STANDARDIZED CONSTRUCTION PROCUREMENT DOCUMENTS FOR PROFESSIONAL SERVICES (August 2006) Construction Industry Development Board Pretoria Note to users This document has been issued to enable users to become familiar with the manner in which procurement documents are to be compiled in accordance with the provisions of the CIDB Standard for Uniformity in Construction Procurement (August 2006) as amended in Board Notice 94 of 2006 in Government Gazette No. 29138 of 18 August 2006. Any comments on this document should be addressed to:

Upload: others

Post on 19-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

STANDARDIZED CONSTRUCTION PROCUREMENT DOCUMENTS FOR

PROFESSIONAL SERVICES

(August 2006)

Construction Industry Development BoardPretoriaTel: 012 343 7136 or 012 481 9030Fax: 012 343 7153E-mail: [email protected]

Note to users

This document has been issued to enable users to become familiar with the manner in which procurement documents are to be compiled in accordance with the provisions of the CIDB Standard for Uniformity in Construction Procurement (August 2006) as amended in Board Notice 94 of 2006 in Government Gazette No. 29138 of 18 August 2006.

Any comments on this document should be addressed to:

The CIDB-PDM Manager: Attention : Nomaphoso [email protected]

Page 2: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Notes on the use of the Standardized Procurement Documents for Professional Services

1 Background

The Standard for Uniformity in Construction Procurement (the Standard) is published in terms of sections 4(f), 5(3)(c) and 5(4)(b) of the Construction Industry Development Board Act, 2000 (Act no. 38 of 2000).

Regulation 16A6.3(a)(ii) of the Treasury Regulations for departments, trading entities, constitutional institutions and public entities issued in terms of the Public Finance Management Act (Act no. 1 of 1999) requires accounting officers or accounting authorities to ensure that bid documentation and the general conditions of a contract are in accordance with the prescripts of the Construction Industry Development Board, in the case of a bid relating to the construction industry.

Regulation 21(a)(ii) of the Municipal Supply Chain Management Regulations issued in terms of the Local Government: Municipal Finance Management Act (Act no 56 of 2003) states that a supply chain policy must determine the criteria to which bid documentation for competitive bidding process must comply, and state that in addition to regulation 13 the bid documentation must take into account the requirements of the Construction Industry Development Board in the case of a bid relating to construction, upgrading or refurbishment of buildings of infrastructure.

Uniformity in construction procurement documentation, procedures and practices is essential to improved industry performance and improved value to clients. It engenders a culture of consistency and predictability within the procurement process.

This standardized set of procurement documents enables those responsible for drafting procurement documents to readily develop tender and contract documents that satisfy the Standard’s requirements in respect of professional services. This document also provides guidance on the content of each of the component documents making up a tender or contract document. It does not provide guidance on how each of the component documents is to be applied as such guidance is provided in the User Guide for the Standard for Uniformity in Construction Procurement

2 Requirements for formatting and compiling procurement documents

2.1 Background

Procurement documents are required primarily to

a) solicit tender offers; andb) form the basis for a contract.

Figure 1 illustrates the concept of offer and acceptance that results in a contract being entered into. Procurement documents provide tenderers with the necessary inputs to allow them to compile their tender submissions. Their tender submissions are in turn inputs into the contract that may be concluded following the acceptance of their tender offer. Uniformity in procurement documentation is based on a principle proposed in the Green Paper on Public Sector Procurement Reform in South Africa (1997) namely that there be a complete separation in the component documents that make up a procurement document i.e. the conditions of tender, the conditions of contract, the specifications and methods of measurement and payment. Should this be done, different conditions of contract, or for that matter, payment systems can be used without affecting the remaining component documents.

Notes i

Page 3: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

The requirements for procurement documents contained in the Standard for Uniformity are based on the aforementioned green paper principle and a number of documents that have been developed and extensively reviewed within the South African construction Industry, namely:

Recommendations on Refinements in Public Sector Procurement Policy, Practices and Procedures in the Construction Sector as endorsed by the Interministerial Task Team for Construction Industry Development (2000);

SANS 10403: 2003, Formatting and compiling of construction procurement documents; SANS 294: 2004, Construction procurement processes, methods and systems; and Construction Procurement Best Practices recognized by the Construction Industry Development

Board (2004).

2.2 Headings and content of component documents The Standard for Uniformity in Construction Procurement provides a series of standard headings of component documents based on the “offer” and “acceptance” process illustrated in Figure 1. Procurement documents comprise several component documents dealing with different topics bound together in a logical sequence. The first cluster of documents contains only those documents that are relevant to the tender enquiry (see Table 1) and the second cluster those documents that relate to the contract that will be created upon the acceptance of the tender (see Table 2).

Table 1: Documents that relate to the “Tender” (See SANS 10403)

ContentsFunction and broad outline of contentsNumber Heading

Part T1: Tendering proceduresT1.1 Tender Notice and

Invitation to Tender

Alerts tenderers to the nature of the supplies, services and engineering and construction works required by the employer and should contain sufficient information to enable them to respond appropriately.

T1.2 Tender Data States what the applicable conditions of tender are and where they may be found. Tender Data also provides the variables for standardised conditions of tender.

Part T2: Returnable documentsT2.1 List of Returnable

DocumentsEnsures that everything the employer requires a tenderer to submit with his tender is included in, or returned with, his tender submission.

T2.2 Returnable Schedules

Contains documents that the tenderer is required to complete for the purpose of evaluating tenders and other schedules which upon acceptance become part of the subsequent contract.

Notes

Employer solicits tender offers

Input

Tenderer compiles tender offer and submits it to the Employer

Proposed terms and conditionsDescription of what is to be providedRequirements and constraints relating to the manner in which the work is to be performed

Employer compiles contract after evaluating tender offers

Terms and conditionsDescription of what is to be providedRequirements and constraints relating to the manner in which the work is to be performed Amounts payable on completion of an activity, deliverable or attainment of a milestone

Response to terms and conditions, constraints and requirementsFinancial offer

Output

Input

Output

Figure 1: The concept of offer and acceptance

ii

Page 4: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

The Standard requires that the headings contained in Tables 1 and 2 be used with procurement documents (tender and contract) relating to the provision of engineering and construction works, services and supplies. The headings must not be changed to suit personal preferences e.g. scope of work being changed to “terms of reference” or “specification”. Likewise the documents or parts must not be renumbered. This defeats the objective of having a uniform set of headings.

Table 2: Documents that relate to the “Contract” (See SANS 10403)

Contents Broad outline of contentsNumber HeadingPart C1: Agreements and contract dataC1.1 Form of Offer and

AcceptanceFormalises the legal process of offer and acceptance

C1.2 Contract Data States the applicable conditions of contract and associated contract specific data that collectively describe the risks, liabilities and obligations of the contracting parties and the procedures for the administration of the contract.

Part C2: Pricing dataC2.1 Pricing

InstructionsProvides the criteria and assumptions which it will be assumed (in the contract) that the tenderer has taken into account when developing his prices, or target in the case of target and cost reimbursable contracts.

C2.2 Activity Schedule / Bills of Quantities

Records the contractor's prices for providing supplies / services / engineering and construction works which are described elsewhere in a specification within the Scope of Work section of the contract.

Part C3: Scope of WorkC3 Scope of Work Specifies and describes the supplies, services, or engineering and construction

works which are to be provided and any other requirements and constraints relating to the manner in which the contract work is to be performed

Part C4: Site information (engineering and construction works contracts only)C4 Site Information Describes the site as at the time of tender to enable the tenderer to price his

tender and to decide upon his method of working and programming and risks.

The requirements of the Standard for Uniformity in Construction Procurement are based on SANS 10403, Formatting and compilation of construction procurement documents, which establishes at both prime and subcontract level:

a) a uniform format for the compilation of procurement documents for supplies, services and engineering and construction works contracts; and

b) the general principles for compiling procurement documents in respect of supplies, services and engineering and construction works.

Guidance is provided in SANS 10403 as to what the content of each component should be.

Users of this system who are familiar with the standardised procurement documents of an organization will only need to read the project specific sections for any specific project in order to know what the organisation requires. On the other hand, users who are not familiar with an organisation’s standardised documents can quickly locate information that they may require should they have a working knowledge of the framework for the formatting and compilation of procurement documents provided in SANS 10403.

2.3 Compiling procurement documents

The standard for uniformity provides two options for compiling and issuing procurement documents, namely the “three volume approach” and the “single volume approach.”

In the “three volume” approach, the component documents are compiled in three volumes (divisions) in accordance with the provisions of Table 3. Volume I comprises the Tendering Procedures (Part 1 of the Tender), Volume 2 comprising the Returnable Documents (Part 2 of the Tender and documents C1.1 and C1.2 of Part 1 of the Contract and documents C2.1 and C2.2 of Part 2 of the Contract, if relevant, i.e. all the documents in which the tenderer is required to provide data to complete his tender) and Volume 3 which

Notes iii

Page 5: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

contains the draft contract (i.e. all components of the Contract which are not included in Volume 2). Tenderers will complete and return Volume 2 as their tender submission. Organisations will compile the contract (see Table 2) from the tender submission (Volume 2). In this manner, the final contract will contain all the provisions agreed to by the parties during the tender process and will not include redundant information relating to the process that led to the formation and signing of the contract. (See Figure 2).

Table 3: Standard headings and sequencing of documents when soliciting tenders where a three volume approach is adopted

Volume ContentsNumber Heading

Volume 1 Part T1: Tendering proceduresT1.1 Tender Notice and Invitation to TenderT1.2 Tender Data

Volume 2 Part T2: Returnable documentsT2.1 List of Returnable DocumentsC1.1 Form of Offer and Acceptance C1.2 Contract Data (Part 2: Data Provided By The Contractor)C2.2 Activity Schedule or Bill of QuantitiesT2.2 Returnable Schedules

Volume 3 Part C1: Agreement and Contract DataC1.2 Contract Data (Part 1: Data provided by the employer)Part C2: Pricing dataC2.1 Pricing InstructionsPart C3: Scope of WorkC3 Scope of Work

Notes

DOCUMENTS REQUIRED FOR THE SOLICITATION OF TENDER OFFERSVolume 1Tendering proceduresPart T1: Tendering proceduresTender Notice and Invitation to TenderTender DataVolume 2Returnable documentsPart T2: Returnable documentsList of Returnable DocumentsForm of Offer and Acceptance Contract Data (Part 2: Data provided by the Contractor)Activity Schedule / Bill of QuantitiesReturnable SchedulesVolume 3Contract

Part C1: Agreement and Contract DataContract Data (Part 1: Data provided by the Employer)Part C2: Pricing dataPricing InstructionsPart C3: Scope of WorkScope of Work

DOCUMENTS REQUIRED FOR THE CONTRACT ENTERED INTO WITH THE SUCESSFUL TENDERERVolume 1Tendering proceduresNo longer relevantVolume 2Returnable documentsNo longer relevant or incorporated into the contractVolume 3Contract

Part C1: Agreement and Contract DataForm of Offer and AcceptanceContract DataRelevant returnable schedulesPart C2: Pricing dataPricing InstructionsActivity Schedule / Bill of QuantitiesPart C3: Scope of WorkScope of WorkRelevant returnable schedules

Note: The contract also incorporates any amendments made between the offer and acceptance

Figure 2: The relationship between the standard headings and the concept of “offer” and “acceptance”

iv

Page 6: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

In the single volume approach the documents listed in Table 1 are headed “Tender” and those in Table 2, “Contract” (See Table 4). The List of Returnable Documents identifies which of the documents a tenderer must complete when submitting a tender offer. The tenderer submits his tender offer by completing those forms, signing the "Offer" document in the Forms of Offer and Acceptance and delivering the single volume back to the employer bound up as it was when it was received. If the tender offer is accepted, the employer simply records all the agreed changes in the procurement document between offer and acceptance in the schedule of deviations attached to the Form of Offer and Acceptance and signs the ‘Acceptance’ document in the Forms of Offer and Acceptance and a Contract is formed i.e., the tender document becomes the contract document.

Table 4: Standard headings and sequencing of documents when soliciting tenders where a single volume approach is adopted

ContentsNumber HeadingThe TenderPart T1: Tendering proceduresT1.1 Tender Notice and Invitation to TenderT1.2 Tender DataPart T2: Returnable documentsT2.1 List of Returnable DocumentsT2.2 Returnable SchedulesThe ContractPart C1: Agreement and Contract DataC1.1 Form of Offer and Acceptance C1.2 Contract Data Part C2: Pricing dataC2.1 Pricing InstructionsC2.2 Activity Schedule or Bills of QuantitiesPart C3: Scope of WorkC3 Scope of WorkPart C4: Site information C4 Site Information

A contract arising from the Negotiated Procedure (i.e. in the case of an emergency) must be formatted and compiled under the headings contained in Table 2.

2.4 Colour coding component documents

The Standard for Uniformity in Construction Procurement has no requirement for colour coding component documents. It is, nevertheless, recommended that any colour identification of component documents be undertaken in accordance with the provisions of SANS 10403 as this standard is recognized by the CIDB as best practice.

SANS 10403 suggests that for ease of identification of the various sections, each section may be printed on different coloured paper or be separated with coloured paper. Where this is done, the colours for each subcomponent should be as indicated in Table 5. It should be noted that all documents in Volume 2 of the relevant documents are coloured yellow.

3 Terminology used in the Standard for Uniformity in Construction Procurement

3.1 “Bid” versus “tender”

The CIDB has adopted the terms “tender” and “tenderer” in preference to “bid” and “bidder”. The rationale for this is as follows:

Notes v

Page 7: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Table 5: Colours used to distinguish component documents

Colour of pages DocumentNumber Heading

White T1.1 Tender Notice and Invitation to TenderPink T1.2 Tender DataYellow T2.1 List of Returnable DocumentsYellow T2.2 Returnable SchedulesYellow C1.1 Form of Offer and AcceptanceYellow C1.2 Contract DataWhite C1.3 Forms of SecuritiesWhite C1.4 Forms for Adjudicators AppointmentYellow C2.1 Pricing InstructionsYellow C2.2 Activity Schedule / Bill of QuantitiesBlue C3 Scope of Work

1. Accepted English usage:

The New Shorter Oxford Dictionary contains the following definitions:

Bidder: A person who bids, especially at an auction or at cards.Bid: The offer of a price, especially at an auction; an offer made at a stated

price, a tender.Tender: A formal offer made by one party to another; specifically an offer of money etc. made to

discharge a debt or liability. An offer of anything for acceptance.A written offer made by one party to another to supply goods or carry out work at a set price or rate.

Tenderer: A person who tenders or makes a formal offer, especially for a proposed contract

2. Common international usage of procurement terms:

The World Bank is the only major international organization that uses the terms “bid” and “bidder” in a procurement context. (See Table 6).

Table 6: International usage of the terms “bid” and “tender”

Organization Publication Terms usedUnited Nations Commission on International Trade Law

Model law on procurement of goods, construction and services (1994)

“Bidding to do Government work” used once only. The terms bid and bidder are not encountered.Tender and tendering used throughout the document

World Trade Organisation

Agreement on Government Procurement

The terms “bid, bidder or bidding” is not found in the agreement whatsoever. The terms tender, tenderer and tendering found throughout the document.

