web.eng.fiu.eduweb.eng.fiu.edu/chen/spring 2016/sap us gbi/gbi...  · web view2014. 8. 8. ·...

209
CASE STUDY SAP ERP Configuration Phase IV – Production © SAP AG Product SAP ERP GBI Release 6.04 Revised 6/24/2014 Focus Production Authors Simha R. Magal Stefan Weidner Tom Wilder Version 2.23 MOTIVATION You will configure the enterprise structure and business processes for Production. After setting up the organization units and process parameters, you will create necessary master data and test the business process. PREREQUISITES You should be familiar with navigation in the SAP system. It is also recommended that you have gone through the fulfillment exercise. ACKNOWLEDGEMENT This material was prepared with the assistance of student interns at the Seidman ERP program at Grand Valley State University and the SAP Club at CSU Chico as well as student and research assistants at SAP UCC Magdeburg. Also, thanks to Corrie Fiedler (Senior Lecturer, Information & Decision Sciences, Carlson School of Management, University of Minnesota) for her assistance in improving this exercise.

Upload: others

Post on 05-Jun-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

CASE STUDY

SAP ERP Configuration Phase IV – Production

© SAP AG

ProductSAP ERP GBIRelease 6.04

Revised6/24/2014

FocusProduction

AuthorsSimha R. MagalStefan WeidnerTom Wilder

Version2.23

MOTIVATIONYou will configure the enterprise structure and business processes for Production.

After setting up the organization units and process parameters, you will create necessary master data and test the business process.

PREREQUISITESYou should be familiar with navigation in the SAP system.

It is also recommended that you have gone through the fulfillment exercise.

ACKNOWLEDGEMENTThis material was prepared with the assistance of student interns at the Seidman ERP program at Grand Valley State University and the SAP Club at CSU Chico as well as student and research assistants at SAP UCC Magdeburg.

Also, thanks to Corrie Fiedler (Senior Lecturer, Information & Decision Sciences, Carlson School of Management, University of Minnesota) for her assistance in improving this exercise.

Page 2: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Overview and Table of Contents

Table of Contents

General Notes and Cautions.........................................................................................................1

Part IV.1 – Enterprise Structure.....................................................................................................3

Part IV.2 – Rules and Parameters.................................................................................................5

Part IV.3 – Master Data...............................................................................................................21

Part IV.4 – Process Execution.....................................................................................................41

© SAP AG

Enterprise Structure

Rules and Parameters Master Data Process

Execution

Page 3: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

General Notes and CautionsWarning: When working with other classmates at the same time in the same transactions within “SPRO”, tables will tend to lock up and you will only be able to display them. This is due to the fact that the system does not allow multiple users in the same transaction at the same time. To get passed this message, simply wait until the current user in the transaction is finished and then proceed.

Attributes: At times, certain attributes or fields may not appear to have the name of them in front of the user. To display the full name of the attribute or field, simply click within the field and then press the F1 key. This will bring up not only the title of the field, but it will bring up the full description of it to read.

The ## Symbol: When working with other classmates at the same time, you will be assigned your own unique identifier which is called the ## Symbol or the “Pound Pound” Symbol. This will be your identifier and is ASSIGNED FOR YOUR OWN USE ONLY!!! Please be cautious about other classmates attempting to use your identifier whether it is on purpose or not and if you suspect other classmates using it, inform your professor immediately so that fixes can be made accordingly. For example, if Ashley has an identifier of 09, Ashley’s company code will be US09.

The Search Tool: At times in this document, the instructions will ask you to search for something to put in a field. When it does this, simply click on the field itself and click on the icon to the right of it (it looks like a white square). Clicking on it will bring up another window and you will search from there. You may also search other field by clicking on the downward arrow that may be on the left or right of the field. It will bring up a drop down menu that will have options to choose from and click.

Where do I start? : There are three ways to proceed within the SAP system: Using the “SAP Easy Access” menu, using the “SAP Menu Bar”, and using the “SAP Customizing Implementation Guide” menu. All three of these are explained below:

1. The SAP Easy Access menu appears when you start a new session.2. The SAP Menu Bar also appears when you start a new session at the very top of the screen.

3. In the SAP Customizing Implementation Guide, there are two ways you may use to get here:

a. The first is to simply type “SPRO” in the transaction field at the top of the screen.b. Proceed through the path to get there. The path consists of the following:

(In the main menu of SAP, click on the black arrows on the left of these names) SAP menu ► Tools ► Customizing ► IMG ► Execute Project (double-click on “Execute Project”)

In the “Customizing: Execute Project” screen, click on the icon.

Saving: When the instructions to tell you to save data, always press the “Enter” key to validate. If there are error(s) that occur, they must be corrected before continuing to the next task. You will find errors from a transaction when there are red icons that appear in the message area. Messages that are yellow contain warnings and not errors. At times, these must be fixed in order to move on. However, most of the

© SAP AG Page 1

Page 4: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

time, they do not need to be fixed and you can simply enter through them. Green messages are obviously showing that nothing went wrong with the transaction and that you may proceed to the next task.Set Controlling Area Pop-Up: At times throughout this phase, there will be times when the system asks you enter your controlling area to clarify which controlling area you are configuring for.

If this should happen, in the “Set Controlling Area” pop-up, enter the following information:

Attribute Description Data ValueControlling Area Uniquely identifies a controlling area. NA##

Click on (CONTINUE (ENTER)).

This will get you into the next screen where the instructions will then tell you what to do for the task.

Enter Chart of Accounts Pop-Up: At times throughout this phase, there will be times when the system asks you enter your chart of accounts to clarify which chart of accounts you are configuring for.

If this should happen, in the “Enter Chart of Accounts” pop-up, enter the following information:

Attribute Description Data ValueChart of Accounts Key that uniquely identifies a chart of accounts. GL##

Click on (CONTINUE (ENTER)).

This will get you into the next screen where the instructions will then tell you what to do for the task.

Differences in Font: Throughout this phase you will see tables with different fonts used in the Data Value column. The normal Times New Roman indicates you enter exactly what is typed out except for the ## Symbol where you would put in your identifier. The italicized Times New Roman font indicates the data is looked up or found.

Attribute Description Data ValueTimes New Roman Font that tells you to enter what is written. Times New Roman

Times New Roman (Italicized)

Font that tells you the data that needs to be looked up.

Times New Roman (Italicized)

© SAP AG Page 2

Page 5: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Part IV.1 – Enterprise Structure

Table of Contents

IV.1.1: Determine Work Center Location.......................................................................................4

© SAP AG Page 3

Enterprise Structure

Rules and Parameters Master Data Process

Execution

Page 6: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

IV.1.1: Determine Work Center Location

Navigation: SAP Customizing Implementation Guide ► Enterprise Structure ► Definition ► Logistics – General ► Define Location

Tasks and Data Entry:

© SAP AG Page 4

Description: You will define a Work Center Location within the city of Dallas, TX. A Work Center Location contains Work Centers and identifies the physical location where work is carried out. A Work Center Location can be a general place description (Philadelphia) or a very specific place description (office 105, desk III).

Please note that a Work Center Location ≠ Work Center. Rather a Work Center Location contains Work Centers.

Warning: See “General Notes and Cautions” about table locks.

Page 7: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

In the “Change View “Locations”: Overview” screen, click on the icon.

In the “New Entries: Overview of Added Entries” screen, enter the following information:

Plnt Location Name

Your Plant Dallas (DL##)DALLAS TX GBI N42##

Click on (ENTER).

In the “Edit address: DL## DALLAS TX” pop-up, enter the following information:

Attribute Description Data ValueCountry The country key contains information which the system uses to check

entries such as the length of the postal code or bank account number.USA (US)

© SAP AG Page 5

Page 8: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Region In some countries, the region forms part of the address. Texas (TX)

In the “Street Address” part, click on the icon.

Enter the following information:

Attribute Description Data ValueJurisdict. code Specifies the tax jurisdiction. Texas Jurisdiction Code

(TX0000000)

© SAP AG Page 6

Page 9: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

© SAP AG Page 7

Page 10: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (ENTER (CONTINUE)). You will receive a message that says “One entry chosen”.

© SAP AG Page 8

Page 11: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

© SAP AG Page 9

Page 12: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

In the “New Entries: Overview of Added Entries” screen, click on the icon.

You will receive a message that says “Data was saved”.

© SAP AG Page 10

Page 13: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Part IV.2 – Rules and Parameters

Table of Contents

IV.2.1: Define Production Scheduling Profile.................................................................................6

IV.2.2: Define Production Scheduler.............................................................................................7

IV.2.3: Configure Automatic Postings............................................................................................8

IV.2.4: Activate Material Requirements Planning..........................................................................9

IV.2.5: Define Checking Control..................................................................................................10

IV.2.6: Define Scheduling Parameters........................................................................................11

IV.2.7: Define Order Dependent Parameters..............................................................................12

IV.2.8: Define Confirmation Parameters......................................................................................13

IV.2.9: Carry Out Maintenance of Materials................................................................................14

IV.2.10: Carry Out Maintenance of Production............................................................................18

IV.2.11: Define Valuation of Goods Received.............................................................................20

© SAP AG Page 11

Enterprise Structure

Rules and Parameters Master Data Process

Execution

Page 14: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

IV.2.1: Define Production Scheduling Profile

Navigation: SAP Customizing Implementation Guide ► Production ► Shop Floor Control ► Master Data ► Define production scheduling profile

Tasks and Data Entry:

© SAP AG Page 12

Description: You will create the Production Scheduling Profile used at your Dallas plant.

GBI management wants to improve plant efficiency by automatically taking the following action when a production order is created. The order is:

automatically released and scheduled without manual intervention. not scheduled unless all materials are available (e.g., partial orders are not allowed).

