webposting request form sample · web viewplease enter the specific website address (url) of the...

29
WEBPOSTING REQUEST FORM Please enter the specific website address (URL) of the page(s) that need(s) to be updated in the box to the right. http://www.waterboards.ca.gov/sandiego/press_room/announcements/ carlsbad_desalination/carslbad_desalination.shtml http:// www.swrcb.ca.gov/rwqcb9/press_room/announcements/ carlsbad_desalination/carslbad_desalination.shtml Please save a COPY of the files (pdf’s or word or excel – preferably searchable pdf for security purposes) that will be linked to the site. Save it in your P drive inside the ”Web Posting” folder (The folder has been created - please don’t delete this folder.) After we copy the documents in your P drive, we will delete the files as well, so make sure you have another copy for yourself in another location as needed. Browse the website that you want updated, highlight the body of the page and copy and paste it onto this form. (See Below). Then modify the copied document to show the changes that you want. Please don’t forget to indicate the filename and where it needs to be linked. If you have a whole new design, copy and paste it as well. Our font style, color and size are all defaulted and cannot be changed. PLEASE MAKE SURE YOUR WEB POSTINGS HAVE BEEN APPROVED BY YOUR SUPERVISOR PRIOR TO SUBMITTING THIS REQUEST This table should be linked to the “I ndex a l so please rename Index on above linked page as follows : Index to Electronically Available Primary Supporting Documents Review of Poseidon Resources Corporation March 9, 2009 Flow, Entrainment and Impingement Minimization Plan Index of Electronically Available Supporting Documents for the March 9, 2009 Flow, Entrainment and Impingement Minimization Plan Submitted by Poseidon Resources Corporation Date/ Type From To Description 8/16/2006 Permit San Diego Regional Water Quality Control Board Adopted Order No. R9-2006-0065, NPDES No. CA109223 (item _ 1.pdf) Provided By IT Staff

Upload: others

Post on 02-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WEBPOSTING REQUEST FORM SAMPLE · Web viewPlease enter the specific website address (URL) of the page(s) that need(s) to be updated in the box to the right

WEBPOSTING REQUEST FORM

Please enter the specific website address (URL) of the page(s) that need(s) to be updated in the box to the right.

http://www.waterboards.ca.gov/sandiego/press_room/announcements/carlsbad_desalination/carslbad_desalination.shtmlhttp://www.swrcb.ca.gov/rwqcb9/press_room/announcements/carlsbad_desalination/carslbad_desalination.shtml

Please save a COPY of the files (pdf’s or word or excel – preferably searchable pdf for security purposes) that will be linked to the site. Save it in your P drive inside the ”Web Posting” folder (The folder has been created - please don’t delete this folder.) After we copy the documents in your P drive, we will delete the files as well, so make sure you have another copy for yourself in another location as needed.

Browse the website that you want updated, highlight the body of the page and copy and paste it onto this form. (See Below). Then modify the copied document to show the changes that you want. Please don’t forget to indicate the filename and where it needs to be linked. If you have a whole new design, copy and paste it as well. Our font style, color and size are all defaulted and cannot be changed.

PLEASE MAKE SURE YOUR WEB POSTINGS HAVE BEEN APPROVED BY YOUR SUPERVISOR PRIOR TO SUBMITTING THIS REQUEST

This table should be linked to the “Index” also please rename Index on above linked page as follows: Index to Electronically Available Primary Supporting Documents

Review of Poseidon Resources Corporation March 9, 2009 Flow, Entrainment and Impingement Minimization PlanIndex of Electronically Available Supporting Documents for the March 9, 2009 Flow, Entrainment and

Impingement Minimization Plan Submitted by Poseidon Resources Corporation

Date/Type From To Description8/16/2006 Permit

San Diego Regional Water Quality Control Board

  Adopted Order No. R9-2006-0065, NPDES No. CA109223 (item_ 1.pdf)

2/12/2007 Report

Poseidon Resources Corporation

San Diego Regional Water Quality Control Board

Flow, Entrainment and Impingement Minimization Plan (Draft) (item_2.pdf)

Attachment 1 – Toxicity Testing Study Plan (item_2_a.pdf)

Attachment 2 – Acute Toxicity Testing Study Results (item_2_b.pdf)

Attachment 3 – Near Shore Saline Effects Due to Reduced Flow Rate Scenarios During Stand-Alone Operations of the Carlsbad Desalination Project at Encina Generating Station (item_2_c.pdf)

Provided By IT Staff

Page 2: WEBPOSTING REQUEST FORM SAMPLE · Web viewPlease enter the specific website address (URL) of the page(s) that need(s) to be updated in the box to the right

Attachment 4 –Flow Minimization Alternatives, Through Screen Velocities & Long-Term West Basin Water Level Analysis for Assessing Threshold Impingement Effects of Reduced Intake Flows at Agua Hedionda Lagoon (item_2_d.pdf)

Attachment 5 – Marine Biology Entrainment in Additional Responses to Comments of the Final EIR-03-05 for the Precise Development Plan and Desalination Plant Project (item_2_e.pdf)

Attachment 6 – Coastal Process Effects of Reduced Intake Flows at Agua Hedionda Lagoon (item_6_f.pdf)

2/21/2007 Public Notice

San Diego Regional Water Quality Control Board

 Notice of Availability-Flow, Entrainment, and Impingement Minimization Plan, Poseidon Resources Corporation(item_3.pdf)

4/9/2007 Letter

Sierra Club, San Diego Chapter

San Diego Regional Water Quality Control Board

Comment Letter on Flow, Entrainment and Impingement Minimization Plan (item_4.pdf)

4/10/2007 Letter

San Diego Coastkeeper

San Diego Regional Water Quality Control Board

Comment Letter on Flow, Entrainment and Impingement Minimization Plan (item_5.pdf)

5/2/2007 Letter

California Coastal Commission

San Diego Regional Water Quality Control Board

Comment Letter on Flow, Entrainment and Impingement Minimization Plan (item_6.pdf)