European Union COUNCIL DIRECTIVE 93/36/EEC (Rules for Supplies)

The terms “tender, tenderer and tendering” are found throughout the document. The term “bidder” is found once in the document. The terms “bid and bidding” is not encountered.

DIRECTIVE 2004/18/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 31 March 2004

“Tender and tenderer” is used throughout the document.The term ”bid and bidder” is only used in the context of electronic auctions.

Federation Internationale des

Conditions of contract for construction for building and

The term “tender” is used.

Notes vi

Page 8: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Ingenieurs-Conseils (FIDIC)

engineering works designed by the employer.

3. The traditional usage of terms in the South African construction industry

The term “tender” has historically been used in industry standard documents published by both the public and private sector. The national standards for construction procurement published by Standards South Africa uses the term “tender”. The term “bid” is not encountered.

4. Consistency

The term “bid” does not sit comfortably with non-competitive selection procedures such as the negotiation procedure.

Most national laws governing procurement use the term “tender”. The Municipal Finance Management Act (Act 56 of 2003) and the Prevention and Combating of Corrupt Activities Act (Act 12 of 2004), however, use both these “bid” and “tender”. The Municipal Finance Management uses both terms even in the same sentence. The Prevention and Combating of Corrupt Activities Act uses the term “bid” in relation to auctions and “tender” in relation to the process that results in a contract or an agreement being made. This Act also makes reference to a Register of Tender Defaulters.

National Treasury have standardized on the term “bid” in the Supply Chain Management Practice Notes. Although, the Regulations for the Framework for Supply Chain Management issued in terms of Public Finance Management Act generally makes reference to the term “bid”, it still refers to a “tender process” and the “Government Tender Bulletin.”

When compiling construction procurement documents in accordance with the Standard, the term tender must be used throughout the documents. Organisations must refrain from changing terms such as “Tender Data” to “Bid Data” as this will necessitate the retyping of the Standard Conditions of Tender and result in inconsistencies in documents. This defeats the objective of having a uniform procurement documents.

3.2 “Quality” versus “functionality” The Standard for Uniformity in Construction Procurement defines quality as:

“the totality of features and characteristics of a product or service that bear on its ability to satisfy stated or implied needs”

This definition is consistent with that used by the International Standards Organisation and Standards South Africa. The Standard uses the term “quality” in a wide context and not just in a tender evaluation context.

The World Bank for the Selection and Employment of Consultants and the European Union Directives (2004) make reference to the evaluation of tenders on the basis of quality. The Regulations issued in terms of the Preferential Procurement Policy Framework Act (Act 5 of 2000) use the term “functionality” and not “quality” in the evaluation of tender offers. This term is not defined and is not encountered in any of the international literature.

In procurement documents compiled in accordance with the Standard, the term “functionality” must not be substituted for “quality” in procurement documents to describe processes surrounding the evaluation of tenders as this defeats the objective of having a uniform procurement documents.

4 Best practice guidelines

Further guidance on various aspects relating to the procurement of professional services may be found in the following best practice guidelines:

Notes vii

Page 9: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

1 Best practice guidelines published by the Construction Industry Development Board

1.1 CIDB Best Practice Guideline C1: Preparing Procurement Documents

This practice guide identifies the various types of procurement documents and provides a uniform format for the drafting and compilation of these documents. It also establishes a practical approach to uniformity and standardization of procurement documents within an organization and makes recommendations regarding the forms of contracts which should be used. It also contains a number of proforma component documents to facilitate a uniform approach.

1.2 CIDB Best Practice Guideline C3: Adjudication

This practice guide provides an overview of what adjudication is, presents the principles underpinning adjudication, reviews the provisions for adjudication in standard forms of contract (NEC, FIDIC and CIDB), outlines an approach for the selection and use of adjudicators, and provides sample clauses and proforma agreements to be included in procurement documents.

1.3 CIDB Best Practice Guideline A7: The procurement of professional services

This practice guide provides an overview of government’s policy regarding the appointment of consultants and the provisions made in the CIDB Standard for Uniformity for the procuring of professional services. It outlines procedures in respect of each of the methods contained in this standard and guidance on the compilation of procurement documentation associated with professional service contracts. It also establishes the relationship between the methodology advocated by the standard and that promoted by National Treasury in their Supply Chain Management Practice Notes.

2 Standards published by Standards South Africa

2.1 SANS 294, Construction procurement processes, methods and procedures

This standard provides processes, methods and procedures for the establishment within an organization of a procurement system that is fair, equitable, transparent, competitive and cost effective. It:

a) describes generic procurement processes around which an organization may develop its procurement system;

b) establishes minimum requirements for the conduct of an organization’s employees, agents, board members and office bearers when engaging in procurement;

c) establishes the framework for the development of an organization’s procurement policy including any preferential procurement policy;

d) establishes generic methods and procedures for procurements including those pertaining to disposals; and

e) provides standard conditions of tender and conditions for the calling for expressions of interest.

2.2 SANS 10403, Formatting and Compilation of Construction Procurement Documents

This standard establishes at both prime and subcontract level:

a) a uniform format for the compilation of procurement documents for supplies, services and engineering and construction works contracts; and

b) the general principles for compiling procurement documents in respect of supplies, services and engineering and construction works.

Notes viii

Page 10: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

5 Acts which impact on the content of procurement documents

The Acts outlined in Table 7 have a direct bearing on aspects of contract documents.

Table 7: Acts which impact on the content of procurement documents

Act Pertinent provisionsThe Conventional Penalties Act (Act 15 of 1962)

This Act provides for the enforceability of penalty stipulations, including stipulations based on pre-estimates of damage.

Arbitration Act (Act 42 of 1965) This Act provides for the settlement of disputes by arbitration tribunals in terms of written arbitration agreements and for the reinforcement of the awards of such tribunals

Notes ix

Page 11: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Part T1: Tendering procedures

Tender 1Part T1: Tendering procedures

Page 12: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Document number

T1.1

Title Tender Notice and Invitation to Tender

Function and broad outline of contents

Alerts tenderers to the nature of the engineering and construction works required by the employer and should contain sufficient information to enable them to respond appropriately.

Notes The Tender Notice and Invitation to Tender is based on the wording provided in Annex B of the Standard for Uniformity in Construction Procurement. Sub-clause 4.4.1.2 of the Standard for Uniformity in Construction Procurement requires that the Notice and Invitation to Tender, as a minimum, contain the wording provided in Annex B.

Media advertisements should be based on this document.

Commentary

1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of 30 May, 2005) requires that the closing date for tenders having an estimated value in excess of R 10 million including VAT or of a long term nature be not less than 30 days and 14 days in all other cases except where a shorter period is permitted by the accounting officer on the grounds of urgency or emergency or in exceptional cases where it is impractical or impossible to follow the official procurement process.

2 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of 30 May, 2005) requires the advertisement to state that tenders may only be submitted on the tender documentation that is issued.

Tender 2 T1.1Part T1: Tendering procedures Tender Notice and Invitation to Tender

Page 13: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

A. T1.1 Tender Notice and Invitation to Tender

Guidance Notes

………………. invites tenders for . . . . . . . Enter the name of the employer and describe briefly what is to be procured, and if appropriate, over what time period.

Preferences are offered to tenderers who …………………. Briefly indicate the nature of the preferences that are applicable, if so desired.

Only tenderers who ………. are eligible to submit tenders. Where applicable, state essence of eligibility criteria.

The physical address for collection of tender documents is:……………... Documents may be collected during working hours after 09:00 on ………..

Enter data

A non-refundable tender deposit of R……payable in cash or by bank guaranteed cheque made out in favour of the Employer is required on collection of the tender documents.

Omit if not a requirement. Amend wording if cheques or cash are not acceptable.

Queries relating to the issue of these documents may be addressed to Mr/Ms . . . . ., Tel No. . . . . . . , Fax No. . . . . . . e mail . . . . . .

Enter data

A compulsory clarification meeting with representatives of the Employer will take place at . . . . . . on . . . . .. starting at . . . . hrs.

Omit if not a requirement

The closing time for receipt of tenders is . . . . . . hrs on . . . . . . .Telegraphic, telephonic, telex, facsimile, e-mail and late tenders will not be accepted.

Enter data and delete that which does not apply

Tenders may only be submitted on the tender documentation that is issued.

Omit if procurement does not fall within the ambit of the Municipal Finance Management Act.

Requirements for sealing, addressing, delivery, opening and assessment of tenders are stated in the Tender Data.

Tender 3 T1.1Part T1: Tendering procedures Tender Notice and Invitation to Tender

Page 14: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Document number

T1.2

Title Tender Data

Function and broad outline of contents

States what the applicable conditions of tender are and where they may be found. Tender Data also provides the variables for standardized conditions of tender.

Notes Sub-clause 4.4.3.1 of the Standard for Uniformity in Construction Procurement requires that the Tender Data reference the Standard Conditions of Tender contained in Annexure B. These standard Conditions of Tender are identical to Annex F of SANS 294, Construction Procurement Processes, Procedures and Methods. (See Appendix B to this document)

The Tender Data informs tenderers about the tendering procedures that are to be observed and the documentation that needs to be submitted with tender offers, failing which, tender offers may be rejected or not be evaluated. The Tender Data also establishes the manner in which the employer undertakes to conduct the tender process and to evaluate tender offers. The Tender Data does this by establishing a set of generic rules relating to the process of offer and acceptance and the tender specific variables relating thereto.

The Standard Conditions of Tender anticipate that certain information associated with particular sub-clauses will be found in the Tender Data. Such sub-clauses may be voided should such information not be provided.

The clauses and sub-clauses in the Standard Conditions of Tender are prefixed with the letter F.

The Standard furthermore requires that the tender offer validity period not generally not exceed eight weeks and in exceptional circumstances, not exceed 12 weeks (sub-clause 4.4.3.3) and provides standard wording in sub-clause 4.4.3.4 relating to the manner in which the standard tender evaluation methods are referenced in the Tender Data. The Standard in sub-clause 4.3 provides a number of ways in which quality may be ensured in the work. The ways in which quality may be addressed through the Tender Data are by:

a) introducing quality into the eligibility criteria; b) establishing a category of preference for quality in the evaluation of tenders; orc) evaluating selected quality (functionality) criteria as an integral part of the tender

offer.

Sub-clauses 4.3.2 to 4.3.5 of the Standard address the evaluation of quality in tender submissions. They describe what quality is and what it is not. They also include examples of what constitutes quality and provides guidance on how to evaluate quality criteria.

Tender 4 T1.2Part T1: Tendering procedures Tender Data

Page 15: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Commentary:

1 Tender offers may only be evaluated in accordance with the evaluation criteria stipulated in the procurement documents. It is therefore essential that the manner in which this is to be done is precisely described in the Tender Data. Sub-clause 4.4.3 of the Standard for Uniformity in Construction Procurement requires that specific wording be incorporated in the Tender Data to precisely define how the evaluation is to take place. These requirements are aligned with the requirements of laws governing public sector procurement. The text may be varied to accommodate private sector procurement requirements as such procurement is not constrained by law.

2 The involvements of women and black persons in contracts should not be evaluated in the form of quality criteria in public contracts. This must be addressed in the preferencing points. It should be noted in this regard that the courts have already ruled that empowerment is specifically catered for in the preference points system. (See Reported case (2002[3] All SA 336 ((case No 18276/2001 in the High Court of South Africa)). Furthermore, the Supply Chain Management Circular issued by National Treasury on 10/05/2005 states that “ Preference points for HDI involvement may not be included as part of functionality, but should be provided for separately as part of the 10 or 20 points allocated for specific goals.” Sub-clause 4.3.4 the Standard for Uniformity in Construction Procurement prohibits the inclusion of social considerations, such as the composition of workforces in terms of race, gender or disability in quality criteria.

3 Any eligibility criteria introduced into the Tender Data should generally be based on the demonstration of the following, as necessary:

a) professional and technical qualifications;b) professional and technical competence;c) financial resources;d) equipment and other physical facilities;e) managerial capacity, reliability, experience; andf) reputation.

Eligibility criteria framed around race and gender may be regarded as a “the denial of access to opportunities”, an action prohibited in terms of sections 7 and 8 of the Promotion of Equality and Prevention of Unfair Discrimination Act of 2000 (Act 4 of 2000). Eligibility criteria must not be used to create captive or restricted markets or to erect unjustifiable barriers to trade.

4 Quality should only be introduced into the evaluation of tender submissions where it is required to achieve policy objectives in terms of an organization’s procurement policy or it is justifiable in terms of procurement outcomes. Quality measures must not promote captive markets and should result in quality that is appropriate to comply with user requirements as opposed to the best quality available.

5 Quality criteria used in the evaluation of tender offers must form an integral part of the tender offer and hence the outcome of the procurement. Such criteria must:

a) relate directly to the supplies, services or engineering and construction works that are being procured and to matters that cannot directly be expressed in monetary terms;

b) be justifiable in terms of projected procurement outcomes; c) enable the most economically advantageous offer to be established; andd) to the extent practicable, be objective and quantifiable.

Quality criteria may include criteria such as:

a) technical merit; b) response to (ability to relate to) the proposed scope of work/project designc) aesthetic and functional characteristics; d) safety and environmental characteristics;e) quality control practices and procedures which ensure compliance with stated employer’s requirements;f) reliability;g) durability; h) organization, logistics and support resources relevant to the scope of work;i) qualifications and demonstrated experience of the key staff (assigned personnel) in relation to the scope

of work;

Tender 5 T1.2Part T1: Tendering procedures Tender Data

Page 16: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

i) demonstrated experience of tendering entity with respect to specific aspects of the project / comparable projects;

j) running costs;k) after-sales service and technical assistance;l) delivery date; and m) delivery period or period of completion

Quality criteria must not include matters relating to the basic capability or capacity of the tendering entity to execute the contract. Quality criteria should wherever appropriate be rated as “poor”, “satisfactory”, “good” or “very good” in terms of qualitative criteria that is communicated to tenderers. Fixed scores should be assigned against each of these ratings.

6 The Supply Chain Management Regulations issued in terms of the Municipal Finance Management Act prohibit the award of contracts to a person in the service of the state, or to a legal entity which has any of its directors, managers, principal shareholders or stakeholders who are in the service of the state or to a person who has advised or acted as a consultant in the development of the scope of work associated with the contract. (The Compulsory Enterprise Questionnaire (see returnable documents) facilitates the gathering of information in this regard)

6 Tender evaluation criteria need to be disclosed to tenderers in a fair, equitable and transparent procurement system. Accordingly, all criteria and weightings need to be disclosed within the procurement documents, and no additional criteria may be imposed after the tenders close.

It is important that the wording for the evaluation of tender offers contained in the Standard for Uniformity in Construction Procurement be used without amendment in the public sector. The Preferential Procurement Policy Framework Act (Act 5 of 2000) only makes provision for the evaluation of tender offers on the basis of “price” and “preference.” As a result, points for quality, financial offer and preference cannot be scored separately and combined arithmetically to arrive at a final score. What can be done is to combine the separate scores for quality and financial offer into a scoring of value for money and to treat this score as the “price”, which may then be scored and combined with “preference” in the manner contemplated in the PPPFA.