A production scheduling profile can be associated either with specific materials or to a production scheduler.

Warning: See “General Notes and Cautions” about table locks.

Page 15: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

In the “Change View “Production Scheduling Profile”: Overview” screen, click on the icon.

In the “New Entries: Details of Added Entries” screen, enter the following information:

Attribute Description Data ValuePlant Key uniquely identifying a plant. Your Plant Dallas

(DL##)

Prod. Sched. Profile Specifies which transactions are carried out in parallel, can trigger an automatic goods receipt, or specify an overall profile for capacity leveling.

10

Description Description of production scheduler profile. ## Release & Schedule

Release Specifies an order is to be released when it is created. Selected

Schedule Order Specifies an order is to be scheduled as it is released. Selected

© SAP AG Page 13

Page 16: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (SAVE). You will receive a message that says “Data was saved”.

© SAP AG Page 14

Page 17: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

IV.2.2: Define Production Scheduler

Navigation: SAP Customizing Implementation Guide ► Production ► Shop Floor Control ► Master Data ► Define production schedule

r

Tasks and Data Entry:

© SAP AG Page 15

Description: You will create a Production Scheduler and associate this scheduler with the production schedule profile created in the previous step. The Production Scheduler is responsible for the day-to-day scheduling activities for a set of manufactured materials across a plant or plants.

Warning: See “General Notes and Cautions” about table locks.

Page 18: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

In the “Change View “Production Scheduler”: Overview” screen, click on the icon.

In the “New Entries: Overview of Added Entries” screen, enter the following information:

Attribute Description Data ValuePlant Uniquely identifies a plant Your Plant Dallas (DL##)ProdSched. Scheduler responsible for a material in production. 0##Description Description of Production Scheduler ## DL Production SchedulerProdProfile Specifies which transactions are carried out in

parallel, can trigger automatic goods receipt, or specify an overall profile for capacity leveling.

10

Click on (SAVE). You will receive a message that says “Data was saved”.

© SAP AG Page 16

Page 19: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

IV.2.3: Configure Automatic Postings

Navigation: SAP Customizing Implementation Guide ► Materials Management ► Valuation and Account Assignment ► Account Determination ► Account Determination Without Wizard ► Configure

© SAP AG Page 17

Description: This is the first of two steps in which you configure SAP to automatically post General Ledger transactions associated with the Production business process.

You will specify the General ledger accounts associated with the Issue Materials process step.

For example, when Raw Materials (Valuation Class = 3000) are issued to a production order (Transaction Key = VBR) financial transaction will post to

Inventory – Raw Materials (specified in a previous step) Raw Material Consumption (the offsetting account, specified in this step).

Notice that the general ledger account for ‘inventory from heaven’ is also specified here.

Warning: See “General Notes and Cautions” about table locks.

Page 20: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Automatic Postings

Tasks and Data Entry:

In the “Automatic Posting” screen, click on the icon.

© SAP AG Page 18

Page 21: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

In the “Maintain FI Configuration: Automatic Posting – Procedures” screen, double-click on GBB.

You are in the “Maintain FI Configuration: Automatic Posting – Accounts” screen.

Enter the following information:

Val. modif. Gen. modif. Valuation class Account0001 3000 Your Raw Material Consumption Expense (720000)

0001 3030 Your Supplies Expense (740000)

0001 3100 Your Trading Good Consumption Expense (720200)

0001 7900 Your Semi-Finished Consumption Expense (720300)

0001 AUF 7900 Your Manufacturing Output settlement (741600)

0001 AUF 7920 Your Manufacturing Output Settlement Variance (741700)

0001 VBR 3000 Your Raw Material Consumption Expense (720000)

0001 VBR 3100 Your Trading Good Consumption Expense (720200)

0001 VBR 7900 Your Semi-Finished Consumption Expense (720300)

0001 BSA 3000 Your Inventory-Suspense (Heaven) (200500)

0001 BSA 3100 Your Inventory-Suspense (Heaven) (200500)

0001 BSA 7920 Your Inventory-Suspense (Heaven) (200500)

© SAP AG Page 19

Page 22: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

0001 BSA 7900 Your Inventory-Suspense (Heaven) (200500)

Click on (SAVE). You will receive a message that says “Changes have been made”.

© SAP AG Page 20

Page 23: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

IV.2.4: Activate Material Requirements Planning

Navigation: SAP Customizing Implementation Guide ► Materials Management ► Consumption-Based Planning ► Planning ► Activate Material Requirements Planning

Tasks and Data Entry:

© SAP AG Page 21

Description: You will activate your three Plants to use material resource planning (MRP).

MRP is used to plan manufacturing, purchasing, and delivering activities. MRP’s basic functions include inventory control, bill of material processing, and scheduling. This activation allows for the execution of single-item and multi-level planning in each of the three plants.

Warning: See “General Notes and Cautions” about table locks.

Page 24: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

In the “Activation” screen, click on the icon.

You are in the “Change View “Activate Requirements Planning”: Overview” screen.

Enter the following information:

Plnt Activate requirements planningYour Plant Dallas(DL##) Selected

Your DC Miami (MI##) Selected

Your DC San Diego (SD##) Selected

© SAP AG Page 22

Page 25: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (SAVE). You will receive a message that says “Data was saved”.

© SAP AG Page 23

Page 26: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

IV.2.5: Define Checking Control

Navigation: SAP Customizing Implementation Guide ► Production ► Shop Floor Control ► Operations ► Availability Check ► Define Checking Control

© SAP AG Page 24

Description: This is the first of four steps in which you specify parameters guiding the creation and release of production orders in your Dallas plant.

You will copy checking control parameters from Company Code US00 to your Company Code US##.

These parameters identify which inventory should be considered as available for use in a production order. GBI management has determined that production orders should be checked for inventory availability at both creation and release. This ensures that no order will be sent to the plant floor for production unless all materials (both raw materials and semi-finished goods) are available.

Warning: See “General Notes and Cautions” about table locks.

Page 27: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Tasks and Data Entry:

In the “Change View “Order Control”: Overview” screen, highlight the “DL00 PP01 1” row.

Highlight the “DL00 Plant PP01 2” row.

Click on (COPY AS…). You will receive a message that says “Specify target entries”.

In the “Change View “Order control”: Details of Selected Set” screen, enter the following information:

Attribute Description Data ValuePlant Key uniquely identifying a plant. Your Plant Dallas (DL##)

© SAP AG Page 25

Page 28: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (ENTER). You will receive a message that says “Specify target entries”.

Enter the following information:

Attribute Description Data ValuePlant Key uniquely identifying a plant. Your Plant Dallas (DL##)

© SAP AG Page 26

Page 29: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (ENTER). You will receive a message that says “Number of entries copied: 2”.

In the “Change View “Order control”: Overview of Selected Set” screen, click on the icon.

© SAP AG Page 27

Page 30: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

You will receive a message that says “Data was saved”.

© SAP AG Page 28

Page 31: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

IV.2.6: Define Scheduling Parameters

© SAP AG Page 29

Description: This is the second of four steps in which you specify parameters guiding the creation and release of standard production orders in your Dallas plant.

You will specify scheduling parameters associated with the Dallas Plant and your Production Scheduler. This step implements GBI management’s strategic decisions regarding production order scheduling:

orders are backwards scheduled, rather than forward scheduled. orders cannot be scheduled to begin in in the past (and hope that production can ‘catch up’). order lead time will not be automatically reduced (in the case the order is ‘running late’).

Warning: See “General Notes and Cautions” about table locks.

Page 32: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Navigation: SAP Customizing Implementation Guide ► Production ► Shop Floor Control ► Operations ► Scheduling ► Define Scheduling Parameters for Production Orders

Tasks and Data Entry:

© SAP AG Page 30

Page 33: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

In the “Change View “Specify scheduling parameters”: Overview” screen, click on the

icon.

In the “New Entries: Details of Added Entries” screen, enter the following information:

Attribute Description Data ValuePlant Key uniquely identifying a plant. Your Plant Dallas (DL##)

Order type Identifies the usage of the orders. Standard Production order (PP01)

Prodn Superv. Scheduler responsible for a material. Your DL Production Scheduler (0##)

Scheduling Type Specifies the scheduling type. Backwards

Automatic Scheduling Specifies that orders or networks are automatically scheduled when saved.

Selected

Click on (SAVE). You will receive a message that says “Data was saved”.

© SAP AG Page 31

Page 34: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

© SAP AG Page 32

Page 35: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

IV.2.7: Define Order Dependent Parameters

© SAP AG Page 33

Description: This is the third of four steps in which you specify parameters guiding the creation and release of standard production orders in your Dallas plant.

You will specify production order parameters associated with the Dallas plant. This step implements GBI management’s tactical decisions regarding standard production orders:

production orders require a routing both planned (standard) costs and actual production costs are calculated for each production

order.

Warning: See “General Notes and Cautions” about table locks.

Page 36: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Navigation: SAP Customizing Implementation Guide ► Production ► Shop Floor Control ► Master Data ► Order ► Define order type-dependent parameters

Tasks and Data Entry:

You are in the “Change View “Order Type-Dependent Parameters: Overview”: Overview” screen.

© SAP AG Page 34

Page 37: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (NEW ENTRIES).

In the “New Entries: Details of Added Entries” screen, enter the following information:

Attribute Description Data ValuePlant Key that uniquely identifies a plant. Your Plant Dallas

(DL##)

Order Type Key that differentiates orders according to their purpose. Standard Production order (PP01)

Routing Selection Controls per plant and order type how the selection of a routing/reference operation set is to be carried out.

Routing Mandatory (automatic selection) (6)

BOM Application Represents a process for automatic determination of alternatives in the different areas within a company.

Production – General (PP01)

© SAP AG Page 35

Page 38: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on the “Cost Accounting” tab.

