull All projects must be on our internal Five Year Capital Plan and any project $2M or greater must be on the Capital Improvement Plan(CIP) submitted to FLDOE

bull Projects may be driven by condition assessment findings

bull Remodel or Renovation projects may be requested by Campus

bull Projects prioritized based availability of funding and review by Senior Administration

Project Numbering

July 30th 2015

Mark Griffin District Director of Facilities Planning and Budget

Ex 1003-C14-010 FIRST 2 DIGIT CAMPUS SITE

00 ndash College Wide

10 ndash Central

Building Number

ldquoCrdquo Construction ldquoMrdquo Maintenance

ldquoPrdquo Planning

Year Project was initiated

Project assigned this year in that building

11 ndash Downtown

12 ndash Weston

14 ndash Cypress

20 ndash North

30 ndash South

31 ndash Miramar West

34 ndash Tiger Tail

35 ndash Pines Center

37 ndash Miramar Town Center

Sub-project

Establish Initial Schedule

Mark Griffin District Director of Facilities Planning and Budget

Based on bull Availability of funding bull Availability of College resources bull Availability of external resources bull Scheduled use of facility if RemodelRenovation bull Estimated duration bull Time lines will be developed based on input from all parties involved

Surveys

Mark Griffin District Director of Facilities Planning and Budget

bull Infrastructure Topographical and Boundary Survey

bull Standards developed apply to all survey work

bull Master survey must be updated for all work performed

bull Data collected supports GIS mapping of infrastructure

bull Facilitates location of utilities and provides condition assessment data

North Campus ndash Keith and Associates

Central Campus ndash Stoner and Associates

South Campus ndash Craven Thompson and Associates

State Required Forms Mark Griffin District Director of Facilities Planning and Budget

Required submittals to FDOE

httpwwwfldoeorgfinanceedual-facilitiesrequirements-for-plan-review-of-constrstml

A board which undertakes the construction remodeling renovation lease or lease-purchase of any educational plant or ancillary facility or day labor project regardless of cost or fund source shall develop policy and procedures for the review of contract and construction documents as outlined in Section 101338 FS permanent archival of plans and submission of project data as requested to the Department pursuant to sect 101350 FS

For all projects over $300000 the following forms shall be submitted to the Office of Educational Facilities for their files

bull OEF Form 110A - Project Implementation Information bull OEF Form 110B - Certificate Of Occupancy bull OEF Form 208 - Letter Of Transmittal bull OEF Form 208A - Facility Space ChartNet And Gross Square Footage bull OEF Form 209 - Certificate Of Final Inspection bull OEF Form 220 - Building Permit Application bull Construction Documents (Phase III) bull Etchellip

State Required Forms Mark Griffin District Director of Facilities Planning and Budget

Required Forms httpspublic2fldoeorgEFISRegistrationRegisteraspx

You must have a Broward College email address (Contingent Worker)

Initiation Planning Occupancy Execute

Project Planning Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Identify Stakeholders Ana Ovalles Director of Facilities Planning

Broward College end users bull Involve upper-management for input of College-wide goals bull Value end-user needs for particulars storage privacy needs and

future requests bull Refer back to Interior and Design Standards bull Request sign-off from Deans and Presidents involved

Scope bull Determine scope based on feedback from Facilities Team bull Always going back to what budget allows

BC Resources bull Coordination and plan review with the following BC personnel

Electrical HVAC Access Control CCTV Landscape Services AV Fire IT Locksmith and others BC PLANNING

Schematic Design Ana Ovalles Director of Facilities Planning

Schematic Design according to approved budget

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

Develop FFampE plan

Tamaris Alvarez Facilities Planner

FFampE coordination

Building 98 Relocation of FFampE Building 98 Equipment

FFampE INSTALL Automotive-Marine

Relocation of existing equipment

bull Planning coordinates with internal BC staff

bull Equipment layout based on approved equipment list

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Electrical amp network installation for furniture

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Equipment List

Tamaris Alvarez Facilities Planner

Furniture Fixture amp Equipment Placement

Engineering Lab Installation of new Powered Workstations bull Dimension of equipment (PC size Monitor size All in one) bull Future electrical needs from end users bull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

bull No need for two shelves bull Shelve will need to hold up to 75 lbs bull Depth for shelve = 18rsquorsquo min bull Distance between work-surface and

shelve = 15rsquorsquo min bull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelve bull Work-surface height = 34rsquorsquo (top) bull Strip 5 duplex + 1 data

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Finishes selection bull Implement standard colors for College-wide renovations and new construction Minimize

maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Project Turnover Tamaris Alvarez Facilities Planner

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

Ellice Martinez Special Projects Manager

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos Responsibilities BCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directory bull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Initiation Planning Occupancy Execute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

Deborah Czubkowski District Director of Design and Construction

Continuing Services Architects bull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendors bull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquos Surveyors Roofers

Engineers Mechanical

Electrical AV

Access Control Etc

BC Design and Construction Standards Deborah Czubkowski District Director of Design and Construction

1 Go to Browardedu

2

COMMUNITY PUBLIC

3

FACILITIES MANAGEMENT

4 STANDARDS

Broward College Design and Construction Standards

Page 3 Conformance Statement

Design Professional Responsibilities

Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditions bull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination

Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design 2 Review BC Design and

Construction Standards 3 Provide Conformance

Statement 4 Coordination with BC

Resources a Information Technology b Locksmith c Electrical and Plumbing d Mechanical e Landscape f Fire Protection g Audio Visual h Access Control i Security j Interior Design

5 Estimate of Probable Cost 6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan 3 SiteworkCivil Work 4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents 100 Design Documents

1 Written summary statement of comments included in the

1 Written summary statement of comments included in the

60 submittal 90 submittal 2

3

4

One set of structural calculations Written statement of BC Fire Marshal approval status Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for

2

3

4

Final landscape material type quantity and spacing approval by BC Landscape Manager Final drainage district approvals and SFWM approvals as applicable Final Approval from BC Fire Marshal

normal and emergency power

5

6

Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) Responsibilities

Deborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

All changes must be approved by Senior Project Manager

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre Construction CMs Responsibilities

Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phase o Preliminary cost estimates o Review of Design Documents o Review Preliminary Schedules o Preliminary Site Evaluations

bull Bid Process o Bid Advertisement o Bid Documents o Pre Bid Meetings o BC SPM to be present at Bid Opening

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 7: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Initiation Planning Occupancy Execute

FACILITIES MANAGEMENT OVERVIEW

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Initiation Planning Occupancy Execute

Project Initiation Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Need amp Funding

Mark Griffin District Director of Facilities Planning and Budget

bull All projects must be on our internal Five Year Capital Plan and any project $2M or greater must be on the Capital Improvement Plan(CIP) submitted to FLDOE

bull Projects may be driven by condition assessment findings

bull Remodel or Renovation projects may be requested by Campus

bull Projects prioritized based availability of funding and review by Senior Administration

Project Numbering

July 30th 2015

Mark Griffin District Director of Facilities Planning and Budget

Ex 1003-C14-010 FIRST 2 DIGIT CAMPUS SITE

00 ndash College Wide

10 ndash Central

Building Number

ldquoCrdquo Construction ldquoMrdquo Maintenance

ldquoPrdquo Planning

Year Project was initiated

Project assigned this year in that building

11 ndash Downtown

12 ndash Weston

14 ndash Cypress

20 ndash North

30 ndash South

31 ndash Miramar West

34 ndash Tiger Tail

35 ndash Pines Center

37 ndash Miramar Town Center

Sub-project

Establish Initial Schedule

Mark Griffin District Director of Facilities Planning and Budget

Based on bull Availability of funding bull Availability of College resources bull Availability of external resources bull Scheduled use of facility if RemodelRenovation bull Estimated duration bull Time lines will be developed based on input from all parties involved

Surveys

Mark Griffin District Director of Facilities Planning and Budget

bull Infrastructure Topographical and Boundary Survey

bull Standards developed apply to all survey work

bull Master survey must be updated for all work performed

bull Data collected supports GIS mapping of infrastructure

bull Facilitates location of utilities and provides condition assessment data

North Campus ndash Keith and Associates

Central Campus ndash Stoner and Associates

South Campus ndash Craven Thompson and Associates

State Required Forms Mark Griffin District Director of Facilities Planning and Budget

Required submittals to FDOE

httpwwwfldoeorgfinanceedual-facilitiesrequirements-for-plan-review-of-constrstml

A board which undertakes the construction remodeling renovation lease or lease-purchase of any educational plant or ancillary facility or day labor project regardless of cost or fund source shall develop policy and procedures for the review of contract and construction documents as outlined in Section 101338 FS permanent archival of plans and submission of project data as requested to the Department pursuant to sect 101350 FS

For all projects over $300000 the following forms shall be submitted to the Office of Educational Facilities for their files

bull OEF Form 110A - Project Implementation Information bull OEF Form 110B - Certificate Of Occupancy bull OEF Form 208 - Letter Of Transmittal bull OEF Form 208A - Facility Space ChartNet And Gross Square Footage bull OEF Form 209 - Certificate Of Final Inspection bull OEF Form 220 - Building Permit Application bull Construction Documents (Phase III) bull Etchellip

State Required Forms Mark Griffin District Director of Facilities Planning and Budget

Required Forms httpspublic2fldoeorgEFISRegistrationRegisteraspx

You must have a Broward College email address (Contingent Worker)

Initiation Planning Occupancy Execute

Project Planning Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Identify Stakeholders Ana Ovalles Director of Facilities Planning

Broward College end users bull Involve upper-management for input of College-wide goals bull Value end-user needs for particulars storage privacy needs and

future requests bull Refer back to Interior and Design Standards bull Request sign-off from Deans and Presidents involved

Scope bull Determine scope based on feedback from Facilities Team bull Always going back to what budget allows

BC Resources bull Coordination and plan review with the following BC personnel

Electrical HVAC Access Control CCTV Landscape Services AV Fire IT Locksmith and others BC PLANNING

Schematic Design Ana Ovalles Director of Facilities Planning

Schematic Design according to approved budget

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

Develop FFampE plan

Tamaris Alvarez Facilities Planner

FFampE coordination

Building 98 Relocation of FFampE Building 98 Equipment

FFampE INSTALL Automotive-Marine

Relocation of existing equipment

bull Planning coordinates with internal BC staff

bull Equipment layout based on approved equipment list

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Electrical amp network installation for furniture

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Equipment List

Tamaris Alvarez Facilities Planner

Furniture Fixture amp Equipment Placement

Engineering Lab Installation of new Powered Workstations bull Dimension of equipment (PC size Monitor size All in one) bull Future electrical needs from end users bull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

bull No need for two shelves bull Shelve will need to hold up to 75 lbs bull Depth for shelve = 18rsquorsquo min bull Distance between work-surface and

shelve = 15rsquorsquo min bull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelve bull Work-surface height = 34rsquorsquo (top) bull Strip 5 duplex + 1 data

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Finishes selection bull Implement standard colors for College-wide renovations and new construction Minimize

maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Project Turnover Tamaris Alvarez Facilities Planner

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

Ellice Martinez Special Projects Manager

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos Responsibilities BCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directory bull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Initiation Planning Occupancy Execute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

Deborah Czubkowski District Director of Design and Construction

Continuing Services Architects bull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendors bull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquos Surveyors Roofers

Engineers Mechanical

Electrical AV

Access Control Etc

BC Design and Construction Standards Deborah Czubkowski District Director of Design and Construction

1 Go to Browardedu

2

COMMUNITY PUBLIC

3

FACILITIES MANAGEMENT

4 STANDARDS

Broward College Design and Construction Standards

Page 3 Conformance Statement

Design Professional Responsibilities

Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditions bull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination

Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design 2 Review BC Design and

Construction Standards 3 Provide Conformance

Statement 4 Coordination with BC

Resources a Information Technology b Locksmith c Electrical and Plumbing d Mechanical e Landscape f Fire Protection g Audio Visual h Access Control i Security j Interior Design