.The Regulations issued in terms of this Act allows the calculation of points for price and functionality (quality) when functionality is regarded as an important evaluation criterion. In this case the tenderer who scored the highest combination of points for price and functionality, must score 80 or 90 points, while other tenderers should score on a pro-rata basis less points out of 80 or 90.

The results of the tender evaluation may be affected by the approach and formula that is adopted as illustrated in the example below. In the interests of transparency, the precise method of evaluating tender submissions must be fully described in the Tender Data.

.Example:

Tenders are invited. Three tenders are received and are scored by the tender evaluation panel as follows:

\Tenderer Financial offer Quality score of 100 (max) Preference granted

A R1 050 000 55,2 0B R 1 550 000 84,53 10C R 2 050 000 98 5

The weighting between financial offer and quality is 20:80 and preferences count a maximum of 10 points

1 Scoring using simple formula

The score for quality is to be calculated using the following formula:

WQ = W2 x SO/SS

where W2 is the weighting given to quality and equals 72 (80 / 100 x 90) SO is the score for quality allocated to the submission under consideration SS is the score for allocated to the tenderer scoring the highest quality score

Tender 6 T1.2Part T1: Tendering procedures Tender Data

Page 17: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Score financial offer using the following formula contained in the PPPFA regulations:

(1 - (P - Pm)) x 20 / 100 x 90 Pmwhere:Pm = the comparative offer of the most favourable tender offer.P = the comparative offer of tender offer under consideration.

Tenderer Score for financial offer

Score for quality

Score for preference

Total Ranking

A 20 40,55 0 60,55 3B 9,43 62,10 10 72,10 2C 0,86 72 2 74,00 1

Note: If tenderer C tendered an amount above R 2 100 000, the formula would yield a negative number and as a result cannot be scored.

2 Use approach contained in the Standard for Uniformity in Construction Procurement and National Treasury SCM Practice Note 3

The percentage weighting is

The score for quality is to be calculated using the following formula:

WQ = W2 x SO/MS

where W2 is the percentage score given to quality and equals 80 SO is the score for quality allocated to the submission under consideration MS is the maximum possible score for quality in respect of a submission

The score for financial offer is calculated using the following formula where W1 is the percentage score given to financial offer and equals 20:

Pm / P x W1

where:Pm = the comparative offer of the most favourable tender offer.P = the comparative offer of tender offer under consideration.

The score for quality and financial offer is combined, before the addition of the score for preference, as follows:

WC = W3 x (1+(S-Sm)) Sm

Where W3 is the number of tender evaluation points for quality and financial offer and equals 90 S is the sum of score for quality and financial offer of the submission under consideration

Sm is sum of the score for quality and financial offer of the submission scoring the highest number of points

Tenderer Score for financial offer

Score for quality

Combined Score for offer

Score for preference

Total Ranking

A 20 44,16 64,16 65,14 0 65,14 3B 13,55 67,62 81,17 82,42 10 92,42 1C 10,24 78,40 88,64 90 2 92,00 2

Had the alternative formula for the calculation of price be used as set out below, the results would have been as follows:

(1 - (P - Pm)) x 20 Pm

Tender 7 T1.2Part T1: Tendering procedures Tender Data

Page 18: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Tenderer Score for financial offer

Score for quality

Combined Score for offer

Score for preference

Total Ranking

A 20 44,16 64,16 72,77 0 72,77 3B 10,48 67,62 78,10 88,58 10 98,58 1C 0,95 78,40 79,35 90 2 92 2

Although in this instance the results are the same, the result could have been very different had the preferences been different.

It is always preferable to use the formula Pm / P x W1 to score the financial offer as it will not yield a negative number.

Tender 8 T1.2Part T1: Tendering procedures Tender Data

Page 19: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

T1.2 Tender Data

Clause number Guidance notes

The conditions of tender are the Standard Conditions of Tender as contained in Annex F of the September 2005 edition of the CIDB Standard for Uniformity in Construction Procurement. The Standard Conditions of Tender for Procurements make several references to the Tender Data for details that apply specifically to this tender. The Tender Data shall have precedence in the interpretation of any ambiguity or inconsistency between it and the standard conditions of tender.Each item of data given below is cross-referenced to the clause in the Standard Conditions of Tender to which it mainly applies.

The CIDB Standard Conditions of Tender are reproduced as Appendix A to this document.An alternative wording for the first sentence is as follows:The conditions of tender are the Standard Conditions of Tender as contained in Annex F of SANS 294.

F.1.1 The employer is ……. Enter name of employerF.1.2 The tender documents issued by the employer comprise:

Volume 1: Tendering proceduresT1.1 Tender notice and invitation to tenderT1.2 Tender dataVolume 2: Returnable documentsT2.1 List of returnable documentsT2.2 Tender schedules C1.1 Form of offer and acceptanceC1.2 Contract data (part 2)C2.2 Activity schedules / Bills of QuantitiesVolume 3: The contractPart 1: Agreements and contract dataC1.2 Contract data (part 1)C1.3 Form of GuaranteeC1.4 Adjudicator’s appointmentPart 2: Pricing dataC2.1 Pricing instructionsPart 3: Scope of workC3 Scope of work

Use for 3 Volume approach and omit if single volume approach is adopted)

Revise list of documents as necessary. (Part 2 of the contract data contains the data which tenderers are to submit).

F.1.2 The tender documents issued by the employer comprise:T1.1 Tender notice and invitation to tenderT1.2 Tender dataT2.1 List of returnable documentsT2.2 Tender schedulesPart 1: Agreements and contract data C1.1 Form of offer and acceptanceC1.2 Contract dataC1.3 Form of GuaranteeC1.4 Adjudicator’s appointmentPart 2: Pricing dataC2.1 Pricing instructionsC2.2 Activity schedules / Bills of QuantitiesPart 3: Scope of workC3 Scope of work

Use for single volume approach and delete if 3 volume approach is adopted.Revise list of documents as necessary.

F.1.4 The employer’s agent is:Name: ……..Address: ……Tel: …….Fax: ……E-mail: ……

Enter data. (Name and contact particulars of employee or external agent)

Tender 9 T1.2Part T1: Tendering procedures Tender Data

Page 20: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

F.2.1 Only those tenderers who satisfy the following eligibility criteria are eligible to submit tenders: …………

Modify statement, state eligibility criteria if other than that relating to contractor grading designation requirements or omit item.

Only those tenderers who score a minimum score of 60 points in respect of the following quality criteria are eligible to submit tenders.

Description of quality criteria and subcriteria

Maximum number of tender

evaluation points

Total evaluation points for quality (WQ)

The persons named in the Schedule of Key Persons of tenderers who satisfy the minimum quality criteria will be invited to an interview. Tenderers who attain a score of less than 50% of the points allocated to the interview will be declared ineligible to tender.

Insert if it is required that tenderers satisfy a minimum threshold of quality. Develop quality criteria around the listings provided in Table 2 of SANS 294.

Make provision for interviews if the quality of proposals / submission is to be confirmed through an interview.

F.2.7 The arrangements for a compulsory/non-compulsory clarification meeting are:Location: …….Date: ……Starting time: …….

Confirmation of attendance to be notified at least one full working day in advance to:Name: …….Tel: …….Fax: …….orThe arrangements for a compulsory clarification meeting are as stated in the Tender Notice and Invitation to Tender.

If not a requirement, replace with “There are no compulsory or clarification meetings.”

F.2.12 If a tenderer wishes to submit an alternative tender offer, the only criteria permitted for such alternative tender offer is that it ……orIf a tenderer wishes to submit an alternative tender offer, the only criteria permitted for such alternative tender offer is that it demonstrably enables the Employer’s objectives for the services as stated in the Scope of Work to be achieved.

Omit if there are no requirements, state requirements or state that:‘No alterative offers will be considered.’

F.2.13.1 Tenderers may offer to provide any of the following parts, or combinations thereof, of the services identified in the contract data:

Omit if not permitted. Amend statement as necessary

F.2.13.3 Parts of each tender offer communicated on paper shall be submitted as an original, plus ….. copies.

Enter the required information.

F.2.13.3 Where tenders are requested in electronic format, supplement electronic format with hard copies and submit hard copy in accordance with the provisions of F.2.13.5.

Insert only in tenders for municipalities and municipal entities where tenders are to be submitted electronically. (See Regulation 22(4) of the MFMA Supply Chain

Tender 10 T1.2Part T1: Tendering procedures Tender Data

Page 21: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Management Regulations)

F.2.13.5 The employer’s address for delivery of tender offers and identification details to be shown on each tender offer package are: Location of tender box: ……..Physical address: …….Identification details: ………

Enter data

Describe how the tender submissions are to be marked

F.2.13F.3.5

A two-envelope procedure will not be followed. Delete the word ‘not’ if a two-envelope procedure is required.

F.2.15 The closing time for submission of tender offers is …… hours on …… (day) ……. (date)

Enter closing time, day and date.

F.2.15 Telephonic, telegraphic, telex, facsimile or e-mailed tender offers will not be accepted.

If telegraphic, telex, facsimile or e-mailed tender offers will be accepted, delete the word ‘not’ from this sentence.

F.2.16 The tender offer validity period is ……… weeks State time period in weeks State time period in weeks –generally not more than 8 weeks, and in exceptional circumstances, 12 weeks.

F.2.19 Access shall be provided for the following inspections, tests and analysis:………

State requirements or omit item.

F.2.22 Return all retained tender documents within 28 day after the expiry of the validity period

Omit if not a requirement.

F.2.23 The tenderer is required to submit with his tender:1) an original valid Tax Clearance Certificate issued by the South

African Revenue Services;2) …….

State requirements.

F.3.4 The time and location for opening of the tender offers are:Time ……. on …….. (date)Location: ………

Insert data or state what the arrangements for opening are.

F.3.11 The procedure for the evaluation of responsive tenders is Method 1 Insert where Method 1 (Financial Offer) is used to evaluate tender offers.

Tender 11 T1.2Part T1: Tendering procedures Tender Data

Page 22: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

F.3.11 The procedure for the evaluation of responsive tenders is Method 2

The financial offer will be scored using Formula …… (option 1) where the value of W1 is:1) 90 where the financial value inclusive of VAT of all responsive

tenders received have a value in excess of R 500 000; or 2) 80 where the financial value inclusive of VAT of one or more

responsive tender offers equals or is less than R 500 000.

Up to 100 minus W1 tender evaluation points will be awarded to tenderers who complete the preferencing schedule and who are found to be eligible for the preference claimed.

A maximum of 100 minus W1 tender evaluation points will be awarded, based on the following formula:

Np = (100 – W1) x D 100

where D = tendered Contract Participation Goal.

A maximum of 100 minus W1 tender evaluation points will be awarded for the extent to which the tendered Contract Participation Goal exceeds the specified minimum. The basis of award of preference points is:

Np = (100 – W1) x (D - Ds) (X - Ds)

where D = tendered Contract Participation Goal. Ds = the minimum Contract Participation Goal below which

no preference will be granted, namely, …….% X = the maximum Contract Participation Goal above which

no further tender evaluation points are awarded, namely …….. %.

Insert where Method 2 (Financial Offer and Preferences) is used to evaluate tender offers.Enter the number of the Formula (1 or 2), depending upon what the comparison is intended to achieve.

Use this wording where direct preferences are used Use this wording where preferences are granted for direct participation

Use this wording where preferences are granted for direct participation . Fill in the values of Ds and X.

Tender 12 T1.2Part T1: Tendering procedures Tender Data

Page 23: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

F.3.11 The procedure for the evaluation of responsive tenders is Method 3

The score for quality is to be calculated using the following formula:

WQ = W2 x SO/MS

where W2 is the percentage score given to quality and equals …… SO is the score for quality allocated to the submission under

considerationMS is the maximum possible score for quality in respect of a

submission

The financial offer will be reduced to a comparative basis using the following formula:

Comparative offer = 100 + Fee Adjustment contained in the Pricing Schedule +

0,1 x (100 + Time Fee Adjustment provided for in the Pricing Schedule)

The score for financial offer is calculated using Formula …… (Option ……. ) where W1 is the percentage score given to financial offer and equals 100 minus W2.

Required where Method 3 (Financial Offer and Quality) is used to evaluate tender offers.Enter the percentage score for quality.

Include where the statutory tariffs of fees are used as the basis for determining the fee payable

Enter the number of the Formula (1 or 2), depending upon what the comparison is intended to achieve and which Option (1 or 2). Option 2 is recommended.

F.3.11 The procedure for the evaluation of responsive tenders is Method 4

The score for quality is to be calculated using the following formula:

WQ = W2 x SO/MS

where W2 is the percentage score given to quality and equals ………

SO is the score for quality allocated to the submission under consideration

MS is the maximum possible score for quality in respect of a submission

The financial offer will be reduced to a comparative basis using the following formula:

Comparative offer = 100 + Fee Adjustment contained in the Pricing Schedule +

0,1 x (100 + Time Fee Adjustment provided for in the Pricing Schedule)

The score for financial offer is calculated using Formula ….. (option 2) where W1 is the percentage score given to financial offer and equals 100 minus W2.

Required where Method 4 (Financial Offer, Quality and Preferences) is used to evaluate tender offers.Enter the percentage score for quality.

Include where the statutory tariffs of fees are used as the basis for determining the fee payable

Enter the number of the Formula (1 or 2), depending upon what the comparison is intended to achieve.

Tender 13 T1.2Part T1: Tendering procedures Tender Data

Page 24: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

The score for quality and financial offer is to be combined, before the addition of the score for preference, as follows:

WC = W3 x (1+(S-Sm)) Sm

Where W3 is the number of tender evaluation points for quality and financial offer and equals:

1) 90 where the financial value inclusive of VAT of all responsive tenders received have a value in excess of R 500 000; or

2) 80 where the financial value inclusive of VAT of one or more responsive tender offers equals or is less than R 500 000.

S is the sum of score for quality and financial offer of the submission under considerationSm is sum of the score for quality and financial offer of the submission scoring the highest number of points

Up to 100 minus W3 tender evaluation points will be awarded to tenderers who complete the preferencing schedule and who are found to be eligible for the preference claimed.

A maximum of 100 minus W3 tender evaluation points will be awarded, based on the following formula:

Np = (100 – W3) x D 100

where D = tendered Contract Participation Goal. A maximum of 100 minus W3 tender evaluation points will be awarded for the extent to which the tendered Contract Participation Goal exceeds the specified minimum. The basis of award of preference points is:

Np = (100 – W1) x (D - Ds) (X - Ds)

where D = tendered Contract Participation Goal. Ds = the minimum Contract Participation Goal below which

no preference will be granted, namely, ……% X = the maximum Contract Participation Goal above which no further tender evaluation points are awarded, namely ….. %.

Use this wording where direct preferences are used

Use this wording where preferences are granted for direct participation

Use this wording where preferences are granted for direct participation. Fill in the values of Ds and X.