Enter the following information:

Attribute Description Data ValueCstg variant planned Key that specifies which costing variant

is used to determine the planned costs.Production Order: Planned (PPP1)

Cstg variant actual Key that specifies the costing variant that Production Order: Actual (PPP2)

© SAP AG Page 36

Page 39: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

is used to determine the actual costs.

Click on (SAVE). You will receive a message that says “Data was saved”.

© SAP AG Page 37

Page 40: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

IV.2.8: Define Confirmation Parameters

© SAP AG Page 38

Description: This is the fourth of four steps in which you specify parameters guiding the creation and release of standard production orders in your Dallas plant.

You will specify confirmation parameters associated with the Dallas Plant. This step implements GBI management’s tactical philosophy regarding the confirmation of standard production orders:

at final confirmation, all production order components (raw materials and semi-finished goods) are ready for issue and thus open reservations are cleared.

Warning: See “General Notes and Cautions” about table locks.

Page 41: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Navigation: SAP Customizing Implementation Guide ► Production ► Shop Floor Control ► Operations ► Confirmation ► Define Confirmation Parameters

Tasks and Data Entry:

You are in the “Change View “Parameters for Order Confirmation”: Overview” screen.

© SAP AG Page 39

Page 42: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (NEW ENTRIES).

In the “New Entries: Details of Added Entries” screen, enter the following information:

Attribute Description Data ValuePlant Key that uniquely identifies a plant. Your Plant Dallas (DL##)

Order Type Key that differentiates orders according to their purpose. Standard Production order (PP01)

Click on the “Individual Entry General” tab.

© SAP AG Page 40

Page 43: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Enter the following information:

Attribute Description Data ValueConfirmation Type Specifies what sort of confirmation is to be automatically

proposed.Final Confirmation

Clear Open Reservations

Specifies that with a final confirmation the indicator “Final issue” is also set for components that are not backflushed.

Selected

Click on (SAVE). You will receive a message that says “Data was saved”.

© SAP AG Page 41

Page 44: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

IV.2.9: Carry Out Maintenance of Materials

Navigation: SAP Customizing Implementation Guide ► Materials Management ► Consumption-Based Planning ► Plant Parameters ► Carry Out Overall Maintenance of Plant Parameters

Tasks and Data Entry:

© SAP AG Page 42

Description: This is the first of two steps in which you specify MRP parameters.

In this step you will: specify the number scheme by which production orders and other production-related

transaction will be numbered. For example, your first Planned Production Order in Dallas will be Planned Order #1,

create an MRP controller (0##). The MRP controller is a planner (or group of planners) responsible for the day-to-day planning activities,

specify other analytical measures (float, for example) that guide the MRP algorithm.

Warning: See “General Notes and Cautions” about table locks.

Page 45: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

You are in the “Plant Parameters for Material Requirements Planning” screen.

Click on (CREATE).

In the “Create Plant Parameters” pop-up, enter the following information:

Attribute Description Data ValuePlant Key that uniquely identifies a plant. Your Plant Dallas (DL##)

Click on (CREATE).

In the “Create Plant Parameters” pop-up, click on the icon.

© SAP AG Page 43

Page 46: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

You will receive a message that says “Plant Parameters for Plant DL## can now be maintained”.

In the “Plant Parameters for Material Requirements” screen, click on the icon.

In the “Maintain Plant Parameters” pop-up, click on the icon.

© SAP AG Page 44

Page 47: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

In the “Maintain Plant Parameters” screen, click on the icon.

In the “Assign Number Ranges” screen, click on the icon.

© SAP AG Page 45

Page 48: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

You will receive a message that says “One entry chosen”.

You are in the “Change View “Number Ranges for Planned Orders”: Overview” screen.

Enter the following information:

Plnt Name 1 NRge pl.ordersYour Plant Dallas (DL##) ## Plant Dallas 01

Click on (SAVE). You will receive a message that says “Data was saved”.

© SAP AG Page 46

Page 49: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (BACK).

In the “Assign Number Ranges” screen, click on the icon.

You will receive a message that says “One entry chosen”.

You are in the “Change View “Number Ranges for Reservations”: Overview” screen.

Enter the following information:

Plnt Name 1 NR: StkTrns Res.Your Plant Dallas (DL##) ## Plant Dallas 01

© SAP AG Page 47

Page 50: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (SAVE). You will receive a message that says “Data was saved”.

Click on (BACK).

In the “Assign Number Ranges” screen, click on the icon.

© SAP AG Page 48

Page 51: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

You will receive a message that says “One entry chosen”.

You are in the “Change View “Number Ranges for Purchase Requisitions”: Overview” screen,

Enter the following information:

Plnt Name1 NR - PReqYour Plant Dallas (DL##) ## Plant Dallas 01

© SAP AG Page 49

Page 52: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (SAVE). You will receive a message that says “Data was saved”.

Click on (BACK).

In the “Assign Number Ranges” screen, click on the icon.

You will receive a message that says “One entry chosen”.

You are in the “Change View “Number Ranges for MRP Lists”: Overview” screen.

© SAP AG Page 50

Page 53: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Enter the following information:

Plnt Name 1 No. Range –MRPYour Plant Dallas (DL##) ## Plant Dallas 01

Click on (SAVE). You will receive a message that says “Data was saved”.

Click on (BACK).

In the “Assign Number Ranges” screen, click on the icon.

You will receive a message that says “One entry chosen”.

© SAP AG Page 51

Page 54: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

You are in the “Change View “Number Range for Sim. Dependent Requirements”: Overview” screen

Enter the following information:

Plnt NR. SimDepRsYour Plant Dallas (DL##) 01

© SAP AG Page 52

Page 55: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (SAVE). You will receive a message that says “Data was saved”.

Click on (BACK).

In the “Assign Number Ranges” screen, click on the icon.

© SAP AG Page 53

Page 56: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

In the “Maintain Plant Parameters” screen click on the icon.

You will receive a message that says “No entries found that match selection criteria”.

© SAP AG Page 54

Page 57: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

In the “Change View “MRP Controllers”: Overview” screen, click on the icon.

In the “New Entries: Details of Added Entries” screen, enter the following information:

Attribute Description Data ValuePlant Key uniquely identifying a plant. Your Plant Dallas (DL##)

MRP Controller Specifies the number of MRP controller or group of MRP controllers responsible for material planning for the material.

0##

Name of MRP Controller Specifies the name of the MRP controller or group of MRP controllers responsible for material requirements planning.

## DL Controller

© SAP AG Page 55

Page 58: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (SAVE). You will receive a message that says “Data was saved”.

Click on (BACK). You will receive a message that says “Only one entry chosen”.

In the “Change View “MRP Controllers”: Details” screen, click on the icon.

© SAP AG Page 56

Page 59: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

In the “Change View “MRP Controllers”: Overview” screen, click on the icon.

© SAP AG Page 57

Page 60: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

In the “Maintain Plant Parameters” screen click on the icon.

© SAP AG Page 58

Page 61: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

In the “Change View “Floats for Scheduling”: Overview” screen, click on the icon.

In the “New Entries: Overview of Added Entries” screen, enter the following information:

Plnt Marg. Opening Period Fl Bef. Fl After Rel. Per.Your Plant Dallas (DL##)

001 1 1 1 1

Click on (SAVE). You will receive a message that says “Data was saved”.

Click on (BACK). You will receive a message that says “Only one entry chosen”.

In the “Change View “Floats for Scheduling”: Overview” screen, click on the icon.

In the “Maintain Plant Parameters” screen, click on the icon.

© SAP AG Page 59

Page 62: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

You will receive a message that says “One entry chosen”.

In the “Change View “Availability Check”: Overview” screen, enter the following information:

Plnt Rule for Availability CheckYour Plant Dallas (DL##)

PP Checking Rule PP

© SAP AG Page 60

Page 63: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (SAVE). You will receive a message that says “Data was saved”.

Click on (BACK).

In the “Maintain Plant Parameters” screen, click on the icon.

© SAP AG Page 61

Page 64: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

You will receive a message that says “One entry chosen”.

You are in the “Change View “Default Values Purchasing/MRP”: Details” screen.

Enter the following information:

Attribute Description Data ValueScheduling: Info Rec/Agreemt Determines whether the planned delivery time in the

record is used for scheduling in the planning run.Selected

© SAP AG Page 62

Page 65: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Schedule lines Indicator controls whether, during the planning run, the system never creates schedule lines, only creates schedule lines in the opening period, or whether it creates schedule lines in the planning horizon.

Schedule lines (3)

Unknown Acct Assignment Account assignment for materials not valuated. Unknown (U)

Click on (SAVE). You will receive a message that says “Data was saved”.

© SAP AG Page 63

Page 66: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

IV.2.10: Carry Out Maintenance of Production

Navigation: SAP Customizing Implementation Guide ► Production ► Material Requirements Planning ► Plant Parameters ► Carry Out Overall Maintenance of Plant Parameters

Tasks and Data Entry:

You are in the “Plant Parameters for Material Requirements Planning” screen.

© SAP AG Page 64

Description: This is the second of two steps in which you will specify MRP parameters.

You will specify that: planned production orders will be converted to Production Orders with Order Type =

Standard. if multiple Bills of Materials (BOM) or Routings are available, SAP will automatically

assign the production BOM and the production Routing.

Warning: See “General Notes and Cautions” about table locks.

Page 67: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (MAINTAIN).

In the “Maintain Plant Parameters” pop-up, enter the following information:

Attribute Description Data ValuePlant Key uniquely identifying a plant. Your Plant Dallas (DL##)

Click on (MAINATIN).

© SAP AG Page 65

Page 68: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

In the “Maintain Plant Parameters” screen, click on the icon.

In the “Conversion” screen, click on the icon.

© SAP AG Page 66

Page 69: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

You will receive a message that says “One entry chosen”.

