Page 1: Wednesday July 3, 2014. Assumptions & Definitions This presentation is an overview of the associated word document Scope of this document is to the trail

PLIAG : Capital Crescent Trail (CCT)

Wednesday July 3, 2014

Page 2: Wednesday July 3, 2014. Assumptions & Definitions This presentation is an overview of the associated word document Scope of this document is to the trail

Assumptions & Definitions This presentation is an overview of the associated word

document Scope of this document is to the trail specifically, homeowner

issues are addressed during other discussions, with the exception of Visual and Audio Intrusions section.

For the purposes of this document, "the trail" is defined as the Capital Crescent Trail (including the Georgetown Branch) between Bethesda and Silver Spring. The Silver Spring Green Trail is a separate physical space

located in Silver Spring, but should have the same considerations/characteristics, when applicable, as the CCT.

Trail users defined as, but not limited to: walkers, cyclists, runners, with special consideration for children (infants, toddlers, and school aged), as well as the elderly.

Page 3: Wednesday July 3, 2014. Assumptions & Definitions This presentation is an overview of the associated word document Scope of this document is to the trail

General Overarching QuestionsOwnership: Is it the case that the County will own the

entire trail? Are there any exceptions? What county agency will own it? 

Maintenance: Who is responsible for hard-scape (including the trail surface), the mechanical elements, signs, and warning gates. Who picks up the trash and maintains the trash receptacles? Finally, someone will have to maintain the landscape; mow the grass, and trim bushes and trees.

What are the responsibilities of state agencies, county agencies and the P3 partner? How can community groups and individuals efficiently communicate with these partners on trail issues?

Page 4: Wednesday July 3, 2014. Assumptions & Definitions This presentation is an overview of the associated word document Scope of this document is to the trail

10 Areas of Focus NoiseVibration LightingVisual appearance/Aesthetics/Maintenance Visual and Audio Intrusions Pedestrian Access Safety Environmental IssuesTrail/Transit Construction and Trail AvailabilityPlanning

Page 5: Wednesday July 3, 2014. Assumptions & Definitions This presentation is an overview of the associated word document Scope of this document is to the trail

Noise- General All efforts to minimize noise to trail users should be

taken into consideration. Noise mitigation measures to minimize the noise exposure need to be factored into the trail/transit design. Considerations: Train speed is a significant contributor for the

noise level and that noise levels decrease as train speed decreases. Decrease the speed of the trains.

Noise abatement for residences that will be exposed to horn soundings.

Sound-muffling from the traction power substations and overhead wires.

Comply with the strictest noise ordinances

Page 6: Wednesday July 3, 2014. Assumptions & Definitions This presentation is an overview of the associated word document Scope of this document is to the trail

Noise Barrier- Priority Issue Issue: Placement of noise wall Current Proposal: Noise wall- transit line- fence-

green space- trail- noise wallResults of MTA noise analysis requested at last

meeting?Preference: Assuming that by placing the noise

wall between the trail and the transit line does not increase noise to trail users or homeowners, then it is the preference of the MC Planning Board and the COPLN group, and their associated communities that the noise wall be placed between the trail and the transit way.

Page 7: Wednesday July 3, 2014. Assumptions & Definitions This presentation is an overview of the associated word document Scope of this document is to the trail

MTA Concern: This design would block users view of the green track,

which is aesthetically appealing to the trail users.It would also create undesirable scenarios where CCT

users are between two walls.Response:

The green trail can be placed on either or both sides of the trail. As there is currently a tree buffer between homes and the trail, the MTA/MCDOT could consider a natural barrier between the homes and the trail.

As it is currently designed we have undesirable scenarios where CCT users are between two walls.

Importantly, this type of noise mitigation will significantly reduce noise exposure at the trail access points and for homes adjacent to these points.

Page 8: Wednesday July 3, 2014. Assumptions & Definitions This presentation is an overview of the associated word document Scope of this document is to the trail

Vibration The community requests that the maximum

vibration level be 65 VdB measured 50 feet from the centerline of the tracks.

This commitment has been made in areas between the Columbia Country Club and East West Highway, and the same should be made for all residents and communities.

Trail construction materials should absorb vibrations without disrupting the trail user’s experience.

Page 9: Wednesday July 3, 2014. Assumptions & Definitions This presentation is an overview of the associated word document Scope of this document is to the trail

LightingWhat is the position of lighting the trail? Concerns: security reasons & light pollution into homes/yards.

Proposed Lighting at junctions, underpasses, and other critical locations Additional $600,000 for lighting upgrades along the trail, which is intended to be the

conduit for potential future wiring for lighting the entire trail.

The Council has not made a decision to light the entire trail, largely because of homeowner concerns. But if they do decide to light the entire trail, having the conduit in place means you have to tear up less of the trail, reducing costs and disruption.

The community does not support additional construction at a later time.

Light fixtures be solar powered for environmental and maintenance reasons, as well as ascetically pleasing.

Install low lighting for trail access.