5 Estimate of Probable Cost 6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan 3 SiteworkCivil Work 4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents 100 Design Documents

1 Written summary statement of comments included in the

1 Written summary statement of comments included in the

60 submittal 90 submittal 2

3

4

One set of structural calculations Written statement of BC Fire Marshal approval status Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for

2

3

4

Final landscape material type quantity and spacing approval by BC Landscape Manager Final drainage district approvals and SFWM approvals as applicable Final Approval from BC Fire Marshal

normal and emergency power

5

6

Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) Responsibilities

Deborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

All changes must be approved by Senior Project Manager

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre Construction CMs Responsibilities

Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phase o Preliminary cost estimates o Review of Design Documents o Review Preliminary Schedules o Preliminary Site Evaluations

bull Bid Process o Bid Advertisement o Bid Documents o Pre Bid Meetings o BC SPM to be present at Bid Opening

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 8: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Initiation Planning Occupancy Execute

Project Initiation Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Need amp Funding

Mark Griffin District Director of Facilities Planning and Budget

bull All projects must be on our internal Five Year Capital Plan and any project $2M or greater must be on the Capital Improvement Plan(CIP) submitted to FLDOE

bull Projects may be driven by condition assessment findings

bull Remodel or Renovation projects may be requested by Campus

bull Projects prioritized based availability of funding and review by Senior Administration

Project Numbering

July 30th 2015

Mark Griffin District Director of Facilities Planning and Budget

Ex 1003-C14-010 FIRST 2 DIGIT CAMPUS SITE

00 ndash College Wide

10 ndash Central

Building Number

ldquoCrdquo Construction ldquoMrdquo Maintenance

ldquoPrdquo Planning

Year Project was initiated

Project assigned this year in that building

11 ndash Downtown

12 ndash Weston

14 ndash Cypress

20 ndash North

30 ndash South

31 ndash Miramar West

34 ndash Tiger Tail

35 ndash Pines Center

37 ndash Miramar Town Center

Sub-project

Establish Initial Schedule

Mark Griffin District Director of Facilities Planning and Budget

Based on bull Availability of funding bull Availability of College resources bull Availability of external resources bull Scheduled use of facility if RemodelRenovation bull Estimated duration bull Time lines will be developed based on input from all parties involved

Surveys

Mark Griffin District Director of Facilities Planning and Budget

bull Infrastructure Topographical and Boundary Survey

bull Standards developed apply to all survey work

bull Master survey must be updated for all work performed

bull Data collected supports GIS mapping of infrastructure

bull Facilitates location of utilities and provides condition assessment data

North Campus ndash Keith and Associates

Central Campus ndash Stoner and Associates

South Campus ndash Craven Thompson and Associates

State Required Forms Mark Griffin District Director of Facilities Planning and Budget

Required submittals to FDOE

httpwwwfldoeorgfinanceedual-facilitiesrequirements-for-plan-review-of-constrstml

A board which undertakes the construction remodeling renovation lease or lease-purchase of any educational plant or ancillary facility or day labor project regardless of cost or fund source shall develop policy and procedures for the review of contract and construction documents as outlined in Section 101338 FS permanent archival of plans and submission of project data as requested to the Department pursuant to sect 101350 FS

For all projects over $300000 the following forms shall be submitted to the Office of Educational Facilities for their files

bull OEF Form 110A - Project Implementation Information bull OEF Form 110B - Certificate Of Occupancy bull OEF Form 208 - Letter Of Transmittal bull OEF Form 208A - Facility Space ChartNet And Gross Square Footage bull OEF Form 209 - Certificate Of Final Inspection bull OEF Form 220 - Building Permit Application bull Construction Documents (Phase III) bull Etchellip

State Required Forms Mark Griffin District Director of Facilities Planning and Budget

Required Forms httpspublic2fldoeorgEFISRegistrationRegisteraspx

You must have a Broward College email address (Contingent Worker)

Initiation Planning Occupancy Execute

Project Planning Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Identify Stakeholders Ana Ovalles Director of Facilities Planning

Broward College end users bull Involve upper-management for input of College-wide goals bull Value end-user needs for particulars storage privacy needs and

future requests bull Refer back to Interior and Design Standards bull Request sign-off from Deans and Presidents involved

Scope bull Determine scope based on feedback from Facilities Team bull Always going back to what budget allows

BC Resources bull Coordination and plan review with the following BC personnel

Electrical HVAC Access Control CCTV Landscape Services AV Fire IT Locksmith and others BC PLANNING

Schematic Design Ana Ovalles Director of Facilities Planning

Schematic Design according to approved budget

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

Develop FFampE plan

Tamaris Alvarez Facilities Planner

FFampE coordination

Building 98 Relocation of FFampE Building 98 Equipment

FFampE INSTALL Automotive-Marine

Relocation of existing equipment

bull Planning coordinates with internal BC staff

bull Equipment layout based on approved equipment list

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Electrical amp network installation for furniture

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Equipment List

Tamaris Alvarez Facilities Planner

Furniture Fixture amp Equipment Placement

Engineering Lab Installation of new Powered Workstations bull Dimension of equipment (PC size Monitor size All in one) bull Future electrical needs from end users bull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

bull No need for two shelves bull Shelve will need to hold up to 75 lbs bull Depth for shelve = 18rsquorsquo min bull Distance between work-surface and

shelve = 15rsquorsquo min bull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelve bull Work-surface height = 34rsquorsquo (top) bull Strip 5 duplex + 1 data

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Finishes selection bull Implement standard colors for College-wide renovations and new construction Minimize

maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Project Turnover Tamaris Alvarez Facilities Planner

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

Ellice Martinez Special Projects Manager

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos Responsibilities BCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directory bull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Initiation Planning Occupancy Execute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

Deborah Czubkowski District Director of Design and Construction

Continuing Services Architects bull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendors bull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquos Surveyors Roofers

Engineers Mechanical

Electrical AV

Access Control Etc

BC Design and Construction Standards Deborah Czubkowski District Director of Design and Construction

1 Go to Browardedu

2

COMMUNITY PUBLIC

3

FACILITIES MANAGEMENT

4 STANDARDS

Broward College Design and Construction Standards

Page 3 Conformance Statement

Design Professional Responsibilities

Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditions bull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination

Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design 2 Review BC Design and

Construction Standards 3 Provide Conformance

Statement 4 Coordination with BC

Resources a Information Technology b Locksmith c Electrical and Plumbing d Mechanical e Landscape f Fire Protection g Audio Visual h Access Control i Security j Interior Design

5 Estimate of Probable Cost 6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan 3 SiteworkCivil Work 4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents 100 Design Documents

1 Written summary statement of comments included in the

1 Written summary statement of comments included in the

60 submittal 90 submittal 2

3

4

One set of structural calculations Written statement of BC Fire Marshal approval status Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for

2

3

4

Final landscape material type quantity and spacing approval by BC Landscape Manager Final drainage district approvals and SFWM approvals as applicable Final Approval from BC Fire Marshal

normal and emergency power

5

6

Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) Responsibilities

Deborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

All changes must be approved by Senior Project Manager

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre Construction CMs Responsibilities

Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phase o Preliminary cost estimates o Review of Design Documents o Review Preliminary Schedules o Preliminary Site Evaluations

bull Bid Process o Bid Advertisement o Bid Documents o Pre Bid Meetings o BC SPM to be present at Bid Opening

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 9: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Identify Need amp Funding

Mark Griffin District Director of Facilities Planning and Budget

bull All projects must be on our internal Five Year Capital Plan and any project $2M or greater must be on the Capital Improvement Plan(CIP) submitted to FLDOE

bull Projects may be driven by condition assessment findings

bull Remodel or Renovation projects may be requested by Campus

bull Projects prioritized based availability of funding and review by Senior Administration

Project Numbering

July 30th 2015

Mark Griffin District Director of Facilities Planning and Budget

Ex 1003-C14-010 FIRST 2 DIGIT CAMPUS SITE

00 ndash College Wide

10 ndash Central

Building Number

ldquoCrdquo Construction ldquoMrdquo Maintenance

ldquoPrdquo Planning

Year Project was initiated

Project assigned this year in that building

11 ndash Downtown

12 ndash Weston

14 ndash Cypress

20 ndash North

30 ndash South

31 ndash Miramar West

34 ndash Tiger Tail

35 ndash Pines Center

37 ndash Miramar Town Center

Sub-project

Establish Initial Schedule

Mark Griffin District Director of Facilities Planning and Budget

Based on bull Availability of funding bull Availability of College resources bull Availability of external resources bull Scheduled use of facility if RemodelRenovation bull Estimated duration bull Time lines will be developed based on input from all parties involved

Surveys

Mark Griffin District Director of Facilities Planning and Budget

bull Infrastructure Topographical and Boundary Survey

bull Standards developed apply to all survey work

bull Master survey must be updated for all work performed

bull Data collected supports GIS mapping of infrastructure

bull Facilitates location of utilities and provides condition assessment data

North Campus ndash Keith and Associates

Central Campus ndash Stoner and Associates

South Campus ndash Craven Thompson and Associates

State Required Forms Mark Griffin District Director of Facilities Planning and Budget

Required submittals to FDOE

httpwwwfldoeorgfinanceedual-facilitiesrequirements-for-plan-review-of-constrstml

A board which undertakes the construction remodeling renovation lease or lease-purchase of any educational plant or ancillary facility or day labor project regardless of cost or fund source shall develop policy and procedures for the review of contract and construction documents as outlined in Section 101338 FS permanent archival of plans and submission of project data as requested to the Department pursuant to sect 101350 FS

For all projects over $300000 the following forms shall be submitted to the Office of Educational Facilities for their files

bull OEF Form 110A - Project Implementation Information bull OEF Form 110B - Certificate Of Occupancy bull OEF Form 208 - Letter Of Transmittal bull OEF Form 208A - Facility Space ChartNet And Gross Square Footage bull OEF Form 209 - Certificate Of Final Inspection bull OEF Form 220 - Building Permit Application bull Construction Documents (Phase III) bull Etchellip

State Required Forms Mark Griffin District Director of Facilities Planning and Budget

Required Forms httpspublic2fldoeorgEFISRegistrationRegisteraspx

You must have a Broward College email address (Contingent Worker)

Initiation Planning Occupancy Execute

Project Planning Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Identify Stakeholders Ana Ovalles Director of Facilities Planning

Broward College end users bull Involve upper-management for input of College-wide goals bull Value end-user needs for particulars storage privacy needs and

future requests bull Refer back to Interior and Design Standards bull Request sign-off from Deans and Presidents involved

Scope bull Determine scope based on feedback from Facilities Team bull Always going back to what budget allows

BC Resources bull Coordination and plan review with the following BC personnel

Electrical HVAC Access Control CCTV Landscape Services AV Fire IT Locksmith and others BC PLANNING

Schematic Design Ana Ovalles Director of Facilities Planning

Schematic Design according to approved budget

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

Develop FFampE plan

Tamaris Alvarez Facilities Planner

FFampE coordination

Building 98 Relocation of FFampE Building 98 Equipment

FFampE INSTALL Automotive-Marine

Relocation of existing equipment

bull Planning coordinates with internal BC staff

bull Equipment layout based on approved equipment list

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Electrical amp network installation for furniture

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Equipment List

Tamaris Alvarez Facilities Planner

Furniture Fixture amp Equipment Placement

Engineering Lab Installation of new Powered Workstations bull Dimension of equipment (PC size Monitor size All in one) bull Future electrical needs from end users bull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

bull No need for two shelves bull Shelve will need to hold up to 75 lbs bull Depth for shelve = 18rsquorsquo min bull Distance between work-surface and

shelve = 15rsquorsquo min bull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelve bull Work-surface height = 34rsquorsquo (top) bull Strip 5 duplex + 1 data

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Finishes selection bull Implement standard colors for College-wide renovations and new construction Minimize

maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Project Turnover Tamaris Alvarez Facilities Planner

