· web viewcivil aviation authority of the republic of moldova procedure manual –...

18
Civil Aviation Authority of the Republic of Moldova Procedure Manual – Performance-Based Navigation Operational Approval Annex 1 - R NAV 10 (RNP 10) Approval Process Form When the approval process form has been accepted by CAA RM, It becomes the official schedule which will be used during the approval process NOTE: Applicants are strongly advised to read the “PBN Notes for Approval” from “ Procedure Manual – PBN Operational Approval”, Part 3 and “Applicant Advisory Pamphlet for PBN Approval”, before completing the form. Please complete the form in BLOCK CAPITALS using black or dark blue ink. Please note that a minimum of 30 working days will normally be required to check the information given below from the accepted date of application (Section 2, point e) – if data is missing or omitted the process may take considerably longer. General Information (Section to be completed by the applicant) Operator Name Application for R NAV 10 Operations Approval Intended Date of Operations Initial AOC Certification AOC Variation PBN Initial Request PBN Additional Request Operator Contact Details Name Phone No. E-mail Fleet Details (Section to be completed by the applicant) No . Aircraft type Aircraft series Registration Serial number List Relevant Make and Model of Related Navigation Equipment 1 Phase one: Pre-application Date Remarks (columns to be completed by the applicant) PM-PBN-AN-01 Rev No: 00 / 31.10.2014 Page 1 of 18

Upload: others

Post on 12-Mar-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1:  · Web viewCivil Aviation Authority of the Republic of Moldova Procedure Manual – Performance-Based Navigation Operational Approval Annex 1 - R NAV 10 (RNP 10 Objective. the reception

Civil Aviation Authority of the Republic of MoldovaProcedure Manual – Performance-Based Navigation Operational Approval

Annex 1 - R NAV 10 (RNP 10) Approval Process FormWhen the approval process form has been accepted by CAA RM, It becomes the official schedule which will be used during the approval process

NOTE: Applicants are strongly advised to read the “PBN Notes for Approval” from “Procedure Manual – PBN Operational Approval”, Part 3 and “Applicant Advisory Pamphlet for PBN Approval”, before completing the form. Please complete the form in BLOCK CAPITALS using black or dark blue ink.Please note that a minimum of 30 working days will normally be required to check the information given below from the accepted date of application (Section 2, point e) – if data is missing or omitted the process may take considerably longer.

General Information (Section to be completed by the applicant)

Operator Name

Application for R NAV 10 Operations Approval Intended Date of Operations

Initial AOC Certification AOC Variation PBN Initial Request PBN Additional Request

Operator Contact DetailsName Phone No. E-mail

Fleet Details (Section to be completed by the applicant)

No. Aircraft type Aircraft series Registration Serial number List Relevant Make and Model of Related Navigation Equipment

1 Phase one: Pre-application Date Remarks(columns to be completed by the applicant)

a Applicant making an initial inquiry by letter, phone or fax to CAA RM, and appoints a pre-application meeting

b Initial Contact (pre-application meeting) CAA Certification Commission provide the applicant with:

(1) Information regarding applicable regulations and means of compliance

(2) Guidance related to the application, application attachments and the approval process

i For AOC initial certification. It will be part of certification process meetings

ii For AOC variation. a meeting with the applicant representative will be set

PM-PBN-AN-01Rev No: 00 / 31.10.2014

Page 1 of 13

Page 2:  · Web viewCivil Aviation Authority of the Republic of Moldova Procedure Manual – Performance-Based Navigation Operational Approval Annex 1 - R NAV 10 (RNP 10 Objective. the reception

Civil Aviation Authority of the Republic of MoldovaProcedure Manual – Performance-Based Navigation Operational Approval

Annex 1 - R NAV 10 (RNP 10) Approval Process FormWhen the approval process form has been accepted by CAA RM, It becomes the official schedule which will be used during the approval process

