Footpath - Brick Paving RFT202003 Contractor………………………………….. Schedule 1 – Composition of Tender The Tenderer shall show the lump sum cost of each item in the following schedule. Item Description Amount ($AUD) 1 Preliminaries $ 2 Brick paving preparation $ 3 Brick Paving $ 4 Concrete Plinth $ 5 Miscellaneous $ Tender Lump Sum Amount (excluding GST) $ Tender Provisional Sums (excluding GST) $ TENDER SUM (excluding GST) $ GST $ GROSS TENDER SUM (including GST) $

Upload: others

Post on 12-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: €¦  · Web viewBrick paving preparation $ 3. Brick Paving $ 4. Concrete Plinth $ 5. Miscellaneous $ Tender Lump Sum Amount (excluding GST)$ Tender Provisional Sums (excluding

Footpath - Brick Paving RFT202003

Contractor…………………………………..

Schedule 1 – Composition of Tender

The Tenderer shall show the lump sum cost of each item in the following schedule.

Item Description Amount ($AUD)

1 Preliminaries $

2 Brick paving preparation $

3 Brick Paving $

4 Concrete Plinth $

5 Miscellaneous $

Tender Lump Sum Amount (excluding GST) $

Tender Provisional Sums (excluding GST) $

TENDER SUM (excluding GST) $

GST $

GROSS TENDER SUM (including GST) $