6/29/2007 Report

Poseidon Resources Corporation

San Diego Regional Water Quality Control Board

Revised Flow, Entrainment and Impingement Minimization Plan (item_7.pdf)

Attachment 1 – Toxicity Testing Study Plan (item_7_a.pdf)

Attachment 2 – Acute Toxicity Testing Study Results (item_7_b.pdf)

Attachment 3 – Near Shore Saline Effects Due to Reduced Flow Rate Scenarios During Stand-Alone Operations of the Carlsbad Desalination Project at Encina Generating Station (item_7_c.pdf)

Attachment 4 – Updated Impingement and Entrainment Assessment (item_7_d.pdf)

Attachment 5 - Proposal for Information Collection Clean Water Act 316(b), Encina Power Station, Cabrillo Power I LLC, NPDES Permit No. CA0001350, April 1, 2006 (item_7_e.pdf)

Attachment 6 – Coastal Process Effects of Reduced Intake Flows at Agua Hedionda Lagoon (item_7_f.pdf)

Attachment 7 - Long-Term West Basin Water Level Analysis for Assessing Threshold Impingement Effects of Reduced Intake Flows

Provided By IT Staff

Page 3: WEBPOSTING REQUEST FORM SAMPLE · Web viewPlease enter the specific website address (URL) of the page(s) that need(s) to be updated in the box to the right

at Agua Hedionda Lagoon (item_7_g.pdf)

Attachment 8 – Potential Adverse Changes in Agua Hedionda Lagoon Resulting from Abandonment of the Lagoon Intake (item_7_h.pdf)

9/6/2007 Letter

San Diego Regional Water Quality Control Board

Poseidon Resources Corporation

Review and deferral of determination of Flow, Entrainment and Impingement Plan (item_8.pdf)

9/10/2007 Letter

Poseidon Resources Corporation

San Diego Regional Water Quality Control Board

Response to deferral of determination of Flow, Entrainment and Impingement Plan(item_9.pdf)

9/20/2007 Letter

San Diego Regional Water Quality Control Board

Poseidon Resources Corporation

Rescission of Letter Dated 9/6/2007(item_10.pdf)

2/19/2008 Letter

San Diego Regional Water Quality Control Board

Poseidon Resources Corporation

Review of Flow, Entrainment, and Impingement Minimization Plan dated February 12, 2007 and revised on June 29, 2007 (item_11.pdf)

3/7/2008 Report

Poseidon Resources Corporation

San Diego Regional Water Quality Control Board

Revised Flow, Entrainment, and Impingement Minimization Plan (item_12.pdf)

Attachment 1 - Cost Estimate of Subsurface Intake Alternatives (item_12_a.pdf)

Attachment 2 - Impingement Results, G1 - Traveling Screens and Bar Racks Weekly Surveys, G2 - Heat Treatment Surveys (item_12_b.pdf)

Attachment 3 - Proposal for Information Collection Clean Water Act 316(b), Encina Power Station, Cabrillo Power I LLC, NPDES Permit No. CA0001350, April 1, 2006 (item_12_c.pdf)

Attachment 4 - Updated Impingement and Entrainment Assessment (item_12_d.pdf)

Attachment 5 - Summary of Fish and Target Shellfish Larvae collected from Entrainment and Source Water Studies in the Vicinity of Agua Hedionda Lagoon from June 2005 through May 2006 (item_12_e.pdf)

3/14/2008 Public Notice

San Diego Regional Water Quality Control Board

 Agenda Notice for April 9, 2008 San Diego Regional Board Meeting (item_13.pdf)

3/14/2008 Letter

San Diego Desal Partners

San Diego Regional Water Quality Control Board

Comment Letter for tentative Resolution No. R9-2008-0039 (item_14.pdf)

3/19/2008 Letter

San Diego Coastkeeper and Surfrider Foundation

San Diego Regional Water Quality Control Board

Request for Full Public Hearing on Poseidon's Revised Flow, Entrainment and Impingement Plan (item_15.pdf)

3/20/2008 Letter

California Coastal Commission

San Diego Regional Water Quality Control Board

Comment Letter for tentative Resolution No. R9-2008-0039 (item_16.pdf)

3/26/2008 Letter

Industrial Environmental Association

San Diego Regional Water Quality Control Board

Comment Letter for tentative Resolution No. R9-2008-0039 (item_17.pdf)

3/26/2008 City of Carlsbad, San Diego Regional Comment Letter for tentative Resolution No. R9-

Provided By IT Staff

Page 4: WEBPOSTING REQUEST FORM SAMPLE · Web viewPlease enter the specific website address (URL) of the page(s) that need(s) to be updated in the box to the right

Letter Office of the City Council

Water Quality Control Board

2008-0039 (item_18.pdf)

3/26/2008 Letter

Hubbs-Sea World Research Institute

San Diego Regional Water Quality Control Board

Comment Letter for tentative Resolution No. R9-2008-0039 (item_19.pdf)

3/26/2008 Letter

San Diego North Economic Development Council

San Diego Regional Water Quality Control Board

Comment Letter for tentative Resolution No. R9-2008-0039 (item_20.pdf)

3/26/2008 Letter

Andrew Davis, Carlsbad Aquafarm

San Diego Regional Water Quality Control Board

Comment Letter for tentative Resolution No. R9-2008-0039 (item_21.pdf)

3/27/2008 Letter Sweetwater Authority

San Diego Regional Water Quality Control Board

Comment Letter for tentative Resolution No. R9-2008-0039 (item_22.pdf)

3/27/2008 Letter

Christine Kehoe, Senate, 39th District

San Diego Regional Water Quality Control Board

Comment Letter for tentative Resolution No. R9-2008-0039 (item_23.pdf)

3/27/2008 Letter

San Diego Regional Economic Development Corporation

San Diego Regional Water Quality Control Board

Comment Letter for tentative Resolution No. R9-2008-0039 (item_24.pdf)

3/27/2008 Letter

San Dieguito River Valley Regional Open Space Park

San Diego Regional Water Quality Control Board

Comment Letter for tentative Resolution No. R9-2008-0039 (item_25.pdf)