(3) The Approval Process Form and the items which are necessary to be completed

2 Phase two: Formal application Date Inspectors notesYES NO

a Applicant making a formal application to CAA RM □ □

b AOC Initial certification/variation/renewal application form □ □

c PBN Approval Process Form □ □

d PBN Application Attachments □ □

Indication of inclusion by the operator(column to be completed by applicant)

Inspectors notesYES NO

(1) Aircraft eligibility — airworthiness. AFM, AFM revision, AFM supplement, TCDS showing that the aircraft RNAV systems are eligible. □ □

(2) Aircraft eligibility — modifications (if applicable) Maintenance records documenting installation or modification of aircraft systems to achieve eligibility. □ □

(4) Maintenance program □ □(a) For Aircraft with established RNAV or GPS stand-alone maintenance practices provide

document references □ □(b) For newly installed RNAV or GPS stand-alone provide maintenance practices for review. □ □(5) Minimum Equipment List (MEL) if applicable showing provisions for LRNS □ □(6) Navigation database (if carried). Details of the navigation data validation program □ □(7) Training program for flight crews, flight dispatchers, and maintenance personnel as applicable □ □(8) Operating policies and procedures including relevant section of Operations Manuals and

checklists attached to the application, applicable to RNAV 10 □ □(9) Performance record . Evidence of previous problems, incidents or path-keeping errors,

together with corrective action applied. □ □(10) Withdrawal of approval The need for follow-up action on navigation error reports, with the □ □

PM-PBN-AN-01Rev No: 00 / 31.10.2014

Page 2 of 13

Page 3:  · Web viewCivil Aviation Authority of the Republic of Moldova Procedure Manual – Performance-Based Navigation Operational Approval Annex 1 - R NAV 10 (RNP 10 Objective. the reception

Civil Aviation Authority of the Republic of MoldovaProcedure Manual – Performance-Based Navigation Operational Approval

Annex 1 - R NAV 10 (RNP 10) Approval Process FormWhen the approval process form has been accepted by CAA RM, It becomes the official schedule which will be used during the approval process

possibility of removal of approval.

(11) Validation flight plan . As required. □ □

PM-PBN-AN-01Rev No: 00 / 31.10.2014

Page 3 of 13

Page 4:  · Web viewCivil Aviation Authority of the Republic of Moldova Procedure Manual – Performance-Based Navigation Operational Approval Annex 1 - R NAV 10 (RNP 10 Objective. the reception

Civil Aviation Authority of the Republic of MoldovaProcedure Manual – Performance-Based Navigation Operational Approval

Annex 1 - R NAV 10 (RNP 10) Approval Process FormWhen the approval process form has been accepted by CAA RM, It becomes the official schedule which will be used during the approval process

e Head of Flight Operation Division & Head of Airworthiness Division appoints approval team which consists of: (to be completed only by CAA)

(1) PBN approval team members name:

(a) Flight Operation Inspector – Project manager

(b) Flight Operations Inspector – PBN specialist (if necessary)

(c) Airworthiness inspector

(2) Approval team review of the applicant PBN approval application form

(3) Approval team appoints a date for formal application meeting and inform the applicant and Certification Commission

f Formal application meeting (to be completed only by CAA)

(1) Objective. the reception of PBN approval application attachments, review the approval process and establish a common understanding on the future procedure for the approval process

(2) Attendees:

(a) Certification team

(b) Applicant post holders (Flight operations, Crew training & Maintenance system) or their permanent approval representative

(3) The formal application, application attachments and approval process form are:

(a) Accepted Rejected Date

(b) Team Leader name: Signature :

PM-PBN-AN-01Rev No: 00 / 31.10.2014

Page 4 of 13

Page 5:  · Web viewCivil Aviation Authority of the Republic of Moldova Procedure Manual – Performance-Based Navigation Operational Approval Annex 1 - R NAV 10 (RNP 10 Objective. the reception