Tender 14 T1.2Part T1: Tendering procedures Tender Data

Page 25: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

F.3.11.3 The quality criteria and maximum score in respect of each of the criteria are as follows:

Quality criteria Subcriteria Maximum number of points

Approach paper which responds to the proposed scope of work/project design and outlines proposed approach / methodology and work plan complete with time frames

Technical approach and methodologyWork plan

Organization and staffing -Experience of the key staff (assigned personnel) in relation to the scope of work

General qualificationsAdequacy for the assignmentExperience in the region

PSPs experience with respect to specific aspects of the project / comparable projects

-

Maximum possible score for quality (Ms)

100

Omit item if method 1 or 2 applies

Amend criteria as necessary.

F.3.11.3 Qualify shall be scored independently by not less than three evaluators in accordance with the following schedules:

Evaluation Schedule: Approach Paper Evaluation Schedule: Proposed Organization and Staffing Evaluation Schedule: Experience of the Key Staff Evaluation Schedule: Tenderer’s Experience

Scores of 40, 70, 90 or 100 will be allocated to each of the criteria and subcriteria based on the indicators contained in these schedules. The scores of each of the evaluators will then be averaged, weighted and then totaled to obtain the final score for quality.

Include where standard schedules are used. Adjust as necessary where other schedules are used.

F.3.11 The minimum number of evaluation points for quality is …………..

The persons named in the Schedule of Key Persons of tenderers who satisfy the minimum quality criteria will be invited to an interview. Tenderers who attain a score of less than 50% of the points allocated to the interview will be declared ineligible to tender.

Omit if method 1 or 2 applies or if there is no minimum number of points for quality. State 60 where standard scoring of 40, 70, 90 and 100 is used. Make provision for interviews if the quality of proposals / submission is to be confirmed through an interview.

F3.13.1 Tender offers will only be accepted if:a) the tenderer has in his or her possession an original valid Tax

Clearance Certificate issued by the South African Revenue Services

b) the tenderer is not in arrears for more than 3 months with municipal rates and taxes and municipal service charges;

c) the tenderer or any of its directors is not listed on the Register of Tender Defaulters in terms of the Prevention and Combating of Corrupt Activities Act of 2004 as a person prohibited from doing business with the public sector; and

d) the tenderer has not:i) abused the Employer’s Supply Chain Management System;

orii) failed to perform on any previous contract and has been given

a written notice to this effect.

Omit it there is not a requirement.Insert particulars in accordance with the organization’s procurement policy.(Requirement for valid tax clearance certificate not required if contractor is registered with the CIDB).

Tender 15 T1.2Part T1: Tendering procedures Tender Data

Page 26: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

e) it is considered that the performance of the services will not be compromised through any conflict of interest..

F.3.18 The number of paper copies of the signed contract to be provided by the employer is ………

Insert number.

The additional conditions of tender are:

1 ......................................................................................................

2 ......................................................................................................

3 ......................................................................................................

Such conditions should only be used on very rare occasions.It is easier to use tender schedules for the purpose of soliciting information to be returned with the tender offer. The conditions of tender state that all schedules shall be completed and submitted as part of the tender offer.

Tenderers may not form any joint ventures without the permission of the employer

Use this condition where the qualified procedure is used and a limited number of respondents are short listed, i.e. where competition may be compromised by joint venture formation.

The successful tenderer in respect of this tender and tender number ……. may not be the same for reasons of independence. Should the same tenderer be the preferred tenderer in the evaluation of both these tenders, the employer will award only one of the contracts to the tenderer and declare that the tenderer has a conflict of interest in the other.

Use this condition where independence of advice is sought in the two contracts.

Tender 16 T1.2Part T1: Tendering procedures Tender Data

Page 27: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Part T2: Returnable Schedules

Tender 17Part T2: Returnable documents

Page 28: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Document number T2.1

Title List of Returnable Documents

Function and broad outline of contents

States everything that the employer requires a tenderer to submit with his tender.

Notes The Standard for Uniformity in Construction Procurement has no specific requirements for the List of Returnable Documents. It does, however, require that the following schedules be included in all procurement documents:

Record of Addenda to Tender Documents (see Annex K); and Compulsory Enterprise Questionnaire (see Annex L)

Accordingly, the List of Returnable Documents should as a minimum include these two documents.

Commentary:

1 The List of Returnable Documents lists the documents that are returned with, or constitute, a tender. Whilst many of the returnables are required for the purpose of evaluating tenders, some will form part of the subsequent contract, as they form the basis of the tender offer. For this reason, it is very important that all tenderers return all information requested.

2 Forms and certificates that are to be completed after the award of the contract must not be included in the returnable documents.

3 The list of returnable documents should also indicate which of the schedules are for evaluation purposes and which will form part of the contract.

4 It is costly and time consuming for a tenderer to provide information. Accordingly only that which is absolutely essential for evaluation purposes and the formation of the contract should be requested. It is always possible to request further particulars from “short listed” tenderers as Clause F.2.18.1 of the Standard Conditions of Tender reads as follows:

Provide, on request by the employer, any other material that has a bearing on the tender offer, the tenderer’s commercial position (including notarized joint venture agreements), preferencing arrangements, or samples of materials, considered necessary by the employer for the purpose of a full and fair risk assessment. Should the tenderer not provide the material, or a satisfactory reason as to why it cannot be provided, by the time for submission stated in the employer’s request, the employer may regard the tender offer as being non-responsive.

5 Sub-regulation 35(3) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of 30 May, 2005) requires that tenderers furnish the employer with particulars of all consultancies provided to an organ of state in the last five years and any similar consultancy provided to an organ of state during this period.

6 The acceptance portion of the Form of Offer and Acceptance makes reference to addenda. It is therefore essential to provide a suitable form to capture the addenda issued prior to the closing of tenders.

Tender 18 T2.1Part T2: Returnable documents List of Returnable Documents

Page 29: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

7 Regulation 13 of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of 30 May, 2005) requires that tenderers submit the following to permit municipalities and municipal entities consider their quotation or tender:

a) name, identification number or company registration number or other registration number, and tax reference number and VAT registration number, if any;

b) authority to permit the municipality or municipal entity to obtain a tax clearance certificate from SARS;

c) a disclosure relating to individuals (sole proprietors, individuals, directors, principal shareholders or stakeholders) who are in the service of the state or have been in the service during the last 12 months; and

d) a disclosure relating to individuals (sole proprietors, individuals, directors, principal shareholders or stakeholders) whose spouse, parent or child are in the service of the state or have been in the service during the last 12 months.

The inclusion of the Compulsory Enterprise Questionnaire contained in Annex L of the CIDB Standard for Uniformity in Construction Procurement enables these requirements to be satisfied. It also allows Regulation 21 c) which requires that the procurement documentation must compel bidders to declare any conflict of interest, to be satisfied.

8 Sub-regulation 21(d) requires tenderers to furnish the following information where the transaction is expected to exceed R 10 million including VAT before their tenders may be evaluated:

a) audited financials for the past three years or since the establishment of the enterprise, if required by law to produce annual financial statements;

b) a certificate certifying that the enterprise has no undisputed commitments to a municipality or other service provider in respect of which payment is overdue by more than 30 days;

c) particulars of any contracts awarded by an organ of state during the last five years including particulars of any material non-compliance or dispute concerning their execution over this period; and

d) a statement indicating whether any portion of the goods or services are expected to be sourced from outside the Republic, and, if so, what portion and whether any portion of payment from the municipality or municipal entity is expected to be transferred out of the Republic.

These items must be included in the List of Tender Returnables.

9 Regulation 43 of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations prohibits the award of a contract above R15 000 to a person whose tax matters have not been declared by the South African Revenue Service to be in order and requires the accounting officer to check with SARS whether that person’s tax matters are in order prior to making an award. Sub-regulation 43(3) presumes that a person’s tax matters are in order should SARS not respond within 7 days.

It should be noted that the Compulsory Enterprise Questionnaire authorizes the Employer to obtain a tax clearance certificate from the South African Revenue Services.

10 Regulation 44 of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations prohibits the award of a contract to a natural person who is in the service of the state or to a juristic person with a director, manager, principal shareholder or stakeholder is a person who is in the employ of the state. Regulation 44 requires that the notes to the annual financial statements of a municipality or municipal entity must disclose any award of a contract of more than R2000 to a person who is a spouse, child or parent of a person in the service of the state in the previous 12 months.

It should be noted that the Compulsory Enterprise Questionnaire facilitates the capturing of the information required to implement Regulations 44 and 45.

Tender 19 T2.1Part T2: Returnable documents List of Returnable Documents

Page 30: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

T2.1 List of Returnable Documents

The tenderer must complete the following returnable documents:

1 Returnable Schedules required for tender evaluation purposes

2 Other documents required for tender evaluation purposes

3 Returnable Schedules that will be incorporated into the contract

4 Other documents that will be incorporated into the contract

5 C1.1 Offer and acceptance

6 C1.2 Contract Data (Part 2)

7 C2.2 Activity schedule

Guidance notes

List all schedules required for tender evaluation purposes eg.Certificate of Authority for Signatory, etcInclude Record of Addenda to Tender Documents; and Compulsory Enterprise Questionnaire.

List all certificates and other documents that are required eg. Tax clearance certificate or application for tax clearance certificate and documents included in 8th paragraph of commentary for T2.1 where contract value is expected to exceed R10 million and the employer is a municipality / municipal entity.

List all schedules that will be incorporated into the contract eg Preferencing schedules, Record of Addenda to tender documents.

List other documents, if any, that will form part of the contract.

List all documents that need to be completed by the tenderer.

Tender 20 T2.1Part T2: Returnable documents List of Returnable Documents

Page 31: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Document number T2.2

Title Returnable Schedules

Function and broad outline of contents

Contains documents that the tenderer is required to complete for the purpose of evaluating tenders and other schedules which upon acceptance become part of the subsequent contract upon acceptance.

Notes Returnable schedules comprise those schedules that are:

a) used for evaluation purposes only such as a certificate for signatories, a certificate of attendance at clarification meetings, experience of a tenderer, and proposed subcontractors;

b) included in the subsequent contract such as curricula vita of key personnel, quality plans, management plans and preferencing schedules; and

c) used as the basis for the development of the scope of work of a contract that is entered into.

Returnable schedules that are used for evaluation purposes only should not form part of the subsequent contract. Returnable schedules that form part of the subsequent contract should be attached to the Contract Data, Scope of Work or the Pricing Data, as relevant, when compiling the final contract. The contents of returnable schedules which modify the scope of work presented in the tender documents should be incorporated into the scope of work of the contract by reference in the schedule of deviations of the Form of Offer and Acceptance in single volume approach and by insertion into the text of the contract documents in the three volume approach.

The Standard for Uniformity in Construction Procurement has requirements for Returnable Schedules. These relate only to preferencing schedules. Sub-clause 4.4.2 of the Standard requires that preferencing schedules relating to the targeting of enterprises and labour not differ substantially from the samples provided in Annexes D and E of the Standard and that these returnable schedules, if applicable to the contract, be incorporated in the scope of work when the contract is compiled where a three volume approach in the solicitation of tender offers is adopted. The sample preferencing schedules provided in this document reflect the wording contained in the Standard.

The Standard does, however, require that the following schedules be included in all procurement documents:

Record of Addenda to Tender Documents (see Annex K); and Compulsory Enterprise Questionnaire (see Annex L)

The other returnable schedules provided in this document are samples only.

Tender 21 T2.1Part T2: Returnable documents Returnable Schedules

Page 32: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Tender 22 T2.1Part T2: Returnable documents Returnable Schedules

Page 33: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Certificate of Authority for Joint Ventures

This Returnable Schedule is to be completed by joint ventures.

We, the undersigned, are submitting this tender offer in Joint Venture and hereby authorise

Mr/Ms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . , authorised signatory of the company . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . , acting in the capacity of lead

partner, to sign all documents in connection with the tender offer and any contract resulting from it on our

behalf.

NAME OF FIRM ADDRESS DULY AUTHORISED SIGNATORY

Lead partner

Signature. . . . . . . . . . . . . Name ……..Designation

Signature. . . . . . . . . . . . . Name ……..Designation

Signature. . . . . . . . . . . . . Name ……..Designation

Signature. . . . . . . . . . . . . Name ……..Designation

Tender 23 T2.1Part T2: Returnable documents Returnable Schedules

Page 34: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Record of Addenda to tender documents

We confirm that the following communications received from the Employer before the submission of this tender offer, amending the tender documents, have been taken into account in this tender offer:

Date Title or Details

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

Attach additional pages if more space is required.

Signed Date

Name Position

Tenderer

Tender 24 T2.1Part T2: Returnable documents Returnable Schedules

Page 35: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Compulsory Enterprise Questionnaire

The following particulars must be furnished. In the case of a joint venture, separate enterprise questionnaires in respect of each partner must be completed and submitted.

Section 1: Name of enterprise: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Section 2: VAT registration number, if any: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Section 3: CIDB registration number, if any: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Section 4: Particulars of sole proprietors and partners in partnerships

Name* Identity number* Personal income tax number*

* Complete only if sole proprietor or partnership and attach separate page if more than 3 partners

Section 5: Particulars of companies and close corporations

Company registration number . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Close corporation number . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Tax reference number . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Section 6: Record in the service of the stateIndicate by marking the relevant boxes with a cross, if any sole proprietor, partner in a partnership or director, manager, principal shareholder or stakeholder in a company or close corporation is currently or has been within the last 12 months in the service of any of the following:

a member of any municipal council a member of any provincial legislature a member of the National Assembly or the

National Council of Province a member of the board of directors of any

municipal entity an official of any municipality or municipal entity

an employee of any provincial department, national or provincial public entity or constitutional institution within the meaning of the Public Finance Management Act, 1999 (Act 1 of 1999)

a member of an accounting authority of any national or provincial public entity

an employee of Parliament or a provincial legislature

If any of the above boxes are marked, disclose the following:

Name of sole proprietor, partner, director, manager, principal shareholder or stakeholder

Name of institution, public office, board or organ of state and position held

Status of service(tick appropriate column)Current Within last

12 months

*insert separate page if necessary

Tender 25 T2.1Part T2: Returnable documents Returnable Schedules

Page 36: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Section 7: Record of spouses, children and parents in the service of the stateIndicate by marking the relevant boxes with a cross, if any spouse, child or parent of a sole proprietor, partner in a partnership or director, manager, principal shareholder or stakeholder in a company or close corporation is currently or has been within the last 12 months been in the service of any of the following:

a member of any municipal council a member of any provincial legislature a member of the National Assembly or

the National Council of Province a member of the board of directors of

any municipal entity an official of any municipality or

municipal entity

Name of spouse, child or parent

*insert separate page if necessary

The undersigned, who warrants that he / she is duly authorised to do so on behalf of the enterprise: i) authorizes the Employer to obtain a tax clearance certificate from the South African Revenue Services that my /

our tax matters are in order; ii) confirms that the neither the name of the enterprise or the name of any partner, manager, director or other

person, who wholly or partly exercises, or may exercise, control over the enterprise appears on the Register of Tender Defaulters established in terms of the Prevention and Combating of Corrupt Activities Act of 2004;

iii) confirms that no partner, member, director or other person, who wholly or partly exercises, or may exercise, control over the enterprise appears, has within the last five years been convicted of fraud or corruption;

iv) confirms that I / we are not associated, linked or involved with any other tendering entities submitting tender offers and have no other relationship with any of the tenderers or those responsible for compiling the scope of work that could cause or be interpreted as a conflict of interest; and

iv) confirms that the contents of this questionnaire are within my personal knowledge and are to the best of my belief both true and correct.