3/27/2008 Letter

California Coastal Coalition

San Diego Regional Water Quality Control Board

Comment Letter for tentative Resolution No. R9-2008-0039 (item_26.pdf)

3/27/2008 Letter

San Diego County Building & Construction Trades Council

San Diego Regional Water Quality Control Board

Comment Letter for tentative Resolution No. R9-2008-0039 (item_27.pdf)

3/27/2008 Letter

Robert Simmons, Attorney-at-Law

San Diego Regional Water Quality Control Board

Comment Letter for tentative Resolution No. R9-2008-0039 (item_28.pdf)

3/27/2008 Letter

Rainbow Municipal Water District

San Diego Regional Water Quality Control Board

Comment Letter for tentative Resolution No. R9-2008-0039 (item_29.pdf)

3/28/2008 Letter

Vallecitos Water District

San Diego Regional Water Quality Control Board

Comment Letter for tentative Resolution No. R9-2008-0039 (item_30.pdf)

3/28/2008 Letter City of Oceanside

San Diego Regional Water Quality Control Board

Comment Letter for tentative Resolution No. R9-2008-0039 (item_31.pdf)

3/28/2008 Letter

San Diego Regional Chamber of Commerce

San Diego Regional Water Quality Control Board

Comment Letter for tentative Resolution No. R9-2008-0039 (item_32.pdf)

3/28/2008 Letter

Agua Hedionda Lagoon Foundation

San Diego Regional Water Quality Control Board

Comment Letter for tentative Resolution No. R9-2008-0039 (item_33.pdf)

3/28/2008 Letter Shapery Enterprises

San Diego Regional Water Quality Control Board

Comment Letter for tentative Resolution No. R9-2008-0039 (item_34.pdf)

3/31/2008 Letter

Santa Fe Irrigation District

San Diego Regional Water Quality Control Board

Comment Letter for tentative Resolution No. R9-2008-0039 (item_35.pdf)

3/31/2008 Letter

Farm Bureau, San Diego County

San Diego Regional Water Quality Control Board

Comment Letter for tentative Resolution No. R9-2008-0039 (item_36.pdf)

3/31/2008 Letter

Carlsbad Chamber of Commerce

San Diego Regional Water Quality Control

Comment Letter for tentative Resolution No. R9-2008-0039 (item_37.pdf)

Provided By IT Staff

Page 5: WEBPOSTING REQUEST FORM SAMPLE · Web viewPlease enter the specific website address (URL) of the page(s) that need(s) to be updated in the box to the right

Board

3/31/2008 Letter

Sierra Club, San Diego Chapter

San Diego Regional Water Quality Control Board

Comment Letter for tentative Resolution No. R9-2008-0039 (item_38.pdf)

3/31/2008 Letter

Denise Moreno Ducheny, State Senator, 40th District

San Diego Regional Water Quality Control Board

Comment Letter for tentative Resolution No. R9-2008-0039 (item_39.pdf)

3/31/2008 Letter

Valley Center Municipal Water District

San Diego Regional Water Quality Control Board

Comment Letter for tentative Resolution No. R9-2008-0039 (item_40.pdf)

4/1/2008 Letter

Bill Horn, Supervisor 5th District

San Diego Regional Water Quality Control Board

Comment Letter for tentative Resolution No. R9-2008-0039 (item_41.pdf)

4/1/2008 Letter

Mary Salas, 78th Assembly District

San Diego Regional Water Quality Control Board

Comment Letter for tentative Resolution No. R9-2008-0039 (item_42.pdf)

4/2/2008 Letter Coast Law Group

San Diego Regional Water Quality Control Board

Comment Letter for tentative Resolution No. R9-2008-0039 (item_43.pdf)

4/2/2008 Letter

San Diego Coastkeeper and Surfrider Foundation

San Diego Regional Water Quality Control Board

Comment Letter for tentative Resolution No. R9-2008-0039 (item_44.pdf)

4/2/2008 Letter

San Diego County Water Authority

San Diego Regional Water Quality Control Board

Comment Letter for tentative Resolution No. R9-2008-0039 (item_45.pdf)

4/2/2008 Letter

Poseidon Resources Corporation

San Diego Regional Water Quality Control Board

Response to California Coastal Commission request for postponement (item_46.pdf)

4/2/2008 Letter

Poseidon Resources Corporation

San Diego Regional Water Quality Control Board

Response to San Diego Coastkeeper and Surfrider Foundation request for postponement (item_47.pdf)

4/2/2008 Letter

Metropolitan Water District

San Diego Regional Water Quality Control Board

Comment Letter for tentative Resolution No. R9-2008-0039 (item_48.pdf)

4/2/2008 Letter City of Coronado

San Diego Regional Water Quality Control Board

Comment Letter for tentative Resolution No. R9-2008-0039

4/2/2008 Letter

Assemblymember Martin Garrick, Assembly, California Legislature, 74th District

San Diego Regional Water Quality Control Board

Comment Letter for tentative Resolution No. R9-2008-0039 (item_50.pdf)

4/4/2008

Chiara Clemente, Deborah Woodward, Michael Porter, San Diego Regional Water Quality Control Board

John H. Robertus, San Diego Regional Water Quality Control Board

Review of Carlsbad Seawater Desalination Plant Flow, Entrainment and Impingement Minimization Plan, Poseidon Resources Corporation, dated March 6, 2008(item_104_vol1_i.pdf)

4/7/2008 Letter

California State Lands Commission

San Diego Regional Water Quality Control Board

Comment Letter for tentative Resolution No. R9-2008-0039

4/9/2008 Report

San Diego Regional Water Quality Control Board

 

Executive Officer Summary Report and Supporting Documentation (See Item No. 7) (Link to : http://www.waterboards.ca.gov/sandiego/board_info/agendas/2008/apr_09/apr_09.shtml)

4/9/2008 Report

San Diego Regional Water Quality Control Board

  Supplemental Executive Officers Report and Supporting Documentation (See Item No. 7)(Link to : http://www.waterboards.ca.gov/sandiego/boa

Provided By IT Staff

Page 6: WEBPOSTING REQUEST FORM SAMPLE · Web viewPlease enter the specific website address (URL) of the page(s) that need(s) to be updated in the box to the right

rd_info/agendas/2008/apr_09/apr_09.shtml)

4/9/2008 Presentation

Poseidon Resources Corporation  

Flow, Entrainment and Impingement Minimization Plan PowerPoint Presentation(item_54.pdf)

4/9/2008 Errata

San Diego Regional Water Quality Control Board

 Errata Sheet for tentative Resolution No. R9-2008-0039 (item_55.pdf)

4/9/2008 Transcript

San Diego Regional Water Quality Control Board

 Partial Transcript prepared by Lori Costa, Executive Assistant (item_56.pdf)

4/9/2008 Transcript

Kennedy Court Reporters, Inc.