Civil Aviation Authority of the Republic of MoldovaProcedure Manual – Performance-Based Navigation Operational Approval

Annex 1 - R NAV 10 (RNP 10) Approval Process FormWhen the approval process form has been accepted by CAA RM, It becomes the official schedule which will be used during the approval process

3 Phase three: Documents Evaluation ICAO Doc 9613 Vol II Part B 1

Operator Documents Reference(column to be completed by the

applicant)

AW Inspector notes(column to be completed by the AW

inspector)3a Airworthiness Division Documents Evaluation Compliance Non-compl. Remarks

a Airworthiness documents showing aircraft eligibility for RNAV 10 (RNP 10)1.3.3.1

1.3.3.2.1 □ C □ NC □ R #_____

(1) Eligibility Method 1 – Eligibility of aircraft through RNP certification. (RNP compliance documented in the AFM). 1.3.3.1.2 □ C □ NC □ R #_____

(2) Eligibility Method 2 - Eligibility of aircraft through previous certification of the navigation system. 1.3.3.1.3 □ C □ NC □ R #_____

(3) Eligibility Method 3 - Eligibility of aircraft through data collection. 1.3.3.1.4 □ C □ NC □ R #_____

b Aircraft Equipment. Dual Long Range Navigation Systems. 1.3.4 □ C □ NC □ R #_____

(1) Dual GNSS. 1.3.4.2.1 □ C □ NC □ R #_____

(a) GNSS approved as primary means of navigation (AC 20-138 or equivalent). 1.3.4.2.1. □ C □ NC □ R #_____

(b) Multi-sensor systems into which the GNSS is integrated (AC 20-130 or equivalent). 1.3.4.2.1.2 □ C □ NC □ R #_____

(c) Complies with regulations/advisory information for use of GNSS for primary oceanic/remote performance. 1.3.4.2.1.3 □ C □ NC □ R #_____

(d) Approved FDE prediction program. 1.3.4.2.1.4 □ C □ NC □ R #_____

(2) Dual INS or IRS 1.3.4.2.2. □ C □ NC □ R #_____

(a) INSs or IRUs approved according to 14 CFR, Part 121, Appendix G (time limit 6.2 hours). 1.3.4.2.2 □ C □ NC □ R #_____

(b) INSs or IRUs approved for MNPS operations in the North Atlantic or RNAV operation in Australia (time limit 6.2 hours). 1.3.4.2.2 □ C □ NC □ R #_____

(c) Application for extended time limit 1.3.4.2.3 □ C □ NC □ R #_____

(d) Operator route evaluation conducted 1.3.9.6 □ C □ NC □ R #_____

(3) Single IRS or IRU and Single GNSS 1.3.4.2.4 □ C □ NC □ R #_____

(a) INS/IRU approved to 14 CFR Part 121 Appendix G or equivalent 1.3.4.2.4 □ C □ NC □ R #_____

(b) GNSS authorized for oceanic/remote (TSO C129a with FTE, TSO C145a/146a, 1.3.2.4 □ C □ NC □ R #_____

PM-PBN-AN-01Rev No: 00 / 31.10.2014

Page 5 of 13

Page 6:  · Web viewCivil Aviation Authority of the Republic of Moldova Procedure Manual – Performance-Based Navigation Operational Approval Annex 1 - R NAV 10 (RNP 10 Objective. the reception

Civil Aviation Authority of the Republic of MoldovaProcedure Manual – Performance-Based Navigation Operational Approval

Annex 1 - R NAV 10 (RNP 10) Approval Process FormWhen the approval process form has been accepted by CAA RM, It becomes the official schedule which will be used during the approval process

or equivalent)(c) Approved FDE prediction program 1.3.4.2.4 □ C □ NC □ R #_____

3 Phase three: Documents Evaluation (continue) ICAO Doc 9613 Vol II Part B 1

Operator Documents Reference(column to be completed by the

applicant)