You are in the “Change View “Conv. Planned Ord. -> Prod.Ord., MRP Customizing”: Overview screen.

Enter the following information:

Attribute Description Data ValueProduction order Key that differentiates orders Standard Production Order (PP01)

Click on (SAVE). You will receive a message that says “Data was saved”.

© SAP AG Page 67

Page 70: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (BACK) twice.

In the “Conversion” screen, click on the icon.

© SAP AG Page 68

Page 71: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

In the “Maintain Plant Parameters” screen click on the icon.

In the “Plant Parameters: Reporting” screen, click on the icon.

© SAP AG Page 69

Page 72: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

You will receive a message that says “One entry chosen”.

In the “Change View “Run-Time Statistics”: Overview” screen, enter the following information:

Attribute Description Data ValueDisplay list Instructs the system to create a list of the planned materials. SelectedFrequency Determines if an entry is made in the runtime statistics. 1

Click on (SAVE). You will receive a message that says “Data was saved”.

Click on (BACK).

© SAP AG Page 70

Page 73: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

In the “Plant Parameters: Reporting” screen, click on the icon.

In the “Maintain Plant Parameters” screen click on the icon.

© SAP AG Page 71

Page 74: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

You will receive a message that says “One entry chosen”.

In the “Change View “BOM/Routing Selection”: Overview” screen, enter the following information:

Attribute Description Data ValueBOM Sel ID Determines which BOM is to be used and

with which priority for BOM selection.01 Production (01)

Routing Sel ID Determines which routing is to be used and with which priority for routing selection.

01 Released (general) (01)

© SAP AG Page 72

Page 75: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (SAVE). You will receive a message that says “Maintain selection ID in the parameters”.

Click on (ENTER). You will receive a message that says “Data was saved”.

© SAP AG Page 73

Page 76: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

IV.2.11: Define Valuation of Goods Received

© SAP AG Page 74

Description: This is the first of two steps in which you configure SAP to automatically post General Ledger transactions associated with the Production business process.

You will specify the General ledger accounts associated with the Receive Finished Goods process step.

For example, when a Production Order is completed, and Finished Goods are received, the inventory is valued at:

the actual cost as posted to the production order (if the Finished Good has moving average price control), or

standard cost (if the finished good has standard price control).

Warning: See “General Notes and Cautions” about table locks.

Page 77: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Navigation: SAP Customizing Implementation Guide ► Production ► Shop Floor Control ► Integration ► Define Valuation of Goods Received

Tasks and Data Entry:

You are in the “Change View “Valuation variants for order costing”: Overview” screen.

© SAP AG Page 75

Page 78: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (NEW ENTRIES).

In the “New Entries: Overview of Added Entries” screen, enter the following information:

Attribute Description Data ValueVal. Area Organizational level at which the material is valuated. Your Plant Dallas (DL##)Val. Var. Determines the price of goods receipts for materials. Production Order: Actual

(007)

Click on (SAVE). You will receive a message that says “Data was saved”.

© SAP AG Page 76

Page 79: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Part IV.3 – Master Data

Table of Contents

IV.3.1: Create Activity Type.........................................................................................................22

IV.3.2: Change Activity Output/Prices.........................................................................................23

IV.3.3: Determine Person Responsible.......................................................................................25

IV.3.4: Create Capacity...............................................................................................................26

IV.3.5: Create Work Centers.......................................................................................................28

IV.3.6: Create Raw Materials.......................................................................................................30

IV.3.7: Create Semi-Finished Good.............................................................................................32

IV.3.8: Create Finished Good......................................................................................................34

IV.3.9: Create Bills of Materials...................................................................................................36

IV.3.10: Create Product Routings................................................................................................38

© SAP AG Page 77

Enterprise Structure

Rules and Parameters Master Data Process

Execution

Page 80: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

IV.3.1: Create Activity Type

Navigation: SAP menu ► Accounting ► Controlling ► Cost Center Accounting ► Master Data ► Activity Type ► Individual Processing ► Create

© SAP AG Page 78

Description: This is the first of three steps in which you will define the labor needed to manufacture products.

You will create activity types which describe the various forms of activity that can be performed at a cost center. For simplicity, GBI uses only one activity type: LABOR.

You will implement GBI management’s tactical decisions that LABOR is: measured in Hour (H), evaluated for each cost center, and distributed to the Labor secondary cost element for management accounting.

Page 81: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Tasks and Data Entry:

In the “Create Activity Type: Initial Screen” screen, enter the following information:

Attribute Description Data ValueActivity Type Key uniquely identifying an activity type. LABOR

Valid From Date indicating as of when an entry is valid. First Day of Current Year

Click on (ENTER).

In the “Create Activity Type: Basic Screen” screen, enter the following information:

Attribute Description Data ValueName General description of the object. ## Labor Hours

Activity Unit Time or quantity unit used to post the consumed activity quantities.

Hour (H)

CCtr categories Indicator determining for which cost center types an activity type is allowed for planning and as a sender in activity allocation.

All Cost Center Cate (*)

ATyp category Determining the method of activity planning and allocation.

Manual entry, manual allocation (1)

© SAP AG Page 79

Page 82: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Allocation cost elem A secondary cost element under which the activity type business process is allocated.

Your Labor Allocation (800000)

Price indicator Indicator showing how the system calculates the price of a business process or activity type.

Plan price, automatically based on activity (1)

Æ Make sure to use Hour(H) and not Hours(HR) for the Activity Unit.

Click on (SAVE). You will receive a message that says “Activity type has been created”.

© SAP AG Page 80

Page 83: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

© SAP AG Page 81

Page 84: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

IV.3.2: Change Activity Output/Prices

Navigation: SAP menu ► Accounting ► Controlling ► Cost Center Accounting ► Planning ► Activity

Output/Prices ► Change

Tasks and Data Entry:

In the “Change Activity Type/Price Planning: Initial Screen” screen, enter the following information:

Attribute Description Data ValueVersion A collection of year-dependent indicators for planning data. Plan/Act – Version

(0)

From Period A planning period is the smallest closed unit of a fiscal year in which plan data can be entered and stored in the system.

1

© SAP AG Page 82

Description: This is the second of three steps in which you will define the labor needed to manufacture products.

You will specify how the LABOR activity is distributed between – and among – Cost Centers.

In Phase I, you created an Operations Cost Center Group composed of several Cost Centers. For each of these Cost Centers, you will define the price of LABOR which will be used for product cost calculations.

Page 85: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

To Period A planning period is the smallest closed unit of a fiscal year in which plan data can be entered and stored in the system.

12

Fiscal year Period when a company creates inventory. Current Year

Cost Center group Organizational unit for grouping together cost centers. Your Operations (N40##)

Activity Type A description of the activity produced by a cost center. LABOR

Click on (OVERVIEW SCREEN).

In the “Change Activity Type/Price Planning: Overview Screen” screen, enter the following information:

Activity Plan Activity Distribution key Distribution key Variable priceLABOR 100000 Distribution as

before (2)Distribution as before (2) 10

© SAP AG Page 83

Page 86: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (NEXT COMBINATION).

Repeat this for the rest of the cost centers within the group.

Click on (SAVE). You will receive a message that says “Changed data has been posted”.

In the “Change Activity Type/Price Planning: Initial Screen” screen, enter the following information:

Attribute Description Data ValueFiscal year Period for which a company creates its inventory and balance sheet. Year After Current

© SAP AG Page 84

Page 87: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (OVERVIEW SCREEN).

© SAP AG Page 85

Page 88: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

In the “Change Activity Type/Price Planning: Overview Screen” screen, enter the following information:

Activity Plan Activity Distribution key Distribution key Variable priceLABOR 100000 Distribution as before

(2)Distribution as before (2) 10

Click on (NEXT COMBINATION).

Repeat this for the rest of the cost centers within the group.

Click on (SAVE). You will receive a message that says “Changed data has been posted”.

© SAP AG Page 86

Page 89: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

IV.3.3: Determine Person Responsible

Navigation: SAP Customizing Implementation Guide ► Production ► Basic Data ► Work Center ► General Data ► Determine person responsible

Tasks and Data Entry:

You are in the “Change View “Person Responsible for Work Center”: Overview” screen.

© SAP AG Page 87

Description: You will create a person (## Steve Barton) responsible for maintaining Work Center master data. Note that this person is not responsible for Work Center planning, but rather for maintaining Work Center parameters.

Warning: See “General Notes and Cautions” about table locks.

Page 90: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (NEW ENTRIES).

In the “New Entries: Overview of Added Entries” screen, enter the following information:

Plnt Pers. Respons. Person responsible for work centerYour Plant Dallas (DL##)

0## ## Steve Barton

Click on (SAVE). You will receive a message that says “Data was saved”.

© SAP AG Page 88

Page 91: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

© SAP AG Page 89

Page 92: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

IV.3.4: Create Capacity

Navigation: SAP menu ► Logistics ► Production ► Master Data ► Work Centers ► Capacity ►

Create

Tasks and Data Entry:

In the “Create Capacity: Initial Screen” screen, enter the following information:

Attribute Description Data ValuePlant Key uniquely identifying a plant. Your Plant Dallas (DL##)

Capacity Description by which the capacity is created. SHIFT

Capacity category Key which describes capacity in more detail. Person (002)

© SAP AG Page 90

Description: In order to plan production, GBI must understand the manufacturing capacity at each Plant and Work Center.

GBI has two types of capacity: person hours and machine hours. GBI’s Dallas plant has three people and three machines, both available during day shift only.

Page 93: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (ENTER).