San Diego Regional Water Quality Control Board

Partial Transcript of Proceedings(item_104_vol1_j.pdf)

4/17/2008 Letter and Resolution

San Diego Regional Water Quality Control Board

Poseidon Resources Corporation

Final Resolution No. R9-2008-0039(item_58.pdf)

4/17/2008 Email

Chiara Clemente, San Diego Regional Water Quality Control Board

Peter MacLaggan, Poseidon Resources

Request for clarification of certain aspects of Poseidon's Flow, Entrainment and Impingement Minimization Plan dated March 6, 2008

4/17/2008 Email

Peter MacLaggan, Poseidon Resources

Chiara Clemente, San Diego Regional Water Quality Control Board

Acknowledgement of 4/17/2008 email from Chiara Clemente (item_60.pdf)

4/17/2008 Email

Chiara Clemente, San Diego Regional Water Quality Control Board

Peter MacLaggan, Poseidon Resources

Response to Peter MacLaggan's 4/17/2009 email (item_61.pdf)

4/29/2008 Email

Peter MacLaggan, Poseidon Resources

Chiara Clemente, San Diego Regional Water Quality Control Board

Status of response to 4/17/2008 email from Chiara Clemente (item_62.pdf)

4/30/2008 Email

Peter MacLaggan, Poseidon Resources

Chiara Clemente, San Diego Regional Water Quality Control Board

Response to request for clarification of certain aspects of Poseidon's Flow, Entrainment and Impingement Minimization Plan dated March 6, 2008 (item_63.pdf)

5/6/2008 Email

Sara Townsend, California Coastal Commission

Chiara Clemente, San Diego Regional Water Quality Control Board

Transmits a copy of a Power Point presentation by the Coastal Commission's contractor.(item_64.pdf)

8/6/2008 Report

California Coastal Commission  

Final Adopted Findings (Items W4a). Addendum to E-06-013 - Poseidon Resources (Channelside), LLC – Carlsbad Desalination Facility (item_65.pdf)

11/14/2008 Plan Poseidon Resources

San Diego Regional Water Quality Control Board

Submittal of Marine Life Mitigation Plan in response to Regional Board Resolution No. R9-2008-0039 (item_66.pdf)

11/21/2008 Report

California Coastal Commission  

California Coastal Commission Recommended Revised Condition Compliance Findings (Item W16a). Condition Compliance for CDP No. E-06-013 – Poseidon Resources (Channelside), LLC; Special Condition 8: Submittal of a Marine Life Mitigation Plan (Approved by Coastal Commission 12/10/08) (item_67.pdf)

12/2/2008 Letter

San Diego Regional Water Quality Control Board

Poseidon ResourcesReview of Proposed Poseidon Resources Marine Life Mitigation Plan(item_68.pdf)

12/9/2008 Letter Poseidon Resources

San Diego Regional Water Quality Control Board

Letter in response to Regional Board 12/2/2008 review of Proposed Marine Life Mitigation Plan(item_69.pdf)

1/2/2009 Public Notice

San Diego Regional Water Quality Control  

Corrected Notice of Public Hearing California Regional Water Quality Control Board, San

Provided By IT Staff

Page 7: WEBPOSTING REQUEST FORM SAMPLE · Web viewPlease enter the specific website address (URL) of the page(s) that need(s) to be updated in the box to the right

Board Diego Region re: February 11, 2009 Hearing(item_70.pdf)

1/16/2009 Letter

San Diego Coastkeeper

San Diego Regional Water Quality Control Board

Letter regarding Regional Board's Closed Session of Ongoing Litigation, Surfrider Foundation v. San Diego Regional Board(item_71.pdf)

1/16/2009 Email

Tom Luster, California Coastal Commission

Brian Kelley, San Diego Regional Water Quality Control Board

Transmits a copy of the Coastal Commission's adopted findings for the Carlsbad Desalination Project and a link to the Commission's approval of the Marine Life Mitigation Plan(item_72.pdf)

1/19/2009 Letter

Hubbs-Sea World Research Institute

San Diego Regional Water Quality Control Board

Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_73.pdf)

1/19/2009 Letter

Industrial Environmental Association

San Diego Regional Water Quality Control Board

Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_74.pdf)

1/19/2009 Letter

Carlsbad Chamber of Commerce

San Diego Regional Water Quality Control Board

Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_75.pdf)

1/19/2009 Letter

City of Carlsbad, Office of the Mayor

San Diego Regional Water Quality Control Board

Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_76.pdf)

1/19/2009 Letter

San Diego County Building & Construction Trades Council, AFL-CIO

San Diego Regional Water Quality Control Board

Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_77.pdf)

1/21/2009 Letter

Latham & Watkins, LLP

San Diego Regional Water Quality Control Board

Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_78.pdf)

1/21/2009 Letter Sweetwater Authority

San Diego Regional Water Quality Control Board

Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_79.pdf)

1/21/2009 Letter

San Diego County Taxpayers Association

San Diego Regional Water Quality Control Board

Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_80.pdf)

1/21/2009 Letter

The Flower Fields at Carlsbad Ranch

San Diego Regional Water Quality Control Board

Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_81.pdf)