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

Ellice Martinez Special Projects Manager

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos Responsibilities BCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directory bull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Initiation Planning Occupancy Execute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

Deborah Czubkowski District Director of Design and Construction

Continuing Services Architects bull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendors bull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquos Surveyors Roofers

Engineers Mechanical

Electrical AV

Access Control Etc

BC Design and Construction Standards Deborah Czubkowski District Director of Design and Construction

1 Go to Browardedu

2

COMMUNITY PUBLIC

3

FACILITIES MANAGEMENT

4 STANDARDS

Broward College Design and Construction Standards

Page 3 Conformance Statement

Design Professional Responsibilities

Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditions bull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination

Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design 2 Review BC Design and

Construction Standards 3 Provide Conformance

Statement 4 Coordination with BC

Resources a Information Technology b Locksmith c Electrical and Plumbing d Mechanical e Landscape f Fire Protection g Audio Visual h Access Control i Security j Interior Design

5 Estimate of Probable Cost 6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan 3 SiteworkCivil Work 4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents 100 Design Documents

1 Written summary statement of comments included in the

1 Written summary statement of comments included in the

60 submittal 90 submittal 2

3

4

One set of structural calculations Written statement of BC Fire Marshal approval status Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for

2

3

4

Final landscape material type quantity and spacing approval by BC Landscape Manager Final drainage district approvals and SFWM approvals as applicable Final Approval from BC Fire Marshal

normal and emergency power

5

6

Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) Responsibilities

Deborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

All changes must be approved by Senior Project Manager

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre Construction CMs Responsibilities

Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phase o Preliminary cost estimates o Review of Design Documents o Review Preliminary Schedules o Preliminary Site Evaluations

bull Bid Process o Bid Advertisement o Bid Documents o Pre Bid Meetings o BC SPM to be present at Bid Opening

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 10: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Project Numbering

July 30th 2015

Mark Griffin District Director of Facilities Planning and Budget

Ex 1003-C14-010 FIRST 2 DIGIT CAMPUS SITE

00 ndash College Wide

10 ndash Central

Building Number

ldquoCrdquo Construction ldquoMrdquo Maintenance

ldquoPrdquo Planning

Year Project was initiated

Project assigned this year in that building

11 ndash Downtown

12 ndash Weston

14 ndash Cypress

20 ndash North

30 ndash South

31 ndash Miramar West

34 ndash Tiger Tail

35 ndash Pines Center

37 ndash Miramar Town Center

Sub-project

Establish Initial Schedule

Mark Griffin District Director of Facilities Planning and Budget

Based on bull Availability of funding bull Availability of College resources bull Availability of external resources bull Scheduled use of facility if RemodelRenovation bull Estimated duration bull Time lines will be developed based on input from all parties involved

Surveys

Mark Griffin District Director of Facilities Planning and Budget

bull Infrastructure Topographical and Boundary Survey

bull Standards developed apply to all survey work

bull Master survey must be updated for all work performed

bull Data collected supports GIS mapping of infrastructure

bull Facilitates location of utilities and provides condition assessment data

North Campus ndash Keith and Associates

Central Campus ndash Stoner and Associates

South Campus ndash Craven Thompson and Associates

State Required Forms Mark Griffin District Director of Facilities Planning and Budget

Required submittals to FDOE

httpwwwfldoeorgfinanceedual-facilitiesrequirements-for-plan-review-of-constrstml

A board which undertakes the construction remodeling renovation lease or lease-purchase of any educational plant or ancillary facility or day labor project regardless of cost or fund source shall develop policy and procedures for the review of contract and construction documents as outlined in Section 101338 FS permanent archival of plans and submission of project data as requested to the Department pursuant to sect 101350 FS

For all projects over $300000 the following forms shall be submitted to the Office of Educational Facilities for their files

bull OEF Form 110A - Project Implementation Information bull OEF Form 110B - Certificate Of Occupancy bull OEF Form 208 - Letter Of Transmittal bull OEF Form 208A - Facility Space ChartNet And Gross Square Footage bull OEF Form 209 - Certificate Of Final Inspection bull OEF Form 220 - Building Permit Application bull Construction Documents (Phase III) bull Etchellip

State Required Forms Mark Griffin District Director of Facilities Planning and Budget

Required Forms httpspublic2fldoeorgEFISRegistrationRegisteraspx

You must have a Broward College email address (Contingent Worker)

Initiation Planning Occupancy Execute

Project Planning Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Identify Stakeholders Ana Ovalles Director of Facilities Planning

Broward College end users bull Involve upper-management for input of College-wide goals bull Value end-user needs for particulars storage privacy needs and

future requests bull Refer back to Interior and Design Standards bull Request sign-off from Deans and Presidents involved

Scope bull Determine scope based on feedback from Facilities Team bull Always going back to what budget allows

BC Resources bull Coordination and plan review with the following BC personnel

Electrical HVAC Access Control CCTV Landscape Services AV Fire IT Locksmith and others BC PLANNING

Schematic Design Ana Ovalles Director of Facilities Planning

Schematic Design according to approved budget

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

Develop FFampE plan

Tamaris Alvarez Facilities Planner

FFampE coordination

Building 98 Relocation of FFampE Building 98 Equipment

FFampE INSTALL Automotive-Marine

Relocation of existing equipment

bull Planning coordinates with internal BC staff

bull Equipment layout based on approved equipment list

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Electrical amp network installation for furniture

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Equipment List

Tamaris Alvarez Facilities Planner

Furniture Fixture amp Equipment Placement

Engineering Lab Installation of new Powered Workstations bull Dimension of equipment (PC size Monitor size All in one) bull Future electrical needs from end users bull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

bull No need for two shelves bull Shelve will need to hold up to 75 lbs bull Depth for shelve = 18rsquorsquo min bull Distance between work-surface and

shelve = 15rsquorsquo min bull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelve bull Work-surface height = 34rsquorsquo (top) bull Strip 5 duplex + 1 data

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Finishes selection bull Implement standard colors for College-wide renovations and new construction Minimize

maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Project Turnover Tamaris Alvarez Facilities Planner

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

Ellice Martinez Special Projects Manager

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos Responsibilities BCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directory bull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Initiation Planning Occupancy Execute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

Deborah Czubkowski District Director of Design and Construction

Continuing Services Architects bull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendors bull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquos Surveyors Roofers

Engineers Mechanical

Electrical AV

Access Control Etc

BC Design and Construction Standards Deborah Czubkowski District Director of Design and Construction

1 Go to Browardedu

2

COMMUNITY PUBLIC

3

FACILITIES MANAGEMENT

4 STANDARDS

Broward College Design and Construction Standards

Page 3 Conformance Statement

Design Professional Responsibilities

Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditions bull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination

Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design 2 Review BC Design and

Construction Standards 3 Provide Conformance

Statement 4 Coordination with BC

Resources a Information Technology b Locksmith c Electrical and Plumbing d Mechanical e Landscape f Fire Protection g Audio Visual h Access Control i Security j Interior Design

5 Estimate of Probable Cost 6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan 3 SiteworkCivil Work 4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents 100 Design Documents

1 Written summary statement of comments included in the

1 Written summary statement of comments included in the

60 submittal 90 submittal 2

3

4

One set of structural calculations Written statement of BC Fire Marshal approval status Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for

2

3

4

Final landscape material type quantity and spacing approval by BC Landscape Manager Final drainage district approvals and SFWM approvals as applicable Final Approval from BC Fire Marshal

normal and emergency power

5

6

Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) Responsibilities

Deborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

All changes must be approved by Senior Project Manager

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre Construction CMs Responsibilities

Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phase o Preliminary cost estimates o Review of Design Documents o Review Preliminary Schedules o Preliminary Site Evaluations

bull Bid Process o Bid Advertisement o Bid Documents o Pre Bid Meetings o BC SPM to be present at Bid Opening

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 11: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Establish Initial Schedule

Mark Griffin District Director of Facilities Planning and Budget

Based on bull Availability of funding bull Availability of College resources bull Availability of external resources bull Scheduled use of facility if RemodelRenovation bull Estimated duration bull Time lines will be developed based on input from all parties involved

Surveys

Mark Griffin District Director of Facilities Planning and Budget

bull Infrastructure Topographical and Boundary Survey

bull Standards developed apply to all survey work

bull Master survey must be updated for all work performed

bull Data collected supports GIS mapping of infrastructure

bull Facilitates location of utilities and provides condition assessment data

North Campus ndash Keith and Associates

Central Campus ndash Stoner and Associates

South Campus ndash Craven Thompson and Associates

State Required Forms Mark Griffin District Director of Facilities Planning and Budget

Required submittals to FDOE

httpwwwfldoeorgfinanceedual-facilitiesrequirements-for-plan-review-of-constrstml

A board which undertakes the construction remodeling renovation lease or lease-purchase of any educational plant or ancillary facility or day labor project regardless of cost or fund source shall develop policy and procedures for the review of contract and construction documents as outlined in Section 101338 FS permanent archival of plans and submission of project data as requested to the Department pursuant to sect 101350 FS

For all projects over $300000 the following forms shall be submitted to the Office of Educational Facilities for their files

bull OEF Form 110A - Project Implementation Information bull OEF Form 110B - Certificate Of Occupancy bull OEF Form 208 - Letter Of Transmittal bull OEF Form 208A - Facility Space ChartNet And Gross Square Footage bull OEF Form 209 - Certificate Of Final Inspection bull OEF Form 220 - Building Permit Application bull Construction Documents (Phase III) bull Etchellip

State Required Forms Mark Griffin District Director of Facilities Planning and Budget

Required Forms httpspublic2fldoeorgEFISRegistrationRegisteraspx

You must have a Broward College email address (Contingent Worker)

Initiation Planning Occupancy Execute

Project Planning Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Identify Stakeholders Ana Ovalles Director of Facilities Planning

Broward College end users bull Involve upper-management for input of College-wide goals bull Value end-user needs for particulars storage privacy needs and

future requests bull Refer back to Interior and Design Standards bull Request sign-off from Deans and Presidents involved

Scope bull Determine scope based on feedback from Facilities Team bull Always going back to what budget allows

BC Resources bull Coordination and plan review with the following BC personnel

Electrical HVAC Access Control CCTV Landscape Services AV Fire IT Locksmith and others BC PLANNING

Schematic Design Ana Ovalles Director of Facilities Planning

Schematic Design according to approved budget

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

Develop FFampE plan

Tamaris Alvarez Facilities Planner

FFampE coordination

Building 98 Relocation of FFampE Building 98 Equipment

FFampE INSTALL Automotive-Marine

Relocation of existing equipment

bull Planning coordinates with internal BC staff

bull Equipment layout based on approved equipment list

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Electrical amp network installation for furniture

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Equipment List

Tamaris Alvarez Facilities Planner

Furniture Fixture amp Equipment Placement

Engineering Lab Installation of new Powered Workstations bull Dimension of equipment (PC size Monitor size All in one) bull Future electrical needs from end users bull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

bull No need for two shelves bull Shelve will need to hold up to 75 lbs bull Depth for shelve = 18rsquorsquo min bull Distance between work-surface and

shelve = 15rsquorsquo min bull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelve bull Work-surface height = 34rsquorsquo (top) bull Strip 5 duplex + 1 data

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Finishes selection bull Implement standard colors for College-wide renovations and new construction Minimize

maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Project Turnover Tamaris Alvarez Facilities Planner

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

Ellice Martinez Special Projects Manager

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos Responsibilities BCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directory bull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Initiation Planning Occupancy Execute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

Deborah Czubkowski District Director of Design and Construction

Continuing Services Architects bull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendors bull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquos Surveyors Roofers

Engineers Mechanical

Electrical AV

Access Control Etc

BC Design and Construction Standards Deborah Czubkowski District Director of Design and Construction

1 Go to Browardedu

2

COMMUNITY PUBLIC

3

FACILITIES MANAGEMENT

4 STANDARDS

Broward College Design and Construction Standards

Page 3 Conformance Statement

Design Professional Responsibilities

Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditions bull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination

Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design 2 Review BC Design and

Construction Standards 3 Provide Conformance

Statement 4 Coordination with BC

Resources a Information Technology b Locksmith c Electrical and Plumbing d Mechanical e Landscape f Fire Protection g Audio Visual h Access Control i Security j Interior Design

5 Estimate of Probable Cost 6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan 3 SiteworkCivil Work 4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents 100 Design Documents

1 Written summary statement of comments included in the

1 Written summary statement of comments included in the

60 submittal 90 submittal 2

3

4

One set of structural calculations Written statement of BC Fire Marshal approval status Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for

2

3

4

Final landscape material type quantity and spacing approval by BC Landscape Manager Final drainage district approvals and SFWM approvals as applicable Final Approval from BC Fire Marshal

normal and emergency power

5

6

Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) Responsibilities

Deborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

All changes must be approved by Senior Project Manager

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre Construction CMs Responsibilities

Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phase o Preliminary cost estimates o Review of Design Documents o Review Preliminary Schedules o Preliminary Site Evaluations

bull Bid Process o Bid Advertisement o Bid Documents o Pre Bid Meetings o BC SPM to be present at Bid Opening

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 12: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Surveys

Mark Griffin District Director of Facilities Planning and Budget

bull Infrastructure Topographical and Boundary Survey

bull Standards developed apply to all survey work

bull Master survey must be updated for all work performed

bull Data collected supports GIS mapping of infrastructure

bull Facilitates location of utilities and provides condition assessment data

North Campus ndash Keith and Associates

Central Campus ndash Stoner and Associates

South Campus ndash Craven Thompson and Associates

State Required Forms Mark Griffin District Director of Facilities Planning and Budget

Required submittals to FDOE

httpwwwfldoeorgfinanceedual-facilitiesrequirements-for-plan-review-of-constrstml

A board which undertakes the construction remodeling renovation lease or lease-purchase of any educational plant or ancillary facility or day labor project regardless of cost or fund source shall develop policy and procedures for the review of contract and construction documents as outlined in Section 101338 FS permanent archival of plans and submission of project data as requested to the Department pursuant to sect 101350 FS

For all projects over $300000 the following forms shall be submitted to the Office of Educational Facilities for their files

bull OEF Form 110A - Project Implementation Information bull OEF Form 110B - Certificate Of Occupancy bull OEF Form 208 - Letter Of Transmittal bull OEF Form 208A - Facility Space ChartNet And Gross Square Footage bull OEF Form 209 - Certificate Of Final Inspection bull OEF Form 220 - Building Permit Application bull Construction Documents (Phase III) bull Etchellip

State Required Forms Mark Griffin District Director of Facilities Planning and Budget

Required Forms httpspublic2fldoeorgEFISRegistrationRegisteraspx

You must have a Broward College email address (Contingent Worker)

Initiation Planning Occupancy Execute

Project Planning Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Identify Stakeholders Ana Ovalles Director of Facilities Planning

Broward College end users bull Involve upper-management for input of College-wide goals bull Value end-user needs for particulars storage privacy needs and

future requests bull Refer back to Interior and Design Standards bull Request sign-off from Deans and Presidents involved

Scope bull Determine scope based on feedback from Facilities Team bull Always going back to what budget allows

BC Resources bull Coordination and plan review with the following BC personnel

Electrical HVAC Access Control CCTV Landscape Services AV Fire IT Locksmith and others BC PLANNING

Schematic Design Ana Ovalles Director of Facilities Planning

Schematic Design according to approved budget

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

Develop FFampE plan

Tamaris Alvarez Facilities Planner

FFampE coordination

Building 98 Relocation of FFampE Building 98 Equipment

FFampE INSTALL Automotive-Marine

Relocation of existing equipment

bull Planning coordinates with internal BC staff

bull Equipment layout based on approved equipment list

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Electrical amp network installation for furniture

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Equipment List

Tamaris Alvarez Facilities Planner

Furniture Fixture amp Equipment Placement

Engineering Lab Installation of new Powered Workstations bull Dimension of equipment (PC size Monitor size All in one) bull Future electrical needs from end users bull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

bull No need for two shelves bull Shelve will need to hold up to 75 lbs bull Depth for shelve = 18rsquorsquo min bull Distance between work-surface and

shelve = 15rsquorsquo min bull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelve bull Work-surface height = 34rsquorsquo (top) bull Strip 5 duplex + 1 data

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Finishes selection bull Implement standard colors for College-wide renovations and new construction Minimize

maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Project Turnover Tamaris Alvarez Facilities Planner

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

Ellice Martinez Special Projects Manager

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos Responsibilities BCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directory bull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Initiation Planning Occupancy Execute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

Deborah Czubkowski District Director of Design and Construction

Continuing Services Architects bull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendors bull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquos Surveyors Roofers

Engineers Mechanical

Electrical AV

Access Control Etc

BC Design and Construction Standards Deborah Czubkowski District Director of Design and Construction

1 Go to Browardedu

2

COMMUNITY PUBLIC

3

FACILITIES MANAGEMENT

4 STANDARDS

Broward College Design and Construction Standards

Page 3 Conformance Statement

Design Professional Responsibilities

Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditions bull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination

Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design 2 Review BC Design and

Construction Standards 3 Provide Conformance

Statement 4 Coordination with BC

Resources a Information Technology b Locksmith c Electrical and Plumbing d Mechanical e Landscape f Fire Protection g Audio Visual h Access Control i Security j Interior Design

5 Estimate of Probable Cost 6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan 3 SiteworkCivil Work 4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents 100 Design Documents

1 Written summary statement of comments included in the

1 Written summary statement of comments included in the

60 submittal 90 submittal 2

3

4

One set of structural calculations Written statement of BC Fire Marshal approval status Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for

2

3

4

Final landscape material type quantity and spacing approval by BC Landscape Manager Final drainage district approvals and SFWM approvals as applicable Final Approval from BC Fire Marshal

normal and emergency power

5

6

Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) Responsibilities

Deborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

All changes must be approved by Senior Project Manager

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre Construction CMs Responsibilities

Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phase o Preliminary cost estimates o Review of Design Documents o Review Preliminary Schedules o Preliminary Site Evaluations

bull Bid Process o Bid Advertisement o Bid Documents o Pre Bid Meetings o BC SPM to be present at Bid Opening

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 13: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

State Required Forms Mark Griffin District Director of Facilities Planning and Budget

Required submittals to FDOE

httpwwwfldoeorgfinanceedual-facilitiesrequirements-for-plan-review-of-constrstml

A board which undertakes the construction remodeling renovation lease or lease-purchase of any educational plant or ancillary facility or day labor project regardless of cost or fund source shall develop policy and procedures for the review of contract and construction documents as outlined in Section 101338 FS permanent archival of plans and submission of project data as requested to the Department pursuant to sect 101350 FS

For all projects over $300000 the following forms shall be submitted to the Office of Educational Facilities for their files

bull OEF Form 110A - Project Implementation Information bull OEF Form 110B - Certificate Of Occupancy bull OEF Form 208 - Letter Of Transmittal bull OEF Form 208A - Facility Space ChartNet And Gross Square Footage bull OEF Form 209 - Certificate Of Final Inspection bull OEF Form 220 - Building Permit Application bull Construction Documents (Phase III) bull Etchellip

State Required Forms Mark Griffin District Director of Facilities Planning and Budget

Required Forms httpspublic2fldoeorgEFISRegistrationRegisteraspx

You must have a Broward College email address (Contingent Worker)

Initiation Planning Occupancy Execute

Project Planning Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Identify Stakeholders Ana Ovalles Director of Facilities Planning

Broward College end users bull Involve upper-management for input of College-wide goals bull Value end-user needs for particulars storage privacy needs and

future requests bull Refer back to Interior and Design Standards bull Request sign-off from Deans and Presidents involved

Scope bull Determine scope based on feedback from Facilities Team bull Always going back to what budget allows

BC Resources bull Coordination and plan review with the following BC personnel

Electrical HVAC Access Control CCTV Landscape Services AV Fire IT Locksmith and others BC PLANNING

Schematic Design Ana Ovalles Director of Facilities Planning

Schematic Design according to approved budget

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

Develop FFampE plan

Tamaris Alvarez Facilities Planner

FFampE coordination

Building 98 Relocation of FFampE Building 98 Equipment

FFampE INSTALL Automotive-Marine

Relocation of existing equipment

bull Planning coordinates with internal BC staff

bull Equipment layout based on approved equipment list

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Electrical amp network installation for furniture

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Equipment List

Tamaris Alvarez Facilities Planner

Furniture Fixture amp Equipment Placement

Engineering Lab Installation of new Powered Workstations bull Dimension of equipment (PC size Monitor size All in one) bull Future electrical needs from end users bull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

bull No need for two shelves bull Shelve will need to hold up to 75 lbs bull Depth for shelve = 18rsquorsquo min bull Distance between work-surface and

shelve = 15rsquorsquo min bull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelve bull Work-surface height = 34rsquorsquo (top) bull Strip 5 duplex + 1 data

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Finishes selection bull Implement standard colors for College-wide renovations and new construction Minimize

maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Project Turnover Tamaris Alvarez Facilities Planner

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

Ellice Martinez Special Projects Manager

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos Responsibilities BCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directory bull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Initiation Planning Occupancy Execute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

Deborah Czubkowski District Director of Design and Construction

Continuing Services Architects bull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendors bull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquos Surveyors Roofers

Engineers Mechanical

Electrical AV

Access Control Etc

BC Design and Construction Standards Deborah Czubkowski District Director of Design and Construction

1 Go to Browardedu

2

COMMUNITY PUBLIC

3

FACILITIES MANAGEMENT

4 STANDARDS

Broward College Design and Construction Standards

Page 3 Conformance Statement

Design Professional Responsibilities

Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditions bull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination

Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design 2 Review BC Design and

Construction Standards 3 Provide Conformance

Statement 4 Coordination with BC

Resources a Information Technology b Locksmith c Electrical and Plumbing d Mechanical e Landscape f Fire Protection g Audio Visual h Access Control i Security j Interior Design

5 Estimate of Probable Cost 6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan 3 SiteworkCivil Work 4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents 100 Design Documents

1 Written summary statement of comments included in the

1 Written summary statement of comments included in the

60 submittal 90 submittal 2

3

4

One set of structural calculations Written statement of BC Fire Marshal approval status Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for

2

3

4

Final landscape material type quantity and spacing approval by BC Landscape Manager Final drainage district approvals and SFWM approvals as applicable Final Approval from BC Fire Marshal

normal and emergency power

5

6

Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) Responsibilities

Deborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

All changes must be approved by Senior Project Manager

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre Construction CMs Responsibilities

Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phase o Preliminary cost estimates o Review of Design Documents o Review Preliminary Schedules o Preliminary Site Evaluations

bull Bid Process o Bid Advertisement o Bid Documents o Pre Bid Meetings o BC SPM to be present at Bid Opening

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 14: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

State Required Forms Mark Griffin District Director of Facilities Planning and Budget

Required Forms httpspublic2fldoeorgEFISRegistrationRegisteraspx

You must have a Broward College email address (Contingent Worker)

Initiation Planning Occupancy Execute

Project Planning Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Identify Stakeholders Ana Ovalles Director of Facilities Planning

Broward College end users bull Involve upper-management for input of College-wide goals bull Value end-user needs for particulars storage privacy needs and

future requests bull Refer back to Interior and Design Standards bull Request sign-off from Deans and Presidents involved

Scope bull Determine scope based on feedback from Facilities Team bull Always going back to what budget allows

BC Resources bull Coordination and plan review with the following BC personnel

Electrical HVAC Access Control CCTV Landscape Services AV Fire IT Locksmith and others BC PLANNING