In the “Create Capacity: Header” screen, enter the following information:

Attribute Description Data ValueCapacity short text Describes the capacity in more detail. ## Standard Day Shift

Capacity planner grp Key referring to the capacity planner group. Planner group A (A)

Base unit of meas. Unit in which capacity is maintained. Hour (H)

Start Start of the shift. 08:00:00

Finish End of the shift. 17:00:00

Length of breaks Total break time per shift. 01:00:00

Capacity utilization The relationship between a machine’s actual capacity and its theoretical capacity.

100

No. of indiv. cap. Number of elements which make up a group. 3

Relevant to finite scheduling

Specifies that the system should take the available capacity and the load of this capacity into account during finite scheduling.

Selected

Click on (SAVE).

© SAP AG Page 91

Page 94: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

You will receive a message that says “Capacity SHIFT plant DL## category 002 created”.

In the “Create Capacity: Initial Screen” screen, enter the following information:

Attribute Description Data ValueCapacity category The capacity category enables you to determine

whether it is machine or labor capacity.Machine (001)

Click on (ENTER).

© SAP AG Page 92

Page 95: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

In the “Create Capacity: Header” screen, enter the following information:

Attribute Description Data ValueCapacity short text Describes the capacity in more detail. ## Standard Day Shift

Capacity planner grp Key referring to the capacity planner group. Planner group A (A)

Base unit of meas. Unit in which capacity is maintained. Hour (H)

Start Start of the shift. 08:00:00

Finish End of the shift. 17:00:00

Length of breaks Total break time per shift. 01:00:00

Capacity utilization The relationship between a machine’s actual capacity and its theoretical capacity.

100

No. of indiv. cap. Number of elements which make up a group. 3

Relevant to finite scheduling Specifies that the system should take the available capacity and the load of this capacity into account during finite scheduling.

Selected

Click on (SAVE).

© SAP AG Page 93

Page 96: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

You will receive a message that says “Capacity SHIFT plant DL## category 001 created”.

© SAP AG Page 94

Page 97: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

IV.3.5: Create Work Centers

Navigation: SAP menu ► Logistics ► Production ► Master Data ► Work Centers ► Work Center ►

Create

Tasks and Data Entry:

In the “Create Work Center: Initial Screen” screen, enter the following information:

Attribute Description Data ValuePlant Key uniquely identifying a plant. Your Plant Dallas (DL##)

Work center Key identifying the work center. ASSY10##

Work center cat. Key which distinguishes the work centers. Labor (0003)

© SAP AG Page 95

Description: You will create Work Centers at your Dallas plant and associate each Work Center with a Work Center Location, Cost Center, and Person Responsible.

Work Centers are locations at which value-added work associated with the manufacturing process is carried out. GBI has identified five work centers at the Dallas plant. Each Work Center is associated with Activity Types and Capacity Categories in order to carry out production and capacity planning.

Page 98: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (ENTER).

In the “Create Work Center: Basic Data” screen, enter the following information:

Attribute Description Data ValueDescription Description ## DL Assembly

Person responsible The person or group who is responsible for the work center.

Your Person Responsible (0##)

Location Physical location of the work center. DALLAS TX

Usage Controls which type of task list used. Only routings (001)

Standard value key Dimension to one of up to six values. Normal production (SAP1)

Click on (ENTER).

Enter the following information at the bottom of the screen:

Key Word Rule for Mant.Setup should be entered

Labor should be entered

© SAP AG Page 96

Page 99: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on the “Default Values” tab.

In the “Create Work Center: Default Values” screen, enter the following information:

Attribute Description Data ValueControl key Determines which business transactions should be

executed for the object that belongs to the order.Routing/Ref. op. set – internal proc. (ASSY)

Enter the following information at the bottom of the screen:

Parameter Standard Value UnitSetup Minute (MIN)

Labor Minute (MIN)

© SAP AG Page 97

Page 100: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on the “Scheduling” tab.

In the “Create Work Center: Scheduling” screen, enter the following information:

Attribute Description Data ValueCapacity category Enables the determination of whether it is machine or labor. Person (002)

Capacity Capacity name SHIFT

Setup formula Formula used in scheduling to calculate the setup time. Prod.: Setup time (SAP001)

Processing formula Formula used in scheduling to determine the processing time. Prod.: Labor time

© SAP AG Page 98

Page 101: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

(SAP003)

Click on the “Costing” tab.

In the “Create Work Center: Cost Center Assignment” screen, enter the following information:

Attribute Description Data ValueCost Center Key uniquely identifying a cost center. Your Production Costs (NAPR10##)

Enter the following information at the bottom of the screen:

Alt activity descr. Activity Type Formula keySetup LABOR Prod.: Setup time (SAP001)

© SAP AG Page 99

Page 102: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Labor LABOR Prod.: Labor time (SAP003)

Click on (SAVE).

© SAP AG Page 100

Page 103: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

You will receive a message that says “Work center ASSY10## in plant DL## was created”.

You have just created your Assembly work center in the steps above. Appendix F contains data about all of the Work Centers in GBI. Use the data in appendix F to create the following Work Centers:

© SAP AG Page 101

Page 104: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

INSP10##, MANT10##, PACK10##, and SERV10##. Create each of the work centers using the steps above.

© SAP AG Page 102

Page 105: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

IV.3.6: Create Raw Materials

© SAP AG Page 103

Description: This is the first of three steps in which you create materials for testing the Production process.

You will create Raw Material by copying from the material master in Company Code US00.

Raw Materials (Material Type = ROH) are materials purchased from an external source and used in the production process. The material master for Raw Materials therefore contains both purchasing data and MRP data.

You will begin by copying Socket Head Bolt 5x20mm (BOLT1000) from Company Code US00. You will renumber the original bolts and change the description. You will associate your Raw Materials with your Purchasing Group (N##) created in Phase II and your MRP Controller (0##) created earlier in this Phase.

Page 106: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Navigation: SAP menu ► Logistics ► Materials Management ► Material Master ► Material ► Create (Special) ► Raw Material

Tasks and Data Entry:

In the “Create Raw Material (Initial Screen)” screen, enter the following information:

Attribute Description Data ValueMaterial Key uniquely identifying the material. BOLT10##

Industry sector Industry to which the material is assigned. Mechanical engineering

© SAP AG Page 104

Page 107: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Copy from…Material Material you want the system to copy. BOLT1000

Click on (ENTER).

In the “Select View(s)” pop-up, highlight the “Basic Data 1” row.

Highlight the “Purchasing” row.

Highlight the “MRP1” row.

Highlight the “MRP2” row.

© SAP AG Page 105

Page 108: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Highlight the “General Plant Data / Storage 1” row.

Highlight the “Accounting 1” row.

Highlight the “Costing 1” row.

Click on (SAVE AS DEFAULT VALUES).

© SAP AG Page 106

Page 109: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (CONTUNUE (ENTER)).

In the “Organizational Levels” pop-up, enter the following information:

Attribute Description Data ValuePlant Key uniquely identifying a plant. Your Plant Dallas

(DL##)

Stor. Location The storage location at which the material is stored. Your Raw Materials (RM##)

Copy from Plant Plant of the reference material. DL00

Copy from Stor. Location Storage location of the reference material. RM00

Click on (SAVE AS DEFAULT VALUES).

Click on (CONTINUE (ENTER)).

© SAP AG Page 107

Page 110: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

You will receive a message that says “The material already exists and will be extended”.

In the “Create Raw Material BOLT10##” screen, enter the following information:

Attribute Description Data ValueMaterial Description (Short Text) Material Description ## Socket Head Bolt 5x20mm

Purchasing Group A buyer or a group of buyers. Your Purchasing Group (N##)

© SAP AG Page 108

Page 111: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (ENTER).

Enter the following information:

Attribute Description Data ValueMRP Controller Specifies the number of the MRP Controller or group

of MRP controllers responsible for material planning.Your DL Controller (0##)

© SAP AG Page 109

Page 112: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (ENTER) until you reach the last tab.

Click on (ENTER).

In the “Last data screen reached” pop-up, click on the icon.

You will receive a message that says “Material BOLT10## created”.

You have just created your Socket Head Bolt in the steps above. Appendix G contains data about all of the Raw Materials in GBI. Use the data in appendix G to create the following Raw Materials: BOLT10##, BRKT10##, CHAN10##, DGAM10##, HXNT10##, LWSH10##, PCKG10##, PEDL10##,

© SAP AG Page 110

Page 113: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

TRFR30##, TRHB10##, TRSK10##, TRTB10##, TRTR10##, TRWH10##, WDOC10##. Create each of the materials with the same views you used above.

© SAP AG Page 111

Page 114: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

IV.3.7: Create Semi-Finished Good

© SAP AG Page 112

Description: This is the second of three steps in which you create materials for testing the Production process.

You will create a Semi-Finished Good by copying from the material master in Company Code US00.

Semi-Finished Goods (Material Type = HALB) are produced in-house from other materials (raw materials and/or semi-finished goods) and are used in the production of Finished Goods. The material master for Semi-Finished Goods therefore contains both production data and MRP data.

You will copy the Touring Aluminum Wheel Assembly (TRWA1000) from Company Code US00, renumber the original assembly, and change the description. You will associate your Semi-Finished Good with your MRP Controller (0##) and Production Scheduler (0##) created earlier in this Phase.

Page 115: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Navigation: SAP menu ► Logistics ► Materials Management ► Material Master ► Material ► Create (Special) ► Semifinished Product

Tasks and Data Entry:

In the “Create Semifinished Product (Initial Screen)” screen, enter the following information:

Attribute Description Data ValueMaterial Key identifying the material. TRWA10##

Copy from…Material Material you want to copy from. TRWA1000

© SAP AG Page 113

Page 116: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (ENTER).

In the “Select View(s)” pop-up, highlight the “Basic Data 1” row.

Highlight the “MRP1” row.

Highlight the “MRP2” row.

Highlight the “Work Scheduling” row.

© SAP AG Page 114

Page 117: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Highlight the “General Plant Data / Storage 1” row.