1/21/2009 Letter

Santa Fe Irrigation District

San Diego Regional Water Quality Control Board

Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_82.pdf)

1/21/2009 Letter

Olivenhain Municipal Water District

San Diego Regional Water Quality Control Board

Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_83.pdf)

1/21/2009 Letter

Councilmember Benjamin Hueso, San Diego City Council President

San Diego Regional Water Quality Control Board

Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_84.pdf)

1/21/2009 Assemblymember San Diego Regional Comment Letter regarding Regional Board's

Provided By IT Staff

Page 8: WEBPOSTING REQUEST FORM SAMPLE · Web viewPlease enter the specific website address (URL) of the page(s) that need(s) to be updated in the box to the right

Letter

Martin Garrick, Assembly, California Legislature, 74th District

Water Quality Control Board

February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_85.pdf)

1/21/2009 Letter

Senator Christine Kehoe, California State Senate, 39th District

San Diego Regional Water Quality Control Board

Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_86.pdf)

1/21/2009 Letter

Don Christiansen, Carlsbad Resident

San Diego Regional Water Quality Control Board

Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_87.pdf)

1/21/2009 Letter

Vallecitos Water District

San Diego Regional Water Quality Control Board

Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_88.pdf)

1/21/2009 Letter

Agua Hedionda Lagoon Foundation

San Diego Regional Water Quality Control Board

Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_89.pdf)

1/21/2009 Letter

San Diego North Economic Development Council

San Diego Regional Water Quality Control Board

Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_90.pdf)

1/21/2009 Letter

Farm Bureau, San Diego County

San Diego Regional Water Quality Control Board

Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_91.pdf)

1/22/2009 Letter

Senator Mark Wyland, California State Senate, 38th District

San Diego Regional Water Quality Control Board

Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_92.pdf)

1/22/2009 Letter

Robert Simmons, Counselor-at-Law

San Diego Regional Water Quality Control Board

Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_93.pdf)

1/23/2009 Letter

San Diego Regional Chamber of Commerce

San Diego Regional Water Quality Control Board

Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_94.pdf)

1/23/2009 Letter

Valley Center Water District

San Diego Regional Water Quality Control Board

Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_95.pdf)

1/23/2009 Letter

Council Member Julianne Nygaard, Retired, City of Carlsbad

San Diego Regional Water Quality Control Board

Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_96.pdf)

1/23/2009 Email

Catherine Hagan, San Diego Regional Water Quality Control Board

Christopher Garrett, Latham & Watkins, LLP

Acknowledgement of and initial response to Latham & Watkins January 21 comment letter regarding the Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan (item_97.pdf)

1/26/2009 Letter

San Diego County Water Authority

San Diego Regional Water Quality Control Board

Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_98.pdf)

1/26/2009 Letter Poseidon Resources

San Diego Regional Water Quality Control Board

Request that the audio tape and partial minutes of the November 12, 2008 Regional Board Meeting be admitted to the record

Provided By IT Staff

Page 9: WEBPOSTING REQUEST FORM SAMPLE · Web viewPlease enter the specific website address (URL) of the page(s) that need(s) to be updated in the box to the right

(item_99.pdf)

1/26/2009 Letter

Latham & Watkins, LLP

San Diego Regional Water Quality Control Board

Statement of Procedural Objections and Request for Alternate Procedures at February 11, 2009 Board Meeting (item_100.pdf)

1/26/2009 Report

David Mayer, Ph.D., Tenera Environmental

San Diego Regional Water Quality Control Board

Expert Opinion on Poseidon's Marine Life Mitigation Plan (item_101.pdf)

1/26/2009 Report

Chris Nordby, Nordby Biological Consulting

San Diego Regional Water Quality Control Board

Expert Opinion on Poseidon's Marine Life Mitigation Plan (item_102.pdf)

1/26/2009 Report

Scott A. Jenkins, Ph.D, Scripps Institution of Oceanography

San Diego Regional Water Quality Control Board

Expert Opinion on Poseidon's Impingement and Entrainment Assessment (item_103.pdf)

1/26/2009 Letter and Appendices

Latham & Watkins, LLP

San Diego Regional Water Quality Control Board

Comment Letter (item_104.pdf) with appendices regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan Volume 1 November 14, 2009 Poseidon Resources Marine Life Mitigation Plan (item_104_vol1_a.pdf)

PowerPoint Presentation Prepared by Dr. Raimondi: Review of Carlsbad Seawater Desalinization Project (CDP) (item_104_vol1_b.pdf)

Clean Water Act Section 316(b) Impingement Mortality and Entrainment Characterization Study. Cabrillo Power 1 LLC, Encina Power Station. January 2008. Tenera Environmental. (item_104_vol1_c.pdf)

February 19, 2008 Regional Board Comment Letter on 2/12/07 Revised Plan (item_11.pdf) March 6, 2008 Revised Flow, Entrainment. and Impingement Minimization Plan (item_12.pdf) March 7, 2008 Poseidon Response to February 19, 2008 Regional Board Comments (item_12.pdf) March 7, 2008 Email from Eric Becker to Tom Luster;[email protected]; [email protected]; Peter MacLaggan: [email protected]: [email protected]; Judy Brown;[email protected], copied to John Odermatt; Mike McCann. (item_104_vol1_g.pdf) April 2, 2008 Email from S. Townsend to various people, including E Becker. (item_104_vol1_h.pdf) April 4, 2008 RWQCB Technical

Provided By IT Staff

Page 10: WEBPOSTING REQUEST FORM SAMPLE · Web viewPlease enter the specific website address (URL) of the page(s) that need(s) to be updated in the box to the right

Report, Review of Carlsbad Seawater Desalination Plant Flow, Entrainment and Impingement Minimization Plan (item_104_vol1_i.pdf) April 9, 2008 Reporters Transcript of Proceedings. California Regional Water Quality Control Board, San Diego Region, Partial Transcript of Proceedings, Public Hearing (item_104_vol1_j.pdf)