Signed

Name

Enterprise name

Tender 26 T2.1Part T2: Returnable documents Returnable Schedules

Page 37: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Preferencing schedule where direct preferences are granted in respect of targeted enterprise status

1 Definitions

The following definitions shall apply to this schedule:………………………………

1 Conditions associated with the granting of preferences

The tenderer, who being a Targeted Enterprise undertakes to:1) not subcontract more than …% of the Net Amount of the Contract to non-Targeted

Enterprises;2) remain a Targeted Enterprise for the duration of the Contract;3) accept the sanctions set out in Section 3 below should conditions 1 or 2 be breached; 4) complete the Tender Preference Claim Form contained in Section 4 below; and 5) complete a Targeted Declaration Affidavit and submit this with the tender.

3 Sanctions relating to breaches of preferencing conditions

Termination of the Contract or a financial penalty payable to the Employer equal to …. times the number of tender evaluation points awarded in respect of the preference claimed.

4 Tender preference claim in respect of enterprise status or structure of the tendering entity

I/we apply on behalf of my/our firm for the following preference:

The undersigned, who warrants that he / she is duly authorised to do so on behalf of the firm or sole proprieter confirms that he / she understands the conditions under which such preferences are granted and confirms that the tenderer satisfies the conditions pertaining to the granting of tender preferences.

Signature : ...............................................................................................................................……….

Name : .......................................................................................................................................………

Duly authorised to sign on behalf of :

............................................................................................………

Telephone : ......................................................................

Fax : ................................................................................

Date : ...............................................................................

Guidance notes

Insert definitions for Targeted Enterprises

Insert percentage (typically between 20 and 25%)

Insert factor ≥1,0(typically 1,25 to 1,5

Insert category description and percentage of maximum tender evaluation points tender schedule in table.

Tender 27 T2.1Part T2: Returnable documents Returnable Schedules

Category of Targeted Enterprise

Percentage of maximum tender evaluation points provided for in the Preferential Procurement Policy Framework Act (Act 5 of 2000)

Preference claimed for Targeted Enterprise status(Y=yes)

Page 38: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Preferencing schedule where preferences are granted in respect of HDI equity

1 Definitions

The following definitions shall apply to this schedule:

Equity ownership: The percentage of an enterprise or business owned by individuals or, in respect of a company, the percentage of the company’s shares that are owned by individuals, who are actively involved in the management of an enterprise or business and exercise control over the enterprise, commensurate with their degree of ownership at the closing date of the tender.

Note: All claims for HDI equity ownership by an HDI will be considered according to the following criteria:- equity within private companies will be based on the percentage of equity ownership;- preference points will not be awarded to public companies and tertiary institutions;- equity claims for a trust will only be allowed in respect of those persons who are both trustees and beneficiaries

and who are actively involved in the management of the Trust; and.- a consortium or Joint Venture may, based on the percentage of the contract value managed or executed by their

HDI members, be entitled to equity ownership.

Historically disadvantaged individual (HDI): A natural person who, due to the apartheid policy that had been in place had no franchise in national elections prior to the introduction of the Constitution of the RSA, 1983 (Act 110 of 1983) or the Constitution of the RSA, 1993 (Act 200 of 1993) (the interim Constitution)

2 Conditions associated with the granting of preferences

The tenderer who claims a preference, undertakes to:

1) not subcontract more than 25% of the Net Amount of the Contract to a person who is not an HDI or does not qualify for such preference;

2) maintain a HDI equity ownership of not less than that upon which the preference is based upon for the duration of the Contract;

3) accept the sanctions set out in Section 3 below should conditions 1 or 2 be breached; 4) complete the Tender Preference Claim in respect of Enterprise Status or Structure in the Tendering Entity

contained in Section 4 below; and 5) complete the Declaration with regard to Equity Ownership contained in section 5 below.

3 Sanctions relating to breaches of preferencing conditions

Termination of the Contract or a financial penalty payable to the Employer equal to 1,25 times the number of tender evaluation points awarded in respect of the preference claimed multiplied by the contract price, including Value Added Tax, divided by 100.

4 Tender preference claim in respect of enterprise status or structure of the tendering entity

Number of preference points = NOP x EP / 100

NOP = maximum tender evaluation points provided for in the Preferential Procurement Policy Framework Act (Act 5 of 2000)

EP = the percentage of equity ownership by an HDI within the business enterprise

I/we apply on behalf of my/our firm for a preference based on an HDI equity ownership percentage of ………….%

5 Declaration with regard to equity ownership

5.1 How long has the Company been in existence ?. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5.2 Describe principal business activities:

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Tender 28 T2.1Part T2: Returnable documents Returnable Schedules

Page 39: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5.3 List all shareholders by name, identity number, citizenship, HDI status, ownership, as relevant

Name Position occupied in enterprise

ID number Date RSA or TBVC Citizenship obtained

Percentage owned by HDIs

5.4 How many permanent staff members does the tenderer employ? ……………………

The undersigned, who warrants that he / she is duly authorised to do so on behalf of the firm or sole proprieter confirms that he / she understands the conditions under which such preferences are granted and confirms that the tenderer satisfies the conditions pertaining to the granting of tender preferences.

Signature : ...............................................................................................................................……….

Name : .......................................................................................................................................………

Duly authorised to sign on behalf of : ............................................................................................………

Telephone : ......................................................................

Fax : ................................................................................

Date : ...............................................................................

Tender 29 T2.1Part T2: Returnable documents Returnable Schedules

Page 40: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Proposed amendments and qualifications

The Tenderer should record any deviations or qualifications he may wish to make to the tender documents in this Returnable Schedule. Alternatively, a tenderer may state such deviations and qualifications in a covering letter to his tender and reference such letter in this schedule.

The Tenderer’s attention is drawn to clause F.3.8 of the Standard Conditions of Tender referenced in the Tender Data regarding the employer’s handling of material deviations and qualifications.

Tenderers must not include deviations or qualifications relating to the scope of work in this schedule where they are required to submit an Approach Paper.

Page Clause or item Proposal

Signed Date

Name Position

Tenderer

Tender 30 T2.1Part T2: Returnable documents Returnable Schedules

Page 41: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Evaluation Schedule: Approach paper The approach paper must respond to the proposed scope of work/project design and outline the proposed approach / methodology and work plan complete with time frames, and where relevant and appropriate, propose the scope of work and / or modifications to the scope of work. The approach paper should articulate what the tenderer is offering to provide for the price tendered in the pricing data.

The tenderer must as such explain his / her understanding of the objectives of the assignment and the Employer’s stated and implied requirements, highlight the issues of importance, and explain the technical approach they would adopt to address them. The approach paper should explain the methodologies which is to be adopted, demonstrate the compatibility of those methodologies with the proposed approach (for instance, the methods of interpreting available data carrying out investigations, analyses, and studies; and comparing alternative solutions) and address any modifications to or fully develop the scope of work proposed by the Employer. The approach should also include a quality plan which outlines processes, procedures and associated resources, applied by whom and when, to meet the requirements.

The technical approach and methodology portion of the approach paper, read in conjunction with the work plan, should form the basis of the scope of work incorporated in the contract with the successful tenderer. Accordingly, this portion of the approach paper should clearly articulate the project deliverables.

The tenderer must attach his / her approach paper to this page.

The scoring of the approach paper will be as follows:

Technical approach and methodology Work planPoor(score 40)

The technical approach and / or methodology is poor / is unlikely to satisfy project objectives or requirements. The tenderer has misunderstood certain aspects of the scope of work and does not deal with the critical aspects of the project.

The activity schedule omits important tasks or the timing of the activities and correlation among them are inconsistent with the approach paper. There is lack of clarity and logic in the sequencing.

Satisfactory (score 70)

The approach is generic and not tailored to address the specific project objectives and requirements. The approach does not adequately deal with the critical characteristics of the project. The quality plan is too generic.

All key activities are included in the activity schedule, but are not detailed. There are minor inconsistencies between timing, project deliverables and the proposed approach.

Good(score 90)

The approach is specifically tailored to address the specific project objectives and requirements and is sufficiently flexible to accommodate changes that may occur during execution. The quality plan is specifically tailored to the critical characteristics of the project.

The work plan fits the approach paper well; all important activities are indicated in the activity schedule and their timing and sequencing is appropriate and consistent with project objectives and requirements. There is a fair degree of detail that facilitates understanding of the proposed work plan.

Very good(score 100)

Besides meeting the “good” rating, the important issues are approached in an innovative and efficient way, indicating that the tenderer has outstanding knowledge of state-of-the- art approaches.The approach paper details ways to improve the project outcomes and the quality of the outputs

Besides meeting the “good” rating, decision points and the sequencing and timing of activities are very well defined, indicating that the tenderer has optimized the use of resources. The work plan permits flexibility to accommodate contingencies.

The undersigned, who warrants that he / she is duly authorised to do so on behalf of the enterprise, confirms that the contents of this schedule are within my personal knowledge and are to the best of my belief both true and correct.

Signed Date

Name Position

Tenderer

Tender 31 T2.1Part T2: Returnable documents Returnable Schedules

Page 42: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Evaluation Schedule: Proposed Organisation and staffing

The tenderer should propose the structure and composition of their team i.e. the main disciplines involved, the key staff member / expert responsible for each discipline, and the proposed technical and support staff. The roles and responsibilities of each key staff member / expert should be set out as job descriptions. In the case of an association / joint venture / consortium, it should, indicate how the duties and responsibilities are to be shared.

The tenderer must attach his / her organization and staffing proposals to this page.

The scoring of the proposed organization and staffing will be as follows:

Poor(score 40)

The organization chart is sketchy, the staffing plan is weak in important areas, or the staffing schedule is inconsistent with the timing of the most important deliverables. There is no clarity in allocation of tasks and responsibilities.

Satisfactory (score 70)

The organizational chart is complete and detailed, the technical level and composition of the staffing arrangements are adequate and staffing is consistent with both timing and deliverables.

Good(score 90)

Besides meeting the “satisfactory” rating, staff are well balanced i.e. they show good co-ordination, complimentary skills, clear and defined duties and responsibilities, and limited number of short term experts. Some members of the project team have worked together before on limited occasions.

Very good(score 100)

Besides meeting the “good” rating, the proposed team is well integrated and several members have worked together extensively in the past.

The undersigned, who warrants that he / she is duly authorised to do so on behalf of the enterprise, confirms that the contents of this schedule are within my personal knowledge and are to the best of my belief both true and correct.

Signed Date

Name Position

Tenderer

Tender 32 T2.1Part T2: Returnable documents Returnable Schedules

Page 43: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Evaluation Schedule: Experience of Key Staff

Experience of the key staff (assigned personnel) in relation to the scope of work will be evaluated from three different points of view:

1) General experience (total duration of professional activity), level of education and training and positions held of each key staff member / expert member.

2) The education, training and experience of the key staff members / experts, in the specific sector, field, subject, etc which is directly linked to the scope of work.

3) The key staff members’ / experts’ knowledge of issues which the tenderer considers pertinent to the project e.g. local conditions, affected communities, legislation, techniques etc.

A CV of each key staff member of not more than 2 pages should be attached to this schedule. The CV should be structured under the following headings:

1 Personal particulars - name - date and place of birth - place (s) of tertiary education and dates associated therewith - professional awards

2 Qualifications (degrees, diplomas, grades of membership of professional societies and professional registrations)

3 Name of current employer and position in enterprise4 Overview of post graduate / diploma experience (year, organization and position)5 Outline of recent assignments / experience that has a bearing on the scope of work

The scoring of the experience of key staff will be as follows:

General qualifications(Greater weighting will be given to the team leader)

Adequacy for the assignment(Greater weighting will be given to the team leader)

Knowledge of issues pertinent to the project(Greater weighting will be given to the team leader)

Poor(score 40)

Key staff have limited levels of general experience

Key staff have limited levels of project specific education, training and experience

Key staff have limited experience of issues pertinent to the project

Satisfactory (score 70)

Key staff have reasonable levels of general experience

Key staff have reasonable levels of project specific education, training and experience

Key staff have reasonable experience of issues pertinent to the project

Good(score 90)

Key staff have extensive levels of general experience

Key staff have extensive levels of project specific education, training and experience

Key staff have extensive experience of issues pertinent to the project

Very good(score 100)

Key staff have outstanding levels of general experience

Key staff have outstanding levels of project specific education, training and experience

Key staff have outstanding experience of issues pertinent to the project

The undersigned, who warrants that he / she is duly authorised to do so on behalf of the enterprise, confirms that the contents of this schedule are within my personal knowledge and are to the best of my belief both true and correct.

Signed Date

Name Position

Tenderer

Tender 33 T2.1Part T2: Returnable documents Returnable Schedules

Page 44: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Evaluation Schedule: Tenderer’s Experience

The experience of the tenderer as apposed to the key staff members / experts in similar projects or similar areas and conditions in relation to the scope of work will be evaluated.

Tenderers should very briefly describe his or her experience in this regard and attach this to this schedule.

The description should be put in tabular form with the following headings:

Employer, contact person and telephone number, where available

Description of work (service) Value of work (i.e. the service provided) inclusive of VAT (Rand)

Date completed

The scoring of the tenderer’s experience will be as follows:

Poor(score 40)

Tenderer has limited experience

Satisfactory (score 70)

Tenderer has relevant experience but has not dealt with the critical issues specific to the assignment.

Good(score 90)

Tenderer has extensive experience in relation to the project and has worked previously under similar conditions and circumstances.

Very good(score 100)

Tenderer has outstanding experience in projects of a similar nature.

The undersigned, who warrants that he / she is duly authorised to do so on behalf of the enterprise, confirms that the contents of this schedule are within my personal knowledge and are to the best of my belief both true and correct.

Signed Date

Name Position

Tenderer

Tender 34 T2.1Part T2: Returnable documents Returnable Schedules

Page 45: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Record of Consultancy Services provided to Organs of State

Tenderers are required to complete this record in terms of the Supply Chain Management Regulations issued in terms of the Municipal Finance Management Act of 2003.

Include only those contracts where the tenderer identified in the signature block below was directly contracted by the Employer. Tenderers must not include consultancy services provided in terms of a subconsultancy agreement.

Where contracts were awarded in the name of a joint venture and the tenderer formed part of that joint venture, indicate in the column entitled “Title of the contract for the consultancy service” that it was in joint venture and provide the name of the joint venture that contracted with the employer. In the column for the value of the contract for the service, record the value of the portion of the contract performed (or to be performed) by the tender. Complete the record or attach the required information in the prescribed tabulation.