Highlight the “Accounting 1” row.

Highlight the “Costing 1” row.

Click on (SAVE AS DEFAULT VALUES).

© SAP AG Page 115

Page 118: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (CONTUNUE (ENTER)).

In the “Organizational Levels” pop-up, enter the following information:

Attribute Description Data ValueStor. Location Location at which the material is stored. Your Semi-Finished Goods

(SF##)

Copy from Stor. Location Storage location of the reference material. SF00

Click on (SAVE AS DEFAULT VALUES).

Click on (CONTINUE (ENTER)).

© SAP AG Page 116

Page 119: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

You will receive a message that says “The material already exists and will be extended”.

In the “Create Semifinished Product TRWA10##” screen, enter the following information:

Attribute Description Data ValueMaterial Description (Short Text) Material Description ## Touring Aluminum Wheel Assembly

MRP Controller Controller responsible for material planning.

Your DL Controller (0##)

Click on (ENTER).

© SAP AG Page 117

Page 120: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Enter the following information:

Attribute Description Data ValueIn-house production The time in workdays needed to produce the material in-house. 1

© SAP AG Page 118

Page 121: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (ENTER).

Enter the following information:

Attribute Description Data ValueProdn Supervisor Responsible for materials in production. Your DL Production Scheduler (0##)

Click on (ENTER) until you reach the last tab.

Click on (ENTER).

In the “Last data screen reached” pop-up, click on the icon.

© SAP AG Page 119

Page 122: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

You will receive a message that says “Material TRWA10## created”.

© SAP AG Page 120

Page 123: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

IV.3.8: Create Finished Good

© SAP AG Page 121

Description: This is the third of three steps in which you create materials for testing the Production process.

You will create a Finished Good by copying from the material master in Company Code US00.

Finished Goods (Material Type = FERT) are produced in-house from other materials (raw materials and/or semi-finished goods) and are sold to a Customer. The material master for Finished Goods therefore contains production data, MRP data, and sales data.

You will copy the Deluxe Touring Bike (red) (DXTR3000) from Company Code US00, renumber the original assembly, and change the description. You will associate your new Finished Good with your MRP Controller (0##) and Production Scheduler (0##) created earlier in this Phase.

Page 124: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Navigation: SAP menu ► Logistics ► Materials Management ► Material Master ► Material ► Create (Special) ► Finished Product

Tasks and Data Entry:

In the “Create Finished Product (Initial Screen)” screen, enter the following information:

Attribute Description Data ValueMaterial Key identifying the material. DXTR30##

Copy from…Material Material you want to copy from. DXTR3000

© SAP AG Page 122

Page 125: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (ENTER).

In the “Select View(s)” pop-up, highlight the “Basic Data 1” row.

Highlight the “MRP1” row.

Highlight the “MRP2” row.

© SAP AG Page 123

Page 126: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Highlight the “Work Scheduling” row.

© SAP AG Page 124

Page 127: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Highlight the “General Plant Data / Storage 1” row.

Highlight the “Accounting 1” row.

Highlight the “Costing 1” row.

Click on (SAVE AS DEFAULT VALUES).

Click on (CONTINUE (ENTER)).

In the “Organizational Levels” pop-up, enter the following information:

Attribute Description Data ValueStor. Location Location at which the material is stored. Your Finished Goods

Copy from Stor. Location Storage location of the reference material. FG00

Click on (SAVE AS DEFAULT VALUES).

Click on (CONTINUE (ENTER)).

© SAP AG Page 125

Page 128: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

You will receive a message that says “The material already exists and will be extended”.

In the “Create Finished Product DXTR30##” screen, enter the following information:

Attribute Description Data ValueMaterial Description (Short Text) Material Description ## Deluxe Touring Bike (red)

MRP Controller MRP Controller responsible for material planning for the material.

Your DL Controller (0##)

© SAP AG Page 126

Page 129: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (ENTER).

Enter the following information:

Attribute Description Data ValueIn-house production The time in workdays needed to produce the material in-house. 1

Click on (ENTER).

Enter the following information:

Attribute Description Data ValueProdn Supervisor Responsible for materials in production. Your DL Production Scheduler (0##)

Click on (ENTER) until you reach the last tab.

© SAP AG Page 127

Page 130: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (ENTER).

In the “Last data screen reached” pop-up, click on the icon.

You will receive a message that says “Material DXTR30## created”.

© SAP AG Page 128

Page 131: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

IV.3.9: Create Bills of Materials

Navigation: SAP menu ► Logistics ► Production ► Master Data ► Bills of Material ► Bill of Material ► Material BOM ► Create

Tasks and Data Entry:

In the “Create material BOM: Initial Screen” screen, enter the following information:

© SAP AG Page 129

Description: You will create Bills of Material (BOM) for use at Dallas by copying from Company Code US00.

A BOM is a structured list of all the components and their quantities that make up a manufactured good. You will create BOMs for both your Semi-Finished Good and your Finished Good. Note that the Bill of Material is developed for an individual plant, so GBI can use different Bills of Materials for the same manufactured good as local plant needs dictate.

You will copy the BOM from the Dallas Plant (DL00) in Company Code US00; and change each component from the original material (example, BOLT1000) to your material (example, BOLT10##).

Page 132: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Attribute Description Data ValueMaterial Key uniquely identifying the material. Your Touring Aluminum Wheel Assembly

(TRWA10##)

Plant Key uniquely identifying a plant. Your Plant Dallas (DL##)

BOM Usage Defines the area where a BOM can be used. Production (1)

Click on (COPY FROM…).

In the “Copy From…” pop-up, enter the following information:

Attribute Description Data ValueMaterial Key uniquely identifying the material. Original Touring Aluminum Wheel Assembly

Plant Key uniquely identifying a plant. Original Plant Dallas (DL00)

© SAP AG Page 130

Page 133: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (CONTINUE (ENTER)).

In the “Create material BOM: Copy From” screen, click on the icon.

Click on (COPY).

You will receive an error that says “Material TRTR1000 not maintained in plant DL##”.

In the “Create material BOM: Item: General data” screen, enter the following information:

Attribute Description Data ValueComponent Material number of the components that you enter. Your Touring Tire (TRTR10##)

Click on (ENTER).

© SAP AG Page 131

Page 134: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

You will receive an error that says “Material TRTB1000 not maintained in plant DL##”.

Repeat this to add the rest of your raw materials to your touring wheel assembly bill of materials.

You are now in the “Create material BOM: General Item Overview” screen.

Click on (SAVE). You will receive a message that says “Creating BOM for material TRWA10##”.

In the “Create material BOM: Initial Screen” screen, enter the following information:

Attribute Description Data ValueMaterial Alphanumeric key uniquely identifying the material. Your Deluxe Touring Bike (red)

(DXTR30##)

Click on (COPY FROM…).

In the “Copy From…” pop-up, enter the following information:

Attribute Description Data ValueMaterial Alphanumeric key uniquely identifying the

material.Original Deluxe Touring Bike (red) (DXTR1000)

Plant Key uniquely identifying a plant. Original Plant Dallas (DL00)

© SAP AG Page 132

Page 135: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (CONTINUE (ENTER)).

In the “Create material BOM: Copy From” screen, click on the icon.

Click on (COPY).

You will receive an error that says “Material TRWA1000 not maintained in plant DL##”.

In the “Create material BOM: Item: General data” screen, enter the following information:

Attribute Description Data ValueComponent Number of the components that you enter. Your Touring Aluminum Wheel Assembly

(TRWA10##)

© SAP AG Page 133

Page 136: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (ENTER).

You will receive an error that says “Material TRFR3000 not maintained in plant DL##”.

Repeat this to add all of your raw materials to your deluxe touring bike (red) bill of materials.

You are in the “Create material BOM: General Item Overview” screen.

Click on (SAVE). You will receive a message that says “Creating BOM for material DXTR30##”.

© SAP AG Page 134

Page 137: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

IV.3.10: Create Product Routings

© SAP AG Page 135

Description: This is the third of three steps in which you will define the labor needed to manufacture products.

You will create Product Routings for use at Dallas by copying from Company Code US00.

A Product Routing describes the sequence of operations required to produce a manufactured good. Examples of operations include assembly, inspection, and packing. Each operation is associated with a Work Center.

Note that: the Routing is developed for an individual plant, so GBI can use different Routings for the

same manufactured good as local plant needs dictate. each operation includes setup time, machine time, and labor time. This data allows GBI to do

capacity planning and product costing.

You will copy the Routing from the Dallas Plant (DL00) in Company Code US00; and change each Work Center from the original Work Center (example, ASSY1000) to your Work Center (example, ASSY10##).

Page 138: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Navigation: SAP menu ► Logistics ► Production ► Master Data ► Routings ► Routings ► Standard

Routings ► Create

Tasks and Data Entry:

In the “Create Routing: Initial Screen” screen, enter the following information:

Attribute Description Data ValueMaterial Key uniquely identifying the material. Your Touring Aluminum Wheel Assembly

(TRWA10##)

Plant Key uniquely identifying a plant. Your Plant Dallas (DL##)

© SAP AG Page 136

Page 139: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (COPY FROM…).

In the “Select Type” pop-up, click on the icon.

You are in the “Create Using Copy Function: Select Object to be Copied” pop-up.

Enter the following information:

Attribute Description Data ValueMaterial Key uniquely identifying the material. Original Touring Aluminum Wheel Assembly

Plant Key uniquely identifying a plant. Original Plant Dallas (DL00)

© SAP AG Page 137

Page 140: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (CONTINUE (ENTER)).

In the “Create Routing: Header Data Check” screen, enter the following information:

Attribute Description Data ValueStatus You use the status key to indicate the processing status of a task list. Released (general)

(4)

Click on (ENTER).