Volume 2 April 10, 2008 Email from P. MacLaggan to J Robertus. Subject: Re: Update on Attendees for May 1-2 Meetings (item_104_vol2_a.pdf) April 10, 2008 Email from P. MacLaggan to J. Robertus. Subject: Subject. May 1 Desal Mitigation Meeting (item_104_vol2_b.pdf) April 17, 2008 Email from C. Clemente to P MacLaggan. Subject: Poseidon's CDP Plan - questions regarding IM&E Assessments (item_104_vol2_c.pdf) April 22, 2008 Email from J. Steinbeck to P. Raimondi (item_104_vol2_d.pdf) April 24, 2008 Email from J. Steinbeck to D Mayer (item_104_vol2_e.pdf) April 30, 2008 Email from P. MacLaggan to C Clemente. copied to Brian Kelley; David Barker: Deborah Woodward; Mike McCann. Subject: Re: Poseidon's CDP Plan - questions regarding IM&E assessments (item_104_vol2_f.pdf) July 8, 2008 Email from S. Townsend to various people, including J. Robertus Subject: Poseidon' Marine Life Mitigation Plan (item_104_vol2_g.pdf) August 5, 2008 Email from G Newton to J. Brown Subject: Fwd: RE: Coordination re: Poseidon? (item_104_vol2_h.pdf) August 6, 2008 California Coastal Commission Final Adopted Findings (Item W4a). Application File No. E-06- 013 Permittee Poseidon Resources (Channelside) LLC / Cabrillo Power II LLC (item_65.pdf) August 6, 2008 Reporter's Transcript of Proceedings. California Coastal Commission Meeting. Agenda Items

Provided By IT Staff

Page 11: WEBPOSTING REQUEST FORM SAMPLE · Web viewPlease enter the specific website address (URL) of the page(s) that need(s) to be updated in the box to the right

Nos. 4.a., 5.a., 5.b.. Vol. 2 of 2. pgs 163-347. (item_104_vol2_j.pdf) August 22, 2008 State Lands Commission Final Lease Amendment No. PRC 8727.1 (item_104_vol2_k.pdf) November 21, 2008 California Coastal Commission Recommended Revised Condition Compliance Findings (Item W16a). Condition Compliance for CDP No E-06-013 - Poseidon Resources (Channelside). LLC; Special Condition 8: Submittal of a Marine Life Mitigation Plan (item_67.pdf) December 2, 2008 Letter from RWQCB to Poseidon re: Review of Proposed Poseidon Resources Carlsbad Desalination Plant Marine Life Mitigation Plan, Resolution No. R9- 2008-0039 (item_68.pdf) April 2007 Updated 2005 Urban Water Management Plan. San Diego County water Authority. (item_104_vol2_n.pdf) December 18, 2001 National Pollutant Discharge Elimination System: Regulations Addressing Cooling Water Intake Structures for New Facilities, Final Rule. 66 Fed. Reg 65256 (item_104_vol2_o.pdf) July 9, 2004 National Pollutant Discharge Elimination System—Final Regulations to Establish Requirements for Cooling Water Intake Structures at Phase II Existing Facilities, Final Rule. 69 Fed. Reg. 41576 (item_104_vol2_p.pdf) July 9, 2007 National Pollutant Discharge Elimination System— Suspension of Regulations Establishing Requirements for Cooling Water Intake Structures at Phase II Existing Facilities. 72 Fed. Reg. 37107 (item_104_vol2_q.pdf) 40C.FR 125.84 (item_104_vol2_r.pdf) 40C.FR 125.94 (item_104_vol2_s.pdf)

1/26/2009 Letter and Enclosures

Latham & Watkins, LLP

San Diego Regional Water Quality Control Board

Cover letter (item_105.pdf )with the following enclosures:

Declaration of Peter MacLaggan (item_105_a.pdf)

Declaration of Jessica H. Jones (item_105_b.pdf)

Provided By IT Staff

Page 12: WEBPOSTING REQUEST FORM SAMPLE · Web viewPlease enter the specific website address (URL) of the page(s) that need(s) to be updated in the box to the right

January 26, 2009 Letter from Peter MacLaggan to members of the Regional Board (item_105_c.pdf)

1/26/2009 Letter Poseidon Resources

San Diego Regional Water Quality Control Board

Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_106.pdf)

1/27/2009 Letter

Latham & Watkins, LLP

San Diego Regional Water Quality Control Board

Letter for the removal of documents erroneously attached to Exhibit 16 of Peter MacLaggan's statement contained in Latham & Watkins 1/26/2009 submittal(item_107.pdf)(item_107.pdf)

1/29/2009 Letter

San Diego Regional Water Quality Control Board

Latham & Watkins, LLP

Response to Latham & Watkins 1/21/2009 and 1/26/2009 letters regarding procedural issues raised concerning the February 11, 2009 Regional Board Agenda Notice(item_108.pdf)

1/29/2009 Email

Catherine Hagan, San Diego Regional Water Quality Control Board

Amanda Halter and Christopher Garrett with Latham & Watkins, LLP, Gabriel Solmer, and Marco Gonzales with Coast Law Group

Transmits a copy of the Executive Officer's Summary Report for the Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_109.pdf)

1/30/2009 Letter

California Environmental Protection Agency

San Diego Regional Water Quality Control Board

Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_110.pdf)

2/2/2009 Letter

California Department of Food & Agriculture

San Diego Regional Water Quality Control Board

Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_111.pdf)

2/2/2009 Letter

Governor Arnold Schwarzenegger, State of California

San Diego Regional Water Quality Control Board

Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_112.pdf)

2/2/2009 Letter

California Natural Resources Agency

San Diego Regional Water Quality Control Board

Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_113.pdf)

2/2/2009 Letter

California Department of Fish and Game

San Diego Regional Water Quality Control Board

Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_114.pdf)

2/2/2009 Letter and Enclosure

Latham & Watkins, LLP

San Diego Regional Water Quality Control Board

Response to Staff Claim That Coastal Commission's Approved Inter-Agency MLMP Fails To Contain A Specific Mitigation Proposal(item_115.pdf)

