welcome and introduction
DESCRIPTION
Welcome and Introduction. Carol Johnson NIST. MOBY Personnel in Attendance. Carol Johnson-NIST Dennis Clark-NIST Ken Voss-University of Miami Steve Brown-NIST Mark Yarbrough-Moss Landing Stephanie Flora-Moss Landing. Schedule, Day One. Tuesday July 18th - PowerPoint PPT PresentationTRANSCRIPT
NOAA Research and Operations Marine Optical Buoy Design Review July 18-19, 2006
Welcome and Introduction
Carol Johnson
NIST
NOAA Research and Operations Marine Optical Buoy Design Review July 18-19, 2006
MOBY Personnel in Attendance
• Carol Johnson - NIST
• Dennis Clark - NIST
• Ken Voss - University of Miami
• Steve Brown - NIST
• Mark Yarbrough - Moss Landing
• Stephanie Flora - Moss Landing
NOAA Research and Operations Marine Optical Buoy Design Review July 18-19, 2006
Schedule, Day One• Tuesday July 18th• 8:00 AM Arrival at NIST and check-in at gate• 8:30 AM Welcome and meeting objectives (C. Davis and C. Johnson)• 8:45 AM NOAA prospective and goals for meeting (S. Wilson and K. Hughes)• 9:00 AM MOBY background and need for replacement (D. Clark)• 9:30 AM RNO Concept: design and implementation (D. Clark)• 10:00 AM Coffee Break• 10:30 AM Description of AHAB design
» Physical Structure (30 mins) (M. Yarbrough)» Optical Design (30 mins) (S. Brown)
• 11:30 AM Plan to complete and test re-engineered system (S. Brown)• 12:00 PM Lunch• 1:00 PM Plan for calibration and maintenance of AHAB
» Uncertainty budgets: Laboratory (C. Johnson)» Environmental (K. Voss)
• 2:00 PM AHAB Deployment plan (timeline) (M. Yarbrough)• 2:30 PM Summary (C. Johnson)• 3:00 PM Afternoon Break• 3:30 PM Group Discussion of goals and presentation (C. Davis and K. Hughes)• and development of and initial outline of report• 4:00 PM Review team and NOAA representatives meet in closed session• 4:45 PM Depart for Hotel
NOAA Research and Operations Marine Optical Buoy Design Review July 18-19, 2006
Schedule, Day Two• Wednesday July 19th• 8:00 AM Arrival at NIST and check-in at gate• 8:30 AM Review team reports their initial findings and outline
of the report• 9:00 AM Discussions with the MOBY Team• 10:00 AM Coffee Break• 10:30 AM Review Team and NOAA meeting in closed session
to update report outline• 11:30 AM Reconvene for discussion with the MOBY team and
develop schedule for completion of the report• 12:00 PM Lunch• 1:00 PM Review Team works on first draft of the report• 3:00 PM Afternoon Break• 4:00 PM Adjourn
NOAA Research and Operations Marine Optical Buoy Design Review July 18-19, 2006
MOBY Meeting Objectives
• MOBY Background• Review of the Research and Operations (R&O) progress
– FY05 and FY06 funding– Describe goals based on R&O funding– Show accomplishments
• Describe our vision of the future– Learn from the 9 year MOBY experience– Incorporate R&O lessons
• Solution: New instrument build – ROSES funding requested for build – Plan MOBY decommission and operation use of new instrument
beginning in FY10