Part A: All consultancy services commenced or completed to an organ of state in the last five years

# Organ of state, i.e. national or provincial department, public entity, municipality or municipal entity.

Title of contract for the consultancy service Value of contract for service incl VAT (Rand)

Date completed(State current if not yet completed)

1.

2.

3.

Part B: Similar consultancy services provided to an organ of state

The following contracts recorded in Part A provided similar consultancy services to those required in terms of the scope of work to this tender:

# . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

The undersigned, who warrants that he / she is duly authorised to do so on behalf of the enterprise, confirms that the contents of this schedule are within my personal knowledge and are to the best of my belief both true and correct.

Signed Date

Name Position

Tenderer

Tender 35 T2.1Part T2: Returnable documents Returnable Schedules

Page 46: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Sample preferencing schedule where preferences are granted in respect of the direct participation of targeted enterprises and / or labour

1 Definitions

The following definitions shall apply to this schedule:………………………………….

2 Conditions associated with the granting of preferences

The Tenderer, undertakes to:1) engage one or more…….…..in accordance with the provisions of the SANS 1914-

……..as varied in Section 3 hereunder;2) deliver to the Employer, within 5 working days of being requested in writing to do so,

a completed Joint Venture Disclosure Form (Annex D of SANS 1914-1) and a Joint Venture Agreement, should a joint venture be proposed at prime contract level with Targeted Partners to satisfy Contract Participation Goal undertakings (deliver to the Employer, within 5 working days of being requested in writing to do so, a Targeted Enterprise Declaration Affidavit in respect of all Targeted Enterprises engaged at prime contract level to satisfy Contract Participation Goal undertakings

3) accept the sanctions set out in Section 4 below should such conditions be breached; 4) complete the Tender Preference Claim Form contained in Section 5 below; and5) complete the Supporting Contract Participation Goal Calculation contained in this

schedule.

3 Variations to the targeted construction procurement specification SANS 1914- …..

The variations to SANS 1914-……… are set out below. Should any requirements of the variations conflict with requirements of SANS 1914-, the requirements of the variations shall prevail.

…………………………..

4 Sanctions

In the event that the Tenderer fails to substantiate that any failure to achieve the Contract Participation Goal relating to the granting of a preference was due to quantitative under runs, the elimination of items, or any other reason beyond the Contractor’s control which may be acceptable to the Employer, it shall be liable to pay to the Employer a financial penalty calculated in the following manner:

P = 0,15 x (D – Do) x NA

(100)

where D = tendered Contract Participation Goal percentage.Do = the Contract Participation Goal which the Employer’s

representative based on the credits passed, certifies as being achieved upon completion of the Contract.

NA = Net AmountP = Rand value of penalty payable

5 Tender preference claim in respect of enterprise status or structure of the tendering entity

I / we hereby tender a Contract Participation Goal of ……….% in order to claim a preference.

Guidance notes

Insert definition for Targeted Enterprises and / or Targeted Labour.

Insert targeted enterprises / targeted labour (or both) and insert appropriate SANS part number in 1).Adjust wording to 2) to reflect documentation that is required or delete if not required..

Insert SANS part number. Insert SANS part number and title as relevant.

Insert variations if any. If none, insert “There are no variations”.

Tender 36 T2.1Part T2: Returnable documents Returnable Schedules

Page 47: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

The undersigned, who warrants that he / she is duly authorised to do so on behalf of the firm or sole proprietor confirms that he / she understands the conditions under which such preferences are granted and confirms that the tenderer satisfies the conditions pertaining to the granting of tender preferences.

Signature : ...............................................................................................................................……….

Name : .......................................................................................................................................………

Duly authorised to sign on behalf of : ............................................................................................………

Telephone : ......................................................................

Fax : ......................................................................... Date : .......................................................................

Supporting contract participation goal calculation

…………………………………………………………………………………………….

Insert Annex A: Tendered goal calculation from relevant part of SANS 1914

Tender 37 T2.1Part T2: Returnable documents Returnable Schedules

Page 48: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Part C1: Agreements and contract data

Contract 38Part C1: Agreements and contract data

Page 49: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Document number

C1.1

Title Form of Offer and Acceptance

Function and broad outline of contents

This document formalises the legal process of offer and acceptance. It contains:

a) the offer to provide the professional services for a price, or in accordance with the terms of the financial proposal made;

b) confirmation from the employer that he accepts the tender offer following his tender evaluation, and that a contract therefore exists; and

c) a schedule of deviations which records any agreed changes to the documentation that may occur during the process of offer and acceptance.

Notes This Form of Offer and Acceptance is based on the wording provided in Annex C of the Standard for Uniformity in Construction Procurement and Annex G of SANS 294. Sub-clause 4.4.1.3 of the Standard requires that this Form of Offer and Acceptance together with the schedule of deviations be used with minimal contract specific amendments to form the basis of an agreement arising from the solicitation of tender offers.

The schedule of deviations documents the agreed departures from the tender documents and serves as a record of the outcomes of any negotiations between offer and acceptance.

It should be noted that: a) The extent of deviations from the tender documents issued by the employer

prior to the tender closing date is limited to those permitted in terms of the conditions of tender.

b) A tenderer’s covering letter must not be included in the final contract document. Should any matter in such letter, which constitutes a deviation as aforesaid, be the subject of agreements reached during the process of offer and acceptance, the outcome of such agreement shall be recorded here.

c) Any other matter arising from the process of offer and acceptance either as a confirmation, clarification or change to the tender documents, and which it is agreed by the parties becomes an obligation of the contract, must also be recorded in the schedule.

The schedule of deviations should, in the single volume approach, contain the detail of every change made in terms of addenda issued prior to the close of tenders and all other changes to the wording of the contract arising from the process of offer and acceptance. In the three volume approach, a brief summary of the changes should be provided in sufficient detail so as to allow the reader to understand the nature and extent of the changes. It is not necessary to provide the detail of the changes as these will be incorporated in the final contract documents. In the event that extensive deviations are made, it is preferable to switch to the three volume approach and to incorporate the changes in the final contract documents.

Commentary

Contract 39 C1.1Part C1: Agreements and contract data Form of offer and acceptance

Page 50: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

1 There are two options provided for in the acceptance portion of the Form of Offer and Acceptance. The process of offer and acceptance is relatively straight forward. The tenderer makes an offer and the employer accepts that offer. The contract comes into effect once the tenderer (now service provider / consultant) receives one fully completed original copy of this document. The question that then arises is “how does one establish the start date for the contract?” It is relatively straight forward to establish the date if the contract is presented to the tenderer at the site hand over or when the service provider / consultant comes to the offices of the employer and is presented with a completed contract. Where there are large distances between the offices of the service provider / consultant and the employer, particularly in the case of low value contracts, or where the site is remote from the employer’s offices. As a result, an alternative option is provided whereby the employer can make use of a courier-to-counter delivery / counter-to-counter delivery / door-to-counter delivery /door-to-door delivery /courier service, provided that the employer notifies the tenderer of the tracking number within 24 hours of submitting the documents to such a service. This provides flexibility in the manner in which the process may be managed.

2 In terms of the Form of Offer and Acceptance, depending upon which option is used, the agreement comes into effect either on the date when the tenderer receives one fully completed original copy of this document, including the schedule of deviations (if any), or two working days after the submission by the employer of such documents to a courier-to-counter delivery / counter-to-counter delivery / door-to-counter delivery /door-to-door delivery /courier service. The tenderer (now service provider / consultant) has five working days from the date of such receipt, or within seven working days from the date of such submission to one of the aforementioned services, to notify the employer in writing of any reason why he cannot accept the contents of this agreement, failing which the agreement becomes a binding contract between the parties. The tenderer may only reject the contract on the basis that it does not reflect what was agreed to during the process of offer and acceptance e.g. the contract as issued differs from the draft contract, the schedule of deviations does not capture the addenda that were issued prior to the closing date for tender submissions, the scope of work does not reflect what was agreed to during the process of offer and acceptance etc.

3 The Form of Offer and Acceptance requires that the contract terms and conditions be finalized before the contract is entered into. This approach is in contrast to the linking of the formation of the contract to the notification of award. As such the acceptance does not contain wording such as “Until a formal contract is prepared and executed, this tender, together with written acceptance thereof and your notification of award, shall constitute a binding contract between us.”

4 The Form of Offer and Acceptance requires that the service provider / consultant make arrangements to deliver to the employer’s agent any bonds, guarantees, proof of insurance and any other documentation required in terms of the contract. Failure to provide these documents constitutes a repudiation of the contract.

Contract 40 C1.1Part C1: Agreements and contract data Form of offer and acceptance

Page 51: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

C1.1 Form of Offer and Acceptance (option 1)

Offer

The employer, identified in the acceptance signature block, has solicited offers to enter into a contract for the procurement of:……………………………………………….The tenderer, identified in the offer signature block, has examined the documents listed in the tender data and addenda thereto as listed in the returnable schedules, and by submitting this offer has accepted the conditions of tender.

By the representative of the tenderer, deemed to be duly authorized, signing this part of this form of offer and acceptance, the tenderer offers to perform all of the obligations and liabilities of the service provider / consultant under the contract including compliance with all its terms and conditions according to their true intent and meaning for an amount to be determined in accordance with the conditions of contract identified in the contract data.

THE OFFERED TOTAL OF THE PRICES INCLUSIVE OF VALUE ADDED TAX IS………………………………………..……………………..Rand (in words); R ……….(in figures)

THE OFFERED VARIATION TO THE GUIDELINE TARIFF OF FEES IS: Plus / minus (delete the inapplicable alternative) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . percent (in words)

. . . . . . . . % in figures

This offer may be accepted by the employer by signing the acceptance part of this form of offer and acceptance and returning one copy of this document to the tenderer before the end of the period of validity stated in the tender data, whereupon the tenderer becomes the party named as the provider / consultant in the conditions of contract identified in the contract data.

Signature ……………………………….…………………………………Name ………………………………………………………………...Capacity ………………………………………………………………...for thetenderer …………………………………………………………………….(Name and address of organization)Name and signature of witness ………………………………….. Date ……………………….CIDB registration number ………………………………

Acceptance

By signing this part of this form of offer and acceptance, the employer identified below accepts the tenderer’s offer. In consideration thereof, the employer shall pay the service provider / consultant the amount due in accordance with the conditions of contract identified in the contract data. Acceptance of the tenderer’s offer shall form an agreement between the employer and the tenderer upon the terms and conditions contained in this agreement and in the contract that is the subject of this agreement.

The terms of the contract, are contained in:

Part C1 Agreements and contract data, (which includes this agreement)Part C2 Pricing dataPart C3 Scope of work.

and drawings and documents or parts thereof, which may be incorporated by reference

Guidance notes

Insert broad description of the works.

Delete service provider in brackets if NEC Form of Contract is used and consultant if CIDB Form of Contract is used.Delete if not applicable

Insert where a variation in percentage (up or down) to a guideline tariff is tendered))

Contract 41 C1.1Part C1: Agreements and contract data Form of offer and acceptance

Page 52: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

into Parts C1 to C4 above. Deviations from and amendments to the documents listed in the tender data and any addenda thereto as listed in the tender schedules as well as any changes to the terms of the offer agreed by the tenderer and the employer during this process of offer and acceptance, are contained in the schedule of deviations attached to and forming part of this agreement. No amendments to or deviations from said documents are valid unless contained in this schedule.

The tenderer shall within two weeks after receiving a completed copy of this agreement, including the schedule of deviations (if any), contact the employer’s agent (whose details are given in the contract data) to arrange the delivery of any bonds, guarantees, proof of insurance and any other documentation to be provided in terms of the conditions of contract identified in the contract data. Failure to fulfill any of these obligations in accordance with those terms shall constitute a repudiation of this agreement.

Notwithstanding anything contained herein, this agreement comes into effect on the date when the tenderer receives one fully completed original copy of this document, including the schedule of deviations (if any). Unless the tenderer (now contractor) within five working days of the date of such receipt notifies the employer in writing of any reason why he cannot accept the contents of this agreement, this agreement shall constitute a binding contract between the parties.

Signature ……………………………………………………………………Name ……………………………………………………………………Capacity ……………………………………………………………………for theEmployer ………………………………………………………………………(Name and address of organization)Name and signatureof witness ………………………………………….. Date …………………..

Schedule of Deviations

1 Subject _______________________________________________________________Details _______________________________________________________________2 Subject _______________________________________________________________Details _______________________________________________________________3 Subject _______________________________________________________________Details_______________________________________________________________4 Subject _______________________________________________________________Details _______________________________________________________________

By the duly authorised representatives signing this agreement, the employer and the tenderer agree to and accept the foregoing schedule of deviations as the only deviations from and amendments to the documents listed in the tender data and addenda thereto as listed in the tender schedules, as well as any confirmation, clarification or changes to the terms of the offer agreed by the tenderer and the employer during this process of offer and acceptance.

It is expressly agreed that no other matter whether in writing, oral communication or implied during the period between the issue of the tender documents and the receipt by the tenderer of a completed signed copy of this Agreement shall have any meaning or effect in the contract between the parties arising from this agreement.

Insert the particulars of the employer and the person authorized by the employer to accept the offer.

Contract 42 C1.1Part C1: Agreements and contract data Form of offer and acceptance

Page 53: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Contract 43 C1.1Part C1: Agreements and contract data Form of offer and acceptance

Page 54: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

C1.1 Form of Offer and Acceptance (option 2)

Offer

The employer, identified in the acceptance signature block, has solicited offers to enter into a contract for the procurement of:……………………………………………….The tenderer, identified in the offer signature block, has examined the documents listed in the tender data and addenda thereto as listed in the returnable schedules, and by submitting this offer has accepted the conditions of tender.

By the representative of the tenderer, deemed to be duly authorized, signing this part of this form of offer and acceptance, the tenderer offers to perform all of the obligations and liabilities of the provider / consultant under the contract including compliance with all its terms and conditions according to their true intent and meaning for an amount to be determined in accordance with the conditions of contract identified in the contract data.

THE OFFERED TOTAL OF THE PRICES INCLUSIVE OF VALUE ADDED TAX IS………………………………………..……………………..Rand (in words); R ……….(in figures)

THE OFFERED VARIATION TO THE GUIDELINE TARIFF OF FEES IS: Plus / minus (delete the inapplicable alternative) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . percent (in words)

. . . . . . . . % in figures

This offer may be accepted by the employer by signing the acceptance part of this form of offer and acceptance and returning one copy of this document to the tenderer before the end of the period of validity stated in the tender data, whereupon the tenderer becomes the party named as the provider / consultant in the conditions of contract identified in the contract data.

Signature ……………………………….…………………………………Name ………………………………………………………………...Capacity ………………………………………………………………...for thetenderer …………………………………………………………………….(Name and address of organization)Name and signature of witness ………………………………….. Date ……………………….CIDB registration number ………………………………

Acceptance

By signing this part of this form of offer and acceptance, the employer identified below accepts the tenderer’s offer. In consideration thereof, the employer shall pay the provider / consultant the amount due in accordance with the conditions of contract identified in the contract data. Acceptance of the tenderer’s offer shall form an agreement between the employer and the tenderer upon the terms and conditions contained in this agreement and in the contract that is the subject of this agreement.