2/2/2009 Letter and Enclosures

Poseidon Resources San Diego Regional Water Quality Control Board

Letter transmitting 3 Volumes for the Regional Board's consideration on Item No. 6 at their February 11, 2009 meeting Volume 1 Poseidon Summary Chart and Detailed Response to Executive Officer Summary Report Released January 29, 2009 (item_116_a.pdf)

Poseidon Request for Regional Board

Provided By IT Staff

Page 13: WEBPOSTING REQUEST FORM SAMPLE · Web viewPlease enter the specific website address (URL) of the page(s) that need(s) to be updated in the box to the right

Action Re: Conduct of Hearing for Item No. 6 (item_116_b.pdf)

Poseidon Proposed Resolution For Adoption By Regional Board On February 11th Approving Submitted Marine Life Mitigation Plan, Finding Compliance With Resolution No. R9- 2008-0039, and Compliance With Resolution R9-2006-0065, and Making Appropriate Findings (item_116.c.pdf)

Volume 2 Poseidon’s Response to Staff’s “Overarching Concern” Re: The Inclusion of a “Specific Mitigation Alternative” in the Marine Life Mitigation Plan (item_116_d.pdf)

Supplemental Statement and Evidence Presented by Chris Nordby Re: Impingement Issues (item_116_e.pdf)

Summary Charts of Staff Issues and Poseidon Responses to Regional Board Staff Review Letters and Technical Report of February 19, 2008 and April 4, 2008 (item_116_f.pdf)

Offer of Proof Regarding Testimony and Evidence From Poseidon (item_116_g.pdf)

Coastal Commission Recommended Revised Condition Compliance Findings for CDP No. E-06-013 – Poseidon Resources (Channelside), LLC; Special Condition 8: Submittal of a Marine Life Mitigation Plan, adopted December 10, 2008 (item_116_h.pdf)

Volume 3 Annotated Index of Authority and Technical Studies and Scientific Studies Supporting Board Decision (item_116_i.pdf)

National Pollutant Discharge Elimination System: Regulations Addressing Cooling Water Intake Structures for New Facilities, 66 Fed. Reg. 65256, 65274 (December 18, 2001) (to be codified at 40 C.F.R. pts. 9,122, 123, 124, 125) (2009) (item_116_tab_a.pdf) EPA Requirements Applicable to Cooling Water Intake Structures for New Facilities Under Section 316(B) of the Act, 40 C.F.R. §§ 125.84(b)(2), 125.84(c)(1) (2009) (item_116_tab_b.pdf)

Provided By IT Staff

Page 14: WEBPOSTING REQUEST FORM SAMPLE · Web viewPlease enter the specific website address (URL) of the page(s) that need(s) to be updated in the box to the right

EPA Requirements Applicable to Cooling Water Intake Structures for New Facilities Under Section 316(B) of the Act, 40 C.F.R.§§ 125.94(a)(1)(ii) (2009) (item_116_tab_c.pdf)

John Boreman et al., Impacts of Power Plant Intake Velocities on Fish, in TOPICAL BRIEFS: FISH AND WILDLIFE RESOURCES AND ELECTRIC POWER GENERATION, NO. 1 (Power Plant Project, Office of Biological Services, Fish and Wildlife Service, U.S. Department of the Interior) (1977) (item_116_tab_d.pdf) A.G. Christianson et al., Reviewing Environmental Impact Statements- Power Plant Cooling Systems, Engineering Aspects (National Thermal Pollution Research Program, Pacific Northwest Environmental Research Laboratory, EPA- 660/2-73-016) (1973) (item_116_tab_e.pdf)

John C. Sonnichsen, Jr. et al, A Review of Thermal Power Plant Intake Structure Designs and Related Environmental Considerations (Hanford Engineering Development Laboratory, HEDL–TME 73–24, UC–12) (1973) (item_116_tab_f.pdf)

A.W.H. Turnpenny, The Behavioral Basis of Fish Exclusion from Coastal Power Station Cooling Water Intakes, in RESEARCH REPORT- CENTRAL ELECTRICITY (Vol.RD/L/2201/R88) (1988) (item_116_tab_g.pdf)

King, W. Instructional Memorandum RB- 44: Review of NPDES (National Pollutant Discharge Elimination System) permit applications processed by the EPA (Environmental Protection Agency) or by the State with EPA oversight.' In: U.S. Fish and Wildlife Service Navigable Waters Handbook. (item_116_tab_h.pdf)

Electric Power Research Institute, Inc., Catalog of Assessment Methods for Evaluating the Effects of Power Plant Operations on Aquatic Communities (EPRI,TR-112013) (1999) (item_116_tab_i.pdf)

Electric Power Research Institute, Inc., Evaluation of Biocriteria as a Concept Approach, and Tool for Assessing Impacts of Impingement and Entrainment

Provided By IT Staff

Page 15: WEBPOSTING REQUEST FORM SAMPLE · Web viewPlease enter the specific website address (URL) of the page(s) that need(s) to be updated in the box to the right

Under § 316(b) of the Clean Water Act (EPRI, TR-114007) (2000) (item_116_tab_j.pdf)

Electric Power Research Institute, Inc., Technical Evaluation of the Utility of Intake Approach Velocity as an Indicator of Potential Adverse Environmental Impact under § 316(b) (EPRI, TR- 1000731)(2000) (item_116_tab_k.pdf)

John Steinbeck et al, Assessing Power Plant Cooling Water Intake System Entrainment Impacts (California Energy Commission, CEC-700-2007-010) (2007) (item_116_tab_l.pdf)

Hany Elwany et al, Agua Hedionda Lagoon Hydrodynamic Studies (Tenera Environmental Technical Report, CE No. 05-10) (2005) (item_116_tab_m.pdf)

Scott A. Jenkins & Joseph Wasyl, Coastal Processes Effects of Reduced Flows at Agua Hedionda Lagoon (Study submitted to Tenera Environmental and Poseidon Resources) (2006) (item_116_tab_n.pdf)

Tetra Tech, Inc., Agua Hedionda Watershed Water Quality Analysis and Recommendations Report (Report submitted to City of Vista) (2007) (item_116_tab_o.pdf)

