Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA

1

MONALISA at ATF2 First installation report

15 July 09

Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA

2

Overview

• Installation progress– ATF2 roof: Initial tests with wooden frame

• Initial test results

– ATF2 FF: Mounted at IP in Final Focus• Vacuum test• Force tests• Tilt tests• Magnet lateral movement tests

Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA

3

Good progress• We kept within our proposed schedule

– As set out in ATF2 meeting 17 Jun 09

• All items arrived at KEK 1st July 2009– Brought to ATF2 roof within 15 mins of arrival

• On ATF2 roof– System assembled and retested

• Brought to ATF2 Final focus tunnel – Reassembled at IP Thursday 9th July and

tested

Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA

4

On the roof of the ATF2

Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA

5

Preliminary tests

• Closed the vacuum system– Pumped out to 25 Pa– Limited by small leak (1 Pa/s)

• Due to lower angled tube• Will be fixed in future by

replacing lower angled tube• Vacuum sufficient for test

programme

• Reassembled wooden frame on ATF2 roof

• Benoit measured vibrations (see his talk)

Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA

6

Schematic Layout of Pneumatics • Vacuum in end boxes connected through inner bellows• High pressure only connected to outer bellows chamber

Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA

7

Recalibrated force sensors

• Retested force sensor – Applying loads using spring balance

• Force sensor rather noisy– Produces signals up to +/- 10 mV

• Readout with NI USB 6009 ADC (14 bit)– Sampled at 5kSa/s– Used LabVIEW to average 5000 readings

together

Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA

8

Forces on frame during pumping

• Cycled bellow chamber pressures– Inner chamber 100 kPa to 25 Pa to 100 kPa– Outer chamber 100 kPa to 140 kPa to 100kPa

• Measured forces– Using recalibrated force sensor

• Independently calculated forces– Based on SMC pressure sensors

• One for each chamber

Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA

9

Sensor readout during pumping

Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA

10

Over-pressure regulation• Over-pressure regulator does not behave

as we would like

Control Signal /V

Overpressure / kPa

0

40

Vmax0

No response for over-pressure requests less than (50 mbar)

Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA

11

Required over-pressure regulation• Would want a straight line relationship

even for very low over-pressure

Control Signal /V

Overpressure / kPa

0

40

Vmax0

Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA

12

Into the ATF2 tunnel

Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA

13

Tunnel preparation

Terunua-san installed pipe across the inside of the ATF2 final focus tunnel roof

Equipped with 2 hoists

Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA

14

Mounting Shintake components• Plate mounted using M30 hooks

• End box mounted using hoist

Cables

Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA

15

Mounting QD0 end box• Beeswax was placed on QD0 surface

– To ensure good vibration coupling to magnet

Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA

16

End boxes mutually aligned

• Laser light projected along accelerator axis

• Shintake end box – (left-right adjustable)– Moved to match QD0

end box

Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA

17

The DBS was hoisted into placeFull assembly completed well

within one day

Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA

18

Tilt sensor• Tilt change on Shintake ~5+5 rad

– After MONALISA DBS installed at IP

Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA

19

DBS pumped out: with rods in

• Reached 28 Pa with a different pump– vacuum integrity was unaltered

Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA

20

Forces measured pumping down when mounted at ATF2 IP

Regulator cycle ~225 s

Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA

21

(x,y,z) Physicists coordinates• In the following we’re using the physicists

coordinate frame

Y

X

Z

Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA

22

Tracking QD0 motion in Z• Set MONALISA at operational pressure

– Pumped out vacuum vessel– Over-pressure in outer bellowed chamber

• Set up independent tracking of QD0– Used FARO to survey QD0 position changes– Keyence laser meter tracked QD0 mounted

on SD0 base plate

Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA

23

KEYENCE tracking QD0 Z

Readout sensor in mV

10 V = 5 mm

1 mV = 0.5 m

Readout with ourADC/LabVIEW DAQ

QD0

Supported from SD0

KEYENCE

Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA

24

FARO survey instrument

FARO

Retro

Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA

25

Comparison of FARO & KEYENCE

Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA

26

FARO compared with KEYENCE

Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA

27

FARO tracking X and Z

Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA

28

Tracking QD0 motion in Z

Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA

29

Tracking QD0 motion in X

Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA

30

Left-right QD0 mover tests

Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA

31

Left-right QD0 mover tests

Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA

32

Left-right QD0 mover tests

DBS spring constant is small enough to let QD0 move freely

Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA

33

What to learn from this measurements?

• We are told that static tolerances for QD0:– 100μm in x,y,z

• Our measurements show that even with the current pressure control system we meet this tolerance.

• The low spring constant of the DBS allows the QD0 mover to move the magnet unhindered.

• Dynamic tolerances: vertical: 10 nm, (between Shintake and QD0) horizontal: 500 nm

along beam: 10 μm• The question about dynamic motion and impact on the

Shintake table will be answered in the next two talks.

Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA

34

Summary & Outlook

• MONALISA vacuum system worked well– Many thanks for the wonderful support we got!

• The next step is to do optics tests with the vacuum system in place to gain calibration constants.

• Our goal is to get first position measurements to the Shintake group late next spring.