AW Inspector notes(column to be completed by the AW

inspector)3a Airworthiness Division Documents Evaluation (continue) Compliance Non-compl. Remarks

c Maintenance program. Document navigation database maintenance practices. 1.3.3.2.2.51.3.11 □ C □ NC □ R #_____

d Remark No. Airworthiness Inspector Remarks(a) R #_____

(b) R #_____

(c) R #_____

(d) R #_____

(e) R #_____

(f) R #_____

(g) R #_____

(h) R #_____

(i) R #_____

(j) R #_____

(k) R #_____

(l) R #_____

(m) R #_____

(n) R #_____

(o) R #_____

(p) R #_____

(q) R #_____

PM-PBN-AN-01Rev No: 00 / 31.10.2014

Page 6 of 13

Page 7:  · Web viewCivil Aviation Authority of the Republic of Moldova Procedure Manual – Performance-Based Navigation Operational Approval Annex 1 - R NAV 10 (RNP 10 Objective. the reception

Civil Aviation Authority of the Republic of MoldovaProcedure Manual – Performance-Based Navigation Operational Approval

Annex 1 - R NAV 10 (RNP 10) Approval Process FormWhen the approval process form has been accepted by CAA RM, It becomes the official schedule which will be used during the approval process

e Airworthiness Division letter declaring that, the applicant meets or does not, airworthiness requirements for R NAV 10 approval (section to be completed by AW Inspector)

(b) AW Inspector name: Signature : Date:

PM-PBN-AN-01Rev No: 00 / 31.10.2014

Page 7 of 13

Page 8:  · Web viewCivil Aviation Authority of the Republic of Moldova Procedure Manual – Performance-Based Navigation Operational Approval Annex 1 - R NAV 10 (RNP 10 Objective. the reception

Civil Aviation Authority of the Republic of MoldovaProcedure Manual – Performance-Based Navigation Operational Approval

Annex 1 - R NAV 10 (RNP 10) Approval Process FormWhen the approval process form has been accepted by CAA RM, It becomes the official schedule which will be used during the approval process

3 Phase three: Documents Evaluation (continue) ICAO Doc 9613 Vol II Part B 1

Operator Documents Reference(column to be completed by the

applicant)

OPS Inspector notes(column to be completed by the OPS

inspector)3b Flight Operation Division Documents Evaluation Compliance Non-compl. Remarks

a Minimum Equipment List (MEL) update 1.3.3.2.2.4 □ C □ NC □ R #_____

b Navigation database 1.3.11 □ C □ NC □ R #_____

c Training program 1.3.10 □ C □ NC □ R #_____

(1) Flight crews 1.3.10 □ C □ NC □ R #_____

(2) Flight dispatchers AMC-FD 4.4.3 □ C □ NC □ R #_____

(3) Maintenance personnel Refer to AW □ C □ NC □ R #_____

d Procedures and Policies for RNAV 10 (RNP 10) Operations 1.3.3.2.2.31.3.5 □ C □ NC □ R #_____

(1) Flight planning 1.3.5.2 □ C □ NC □ R #_____

(a) Verify that the aircraft is approved for RNP 10 operations. 1.3.7 □ C □ NC □ R #_____

(b) Verify that two LRNSs are operational. 1.3.6 □ C □ NC □ R #_____

(c) Verify that the RNP 10 time limit has been taken into account (INS/IRU only). 1.3.5.2 □ C □ NC □ R #_____

(d) Verify that FDE is available (GNSS only).1.3.5.21.3.8 □ C □ NC □ R #_____

(e)Verify the FPL: “R” should appear in field 10 and PBN/A1 in field 18.