The terms of the contract, are contained in:

Part C1 Agreements and contract data, (which includes this agreement)Part C2 Pricing dataPart C3 Scope of work.

and drawings and documents or parts thereof, which may be incorporated by reference

Guidance notes

Insert broad description of the works.

Delete service provider in brackets if NEC Form of Contract is used and consultant if CIDB Form of Contract is used.

Delete if not applicable

Insert where a variation in percentage (up or down) to a guideline tariff is tendered))

Contract 44 C1.1Part C1: Agreements and contract data Form of offer and acceptance

Page 55: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

into Parts C1 to C4 above.

Deviations from and amendments to the documents listed in the tender data and any addenda thereto as listed in the tender schedules as well as any changes to the terms of the offer agreed by the tenderer and the employer during this process of offer and acceptance, are contained in the schedule of deviations attached to and forming part of this agreement. No amendments to or deviations from said documents are valid unless contained in this schedule.

The tenderer shall within two weeks after receiving a completed copy of this agreement, including the schedule of deviations (if any), contact the employer’s agent (whose details are given in the contract data) to arrange the delivery of any bonds, guarantees, proof of insurance and any other documentation to be provided in terms of the conditions of contract identified in the contract data. Failure to fulfill any of these obligations in accordance with those terms shall constitute a repudiation of this agreement.

Notwithstanding anything contained herein, this agreement comes into effect two working days after the submission by the employer of one fully completed original copy of this document including the schedule of deviations (if any), to a courier-to-counter delivery / counter-to-counter delivery / door-to-counter delivery /door-to-door delivery /courier service (delete that which is not applicable), provided that the employer notifies the tenderer of the tracking number within 24 hours of such submission. Unless the tenderer (now contractor) within seven working days of the date of such submission notifies the employer in writing of any reason why he cannot accept the contents of this agreement, this agreement shall constitute a binding contract between the parties.

Signature ……………………………………………………………………Name ……………………………………………………………………Capacity ……………………………………………………………………for theEmployer ………………………………………………………………………(Name and address of organization)Name and signatureof witness ………………………………………….. Date …………………..

Schedule of Deviations

1 Subject _______________________________________________________________Details _______________________________________________________________2 Subject _______________________________________________________________Details _______________________________________________________________3 Subject _______________________________________________________________Details _______________________________________________________________4 Subject _______________________________________________________________Details _______________________________________________________________

By the duly authorised representatives signing this agreement, the employer and the tenderer agree to and accept the foregoing schedule of deviations as the only deviations from and amendments to the documents listed in the tender data and addenda thereto as listed in the tender schedules, as well as any confirmation, clarification or changes to the terms of the offer agreed by the tenderer and the employer during this process of offer and acceptance.

Delete options that are not applicable.

Insert the particulars of the employer and the person authorized by the employer to accept the offer.

Contract 45 C1.1Part C1: Agreements and contract data Form of offer and acceptance

Page 56: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

It is expressly agreed that no other matter whether in writing, oral communication or implied during the period between the issue of the tender documents and the receipt by the tenderer of a completed signed copy of this Agreement shall have any meaning or effect in the contract between the parties arising from this agreement.

Contract 46 C1.1Part C1: Agreements and contract data Form of offer and acceptance

Page 57: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Document number C1.2

Title Contract Data

Function and broad outline of contents

This document identifies which standard conditions of contract are applicable, and together with contract specific data, establishes the risks, liabilities and obligations of the contracting parties and the procedures for the administration of the contract.

Notes Clause 4.4.4.1 of the Standard for Uniformity in Construction Procurement requires that the contract data in respect of prime or main contracts must reference one of the following standard industry forms of contract unless the publishers of such forms of contract indicate that such a form of contract is not suited for the intended application:

i) CIDB Standard Professional Services Contract; orii) NEC3 Professional Services Contract.

Clause 4.4.4.2 of the Standard requires that the aforementioned standard industry forms of contract be used with minimal project specific variations and additions which do not change their intended usage.

The abovementioned standard forms of contract need not be issued with a tender or included in the final contract document, but should be referred to as being part of the contract data.

Commentary:

1 The contract data should contain provisions for (see SANS 294, Construction Procurement Processes, Procedures and Methods):

a) price adjustments, should the contract period exceed one year, andb) interest, at the prime interest rate, on monies due to the service provider / consultant, which are not

paid within 30 days of being due, to deter late payment.

2 Contracts involving reimbursements on the basis of time and costs or on the basis of cost plus a fee for profit and overheads must be structured such that

a) expenditure can be readily audited,b) reimbursable costs are at market or competitively tendered prices,c) the end costs of the contract can be continuously tracked and reported on at regular intervals, andd) within a short time after the completion of the contract, the final contract amount is known and can be

settled.

3 Requirements for delivery periods that are incorporated into procurement documents shall be consistent with the organization’s reasonable needs and shall take into account factors such as the complexity of the intended procurement and realistic time frames for completing the work.

4 The Construction Procurement Best Practices published by the CIDB in government gazette no 24627 of 9 June 2004 states the following:

The procedure whereby disputes are settled by arbitration or court proceedings is both costly and time consuming. These procedures are not necessarily in the interests of the parties, or appropriate. The

Contract 47 C1.2Part C1: Agreement and Contract Data Contract Data

Page 58: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

delayed resolution of disputes impacts negatively on project outcomes for all participants. Most standard forms of contract make provision for the settlement of disputes by a number of means including expert determination, mediation, conciliation and adjudication. Each of these has its place in the course of dispute resolution.

Adjudication has become the preferred international procedure for dispute resolution. This rapid and relatively inexpensive procedure, which is conducted by a third party intermediary within the contract period, results in a decision that is binding on the parties in dispute. The decision is final, unless and until it is reviewed by either arbitration or court proceedings. The strength of adjudication lies in the contractual commitment by the parties to engage a specific, named (independent) person or persons who will become and remain acquainted with the project and are therefore enabled to make an expeditious finding. Furthermore, the terms and procedures for the process of adjudication are agreed and detailed in the contract itself. This results in an informed, transparent, relatively speedy decision.

CIDB Construction Procurement Best Practice Guideline C3, Adjudication, provides an overview of what adjudication is, presents the principles underpinning adjudication, reviews the provisions for adjudication in standard forms of contract (NEC, FIDIC and CIDB), outlines an approach for the selection and use of adjudicators, and provides sample clauses and proforma agreements to be included in procurement documents. The sample Contract Data incorporate the guidance provided in this practice guide.

A fair and equitable form of contract contains a dispute procedure to resolve disputes during the contract period. As a result, each contract must contain either a mediation or adjudication procedure to resolve disputes during the contract period and either a litigation or arbitration procedure to finally settle disputes, should it be necessary. Regulation 21(e) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations stipulate that disputes must be settled by means of mutual consultation, mediation (with or without legal representation), or, when unsuccessful, in a South African court of law. This regulation in effect requires that alternative means should be pursued before settling a dispute in court. It should be noted that arbitration is a means of settling a dispute other than through court and courts, in terms of the Arbitration Act of 1965 (Act 42 of 1965), may under certain circumstances, set aside an award of an arbitrator. Thus arbitration is still subject to the courts.

5 Regulation 13 of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of 30 May, 2005) requires that municipalities and municipal entities ensure that copyright in any document produced or the patent rights or ownership in any plant, machinery, thing, system or process designed or devised, by a consultant in the course of a consultancy service is vested in the municipality or entity.

Contract 48 C1.2Part C1: Agreement and Contract Data Contract Data

Page 59: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

C1.2 Contract Data for CIDB Standard Professional Services Contract

The Standard Professional Services Contract (second edition, September, 2005) published by the Construction Industry Development Board, are applicable to this contract.

Copies of these conditions of contract may be obtained from the Construction Industry Development Board’s website www.cidb.org.za

Part 1: Contract Data completed by the Employer………………..

Part 2: Contract Data provided by the Service Provider……………….The variations to the General Conditions of Contract are:…………………

The additional Conditions of Contract are:

1 The minimum amount of any payment certificate is not to be less than R…….

Guidance notes

Compile contract data using the guidance notes provided on pages 17 to 20 of the CIDB Standard Professional Services Contract.

Insert variations if absolutely necessary.

Insert additional conditions of contract or omit if absolutely necessary.

Commentary:

There are a number of ways in which an adjudicator may be appointed. Annexure 4 of the CIDB Construction Procurement Best Practice Guideline #C3 outlines a number of options. The CIDB Standard Professional Services Contract makes use of the CIDB Adjudication Procedure. This document contains a standard CIDB Adjudicator’s Agreement. This agreement should be included as document C1.3 if the adjudicator is named in the tender. This is necessary to ensure that the tenderer enters into the Agreement with the Adjudicator when the contract with the employer is entered into.

Contract 49 C1.2Part C1: Agreement and Contract Data Contract Data

Page 60: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

C1.2 Contract Data for NEC3 Professional Services Contract(PSC)

The conditions of contract are the NEC3 Professional Services Contract (June, 2005), copies of which may be obtained from the South African Institution of Civil Engineering (tel 011-805 5947) or Engineering Contract Strategies (tel 011 803-3008) and the following additional conditions:

Part one - Data provided by the Employer

1 General

…………………………………………..

The Scope is in the document named Scope of Works…………………………………………..

9 Disputes and termination

The tribunal is reference to South African Courts / arbitration.

If the tribunal is arbitration, the arbitration procedure is the Rules for the Conduct of Arbitrations issued by the Association of Arbitrators (Southern Africa) by an Arbitrator to be mutually agreed by the Parties, and failing agreement, to be appointed by the Association of Arbitrators

Part two - Data provided by the Consultant………………………………………………

Guidance notes

The Contract Data should be complied using the relevant pages of the NEC3 PSC and the Guidance notes and flow charts for the NEC3 PSC.

When terms in the Conditions of Contract are shown in italics it means the term is identified in this Contract Data. Hence the data will not mean anything unless read in conjunction with the Conditions of Contract.

Others should only be used with extreme caution and after close examination of the relationship with existing clauses.

Note: No mediation procedure has been suggested for use with the NEC as the culture and structure of the document is framed around the use of adjudication.

Contract 50 C1.2Part C1: Agreement and Contract Data Contract Data

Page 61: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Document number

C1.3

Title Adjudicator’s Agreement

Function and broad outline of contents

This document provides the basis by which the parties to contract may appoint an adjudicator.

Notes The requirements for the Adjudicator’s Agreement flow out of the specific form of contract that is adopted and the manner in which the adjudicator is appointed.

The Adjudicator’s Agreement is not required where mediation is selected as the means for resolving disputes.

Commentary:

1 Construction Procurement Practice Guide # C3: Adjudication provides an overview of what adjudication is, presents the principles underpinning adjudication, reviews the provisions for adjudication in standard forms of contract (NEC and CIDB), outlines an approach for the selection and use of adjudicators, and provides sample clauses and proforma agreements to be included in procurement documents. All documents labeled as being C1.4 are based on the profoma agreements contained in this guide.

2 Clause F.3.17 (Complete adjudicator's contract) contained in the Standard Conditions of Tender reads as follows:

Unless alternative arrangements have been agreed or otherwise provided for in the contract, arrange for both parties to complete formalities for appointing the selected adjudicator at the same time as the main contract is signed. Accordingly, this agreement is signed where the adjudicator is named in the contract. (See Annexure 4 of the Guide for the different ways in which an adjudicator is to be appointed.)

Contract 51 C1.3Part C1: Agreement and Contract Data Adjudicator’s appointment

Page 62: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

C1.3 CIDB ADJUDICATOR’S AGREEMENT

(for use with the CIDB Standard Professional Services Contract)

This agreement is made on the . . . . . . . . day of . . . . . . . . . . . . . . . between:. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (name of company / organisation) of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (address) and. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (name of company / organisation) of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (address)

(the Parties) and. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (name) of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (address)

(the Adjudicator).

Disputes or differences may arise/have arisen* between the Parties under a Contract dated . . . . . . . .

and known as. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

and these disputes or differences shall be/have been* referred to adjudication in accordance with the CIDB Adjudication Procedure, (hereinafter called "the Procedure") and the Adjudicator may be or has been requested to act. * Delete as necessary

IT IS NOW AGREED as follows:

1 The rights and obligations of the Adjudicator and the Parties shall be as set out in the Procedure.2 The Adjudicator hereby accepts the appointment and agrees to conduct the adjudication in

accordance with the Procedure.3 The Parties bind themselves jointly and severally to pay the Adjudicator's fees and expenses in

accordance with the Procedure as set out in the Contract Data.4 The Parties and the Adjudicator shall at all times maintain the confidentiality of the adjudication

and shall endeavour to ensure that anyone acting on their behalf or through them will do likewise, save with the consent of the other Parties which consent shall not be unreasonably refused.

5 The Adjudicator shall inform the Parties if he intends to destroy the documents which have been sent to him in relation to the adjudication and he shall retain documents for a further period at the request of either Party.

Contract 52 C1.3Part C1: Agreement and Contract Data Adjudicator’s appointment

Page 63: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

SIGNED by: SIGNED by: SIGNED by:

Name: Name: Name:

who warrants that he / she is

duly authorised to sign for and

on behalf of the first Party in

the presence of

who warrants that he / she is

duly authorised to sign for

and behalf of the second

Party in the presence of

the Adjudicator in the

presence of

Witness Witness: Witness:

Name: Name Name:

Address: Address: Address:

Date: Date: Date:

Contract Data

1 The Adjudicator shall be paid at the hourly rate of R. . . . . . . . . . . . in respect of all time spent upon, or in connection with, the adjudication including time spent travelling.

2 The Adjudicator shall be reimbursed in respect of all disbursements properly made including, but not restricted to:(a) Printing, reproduction and purchase of documents, drawings, maps, records and

photographs.(b) Telegrams, telex, faxes, and telephone calls.(c) Postage and similar delivery charges.(d) Travelling, hotel expenses and other similar disbursements. (e) Room charges.(f) Charges for legal or technical advice obtained in accordance with the Procedure.

3 The Adjudicator shall be paid an appointment fee of R . . . . . . . . . . . . . This fee shall become payable in equal amounts by each Party within 14 days of the appointment of the Adjudicator, subject to an Invoice being provided. This fee will be deducted from the final statement of any sums which shall become payable under item 1 and/or item 2 of the Contract Data. If the final statement is less than the appointment fee the balance shall be refunded to the Parties.

4 The Adjudicator is/is not* currently registered for VAT.5 Where the Adjudicator is registered for VAT it shall be charged additionally in accordance with

the rates current at the date of invoice.6 All payments, other than the appointment fee (item 3) shall become due 7 days after receipt of

invoice, thereafter interest shall be payable at 5% per annum above the Reserve Bank base rate for every day the amount remains outstanding.