© SAP AG Page 138

Page 141: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

You will receive an error that says “Work center ASSY1000 does not exist in plant DL##”.

In the “Create Routing: Operation – Check” screen, enter the following information:

Attribute Description Data Value

© SAP AG Page 139

Page 142: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Work center Key identifying the work center. ASSY10##(ASSY10##)

Click on (ENTER).

In the “Information” pop-up, click on the icon.

Click on (CONTINUE (ENTER)).

© SAP AG Page 140

Page 143: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

You will receive a message that says “Enter standard value Setup”.

In the “Create Routing: Operation – Check” screen, click on the icon.

You will receive a message that says “Enter standard value Setup”.

Click on (ENTER).

Repeat this to add the rest of your work centers to your touring wheel assembly product routing.

In the “Create Routing: Operation Overview” screen, click on the icon.

You will receive a message that says “Routing was saved with group and material TRWA10##”.

In the “Create Routing: Initial Screen” screen, enter the following information:

© SAP AG Page 141

Page 144: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Attribute Description Data ValueMaterial Alphanumeric key uniquely identifying the material. Your Deluxe Touring Bike (red)

(DXTR30##)

Plant Key uniquely identifying a plant. Your Plant Dallas (DL##)

Æ Make sure to clear the “group” field in the “Create Routing: Initial Screen” before creating the DXTR30## routing.

Click on (COPY FROM…).

In the “Select Type” pop-up, click on the icon.

© SAP AG Page 142

Page 145: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

You are in the “Create Using Copy Function1: Select Object to be Copied” pop-up.

Enter the following information:

Attribute Description Data ValueMaterial Alphanumeric key uniquely identifying the

material.Original Deluxe Touring Bike (red) (DXTR3000)

Plant Key uniquely identifying a plant. Original Plant Dallas (DL00)

Click on (CONTINUE (ENTER)).

In the “Create Routing: Header Data Check” screen, enter the following information:

Attribute Description Data ValueStatus You use the status key to indicate the processing status of a task list. Released (general)

(4)

Click on (ENTER).

© SAP AG Page 143

Page 146: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

You will receive an error that says “Work center ASSY10## does not exist in plant DL##”.

In the “Create Routing: Operation – Check” screen, enter the following information:

Attribute Description Data ValueWork center Key identifying the work center. ASSY10## (ASSY10##)

© SAP AG Page 144

Page 147: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (ENTER).

In the “Information” pop-up, click on the icon.

Click on (CONTINUE (ENTER)).

You will receive a message that says “Enter standard value Setup”.

© SAP AG Page 145

Page 148: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

In the “Create Routing: Operation – Check” screen, click on the icon.

You will receive a message that says “Enter standard value Setup”.

Click on (ENTER).

Repeat these steps to add the rest of your work centers to your deluxe touring bike (red) product routing.

In the “Create Routing: Operation Overview” screen, click on the icon.

You will receive a message that says “Routing was saved with group and material DXTR30##”.

© SAP AG Page 146

Page 149: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Part IV.4 – Process Execution

Table of Contents

IV.4.1: Create Initial Inventory Balances.....................................................................................42

IV.4.2: Create Planned Order for Semifinished...........................................................................43

IV.4.3: Convert Planned Order for Semifinished.........................................................................44

IV.4.4: Issue Materials to Production Order I...............................................................................45

IV.4.5: Confirm Production for Semifinished................................................................................46

IV.4.6: Receive Semifinished Into Inventory................................................................................47

IV.4.7: Create Planned Order for Finished Goods.......................................................................48

IV.4.8: Convert Planned Order for Finished................................................................................49

IV.4.9: Issue Materials to Production Order II..............................................................................50

IV.4.10: Confirm Production for Finished Goods.........................................................................51

IV.4.11: Receive Finished Goods into Inventory.........................................................................52

© SAP AG Page 147

Enterprise Structure

Rules and Parameters Master Data Process

Execution

Page 150: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

IV.4.1: Create Initial Inventory Balances

Navigation: SAP menu ► Logistics ► Materials Management ► Inventory Management ► Goods Movement ► Goods Receipt ► Other

Tasks and Data Entry:

In the “Enter Other Goods Receipts: Initial Screen” screen, enter the following information:

© SAP AG Page 148

Description: Testing of the production process is organized into three parts: Create raw material inventory balance (IV.4.1) Produce semi-finished good (Touring Aluminum Wheel Assembly) (IV.4.2 – 6) Product finished good (Deluxe Touring Bike (red) (IV.4.7 – 11)

In this step, you create the raw material inventory balance required to produce 10 bikes. Normally, the material planning process would create purchase requisitions for the necessary raw materials. You would then execute the procurement process and receive these materials into inventory.

However, for the purpose of this exercise, we will take a shortcut and create “inventory from heaven” using a special movement type (561). Recall that earlier in this Phase, you create the General Ledger accounts required for this special movement type.

Page 151: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Attribute Description Data ValueMovement Type Goods Movement Type Receipt per initial entry of stock balances into unr.-use

(561)

Storage Location Location at which the material is stored.

Your Raw Materials (RM##)

Click on (ENTER).

In the “Enter Other Goods Receipts: New Items” screen, enter the following information:

Material Quantity UnE PlantBOLT10##(BOLT10##) 20 EA Your Plant Dallas (DL##)

BRKT10##(BRKT10##) 10 EA Your Plant Dallas (DL##)

CHAN10##(CHAN10##) 10 EA Your Plant Dallas (DL##)

DGAM10##(DGAM10##) 10 EA Your Plant Dallas (DL##)

HXNT10##(HXNT10##) 20 EA Your Plant Dallas (DL##)

LWSH10##(LWSH10##) 40 EA Your Plant Dallas (DL##)

PCKG10##(PCKG10##) 10 EA Your Plant Dallas (DL##)

© SAP AG Page 149

Page 152: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

PEDL10##(PEDL10##) 10 EA Your Plant Dallas (DL##)

TRFR30##(TRFR30##) 10 EA Your Plant Dallas (DL##)

TRHB10##(TRHB10##) 10 EA Your Plant Dallas (DL##)

TRSK10##(TRSK10##) 10 EA Your Plant Dallas (DL##)

TRTB10##(TRTB10##) 20 EA Your Plant Dallas (DL##)

TRTR10##(TRTR10##) 20 EA Your Plant Dallas (DL##)

TRWH10##(TRWH10##) 20 EA Your Plant Dallas (DL##)

WDOC10##(WDOC10##) 10 EA Your Plant Dallas (DL##)

Æ You may need to press the (NEW ITEMS) button in order to get to another screen where you can enter the rest of the materials.

© SAP AG Page 150

Page 153: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (SAVE). You will receive a message that says “Document posted”.

© SAP AG Page 151

Page 154: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

IV.4.2: Create Planned Order for Semi-finished

Navigation: SAP menu ► Logistics ► Production ► MRP ► Planned Order ► Create

Tasks and Data Entry:

In the “Create Planned Order: Initial Screen” screen, enter the following information:

© SAP AG Page 152

Description: This is the first of five steps to test production of your Semi-Finished Good (Touring Aluminum Wheel Assembly).

You will manually create a planned production order for your wheel assembly. Normally, the material planning process (MRP) would evaluate the demand for bikes, and create planned production orders for the correct quantity of wheel assemblies. However, for the purpose of this exercise, you have manually determined that you need 10 bikes (DXTR30##). To manufacture the bikes, you need 20 wheel assemblies (TRWA10##).

The planned production order for 20 Wheel Assemblies is sent to the Dallas production schedulers specifying when the wheel assemblies must be available in inventory.

Page 155: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Attribute Description Data ValuePlanned order profile Profile that determines the order type, the procurement

type, the special procurement type, and the account assignment type for processing the planned order.

Stock Order (LA)

Click on (ENTER).

In the “Create Planned Order: Stock order” screen, enter the following information:

Attribute Description Data ValueMaterial Number of the material for the order. Your Touring Aluminum Wheel Assembly

(TRWA10##)

Order quantity Quantity to be produced or ordered according to the planned order.

20

Ord.finish Date that you should expect either the completion or the delivery of the order.

One Week from Today

Producing plant Plant in which the order quantity of the internally produced material is to be produced according to the planned order.

Your Plant Dallas (DL##)

Stor. Location Location at which the material is stored. Your Semi-Finished Goods (SF##)

© SAP AG Page 153

Page 156: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (SAVE). You will receive a message that says “Planned order will be created”.

© SAP AG Page 154

Page 157: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

IV.4.3: Convert Planned Order for Semi-finished

Navigation: SAP menu ► Logistics ► Production ► MRP ► Evaluations ► Stock/Requirements List

© SAP AG Page 155

Description: This is the second of five steps to test production of your Semi-Finished Good (Touring Aluminum Wheel Assembly).

You will manually convert your planned production order (PldOrd) into a production order (PrdOrd). This authorizes that production may begin.

Note that after conversion, the production scheduler is able to change components, quantities, or dates.

Page 158: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Tasks and Data Entry:

Æ Be sure that the system defaults your wheel assembly into the material field.

In the “Stock/Requirements List: Initial Screen” screen, click on the icon.

In the “Stock/Requirements List” screen, double-click on PldOrd.

In the “Additional Data for MRP Element” pop-up, click on the icon.

You will receive a message that says “Release carried out”.

In the “Production order Create: Header” screen, click on the icon.

© SAP AG Page 156

Page 159: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

You will receive a message that says “Order number saved”.

© SAP AG Page 157

Page 160: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

IV.4.4: Issue Materials to Production Order I

Navigation: SAP menu ► Logistics ► Production ► Shop Floor Control ► Goods Movements ►

Goods Issue

Tasks and Data Entry:

In the “Enter Goods Issue: Initial Screen” screen, enter the following information:

Attribute Description Data ValueMovement Type Number the system uses to determine the Consumption for order from

© SAP AG Page 158

Description: This is the third of five steps to test production of your Semi-Finished Good (Touring Aluminum Wheel Assembly).