1.3.7 □ C □ NC □ R #_____

(f) Verify operational restrictions as appropriate. 1.3.5.2 □ C □ NC □ R #_____

(g) Verify the flight-planned route including diversions. 1.3.7 □ C □ NC □ R #_____

PM-PBN-AN-01Rev No: 00 / 31.10.2014

Page 8 of 13

Page 9:  · Web viewCivil Aviation Authority of the Republic of Moldova Procedure Manual – Performance-Based Navigation Operational Approval Annex 1 - R NAV 10 (RNP 10 Objective. the reception

Civil Aviation Authority of the Republic of MoldovaProcedure Manual – Performance-Based Navigation Operational Approval

Annex 1 - R NAV 10 (RNP 10) Approval Process FormWhen the approval process form has been accepted by CAA RM, It becomes the official schedule which will be used during the approval process

3 Phase three: Documents Evaluation (continue) ICAO Doc 9613 Vol II Part B 1

Operator Documents Reference(column to be completed by the

applicant)

Inspector Remarks (column to be completed by the OPS

inspector)3b Flight Operation Division Documents Evaluation (continue) Compliance Non-compl. Remarks

(2) Pre-flight 1.3.5.3 □ C □ NC □ R #_____

(a)Verify equipment conditions:

• review flight technical records; • confirm that maintenance actions are complete

1.3.5.3 □ C □ NC □ R #_____

(b) Check the condition of navigation antennas and surrounding fuselage skin. 1.3.5.3 □ C □ NC □ R #_____(c) Review the emergency procedures for RNP 10 operations. 1.3.5.3 □ C □ NC □ R #_____

(3) En-route 1.3.9 □ C □ NC □ R #_____(a) Verify that both LRNSs are RNP 10 capable at the oceanic point of entry. 1.3.9.1 □ C □ NC □ R #_____

(b) Prior to the oceanic point of entry, the aircraft position must be independently checked and updated if necessary. 1.3.9.2 □ C □ NC □ R #_____

(c) Other mandatory navigation cross-checks. 1.3.9.3 □ C □ NC □ R #_____

(d) ATC to be notified if unable to comply with RNP 10 requirements or of any deviation required for contingency procedures. 1.3.9.4 □ C □ NC □ R #_____

(e) Follow route centre line within 5 NM. 1.3.9.5 □ C □ NC □ R #_____

(4) Update LRNS position 1.3.9.7 □ C □ NC □ R #_____

(5) Contingency procedures

Doc 4444,Chapters

15.2.1 and15.2.2

□ C □ NC □ R #_____

(a) Inability to comply with ATC clearance due to meteorological conditions, aircraft performance or pressurization failure. 15.2.1.1 □ C □ NC □ R #_____

(b) Weather deviation. 15.2.3 □ C □ NC □ R #_____

(c) Air-ground communications failure. 5.4.2.6.3.2

PM-PBN-AN-01Rev No: 00 / 31.10.2014

Page 9 of 13

Page 10:  · Web viewCivil Aviation Authority of the Republic of Moldova Procedure Manual – Performance-Based Navigation Operational Approval Annex 1 - R NAV 10 (RNP 10 Objective. the reception

Civil Aviation Authority of the Republic of MoldovaProcedure Manual – Performance-Based Navigation Operational Approval

Annex 1 - R NAV 10 (RNP 10) Approval Process FormWhen the approval process form has been accepted by CAA RM, It becomes the official schedule which will be used during the approval process

15.3

3 Phase three: Documents Evaluation (continue) ICAO Doc 9613 Vol II Part B 1

Operator Documents Reference(column to be completed by the

applicant)

Inspector Remarks (column to be completed by the OPS

inspector)3b Flight Operation Division Documents Evaluation (continue) Compliance Non-compl. Remarks

e Remark No. Flight Operation Inspector Remarks(a) R #_____

(b) R #_____

(c) R #_____

(d) R #_____

(e) R #_____

(f) R #_____

(g) R #_____

(h) R #_____

(i) R #_____

(j) R #_____

(k) R #_____

(l) R #_____

(m) R #_____

(n) R #_____

(o) R #_____

(p) R #_____

(q) R #_____

f Flight Operation Division letter to the applicant, declaring that, the applicant meets or does not, airworthiness and operational requirements for R NAV 10 approval (section to be completed by OPS Inspector)