Schematic Design Ana Ovalles Director of Facilities Planning

Schematic Design according to approved budget

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

Develop FFampE plan

Tamaris Alvarez Facilities Planner

FFampE coordination

Building 98 Relocation of FFampE Building 98 Equipment

FFampE INSTALL Automotive-Marine

Relocation of existing equipment

bull Planning coordinates with internal BC staff

bull Equipment layout based on approved equipment list

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Electrical amp network installation for furniture

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Equipment List

Tamaris Alvarez Facilities Planner

Furniture Fixture amp Equipment Placement

Engineering Lab Installation of new Powered Workstations bull Dimension of equipment (PC size Monitor size All in one) bull Future electrical needs from end users bull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

bull No need for two shelves bull Shelve will need to hold up to 75 lbs bull Depth for shelve = 18rsquorsquo min bull Distance between work-surface and

shelve = 15rsquorsquo min bull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelve bull Work-surface height = 34rsquorsquo (top) bull Strip 5 duplex + 1 data

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Finishes selection bull Implement standard colors for College-wide renovations and new construction Minimize

maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Project Turnover Tamaris Alvarez Facilities Planner

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

Ellice Martinez Special Projects Manager

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos Responsibilities BCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directory bull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Initiation Planning Occupancy Execute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

Deborah Czubkowski District Director of Design and Construction

Continuing Services Architects bull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendors bull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquos Surveyors Roofers

Engineers Mechanical

Electrical AV

Access Control Etc

BC Design and Construction Standards Deborah Czubkowski District Director of Design and Construction

1 Go to Browardedu

2

COMMUNITY PUBLIC

3

FACILITIES MANAGEMENT

4 STANDARDS

Broward College Design and Construction Standards

Page 3 Conformance Statement

Design Professional Responsibilities

Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditions bull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination

Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design 2 Review BC Design and

Construction Standards 3 Provide Conformance

Statement 4 Coordination with BC

Resources a Information Technology b Locksmith c Electrical and Plumbing d Mechanical e Landscape f Fire Protection g Audio Visual h Access Control i Security j Interior Design

5 Estimate of Probable Cost 6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan 3 SiteworkCivil Work 4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents 100 Design Documents

1 Written summary statement of comments included in the

1 Written summary statement of comments included in the

60 submittal 90 submittal 2

3

4

One set of structural calculations Written statement of BC Fire Marshal approval status Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for

2

3

4

Final landscape material type quantity and spacing approval by BC Landscape Manager Final drainage district approvals and SFWM approvals as applicable Final Approval from BC Fire Marshal

normal and emergency power

5

6

Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) Responsibilities

Deborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

All changes must be approved by Senior Project Manager

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre Construction CMs Responsibilities

Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phase o Preliminary cost estimates o Review of Design Documents o Review Preliminary Schedules o Preliminary Site Evaluations

bull Bid Process o Bid Advertisement o Bid Documents o Pre Bid Meetings o BC SPM to be present at Bid Opening

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 15: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Initiation Planning Occupancy Execute

Project Planning Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Identify Stakeholders Ana Ovalles Director of Facilities Planning

Broward College end users bull Involve upper-management for input of College-wide goals bull Value end-user needs for particulars storage privacy needs and

future requests bull Refer back to Interior and Design Standards bull Request sign-off from Deans and Presidents involved

Scope bull Determine scope based on feedback from Facilities Team bull Always going back to what budget allows

BC Resources bull Coordination and plan review with the following BC personnel

Electrical HVAC Access Control CCTV Landscape Services AV Fire IT Locksmith and others BC PLANNING

Schematic Design Ana Ovalles Director of Facilities Planning

Schematic Design according to approved budget

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

Develop FFampE plan

Tamaris Alvarez Facilities Planner

FFampE coordination

Building 98 Relocation of FFampE Building 98 Equipment

FFampE INSTALL Automotive-Marine

Relocation of existing equipment

bull Planning coordinates with internal BC staff

bull Equipment layout based on approved equipment list

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Electrical amp network installation for furniture

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Equipment List

Tamaris Alvarez Facilities Planner

Furniture Fixture amp Equipment Placement

Engineering Lab Installation of new Powered Workstations bull Dimension of equipment (PC size Monitor size All in one) bull Future electrical needs from end users bull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

bull No need for two shelves bull Shelve will need to hold up to 75 lbs bull Depth for shelve = 18rsquorsquo min bull Distance between work-surface and

shelve = 15rsquorsquo min bull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelve bull Work-surface height = 34rsquorsquo (top) bull Strip 5 duplex + 1 data

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Finishes selection bull Implement standard colors for College-wide renovations and new construction Minimize

maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Project Turnover Tamaris Alvarez Facilities Planner

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

Ellice Martinez Special Projects Manager

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos Responsibilities BCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directory bull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Initiation Planning Occupancy Execute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

Deborah Czubkowski District Director of Design and Construction

Continuing Services Architects bull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendors bull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquos Surveyors Roofers

Engineers Mechanical

Electrical AV

Access Control Etc

BC Design and Construction Standards Deborah Czubkowski District Director of Design and Construction

1 Go to Browardedu

2

COMMUNITY PUBLIC

3

FACILITIES MANAGEMENT

4 STANDARDS

Broward College Design and Construction Standards

Page 3 Conformance Statement

Design Professional Responsibilities

Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditions bull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination

Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design 2 Review BC Design and

Construction Standards 3 Provide Conformance

Statement 4 Coordination with BC

Resources a Information Technology b Locksmith c Electrical and Plumbing d Mechanical e Landscape f Fire Protection g Audio Visual h Access Control i Security j Interior Design

5 Estimate of Probable Cost 6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan 3 SiteworkCivil Work 4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents 100 Design Documents

1 Written summary statement of comments included in the

1 Written summary statement of comments included in the

60 submittal 90 submittal 2

3

4

One set of structural calculations Written statement of BC Fire Marshal approval status Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for

2

3

4

Final landscape material type quantity and spacing approval by BC Landscape Manager Final drainage district approvals and SFWM approvals as applicable Final Approval from BC Fire Marshal

normal and emergency power

5

6

Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) Responsibilities

Deborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

All changes must be approved by Senior Project Manager

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre Construction CMs Responsibilities

Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phase o Preliminary cost estimates o Review of Design Documents o Review Preliminary Schedules o Preliminary Site Evaluations

bull Bid Process o Bid Advertisement o Bid Documents o Pre Bid Meetings o BC SPM to be present at Bid Opening

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 16: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Identify Stakeholders Ana Ovalles Director of Facilities Planning

Broward College end users bull Involve upper-management for input of College-wide goals bull Value end-user needs for particulars storage privacy needs and

future requests bull Refer back to Interior and Design Standards bull Request sign-off from Deans and Presidents involved

Scope bull Determine scope based on feedback from Facilities Team bull Always going back to what budget allows

BC Resources bull Coordination and plan review with the following BC personnel

Electrical HVAC Access Control CCTV Landscape Services AV Fire IT Locksmith and others BC PLANNING

Schematic Design Ana Ovalles Director of Facilities Planning

Schematic Design according to approved budget

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

Develop FFampE plan

Tamaris Alvarez Facilities Planner

FFampE coordination

Building 98 Relocation of FFampE Building 98 Equipment

FFampE INSTALL Automotive-Marine

Relocation of existing equipment

bull Planning coordinates with internal BC staff

bull Equipment layout based on approved equipment list

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Electrical amp network installation for furniture

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Equipment List

Tamaris Alvarez Facilities Planner

Furniture Fixture amp Equipment Placement

Engineering Lab Installation of new Powered Workstations bull Dimension of equipment (PC size Monitor size All in one) bull Future electrical needs from end users bull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

bull No need for two shelves bull Shelve will need to hold up to 75 lbs bull Depth for shelve = 18rsquorsquo min bull Distance between work-surface and

shelve = 15rsquorsquo min bull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelve bull Work-surface height = 34rsquorsquo (top) bull Strip 5 duplex + 1 data

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Finishes selection bull Implement standard colors for College-wide renovations and new construction Minimize

maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Project Turnover Tamaris Alvarez Facilities Planner

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

Ellice Martinez Special Projects Manager

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos Responsibilities BCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directory bull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Initiation Planning Occupancy Execute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

Deborah Czubkowski District Director of Design and Construction

Continuing Services Architects bull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendors bull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquos Surveyors Roofers

Engineers Mechanical

Electrical AV

Access Control Etc

BC Design and Construction Standards Deborah Czubkowski District Director of Design and Construction

1 Go to Browardedu

2

COMMUNITY PUBLIC

3

FACILITIES MANAGEMENT

4 STANDARDS

Broward College Design and Construction Standards

Page 3 Conformance Statement

Design Professional Responsibilities

Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditions bull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination

Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design 2 Review BC Design and

Construction Standards 3 Provide Conformance

Statement 4 Coordination with BC

Resources a Information Technology b Locksmith c Electrical and Plumbing d Mechanical e Landscape f Fire Protection g Audio Visual h Access Control i Security j Interior Design

5 Estimate of Probable Cost 6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan 3 SiteworkCivil Work 4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents 100 Design Documents

1 Written summary statement of comments included in the

1 Written summary statement of comments included in the

60 submittal 90 submittal 2

3

4

One set of structural calculations Written statement of BC Fire Marshal approval status Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for

2

3

4

Final landscape material type quantity and spacing approval by BC Landscape Manager Final drainage district approvals and SFWM approvals as applicable Final Approval from BC Fire Marshal

normal and emergency power

5

6

Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) Responsibilities

Deborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

All changes must be approved by Senior Project Manager

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre Construction CMs Responsibilities

Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phase o Preliminary cost estimates o Review of Design Documents o Review Preliminary Schedules o Preliminary Site Evaluations

bull Bid Process o Bid Advertisement o Bid Documents o Pre Bid Meetings o BC SPM to be present at Bid Opening

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 17: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Schematic Design Ana Ovalles Director of Facilities Planning

Schematic Design according to approved budget

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

Develop FFampE plan

Tamaris Alvarez Facilities Planner

FFampE coordination

Building 98 Relocation of FFampE Building 98 Equipment

FFampE INSTALL Automotive-Marine

Relocation of existing equipment

bull Planning coordinates with internal BC staff

bull Equipment layout based on approved equipment list

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Electrical amp network installation for furniture

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Equipment List

Tamaris Alvarez Facilities Planner

Furniture Fixture amp Equipment Placement

Engineering Lab Installation of new Powered Workstations bull Dimension of equipment (PC size Monitor size All in one) bull Future electrical needs from end users bull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

bull No need for two shelves bull Shelve will need to hold up to 75 lbs bull Depth for shelve = 18rsquorsquo min bull Distance between work-surface and

shelve = 15rsquorsquo min bull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelve bull Work-surface height = 34rsquorsquo (top) bull Strip 5 duplex + 1 data

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Finishes selection bull Implement standard colors for College-wide renovations and new construction Minimize

maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Project Turnover Tamaris Alvarez Facilities Planner

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

Ellice Martinez Special Projects Manager

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos Responsibilities BCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directory bull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Initiation Planning Occupancy Execute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

Deborah Czubkowski District Director of Design and Construction

Continuing Services Architects bull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendors bull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquos Surveyors Roofers

Engineers Mechanical

Electrical AV

Access Control Etc

BC Design and Construction Standards Deborah Czubkowski District Director of Design and Construction

1 Go to Browardedu

2

COMMUNITY PUBLIC

3

FACILITIES MANAGEMENT

4 STANDARDS

Broward College Design and Construction Standards

Page 3 Conformance Statement

Design Professional Responsibilities

Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditions bull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination

Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design 2 Review BC Design and

Construction Standards 3 Provide Conformance

Statement 4 Coordination with BC

Resources a Information Technology b Locksmith c Electrical and Plumbing d Mechanical e Landscape f Fire Protection g Audio Visual h Access Control i Security j Interior Design

5 Estimate of Probable Cost 6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan 3 SiteworkCivil Work 4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents 100 Design Documents

1 Written summary statement of comments included in the

1 Written summary statement of comments included in the

60 submittal 90 submittal 2

3

4

One set of structural calculations Written statement of BC Fire Marshal approval status Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for