You will manually release (issue) the raw materials needed to produce the 20 wheel assemblies. This goods issue transaction posts the raw material costs to the production order, and decreases inventory from the Raw Materials storage location.

Page 161: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

rules for updating quantities and values in the relevant general ledger accounts.

warehouse (261)

Storage Location Location at which the material is stored. Raw Materials (RM##)

Click on (TO ORDER…).

In the “Reference: Order” pop-up, enter the following information:

Attribute Description Data ValueOrder Number of production order to which you issue the materials. Production Order Number

© SAP AG Page 159

Page 162: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (CONTINUE (ENTER)).

In the “Enter Goods Issue: Selection Screen” screen, click on the icon.

© SAP AG Page 160

Page 163: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

You will receive a message that says “Document posted”.

© SAP AG Page 161

Page 164: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

IV.4.5: Confirm Production for Semi-finished

Navigation: SAP menu ► Logistics ► Production ► Shop Floor Control ► Confirmation ► Enter ►

For Order

Tasks and Data Entry:

In the “Enter Production Order Confirmation: Initial Screen” screen, enter the following information:

Attribute Description Data ValueOrder Number which identifies an order number. Production Order Number

© SAP AG Page 162

Description: This is the fourth of five steps to test production of your Semi-Finished Good (Touring Aluminum Wheel Assembly).

In the previous step, you released raw material to the production order. You will now confirm the completion of the wheel assemblies. Your Dallas plant completed all 20 wheel assemblies, so you verify a yield of 20.

Page 165: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (ENTER).

In the “Confirmation of Production Order Enter: Actual Data” screen, enter the following information:

Attribute Description Data ValueYield to conf. Yield that you want to confirm for the operation. 20

© SAP AG Page 163

Page 166: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (SAVE). You will receive a message that says “Confirmation of order saved”.

© SAP AG Page 164

Page 167: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

IV.4.6: Receive Semi-finished Into Inventory

Navigation: SAP menu ► Logistics ► Production ► Shop Floor Control ► Goods Movements ►

Goods Receipt

Tasks and Data Entry:

In the “Goods Receipt for Order: Initial Screen” screen, enter the following information:

Attribute Description Data ValueMovement Type Goods Movement Type Good receipt for order into warehouse

© SAP AG Page 165

Description: This is the last of five steps to test production of your Semi-Finished Good (Touring Aluminum Wheel Assembly).

In the previous step, you confirmed the yield of the production process. You will now receive the 20 wheel assemblies into inventory. This goods receipt transaction increases inventory in the Semi-Finished Goods storage location.

Page 168: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

(101)

Order Identifies an order within a client. Production Order Number

Storage Location Location at which the material is stored. Your Semi-Finished Goods (SF##)

Click on (ADOPT + DETAILS).

In the “Goods Receipt for Order: New Items 0001” screen, enter the following information:

Attribute Description Data ValueDeliv. Compl. Indicates that the item is to be regarded as closed. Selected

© SAP AG Page 166

Page 169: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (SAVE). You will receive a message that says “Document posted”.

© SAP AG Page 167

Page 170: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

IV.4.7: Create Planned Order for Finished Goods

Navigation: SAP menu ► Logistics ► Production ► MRP ► Planned Order ► Create

Tasks and Data Entry:

In the “Create Planned Order: Initial Screen” screen, click on the icon.

© SAP AG Page 168

Description: This is the first of five steps to test production of your Finished Good (Deluxe Touring Bike (red)).

You will manually create a planned production order for your touring bikes. Normally, the material planning process (MRP) would evaluate the demand for bikes, and create planned production orders for the correct quantity of red touring bikes. However, for the purpose of this exercise, you have manually determined that you need 10 bikes (DXTR30##).

The planned production order for 10 bikes is sent to the Dallas production schedulers specifying when the bikes must be available in inventory.

Page 171: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

In the “Create Planned Order: Stock order” screen, enter the following information:

Attribute Description Data ValueMaterial Number of the material. Your Deluxe Touring Bike (red)

(DXTR30##)

Order quantity Quantity to be produced or ordered according to the planned order.

10

Ord.finish Date, according to the planned order, that you should expect either the completion or the delivery of the planned order quantity.

One Week from Today

Producing plant Plant in which the order quantity of the internally produced material is to be produced according to the planned order.

Your Plant Dallas (DL##)

Stor. Location Location at which the material is stored. Your Finished Goods (FG##)

© SAP AG Page 169

Page 172: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (SAVE). You will receive a message that says “Planned order will be created”.

© SAP AG Page 170

Page 173: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

IV.4.8: Convert Planned Order for Finished

Navigation: SAP menu ► Logistics ► Production ► MRP ► Evaluations ► Stock/Requirements List

Tasks and Data Entry:

In the “Stock/Requirements List: Initial Screen” screen, click on the icon.

© SAP AG Page 171

Description: This is the second of five steps to test production of your Finished Good (Deluxe Touring Bike (red)).

You will manually convert your planned production order into a production order. This authorizes that production may begin.

Page 174: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

In the “Stock/Requirements List” screen, double-click on PldOrd.

In the “Additional Data for MRP Element” pop-up, click on the icon.

You will receive a message that says “Release carried out”.

In the “Production order Create: Header” screen, click on the icon.

© SAP AG Page 172

Page 175: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

You will receive a message that says “Order number saved”.

© SAP AG Page 173

Page 176: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

IV.4.9: Issue Materials to Production Order II

Navigation: SAP menu ► Logistics ► Production ► Shop Floor Control ► Goods Movements ►

Goods Issue

Tasks and Data Entry:

In the “Enter Goods Issue: Initial Screen” screen, enter the following information:

© SAP AG Page 174

Description: This is the third of five steps to test production of your Finished Good (Deluxe Touring Bike (red)).

You will manually release (issue) the raw materials and semi-finished goods needed to produce the 10 bikes. This goods issue transaction posts the raw material and semi-finished goods costs to the production order, and decreases inventory from the Raw Materials storage location and from the Semi-Finished Goods storage location.

Page 177: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Attribute Description Data ValueMovement Type

Number the system uses to determine the rules for updating quantities and values in the relevant ledger accounts.

Consumption for order from warehouse (261)

Storage Location

Number of the storage location at which the material is stored. A plant may contain one or more storage locations.

Your Raw Materials (RM##)

Click on (TO ORDER…).

In the “Reference: Order” pop-up, enter the following information:

Attribute Description Data ValueOrder Order Number Production Order Number

© SAP AG Page 175

Page 178: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (ADOPT + DETAILS).

In the “Enter Goods Issue: New Item 0001” screen, enter the following information:

Material Quantity SLocYour Touring Aluminum Wheel Assembly (TRWA10##)

20 Your Semi-Finished Goods (SF##)

© SAP AG Page 176

Page 179: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (ADOPT).

In the “Enter Goods Issue: New Item 0002” screen, click on the icon.

Repeat this for the remaining materials.

Æ Keep in mind that the rest of the materials are all raw materials.

In the “Enter Goods Issue: Overview” screen, click on the icon.

© SAP AG Page 177

Page 180: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

You will receive a message that says “Document posted”.

IV.4.10: Confirm Production for Finished Goods

© SAP AG Page 178

Description: This is the fourth of five steps to test production of your Finished Good (Deluxe Touring Bike (red)).

In the previous step, you released raw materials and semi-finished goods to the production order. You will now confirm completion of the bikes. Your Dallas plant completed all 10 bikes, so you verify a yield of 10.

Page 181: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Navigation: SAP menu ► Logistics ► Production ► Shop Floor Control ► Confirmation ► Enter ►

For Order

Tasks and Data Entry:

In the “Enter Production Order Confirmation: Initial Screen” screen, enter the following information:

Attribute Description Data ValueOrder Order of which you wish to confirm production. Production Order Number

© SAP AG Page 179

Page 182: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (ENTER).

In the “Confirmation of Production Order Enter: Actual Data” screen, enter the following information:

Attribute Description Data ValueYield to conf. Yield that you want to confirm for the operation. 10

© SAP AG Page 180

Page 183: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (SAVE). You will receive a message that says “Confirmation of order saved”.

© SAP AG Page 181

Page 184: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

IV.4.11: Receive Finished Goods into Inventory

Navigation: SAP menu ► Logistics ► Production ► Shop Floor Control ► Goods Movements ►

Goods Receipt

Tasks and Data Entry:

In the “Enter Receipt for Order: Initial Screen” screen, enter the following information:

Attribute Description Data Value

© SAP AG Page 182

Description: This is the fifth of five steps to test production of your Finished Good (Deluxe Touring Bike (red)).

In the previous step, you confirmed the yield of the production process. You will now receive the 10 bikes into inventory. This goods receipt transaction increases inventory in the Finished Goods storage location.

Page 185: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Movement Type Movement Good receipt for order into warehouse (101)

Order Number which identifies an order within a client.

Production Order Number

Storage Location Number of the storage location at which the material is stored.

Your Finished Goods (FG##)

Click on (ADOPT + DETAILS).

In the “Goods Receipt for Order: Items 0001” screen, enter the following information:

Attribute Description Data ValueDeliv. Compl. Indicates that the item is to be regarded as closed. Selected

© SAP AG Page 183

Page 186: web.eng.fiu.eduweb.eng.fiu.edu/CHEN/Spring 2016/SAP US GBI/GBI...  · Web view2014. 8. 8. · ACKNOWLEDGEMENT. This material was prepared with the assistance of student interns at

Phase IV – Production CASE STUDY

Click on (SAVE). You will receive a message that says “Document posted”.

© SAP AG Page 184