PM-PBN-AN-01Rev No: 00 / 31.10.2014

Page 10 of 13

Page 11:  · Web viewCivil Aviation Authority of the Republic of Moldova Procedure Manual – Performance-Based Navigation Operational Approval Annex 1 - R NAV 10 (RNP 10 Objective. the reception

Civil Aviation Authority of the Republic of MoldovaProcedure Manual – Performance-Based Navigation Operational Approval

Annex 1 - R NAV 10 (RNP 10) Approval Process FormWhen the approval process form has been accepted by CAA RM, It becomes the official schedule which will be used during the approval process

(a) FOI name: Signature : Date:

(b) Date of receiving corrective actions:

4 Phase four: Demonstration and inspectionProposed date (column to be

completed by the applicant)

Accomplished date(column to be

completed by the OPS Inspector)

Remarks(column to be completed by the OPS Inspector)

a Flight Operation Division

(1) Flight crew training program inspection

(2) Flight crew qualification and training records inspection

(3) Aircraft dispatcher training program inspection

(4) Aircraft dispatcher qualification and training records inspection

(5) Release of Flight/Dispatch Inspection

b Airworthiness Division

(1) Refer to Airworthiness team member

c Operator’s Declaration (Section to be completed by the applicant)

The undersigned certify that statements and answers provided in this approval process form and attachments are complete and true to the best of my knowledge and agree that they are to be considered as part of the basis for issuance of PBN approval in accordance with JAR OPS 1 and ICAO Doc. 9613

Title Name Surname Signature Date

Flight Operations Post Holder

Crew Training Post Holder

Maintenance System Post Holder

PM-PBN-AN-01Rev No: 00 / 31.10.2014

Page 11 of 13

Page 12:  · Web viewCivil Aviation Authority of the Republic of Moldova Procedure Manual – Performance-Based Navigation Operational Approval Annex 1 - R NAV 10 (RNP 10 Objective. the reception

Civil Aviation Authority of the Republic of MoldovaProcedure Manual – Performance-Based Navigation Operational Approval

Annex 1 - R NAV 10 (RNP 10) Approval Process FormWhen the approval process form has been accepted by CAA RM, It becomes the official schedule which will be used during the approval process

Accountable Manager

PM-PBN-AN-01Rev No: 00 / 31.10.2014

Page 12 of 13

Page 13:  · Web viewCivil Aviation Authority of the Republic of Moldova Procedure Manual – Performance-Based Navigation Operational Approval Annex 1 - R NAV 10 (RNP 10 Objective. the reception

Civil Aviation Authority of the Republic of MoldovaProcedure Manual – Performance-Based Navigation Operational Approval

Annex 1 - R NAV 10 (RNP 10) Approval Process FormWhen the approval process form has been accepted by CAA RM, It becomes the official schedule which will be used during the approval process

d Flight Operation Division letter to the applicant, declaring that, the applicant meets and complies or does not, airworthiness and operational requirements for R NAV 10 approval (section to be completed by OPS Inspector)

(a) FOI name: Signature : Date:

(b) Date of receiving corrective actions plan :

FOR CAA RM USE ONLY

5 Phase five: CAA RM Approval

a PBN Approval Report Contents

(1) AOC Variation application form □(2) PBN approval process form □(3) Airworthiness Division letter declaring that, the applicant meets airworthiness requirements for R NAV 10 approval □(4) Flight Operation Division letter declaring that, the applicant meets and complies with operational and airworthiness requirements for R NAV 10 approval □(5) Official report regarding AOC modification □b Director CAA RM signing Date

(1) Amendment of the OPS SPECS for R NAV 10 approval

PM-PBN-AN-01Rev No: 00 / 31.10.2014

Page 13 of 13