2

3

4

Final landscape material type quantity and spacing approval by BC Landscape Manager Final drainage district approvals and SFWM approvals as applicable Final Approval from BC Fire Marshal

normal and emergency power

5

6

Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) Responsibilities

Deborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

All changes must be approved by Senior Project Manager

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre Construction CMs Responsibilities

Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phase o Preliminary cost estimates o Review of Design Documents o Review Preliminary Schedules o Preliminary Site Evaluations

bull Bid Process o Bid Advertisement o Bid Documents o Pre Bid Meetings o BC SPM to be present at Bid Opening

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 18: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

Develop FFampE plan

Tamaris Alvarez Facilities Planner

FFampE coordination

Building 98 Relocation of FFampE Building 98 Equipment

FFampE INSTALL Automotive-Marine

Relocation of existing equipment

bull Planning coordinates with internal BC staff

bull Equipment layout based on approved equipment list

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Electrical amp network installation for furniture

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Equipment List

Tamaris Alvarez Facilities Planner

Furniture Fixture amp Equipment Placement

Engineering Lab Installation of new Powered Workstations bull Dimension of equipment (PC size Monitor size All in one) bull Future electrical needs from end users bull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

bull No need for two shelves bull Shelve will need to hold up to 75 lbs bull Depth for shelve = 18rsquorsquo min bull Distance between work-surface and

shelve = 15rsquorsquo min bull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelve bull Work-surface height = 34rsquorsquo (top) bull Strip 5 duplex + 1 data

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Finishes selection bull Implement standard colors for College-wide renovations and new construction Minimize

maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Project Turnover Tamaris Alvarez Facilities Planner

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

Ellice Martinez Special Projects Manager

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos Responsibilities BCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directory bull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Initiation Planning Occupancy Execute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

Deborah Czubkowski District Director of Design and Construction

Continuing Services Architects bull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendors bull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquos Surveyors Roofers

Engineers Mechanical

Electrical AV

Access Control Etc

BC Design and Construction Standards Deborah Czubkowski District Director of Design and Construction

1 Go to Browardedu

2

COMMUNITY PUBLIC

3

FACILITIES MANAGEMENT

4 STANDARDS

Broward College Design and Construction Standards

Page 3 Conformance Statement

Design Professional Responsibilities

Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditions bull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination

Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design 2 Review BC Design and

Construction Standards 3 Provide Conformance

Statement 4 Coordination with BC

Resources a Information Technology b Locksmith c Electrical and Plumbing d Mechanical e Landscape f Fire Protection g Audio Visual h Access Control i Security j Interior Design

5 Estimate of Probable Cost 6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan 3 SiteworkCivil Work 4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents 100 Design Documents

1 Written summary statement of comments included in the

1 Written summary statement of comments included in the

60 submittal 90 submittal 2

3

4

One set of structural calculations Written statement of BC Fire Marshal approval status Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for

2

3

4

Final landscape material type quantity and spacing approval by BC Landscape Manager Final drainage district approvals and SFWM approvals as applicable Final Approval from BC Fire Marshal

normal and emergency power

5

6

Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) Responsibilities

Deborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

All changes must be approved by Senior Project Manager

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre Construction CMs Responsibilities

Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phase o Preliminary cost estimates o Review of Design Documents o Review Preliminary Schedules o Preliminary Site Evaluations

bull Bid Process o Bid Advertisement o Bid Documents o Pre Bid Meetings o BC SPM to be present at Bid Opening

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 19: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Develop FFampE plan

Tamaris Alvarez Facilities Planner

FFampE coordination

Building 98 Relocation of FFampE Building 98 Equipment

FFampE INSTALL Automotive-Marine

Relocation of existing equipment

bull Planning coordinates with internal BC staff

bull Equipment layout based on approved equipment list

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Electrical amp network installation for furniture

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Equipment List

Tamaris Alvarez Facilities Planner

Furniture Fixture amp Equipment Placement

Engineering Lab Installation of new Powered Workstations bull Dimension of equipment (PC size Monitor size All in one) bull Future electrical needs from end users bull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

bull No need for two shelves bull Shelve will need to hold up to 75 lbs bull Depth for shelve = 18rsquorsquo min bull Distance between work-surface and

shelve = 15rsquorsquo min bull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelve bull Work-surface height = 34rsquorsquo (top) bull Strip 5 duplex + 1 data

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Finishes selection bull Implement standard colors for College-wide renovations and new construction Minimize

maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Project Turnover Tamaris Alvarez Facilities Planner

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

Ellice Martinez Special Projects Manager

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos Responsibilities BCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directory bull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Initiation Planning Occupancy Execute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

Deborah Czubkowski District Director of Design and Construction

Continuing Services Architects bull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendors bull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquos Surveyors Roofers

Engineers Mechanical

Electrical AV

Access Control Etc

BC Design and Construction Standards Deborah Czubkowski District Director of Design and Construction

1 Go to Browardedu

2

COMMUNITY PUBLIC

3

FACILITIES MANAGEMENT

4 STANDARDS

Broward College Design and Construction Standards

Page 3 Conformance Statement

Design Professional Responsibilities

Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditions bull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination

Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design 2 Review BC Design and

Construction Standards 3 Provide Conformance

Statement 4 Coordination with BC

Resources a Information Technology b Locksmith c Electrical and Plumbing d Mechanical e Landscape f Fire Protection g Audio Visual h Access Control i Security j Interior Design

5 Estimate of Probable Cost 6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan 3 SiteworkCivil Work 4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents 100 Design Documents

1 Written summary statement of comments included in the

1 Written summary statement of comments included in the

60 submittal 90 submittal 2

3

4

One set of structural calculations Written statement of BC Fire Marshal approval status Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for

2

3

4

Final landscape material type quantity and spacing approval by BC Landscape Manager Final drainage district approvals and SFWM approvals as applicable Final Approval from BC Fire Marshal

normal and emergency power

5

6

Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) Responsibilities

Deborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

All changes must be approved by Senior Project Manager

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre Construction CMs Responsibilities

Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phase o Preliminary cost estimates o Review of Design Documents o Review Preliminary Schedules o Preliminary Site Evaluations

bull Bid Process o Bid Advertisement o Bid Documents o Pre Bid Meetings o BC SPM to be present at Bid Opening

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 20: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Electrical amp network installation for furniture

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Equipment List

Tamaris Alvarez Facilities Planner

Furniture Fixture amp Equipment Placement

Engineering Lab Installation of new Powered Workstations bull Dimension of equipment (PC size Monitor size All in one) bull Future electrical needs from end users bull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

bull No need for two shelves bull Shelve will need to hold up to 75 lbs bull Depth for shelve = 18rsquorsquo min bull Distance between work-surface and

shelve = 15rsquorsquo min bull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelve bull Work-surface height = 34rsquorsquo (top) bull Strip 5 duplex + 1 data

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Finishes selection bull Implement standard colors for College-wide renovations and new construction Minimize

maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Project Turnover Tamaris Alvarez Facilities Planner

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

Ellice Martinez Special Projects Manager

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos Responsibilities BCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directory bull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Initiation Planning Occupancy Execute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

Deborah Czubkowski District Director of Design and Construction

Continuing Services Architects bull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendors bull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquos Surveyors Roofers

Engineers Mechanical

Electrical AV

Access Control Etc

BC Design and Construction Standards Deborah Czubkowski District Director of Design and Construction

1 Go to Browardedu

2

COMMUNITY PUBLIC

3

FACILITIES MANAGEMENT

4 STANDARDS

Broward College Design and Construction Standards

Page 3 Conformance Statement

Design Professional Responsibilities

Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditions bull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination

Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design 2 Review BC Design and

Construction Standards 3 Provide Conformance

Statement 4 Coordination with BC

Resources a Information Technology b Locksmith c Electrical and Plumbing d Mechanical e Landscape f Fire Protection g Audio Visual h Access Control i Security j Interior Design

5 Estimate of Probable Cost 6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan 3 SiteworkCivil Work 4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents 100 Design Documents

1 Written summary statement of comments included in the

1 Written summary statement of comments included in the

60 submittal 90 submittal 2

3

4

One set of structural calculations Written statement of BC Fire Marshal approval status Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for

2

3

4

Final landscape material type quantity and spacing approval by BC Landscape Manager Final drainage district approvals and SFWM approvals as applicable Final Approval from BC Fire Marshal

normal and emergency power

5

6

Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) Responsibilities

Deborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

All changes must be approved by Senior Project Manager

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre Construction CMs Responsibilities

Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phase o Preliminary cost estimates o Review of Design Documents o Review Preliminary Schedules o Preliminary Site Evaluations

bull Bid Process o Bid Advertisement o Bid Documents o Pre Bid Meetings o BC SPM to be present at Bid Opening

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 21: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Equipment List

Tamaris Alvarez Facilities Planner

Furniture Fixture amp Equipment Placement

Engineering Lab Installation of new Powered Workstations bull Dimension of equipment (PC size Monitor size All in one) bull Future electrical needs from end users bull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

bull No need for two shelves bull Shelve will need to hold up to 75 lbs bull Depth for shelve = 18rsquorsquo min bull Distance between work-surface and

shelve = 15rsquorsquo min bull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelve bull Work-surface height = 34rsquorsquo (top) bull Strip 5 duplex + 1 data

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Finishes selection bull Implement standard colors for College-wide renovations and new construction Minimize

maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Project Turnover Tamaris Alvarez Facilities Planner

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

Ellice Martinez Special Projects Manager

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos Responsibilities BCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directory bull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Initiation Planning Occupancy Execute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

Deborah Czubkowski District Director of Design and Construction

Continuing Services Architects bull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendors bull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquos Surveyors Roofers

Engineers Mechanical

Electrical AV

Access Control Etc

BC Design and Construction Standards Deborah Czubkowski District Director of Design and Construction

1 Go to Browardedu

2

COMMUNITY PUBLIC

3

FACILITIES MANAGEMENT

4 STANDARDS

Broward College Design and Construction Standards

Page 3 Conformance Statement

Design Professional Responsibilities

Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditions bull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination

Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design 2 Review BC Design and

Construction Standards 3 Provide Conformance

Statement 4 Coordination with BC

Resources a Information Technology b Locksmith c Electrical and Plumbing d Mechanical e Landscape f Fire Protection g Audio Visual h Access Control i Security j Interior Design

5 Estimate of Probable Cost 6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan 3 SiteworkCivil Work 4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents 100 Design Documents

1 Written summary statement of comments included in the

1 Written summary statement of comments included in the

60 submittal 90 submittal 2

3

4

One set of structural calculations Written statement of BC Fire Marshal approval status Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for

2

3

4

Final landscape material type quantity and spacing approval by BC Landscape Manager Final drainage district approvals and SFWM approvals as applicable Final Approval from BC Fire Marshal

normal and emergency power

5

6

Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) Responsibilities

Deborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

All changes must be approved by Senior Project Manager

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre Construction CMs Responsibilities

Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phase o Preliminary cost estimates o Review of Design Documents o Review Preliminary Schedules o Preliminary Site Evaluations

bull Bid Process o Bid Advertisement o Bid Documents o Pre Bid Meetings o BC SPM to be present at Bid Opening

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 22: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Develop FFampE plan

Tamaris Alvarez Facilities Planner

Finishes selection bull Implement standard colors for College-wide renovations and new construction Minimize

maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Project Turnover Tamaris Alvarez Facilities Planner

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

Ellice Martinez Special Projects Manager

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos Responsibilities BCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directory bull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Initiation Planning Occupancy Execute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

Deborah Czubkowski District Director of Design and Construction

Continuing Services Architects bull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendors bull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquos Surveyors Roofers

Engineers Mechanical

Electrical AV

Access Control Etc

BC Design and Construction Standards Deborah Czubkowski District Director of Design and Construction

1 Go to Browardedu

2

COMMUNITY PUBLIC

3

FACILITIES MANAGEMENT

4 STANDARDS

Broward College Design and Construction Standards

Page 3 Conformance Statement

Design Professional Responsibilities

Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditions bull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination

Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design 2 Review BC Design and

Construction Standards 3 Provide Conformance

Statement 4 Coordination with BC

Resources a Information Technology b Locksmith c Electrical and Plumbing d Mechanical e Landscape f Fire Protection g Audio Visual h Access Control i Security j Interior Design

5 Estimate of Probable Cost 6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan 3 SiteworkCivil Work 4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents 100 Design Documents

1 Written summary statement of comments included in the

1 Written summary statement of comments included in the

60 submittal 90 submittal 2

3

4

One set of structural calculations Written statement of BC Fire Marshal approval status Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for

2

3

4

Final landscape material type quantity and spacing approval by BC Landscape Manager Final drainage district approvals and SFWM approvals as applicable Final Approval from BC Fire Marshal

normal and emergency power

5

6

Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) Responsibilities

Deborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

All changes must be approved by Senior Project Manager

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre Construction CMs Responsibilities

Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phase o Preliminary cost estimates o Review of Design Documents o Review Preliminary Schedules o Preliminary Site Evaluations

bull Bid Process o Bid Advertisement o Bid Documents o Pre Bid Meetings o BC SPM to be present at Bid Opening

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 23: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Project Turnover Tamaris Alvarez Facilities Planner

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

Ellice Martinez Special Projects Manager

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos Responsibilities BCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directory bull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Initiation Planning Occupancy Execute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

Deborah Czubkowski District Director of Design and Construction

Continuing Services Architects bull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendors bull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquos Surveyors Roofers

Engineers Mechanical

Electrical AV

Access Control Etc

BC Design and Construction Standards Deborah Czubkowski District Director of Design and Construction

1 Go to Browardedu

2

COMMUNITY PUBLIC

3

FACILITIES MANAGEMENT

4 STANDARDS

Broward College Design and Construction Standards

Page 3 Conformance Statement

Design Professional Responsibilities

Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditions bull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination

Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design 2 Review BC Design and

Construction Standards 3 Provide Conformance

Statement 4 Coordination with BC

Resources a Information Technology b Locksmith c Electrical and Plumbing d Mechanical e Landscape f Fire Protection g Audio Visual h Access Control i Security j Interior Design

5 Estimate of Probable Cost 6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan 3 SiteworkCivil Work 4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents 100 Design Documents

1 Written summary statement of comments included in the

1 Written summary statement of comments included in the

60 submittal 90 submittal 2

3

4

One set of structural calculations Written statement of BC Fire Marshal approval status Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for

2

3

4

Final landscape material type quantity and spacing approval by BC Landscape Manager Final drainage district approvals and SFWM approvals as applicable Final Approval from BC Fire Marshal

normal and emergency power

5

6

Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) Responsibilities

Deborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

All changes must be approved by Senior Project Manager

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre Construction CMs Responsibilities

Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phase o Preliminary cost estimates o Review of Design Documents o Review Preliminary Schedules o Preliminary Site Evaluations

bull Bid Process o Bid Advertisement o Bid Documents o Pre Bid Meetings o BC SPM to be present at Bid Opening

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 24: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Ellice Martinez Special Projects Manager

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos Responsibilities BCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directory bull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Initiation Planning Occupancy Execute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

Deborah Czubkowski District Director of Design and Construction

Continuing Services Architects bull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendors bull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquos Surveyors Roofers

Engineers Mechanical

Electrical AV

Access Control Etc

BC Design and Construction Standards Deborah Czubkowski District Director of Design and Construction

1 Go to Browardedu

2

COMMUNITY PUBLIC

3

FACILITIES MANAGEMENT

4 STANDARDS

Broward College Design and Construction Standards

Page 3 Conformance Statement

Design Professional Responsibilities

Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditions bull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination

Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design 2 Review BC Design and

Construction Standards 3 Provide Conformance

Statement 4 Coordination with BC

Resources a Information Technology b Locksmith c Electrical and Plumbing d Mechanical e Landscape f Fire Protection g Audio Visual h Access Control i Security j Interior Design

5 Estimate of Probable Cost 6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan 3 SiteworkCivil Work 4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents 100 Design Documents

1 Written summary statement of comments included in the

1 Written summary statement of comments included in the

60 submittal 90 submittal 2

3

4

One set of structural calculations Written statement of BC Fire Marshal approval status Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for

2

3

4

Final landscape material type quantity and spacing approval by BC Landscape Manager Final drainage district approvals and SFWM approvals as applicable Final Approval from BC Fire Marshal

normal and emergency power

5

6

Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) Responsibilities

Deborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

All changes must be approved by Senior Project Manager

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre Construction CMs Responsibilities

Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phase o Preliminary cost estimates o Review of Design Documents o Review Preliminary Schedules o Preliminary Site Evaluations

bull Bid Process o Bid Advertisement o Bid Documents o Pre Bid Meetings o BC SPM to be present at Bid Opening

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 25: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Ellice Martinez Special Projects Manager

Procorersquos Responsibilities BCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directory bull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Initiation Planning Occupancy Execute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

Deborah Czubkowski District Director of Design and Construction

Continuing Services Architects bull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendors bull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquos Surveyors Roofers

Engineers Mechanical

Electrical AV

Access Control Etc

BC Design and Construction Standards Deborah Czubkowski District Director of Design and Construction

1 Go to Browardedu

2

COMMUNITY PUBLIC

3

FACILITIES MANAGEMENT

4 STANDARDS

Broward College Design and Construction Standards

Page 3 Conformance Statement

Design Professional Responsibilities

Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditions bull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination

Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design 2 Review BC Design and

Construction Standards 3 Provide Conformance

Statement 4 Coordination with BC

Resources a Information Technology b Locksmith c Electrical and Plumbing d Mechanical e Landscape f Fire Protection g Audio Visual h Access Control i Security j Interior Design

5 Estimate of Probable Cost 6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan 3 SiteworkCivil Work 4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents 100 Design Documents

1 Written summary statement of comments included in the

1 Written summary statement of comments included in the

60 submittal 90 submittal 2

3

4

One set of structural calculations Written statement of BC Fire Marshal approval status Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for

2

3

4

Final landscape material type quantity and spacing approval by BC Landscape Manager Final drainage district approvals and SFWM approvals as applicable Final Approval from BC Fire Marshal

normal and emergency power

5

6

Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) Responsibilities

Deborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

All changes must be approved by Senior Project Manager

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre Construction CMs Responsibilities

Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phase o Preliminary cost estimates o Review of Design Documents o Review Preliminary Schedules o Preliminary Site Evaluations

bull Bid Process o Bid Advertisement o Bid Documents o Pre Bid Meetings o BC SPM to be present at Bid Opening

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 26: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Initiation Planning Occupancy Execute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

Deborah Czubkowski District Director of Design and Construction

Continuing Services Architects bull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendors bull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquos Surveyors Roofers

Engineers Mechanical

Electrical AV

Access Control Etc

BC Design and Construction Standards Deborah Czubkowski District Director of Design and Construction

1 Go to Browardedu

2

COMMUNITY PUBLIC

3

FACILITIES MANAGEMENT

4 STANDARDS

Broward College Design and Construction Standards

Page 3 Conformance Statement

Design Professional Responsibilities

Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditions bull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination

Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design 2 Review BC Design and

Construction Standards 3 Provide Conformance

Statement 4 Coordination with BC

Resources a Information Technology b Locksmith c Electrical and Plumbing d Mechanical e Landscape f Fire Protection g Audio Visual h Access Control i Security j Interior Design

5 Estimate of Probable Cost 6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan 3 SiteworkCivil Work 4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents 100 Design Documents

1 Written summary statement of comments included in the

1 Written summary statement of comments included in the

60 submittal 90 submittal 2

3

4

One set of structural calculations Written statement of BC Fire Marshal approval status Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for

2

3

4

Final landscape material type quantity and spacing approval by BC Landscape Manager Final drainage district approvals and SFWM approvals as applicable Final Approval from BC Fire Marshal

normal and emergency power

5

6

Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) Responsibilities

Deborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

All changes must be approved by Senior Project Manager

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre Construction CMs Responsibilities

Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phase o Preliminary cost estimates o Review of Design Documents o Review Preliminary Schedules o Preliminary Site Evaluations

bull Bid Process o Bid Advertisement o Bid Documents o Pre Bid Meetings o BC SPM to be present at Bid Opening

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 27: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Initiation Planning Occupancy Execute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

Deborah Czubkowski District Director of Design and Construction

Continuing Services Architects bull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendors bull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquos Surveyors Roofers

Engineers Mechanical

Electrical AV

Access Control Etc

BC Design and Construction Standards Deborah Czubkowski District Director of Design and Construction

1 Go to Browardedu

2

COMMUNITY PUBLIC

3

FACILITIES MANAGEMENT

4 STANDARDS

Broward College Design and Construction Standards

Page 3 Conformance Statement

Design Professional Responsibilities

Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditions bull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination

Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design 2 Review BC Design and

Construction Standards 3 Provide Conformance

Statement 4 Coordination with BC

Resources a Information Technology b Locksmith c Electrical and Plumbing d Mechanical e Landscape f Fire Protection g Audio Visual h Access Control i Security j Interior Design

5 Estimate of Probable Cost 6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan 3 SiteworkCivil Work 4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents 100 Design Documents

1 Written summary statement of comments included in the

1 Written summary statement of comments included in the

60 submittal 90 submittal 2

3

4

One set of structural calculations Written statement of BC Fire Marshal approval status Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for

2

3

4

Final landscape material type quantity and spacing approval by BC Landscape Manager Final drainage district approvals and SFWM approvals as applicable Final Approval from BC Fire Marshal

normal and emergency power

5

6

Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) Responsibilities

Deborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

All changes must be approved by Senior Project Manager

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre Construction CMs Responsibilities

Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phase o Preliminary cost estimates o Review of Design Documents o Review Preliminary Schedules o Preliminary Site Evaluations

bull Bid Process o Bid Advertisement o Bid Documents o Pre Bid Meetings o BC SPM to be present at Bid Opening

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 28: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Contingent Worker

Deborah Czubkowski District Director of Design and Construction

Continuing Services Architects bull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendors bull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquos Surveyors Roofers

Engineers Mechanical

Electrical AV

Access Control Etc

BC Design and Construction Standards Deborah Czubkowski District Director of Design and Construction

1 Go to Browardedu

2

COMMUNITY PUBLIC

3

FACILITIES MANAGEMENT

4 STANDARDS

Broward College Design and Construction Standards

Page 3 Conformance Statement

Design Professional Responsibilities

Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditions bull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination

Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design 2 Review BC Design and

Construction Standards 3 Provide Conformance

Statement 4 Coordination with BC

Resources a Information Technology b Locksmith c Electrical and Plumbing d Mechanical e Landscape f Fire Protection g Audio Visual h Access Control i Security j Interior Design

5 Estimate of Probable Cost 6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan 3 SiteworkCivil Work 4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents 100 Design Documents

1 Written summary statement of comments included in the

1 Written summary statement of comments included in the

60 submittal 90 submittal 2

3

4

One set of structural calculations Written statement of BC Fire Marshal approval status Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for

2

3

4

Final landscape material type quantity and spacing approval by BC Landscape Manager Final drainage district approvals and SFWM approvals as applicable Final Approval from BC Fire Marshal

normal and emergency power

5

6

Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) Responsibilities

Deborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

All changes must be approved by Senior Project Manager

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre Construction CMs Responsibilities

Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phase o Preliminary cost estimates o Review of Design Documents o Review Preliminary Schedules o Preliminary Site Evaluations

bull Bid Process o Bid Advertisement o Bid Documents o Pre Bid Meetings o BC SPM to be present at Bid Opening

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 29: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

BC Design and Construction Standards Deborah Czubkowski District Director of Design and Construction

1 Go to Browardedu

2

COMMUNITY PUBLIC

3

FACILITIES MANAGEMENT

4 STANDARDS

Broward College Design and Construction Standards

Page 3 Conformance Statement

Design Professional Responsibilities

Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditions bull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination

Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design 2 Review BC Design and

Construction Standards 3 Provide Conformance

Statement 4 Coordination with BC

Resources a Information Technology b Locksmith c Electrical and Plumbing d Mechanical e Landscape f Fire Protection g Audio Visual h Access Control i Security j Interior Design

5 Estimate of Probable Cost 6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan 3 SiteworkCivil Work 4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents 100 Design Documents

1 Written summary statement of comments included in the

1 Written summary statement of comments included in the

60 submittal 90 submittal 2

3

4

One set of structural calculations Written statement of BC Fire Marshal approval status Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for

2

3

4

Final landscape material type quantity and spacing approval by BC Landscape Manager Final drainage district approvals and SFWM approvals as applicable Final Approval from BC Fire Marshal

normal and emergency power

5

6

Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) Responsibilities

Deborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

All changes must be approved by Senior Project Manager

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre Construction CMs Responsibilities

Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phase o Preliminary cost estimates o Review of Design Documents o Review Preliminary Schedules o Preliminary Site Evaluations

bull Bid Process o Bid Advertisement o Bid Documents o Pre Bid Meetings o BC SPM to be present at Bid Opening

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 30: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Broward College Design and Construction Standards

Page 3 Conformance Statement

Design Professional Responsibilities

Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditions bull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination

Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design 2 Review BC Design and

Construction Standards 3 Provide Conformance

Statement 4 Coordination with BC

Resources a Information Technology b Locksmith c Electrical and Plumbing d Mechanical e Landscape f Fire Protection g Audio Visual h Access Control i Security j Interior Design

5 Estimate of Probable Cost 6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan 3 SiteworkCivil Work 4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents 100 Design Documents

1 Written summary statement of comments included in the

1 Written summary statement of comments included in the

60 submittal 90 submittal 2

3

4

One set of structural calculations Written statement of BC Fire Marshal approval status Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for

2

3

4

Final landscape material type quantity and spacing approval by BC Landscape Manager Final drainage district approvals and SFWM approvals as applicable Final Approval from BC Fire Marshal

normal and emergency power

5

6

Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) Responsibilities

Deborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

All changes must be approved by Senior Project Manager

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre Construction CMs Responsibilities

Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phase o Preliminary cost estimates o Review of Design Documents o Review Preliminary Schedules o Preliminary Site Evaluations

bull Bid Process o Bid Advertisement o Bid Documents o Pre Bid Meetings o BC SPM to be present at Bid Opening

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 31: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Design Professional Responsibilities

Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditions bull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination

Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design 2 Review BC Design and

Construction Standards 3 Provide Conformance

Statement 4 Coordination with BC

Resources a Information Technology b Locksmith c Electrical and Plumbing d Mechanical e Landscape f Fire Protection g Audio Visual h Access Control i Security j Interior Design

5 Estimate of Probable Cost 6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan 3 SiteworkCivil Work 4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents 100 Design Documents

1 Written summary statement of comments included in the

1 Written summary statement of comments included in the

60 submittal 90 submittal 2

3

4

One set of structural calculations Written statement of BC Fire Marshal approval status Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for

2

3

4

Final landscape material type quantity and spacing approval by BC Landscape Manager Final drainage district approvals and SFWM approvals as applicable Final Approval from BC Fire Marshal

normal and emergency power

5

6

Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) Responsibilities

Deborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

All changes must be approved by Senior Project Manager

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre Construction CMs Responsibilities

Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phase o Preliminary cost estimates o Review of Design Documents o Review Preliminary Schedules o Preliminary Site Evaluations

bull Bid Process o Bid Advertisement o Bid Documents o Pre Bid Meetings o BC SPM to be present at Bid Opening

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 32: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

AE Deliverables amp BC Disciplines Coordination

Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design 2 Review BC Design and

Construction Standards 3 Provide Conformance

Statement 4 Coordination with BC

Resources a Information Technology b Locksmith c Electrical and Plumbing d Mechanical e Landscape f Fire Protection g Audio Visual h Access Control i Security j Interior Design

5 Estimate of Probable Cost 6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan 3 SiteworkCivil Work 4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents 100 Design Documents

1 Written summary statement of comments included in the

1 Written summary statement of comments included in the

60 submittal 90 submittal 2

3

4

One set of structural calculations Written statement of BC Fire Marshal approval status Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for

2

3

4

Final landscape material type quantity and spacing approval by BC Landscape Manager Final drainage district approvals and SFWM approvals as applicable Final Approval from BC Fire Marshal

normal and emergency power

5

6

Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) Responsibilities

Deborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

All changes must be approved by Senior Project Manager

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre Construction CMs Responsibilities

Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phase o Preliminary cost estimates o Review of Design Documents o Review Preliminary Schedules o Preliminary Site Evaluations

bull Bid Process o Bid Advertisement o Bid Documents o Pre Bid Meetings o BC SPM to be present at Bid Opening

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 33: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

BC Senior Project Manager (SPM) Responsibilities

Deborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

All changes must be approved by Senior Project Manager

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre Construction CMs Responsibilities

Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phase o Preliminary cost estimates o Review of Design Documents o Review Preliminary Schedules o Preliminary Site Evaluations

bull Bid Process o Bid Advertisement o Bid Documents o Pre Bid Meetings o BC SPM to be present at Bid Opening

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 34: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Pre Construction CMs Responsibilities

Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phase o Preliminary cost estimates o Review of Design Documents o Review Preliminary Schedules o Preliminary Site Evaluations

bull Bid Process o Bid Advertisement o Bid Documents o Pre Bid Meetings o BC SPM to be present at Bid Opening

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 35: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Pre Construction CMs Responsibilities

Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phase o Preliminary cost estimates o Review of Design Documents o Review Preliminary Schedules o Preliminary Site Evaluations

bull Bid Process o Bid Advertisement o Bid Documents o Pre Bid Meetings o BC SPM to be present at Bid Opening

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 36: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 37: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Bidding Process Zaida Riollano District Director Strategic Sourcing Procurement Dr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Requirements Construction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 38: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Auxiliary Services Peggy Howse District Director Auxiliary Services

Coordination College Bookstores Cafeacutersquos Food Service ndash Subway amp Dunkin Donuts Vending ndash Snack and Beverage

Restrictions amp Timelines Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day notice Vending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 39: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Supplier Diversity Small Business (SDSB) Program

Anthea Pennant District Director Supplier Relations and Diversity

SDSB Program at BC Program Goals bull Constructionmdash34 percent bull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percent bull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the following bull Broward County (Florida) ndash Small Business Division bull Florida State Minority Supplier Development Council (FSMSDC) bull Miami Dade County (Florida) ndash Department of Business Development bull Palm Beach County (Florida) ndash Office of Small Business Assistance bull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreach bull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 40: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Initiation Planning Occupancy Execute

Project Preconstruction Phase

Design Pre-Con

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 41: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Evaluate Cost Value Engineering

Nelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 42: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

GMP ndash Guarantee Maximum Price

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Schedule of Value o Summary Sheet o Detail Sheet o CSI Format o CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptions bull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 43: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Purchase Order (PO)

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 44: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Pre Construction Meeting

Nelson Goris North Campus SPMNelson Goris Senior Project Manager

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards) o Staging Area o Hours of Operation o Other project related information

bull Attendance o CM o Superintendent o BC SPM o End User o Building Official o Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 45: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Initiation Planning Occupancy Execute

Project Execute Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 46: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Permits

Otto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 47: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 48: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Plan Reviews and Inspections

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 49: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Construction amp Inspections

Otto Letzelter Chief Building Official

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 50: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Fire Inspections

Otto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 51: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Amanda Williams Senior Analyst Construction and Capital Accounts

Progress Payments

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 52: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Schedule of Values (SOV) Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000 At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on c e Subtotal with OHampP $115500000 f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750 Based on e but included at Owners

discretion

Subtotal with Insurances $118676250 h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084 Amount of the Purchase Order to be

issued e+f+g+h

Progress Payments Amanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 53: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 54: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Contingency Change Authorizations Log (CCA) Amanda Williams Senior Analyst Construction and Capital Accounts

Includes Original Contingency Balance Description Date approved by BCSPM Which payment application it was included in Value ndash decreases and increases to balance Remaining Contingency Balance

Values should match to the G703

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 55: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Cost Details ndash AIA G703 Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 56: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Payment Applications

Cost Summary ndash AIA G702

Amanda Williams Senior Analyst Construction and Capital Accounts

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 57: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Payment Applications

Waivers Materials Presently Stored

Amanda Williams Senior Analyst Construction and Capital Accounts

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 58: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Retainage Amanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 59: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Roofing Projects

Priscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 60: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Initiation Planning Occupancy Execute

Project Occupancy Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 61: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Punch List

Priscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 62: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

TCOCO

Priscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 63: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Coordinate Staff Move

Priscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 64: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Initiation Planning Occupancy Execute

Project Closeout Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Stakeholders

amp Scope

Schematic Design

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Contingent Worker

BC Design amp Construction

Standards

Design Professional

AE Deliverables

and BC

Disciplines Coordination

BC Senior PM

Precon Construction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Permits

Plan Reviews and

Inspections

Construction and

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 65: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Closeout Process Robert Bellot Senior Project Manager

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 66: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Closeout Process Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 67: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

CHECKLIST

Project NTP Final Completion date

Detail Check for

Completion Completion

Date Notes 1 All field issues are resolved 2 Site and building clean per specifications

3 All building systems tested and certified complete and operational per specifications

31 Electric 32 Plumbing 33 Mechanical 34 Telecom 35 Special systems 36 Life safety systems

4 All field inspection reports issue signed by contractor and returned 5 Test and Balance reports issued and submitted to AE for review 6 All spare parts amp attic stock submitted per contract 7 All Keys turned to owner 8 All owner training completed 9 All regulatory documents properly submitted

10 All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved 12 All punch list items are certified by the owner and AE for completion 13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties 132 As built Drawings 133 Manufacturer Instructions

Detail Check for

Completion Completion

Date Notes 15 Final LEED Submittals are complete 16 Substantial Completion form is complete and approved 17 Certificate of Final Completion is complete and approved 18 Application for final payment is complete and submitted 19 Release of lien are submitted and approved 20 Consent of Surety is submit and approved 21 Certificate of Occupancy is complete and approved

22 AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted 24 Board has approved project 25 Final Payment is released

Sheet1

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 68: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

As-Built Robert Bellot Senior Project Manager

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Page 69: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

As-Built Robert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Page 70: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

As-Built Robert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Page 71: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

As-Built Robert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Page 72: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Closeout Documents

Jonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Location bull Usage Information bull Dates bull CostPurchase bull Warranty

Archibus Data Transfer

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Page 73: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Consultant Performance Evaluation

Deborah Czubkowski District Director of Design and Construction

CONSULTANT PERFORMANCE EVALUATION

Firm Project Total Construction Amount Construction Project Manager Contract Completion Date

CATEGORIES NOT APPLICABLE

PERFORMED NOTABLY WELL

SATISFACTORY PERFORMANCE

INFERIOR PERFORMANCE

1 Quality of Technical Services Architectural

Mechanical Eng Electrical Eng Structural Eng Civil Eng Other

2 AdministrationCoordination of Design Team 3 Timeliness of Services 4 Quality of Technical Documentation 5 Cooperation Concern for College Interests 6 Administration of Project Paperwork 7 Achievement of Study Program or Design Objectives 8 AdministrationEnforcement of Contract Documents 9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes No Comments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Director Signature_________________________________

Date______________ Date______________

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Page 74: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Sheet1

X

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Page 75: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Sheet2

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Page 76: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Sheet3

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Page 77: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

Lessons Learned

Deborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
Page 78: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONS bull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
Page 79: WELCOME! [] · d. Check-in with Campus Safety by contacting 954-201-4357. i. Provide contact person who requested work order. ii. Proper identification should be worn at all …
  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80