Page 10: Wednesday July 3, 2014. Assumptions & Definitions This presentation is an overview of the associated word document Scope of this document is to the trail

Visual Appearance, Aesthetics & Maintenance

NatureTrees and Plants Benches and water fountainsUse natural colors, textures & materials Grass tracks along the Georgetown Branch right-

of-way.Local artistsThe trail should be as natural as possible, with

urban aspects disguised using natural and design features.

Page 11: Wednesday July 3, 2014. Assumptions & Definitions This presentation is an overview of the associated word document Scope of this document is to the trail

Visual and Audio Intrusions Evergreen plantings/other measures to minimize

visual intrusion on residences adjacent to the transitway and where the elevated trail crosses over the transitway.

See Lighting above

Page 12: Wednesday July 3, 2014. Assumptions & Definitions This presentation is an overview of the associated word document Scope of this document is to the trail

Pedestrian AccessAll ramp connections to the CCT should be flared

to the extent possible to facilitate access to the trail.

The path/sidewalks should be wide enough for two double wide strollers to pass each other safely at a run.

Ensure outreach to the communities surrounding specific access points to address noted concerns and new ones as they develop. Example: Sleford Road

See lighting, see above

Page 13: Wednesday July 3, 2014. Assumptions & Definitions This presentation is an overview of the associated word document Scope of this document is to the trail

Safety No track accessTunnels must be well light and locked at

night Medians, sidewalks, ramps and trail access

should be wide enough for 2 double strollers to pass at a run.

Access should favor those with disabilities and small children.

Information and way finding- developed/designed and created by local artists.

See lighting above

Page 14: Wednesday July 3, 2014. Assumptions & Definitions This presentation is an overview of the associated word document Scope of this document is to the trail

Environmental Endangered species and due process of their

protectionWater drainage and management

Permeable services No standing water during or after construction

(safety, tree protection, mosquitoes)Trees

To the extent privately owned trees are damaged during the construction process, the land owner should be compensated for the value of the tree, the cost to have it safely removed, and the cost of planting comparable replacement trees.

Page 15: Wednesday July 3, 2014. Assumptions & Definitions This presentation is an overview of the associated word document Scope of this document is to the trail

A firm and detailed commitment to a tree-loss prevention plan and tree re-planting plan

New trees should have high CO2 conversion Begin the tree canopy replacement

program as early as possible. Commit to a tree re-replanting plan that calls

for the maximum number of trees that can be ecologically sustained in the remaining portion of the Georgetown Branch right-of-way not used for the trail or tracks, rather than the minimum required by state or local law.

Trees, Trees and more Trees

Page 16: Wednesday July 3, 2014. Assumptions & Definitions This presentation is an overview of the associated word document Scope of this document is to the trail

Tree Analysis The FEIS contains no survey of trees on private land

adjacent to the Georgetown Branch right-of-way, nor does it analyze the extent to which such trees may be damaged or killed as a result of construction activity. Therefore, the government should: Conduct a tree survey to identify trees on private property

whose critical root zones overlap the construction impact zone;

Create tree protection measures (fencing, signage, etc.) in the plans and specifications for the construction contract; and

Enact a monitoring system to ensure trees identified in the survey are not impacted by construction operations.

Share the results with the public.

Page 17: Wednesday July 3, 2014. Assumptions & Definitions This presentation is an overview of the associated word document Scope of this document is to the trail

Trail/Transit Construction and Trail Availability

The trail should be available, in its best form, for use for the greatest extent possible during construction. The Purple Line RFP should provide a strong incentive to keeping the trail closure to a minimum and phase trail closures in a logical sequence, consistent with construction phasing/schedules.

Comply with local noise ordinances of 65 dB(A) during daytime hours and 55 dB(A) during nighttime hours.

Page 18: Wednesday July 3, 2014. Assumptions & Definitions This presentation is an overview of the associated word document Scope of this document is to the trail

Water should be directed away from communities, the trail and environments where it would be damaging.

Construction access to the trail/transit right-of-way shall be from major roads such as Connecticut Avenue or Pearl Street

Page 19: Wednesday July 3, 2014. Assumptions & Definitions This presentation is an overview of the associated word document Scope of this document is to the trail

Planning B/w Lyttonsville & the Talbot Avenue bridge,

minimize the amount of private property neededSafe, secure ADA compliant access is needed at

all access pointsInclude places along the trail where hikers and

bikers can stop for food and drink, either from permanent shops or food trucks. Way finding signs indicating nearby commercial establishments should also be incorporated into the trail.

Incorporate bike share and repair facilities on the trail

Page 20: Wednesday July 3, 2014. Assumptions & Definitions This presentation is an overview of the associated word document Scope of this document is to the trail

Hot TopicsPlan B

The trail is restored/maintained as a park/path RT is considered between Silver Spring and Bethesda.

CSX Revised trail plans are submitted to the Planning

Board, the public and the county. The public must be made aware of this change, the

new proposal and be given the opportunity (at least 4 opportunities, at least 2 of which should be in the evening or weekend) to comment to the county, MTA and County Council.