NWS, 2009, “National Weather Service Daily Climate Reports,” http://www.wrh.noaa.gov/sgx/obs/rtp/ carlsbad.html (item_116_tab_p.pdf)

Curriculum Vitae of David L. Mayer, PhD. –President / Principal Scientist – Tenera Environmental Inc. (item_116_tab_q.pdf)

2/3/2009 Letter

Assemblymember Mary Salas, Assembly, California Legislature, 79th District

San Diego Regional Water Quality Control Board

Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_117.pdf)

2/5/2009 Letter Sierra Club

San Diego Regional Water Quality Control Board

Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_118.pdf)

2/6/2009 Letter

Mayor Jerry Sanders, City of San Diego

San Diego Regional Water Quality Control Board

Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_119.pdf)

2/9/2009 Carlsbad Desalination Chiara Clemente, San Comments regarding Regional Board's February Provided By IT Staff

Page 16: WEBPOSTING REQUEST FORM SAMPLE · Web viewPlease enter the specific website address (URL) of the page(s) that need(s) to be updated in the box to the right

Email Project Diego Regional Water Quality Control Board

11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_120.pdf)

2/9/2009 Email

Ed Kimura, Sierra Club

Mike Porter, Michelle Mata, and Chiara Clemente, San Diego Regional Water Quality Control Board

Comments regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_121.pdf)

2/9/2009 Email

Tom Luster, California Coastal Commission

Brian Kelley, San Diego Regional Water Quality Control Board

Information for the Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_122.pdf)

2/10/2009 Letter

Coast Law Group, LLP

San Diego Regional Water Quality Control Board

Environmental Groups' response to Poseidon's comments regarding the Regional Board's February 11, 2009 meeting to consider the Marine Life Mitigation Plan(item_123.pdf)

2/11/2009 EOSR

San Diego Regional Water Quality Control Board

San Diego Regional Water Quality Control Board

Executive Officer Summary Report for Item 6 of the Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan (See Item 6) (Link to: http://www.waterboards.ca.gov/sandiego/board_info/agendas/2009/feb/feb_09.shtml)item

2/11/2009 Revised EOSR

San Diego Regional Water Quality Control Board

San Diego Regional Water Quality Control Board

Revised Executive Officer Summary Report for Item 6 of the Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan (See Item 6) (Link to: http://www.waterboards.ca.gov/sandiego/board_info/agendas/2009/feb/feb_09.shtml)

2/11/2009 Presentation

Peter MacLaggan, Poseidon Resources

San Diego Regional Water Quality Control Board

Power Point presentation for Item 6 at the Regional Board's 2/11/2009 meeting (item_126.pdf)

2/11/2009 Presentation

Marco Gonzalez, Coast Law Group, LLP

San Diego Regional Water Quality Control Board

Power Point presentation for Item 6 at the Regional Board's 2/11/2009 meeting to consider Poseidon's Marine Life Mitigation Plan (item_127.pdf)

2/25/2009Letter

Assembly California Legislature

San Diego Regional Water Quality Control Board

Comment Letter regarding Regional Board's April 8, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan(item_128.pdf)

3/2/2009 Email

Catherine Hagan, San Diego Regional Water Quality Control Board

Chiara Clemente, Brian Kelley, Deborah Woodward and Michelle Mata, San Diego Regional Water Quality Control Board

Documents related to other agencies requirements regarding the Carlsbad Desalination Project: Planning Commission Resolution No. 6090 (item_129_a.pdf) Planning Commission Resolution No. 6091 (item_129_b.pdf) Exhibit "EIR-B", City of Carlsbad (item_129_c.pdf) Planning Commission Resolution No. 6088 (item_129_d.pdf) State Lands Commission Amendment of Lease PRC 8727 (item_129_e.pdf) Coastal Commission (item_129_f.pdf)

Provided By IT Staff

Page 17: WEBPOSTING REQUEST FORM SAMPLE · Web viewPlease enter the specific website address (URL) of the page(s) that need(s) to be updated in the box to the right

3/9/2009 Public Notice

San Diego Regional Water Quality Control Board

Notice of Public Hearing California Regional Water Quality Control Board, San Diego Region re: April 8, 2009 Hearing (item_13029.pdf)

3/9/2009 Email

Amanda Halter with Latham & Watkins, LLP

Catherine Hagan, San Diego Regional Water Quality Control Board

Minimization Plan and Attachments (item_131.pdf) Attachment 1- EPS's 2008 Daily Flow Data (item_131_a.pdf) Attachment 2 - Cost Estimate of Subsurface Intake Alternatives (item_131_b.pdf) Attachment 3 - Impingement Results, G1 - Traveling Screens and Bar Racks Weekly Surveys, G2 - Heat Treatment Surveys (item_131_c.pdf) Attachment 4 - Proposal for Information Collection Clean Water Act 316(b), Encina Power Station, Cabrillo Power I LLC, NPDES Permit No. CA0001350, April 1, 2006 (item_131_d.pdf) Attachment 5 – Estimation of the Potential for Impingement Should the CDP Operate in Stand-Alone Mode (item_131_e.pdf) Attachment 6 - Carlsbad Desalination Facility, Encina Power Station Summary of Fish and Target Shellfish Larvae collected from Entrainment and Source Water Studies in the Vicinity of Agua Hedionda Lagoon from June 2005 through May 2006 (item_131_f.pdf) Attachment 7 – Mitigation Computation Based on Impingement Assessment- Chris Nordby (item_131_g.pdf) Attachment 8 – Numbers and Biomass of Species Collected During 2004/2005 Sampling Period (item_131_h.pdf)

3/9/2009San Diego Regional Water Quality Control Board

Tentative Order No. R9-2009-0038(item_1321.pdf)

** This is not a complete administrative record. Some documents are only available in hard copy at the Regional Board Office.

Provided By IT Staff

Page 18: WEBPOSTING REQUEST FORM SAMPLE · Web viewPlease enter the specific website address (URL) of the page(s) that need(s) to be updated in the box to the right

Provided By IT Staff