* Delete as necessary

Contract 53 C1.3Part C1: Agreement and Contract Data Adjudicator’s appointment

Page 64: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

C1.3 Adjudicator’s appointment for use in NEC3 Professional Service Contract

This agreement is made on the . . . . . . . . day of . . . . . . . . . . . . . . . between:. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (name of company / organisation) of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (address) and. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (name of company / organisation) of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (address)

(the Parties) and. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (name) of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (address)

(the Adjudicator).

1 The Parties appoint the Adjudicator in accordance with the conditions of contract NEC3 Adjudicator’s Contract and the Contract Data attached to this agreement.

2 The Adjudicator accepts this appointment and undertakes to carry out the Adjudicator’s duties as described in the conditions of contract.

Signed jointly on behalf of the Parties by:

(Signature:)

Name

Position

who warrants that he/ she is duly authorized to sign on behalf of

and

(Signature:)

Name

Position

on behalf of

and signed by the Adjudicator

(Signature:)

Contract 54 C1.3Part C1: Agreement and Contract Data Adjudicator’s appointment

Page 65: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

NEC3 Adjudicator’s Contract

Contract DataGuidance notes

The contract between the Parties is . . . . . . . . . . . . . . . . Insert the title of the main contract/ contract for which the adjudicator is required

The period of retention is . . . . . . . . . . . weeks. Insert period.

The law of the contract is the law of South Africa Item completed.

The language of this contract is English Item completed.

He amount of advance payment is . . . . . . . . . . Insert amount

The Adjudicator’s fee is . . . . . per hour excluding value added tax. Insert fee. (Fee also applies to hours spent traveling etc See Clause 3.1)

The interest rate is . . . . . . .% per annum above the prime rate of . . . . . . . . .

Insert percentage and name of Bank.

The currency of this contract is the South African Rand. Item completed.

The Adjudicator’s appointment terminates on. . . . . . . . . . . . (date) Insert date. (Intended to be (say) a year after the end of the contract between the Parties.)

The period for payment of invoices, if it is not three weeks, is . . . . . . . . . . . . weeks

The default payment period is three weeks. If otherwise, state here.Delete row if not required.

The following additional conditions shall apply to this contract: Insert if required (optional)

1 The Adjudicator may ask for any additional information from the Parties to help him in carrying out his work. The Parties provide the additional information within two weeks of the Adjudicator’s request.

This additional condition has been found useful from experience.Delete row if not required.

2 Other additional conditions may need to be added, particularly if the

adjudicator requires payment at intervals during adjudications for which

extended time periods for submission and his decision have been agreed, or

if he requires payment before he provides his decision.

Delete row if not required.

Contract 55 C1.3Part C1: Agreement and Contract Data Adjudicator’s appointment

Page 66: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Part C2: Pricing data

Contract 56Part C2: Pricing Data

Page 67: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Document number

C2.1

Title Pricing Instructions

Function and broad outline of contents

Provides the criteria and assumptions which it will be assumed (in the contract) that the tenderer has taken into account when developing his prices, or target in the case of target and cost reimbursable contracts.

Notes The Standard for Uniformity in Construction Procurement does not have any requirements for Pricing Instructions.

Commentary:

1 The pricing data comprises the pricing instructions and the pricing schedules. The pricing instructions describe the criteria and assumptions which will be assumed in the contract that the tenderer has taken into account when developing his prices, or target in the case of cost reimbursable contracts. The pricing schedule records the service provider’s / consultant’s prices for providing the works in accordance with the requirements of the scope of work.

The tenderer’s obligations in pricing the tender offer and the employer’s undertakings in the checking and correction of arithmetical errors are dealt with in the Standard Conditions of Tender.

It should be noted that the Standard Conditions of Tender address issues such as the inclusion of taxes in the rates (F2.10.1), the indicating of VAT as a separate item (F.2.10.2), currency for the rates and prices (F2.10.4), completion of documents in black ink (F.2.13.2), and the correction of arithmetical errors (F.3.9).

2 The terms of payment and the provisions for price adjustment for inflation, if applicable, are established in the contract data. These items should not be described in the pricing data.

3 The pricing data must reflect the selected pricing strategies. Commonly encountered pricing strategies for professional services include:

Type of contract Recommended usage Advantages / disadvantagesLump sum (fixed price) contractPayment is linked to outputs (deliverables).

Use in assignments where the content and duration of the services and the required outputs are clearly defined.

Contracts are easy to administer as they are linked to deliverables.

Time-based contractPayment based on agreed hourly, weekly or monthly rates for staff named in the contract and on agreed rates and reimbursable items .Typically, a ceiling amount is provided.

When it is difficult to define the scope and length of services

Time-based payments need to be closely monitored and administered to ensure that the assignment is progressing satisfactorily and payments claimed are appropriate.

Percentage contractBased on the estimated or actual project construction cost or the cost of goods inspected or procured.

For architectural or engineering services relating to the built environment or to services relating to procurement and inspection agents

Implicitly lacks incentives for economic design in architectural and engineering services.

Indefinite Delivery Contract (Price agreement)Unit rates are agreed. Payment based on time actually used.

Where consultants are required on call in respect of specialized services, the extent and timing of which cannot be defined in advance, normally for a period of a year

Contract 57Part C2: Pricing Data

Page 68: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

4 The NEC3 Professional Services Contract provides for payment mechanisms for a number of risk allocation options, namely:

Option A: Priced contract with activity schedule Option C: Target contract Option E: Time based contract Option G: Term contract

Compilers are referred to the NEC3 Professional Services Contract (PSC) Guidance Notes and Flow Charts for full details of how the PSC works.

The provisions of the PSC3 require that the Consultant Provides the Services in accordance with the Scope (core clause 21.1). ‘Provide the Services’ is a defined term (core clause 11.2(9)) and embraces all things necessary and incidental to completing the services.

It should be noted that Clause 50.3 (Payment) states that:

The amount due is The Price for Services Provided to Date, The amount of expenses properly spent by the Consultant in Providing the Services and other amounts to be paid to the Consultant less amounts to be paid by or retained from the Consultant.

The contract data must make provision for either the Employer or the Consultant to state the expenses or indicate that such expenses are described in the Pricing Data.

The term “Time Charge” is defined as the sum of the products of each of the staff rates multiplied by the total staff time appropriate to that rate properly spent on the work in this contract. Payments due and adjustments to the Prices in respect of compensation events may be based on Time Charges. Accordingly, the contract data must allow the Employer or the Consultant to state the applicable staff rates or indicate that such expenses are described in the Pricing Data.

Generally it is the Consultant who prepares the Activity Schedule as part of his tender by breaking down the work described within the Scope of Work into suitable activities which can be well defined, priced as a lump sum and shown on the programme. The Employer, in the Pricing Instructions, may have listed some items that he requires the Consultant to include in his Activity Schedule and be priced accordingly. If the services are not well defined or typical based on other applications, then Option A should not be used. Instead option C (or E, which is a time-based contract), should be specified.

The Prices are defined in clause 11.2(12) of Option A as the lump sum prices for each activity on the Activity Schedule unless later changed in accordance with the contract and the Price for Services Provided to Date (PSPD) (the amount due to the consultant) is defined as the total of the Prices for the activities which have been completed. Hence activities in the Activity Schedule for an option A contract should be structured so as to provide an acceptable monthly cash flow as they are only assessed for payment on the assessment date if they have been completed.

The Price for Services Provided to Date in Option C (11.2(16)) is different as the consultant is paid on the basis of tendered staff rates multiplied by time applied for each staff member. At the end of the contract the total of the Prices in the tendered Activity Schedule is compared with the total amount paid, and the difference is shared in accordance with a formula stated in the Contract Data.

In the case of Option A, if the Consultant has decided not to identify a particular activity, the cost to the Consultant of doing the work must be included in, or spread across, the other Prices in order to fulfil the obligation to complete the services for the tendered total of the Prices. There is no adjustment to the lump sum Activity Schedule price if the amount, or quantity, of work within that activity later turns out to be different to that which the consultant estimated at time of tender. The only basis for a change to the Prices is as a result of a compensation event. See Clause 60.1. However, the Consultant does not have to allow in his Prices for matters that may arise as a result of a compensation event. Adjustment of the Prices for inflation would only apply if secondary option X1 is included in the contract.

In the payment clauses, the amount due to the Consultant is stated as the Price for Services Provided to Date plus payment for expenses in Providing the Services as stated in the Contract Data. Accordingly, unless the Employer states in Pricing Instructions that he requires expenses to be included within the Activity Schedule Prices (and has provided an additional condition of contract in Option Z to change the above wording), the

Contract 58Part C2: Pricing Data

Page 69: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

expenses listed and rate priced in the Contract Data are paid at the rates stated in the Data as and when incurred.

There is no provision in the PSC for the Consultant to be paid on the basis of a percentage of the cost to the Employer of the construction works carried out by others.

Options A and C require a priced Activity Schedule

Option G will be used when an Employer requires to have a contract with a Consultant for a specified term for work probably not yet specified, or specified but only needed on an intermittent basis, such as a geotechnical investigation service for various projects that may arise during the term of the contract, or advisory services of a specified nature on an ad hoc basis. The Task Schedule is accordingly a schedule of rates (a shopping list) of people and other resources likely to be used by the Consultant when work is carried out. Clearly such a schedule could include the use of special equipment (plotters, etc ) or subconsultants or subcontractors.

The Price for Services Provided to Date is, for each Task, the total of the Time Charge for work which has been completed on time based items on the Task Schedule and a proportion of the lump sum price for each item on the Task Schedule that is a proportion of the work completed on that item. Accordingly, the Consultant is paid on a cost reimbursable basis at the rates stated in the Task Schedule for the period (term) of the contract. Changes to the rates in the schedule can arise from compensation events, and adjustments for inflation would apply if secondary option X1 is included.

There is no provision in the NEC3 PSC for the Consultant to be paid on the basis of a percentage of the cost to the Employer of the construction works carried out by others. Additional conditions of contract in the form of a Z clause needs to be developed to provide for this option.

5 Pricing Data is defined in the CIDB Standard Professional Services Contract as data that establishes the criteria and assumptions that were taken into account when developing the Contract Price and the record of the components that make up of the Contract Price. Clause 14 states that the Employer shall remunerate and reimburse the Service Provider for the performance of the Services as set out in the Pricing Data.

Clause 14 also provides some default provisions.

This form of contract accordingly allows the employer to specify remuneration in the pricing data in a number of ways including:

Lump sum for each activity to be provided,

Contract 59Part C2: Pricing Data

Example of Z clause for Percentage fee contract

Option P: Percentage fee contract

Identified and defined terms11The Price for Services Provided to Date is the fee determined in accordance with the provisions of the Pricing Data for a stage that has been completed or in proportion to the work completed towards the completion of a stage.The Consultant’s obligations21The Consultant prepares forecasts of total expenses for the whole of the services and submits them to the Employer. Forecasts are prepared at the intervals stated in the Contract Data from the starting date until Completion of the whole of the services. An explanation of the changes made since the previous forecast is submitted with each forecast.Acceleration34When the Employer accepts a quotation for an acceleration, he changes the Prices, the Completion Date and the Key Date accordingly and accepts the revised programme.Accounts and records52The Consultant keeps accounts and records of his expenses and allows the Employer to inspect them at any time within working hours.Quotations for compensation events62The cost of preparing quotations for compensation events is not included in the assessment of compensation events.Implementing compensation events65The changes in the Prices, the Completion Date and the Key Dates are included in the notification implementing a compensation event. Note: Reference should be made in the contract data to the effect that the expenses and staff rates are as provided for in the Pricing Data.

Page 70: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Percentage fee based on the value of works to be constructed by others, Hourly rates, or Reference to published remuneration guidelines.

Note: Tenderers may be required to tender a percentage up or down of a guideline tariff of fees.

Example Pricing Instructions

1 The Consultant is to allocate an approximate budget to each activity in the activity schedule.

2 All activities must be invoiced on a monthly basis, based on the actual hours spent on the activity.

3 Payment will be based on the actual hours spent on such activities provided that reasonable progress towards the completion of the activity within the estimated budget is demonstrated.

4 The budget allocated to each activity and the total of prices for the activities shall not exceed 15% without the written agreement of the Employer.

6 The Councils for the various built environment professions are empowered through their respective pieces of legislation to publish in the Gazette on an annual basis, after consultation with the voluntary associations, representatives of service providers and clients in the public and private sector, guideline professional fees. The Engineering Council of South Africa, for example, publishes the following two documents in this regard:

Guideline Scope of Services and Tariff of Fees for Persons Registered in terms of the Engineering Profession Act, 2000; and

Indicative Time Based Fee Rates

These guideline fees may be used in a competitive selection process whereby consultants are required to tender for percentage up or down from the tariff and the amounts due, are based on the fee calculated in terms of these tariffs plus / minus the percentage tendered. The recommended wording which should be included in the Pricing Data, where this approach is to be followed is set out in as follows:

Service Pricing DataPricing Instructions Pricing Schedule

Architectural 1 The fee for services rendered in accordance with the Scope of Work shall be calculated in accordance with the RECOMMENDED TARIFF OF FEES IN RESPECT OF SERVICES RENDERED BY A PERSON REGISTERED IN TERMS OF SECTION 19(2) OF THE ACT IN PRIVATE CONSULTING PRACTICE, published in terms of Board Notice 161 of 2001, issued in terms of the Architectural Profession Act, 2000, (Tariff of Fees). No reduction in fee for the firm not being the principal agent shall apply. 2 The project cost based fee payable shall be calculated in accordance with the following formula:

Project cost based fee payable = ( 1 ± PFA) × FC where FC is the project cost based fee calculated in accordance with the Tariff of Fees and PFA is the Project Cost Based Fee Adjustment contained in the Pricing Schedule. 3 The project cost based fee payable in terms of 2 shall include all disbursements and travelling time referred to in the Tariff of Fees relating to work remunerated on such a basis, save those for the cost of printing drawings and documents. 4 Fees for supplementary and other services, which cannot be calculated as a project cost based fee in accordance with the Tariff of Fees, shall be either paid for on a lump sum basis if scheduled as such in the Pricing Schedule, or on a time and disbursement basis in accordance with the Tariff of Fees.5 The time based fee shall be calculated in accordance with the following formula:

Time based fee payable = ( 1 ±TFA) × h x Rwhere TFA is the Time Based Fee Adjustment provided for in the Pricing Schedule, h is the number of hours spent in providing the applicable time related service and R is the applicable time based fee in accordance with the

1 Project Cost Based Fee Adjustment (PFA)

Plus +………. % or minus -………..% (complete or delete that which is not applicable)

2 Lump sum fees for supplementary and other services

2.1 . . . . . . . . . . . . . . . : R . . . 2.2 . . . . . . . . . . . . . . . : R . . . 2.3 . . . . . . .Total R . . . . . . . . .

3 Time Based Fee Adjustment (TFA)

Plus +………. % or minus -………..% (complete or delete that which is not applicable)

Contract 60Part C2: Pricing Data

Page 71: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Service Pricing DataPricing Instructions Pricing Scheduleprovisions of the Tariff of Fees. 6 Work of a routine nature undertaken on a time basis shall be paid for under the categories provided for staff., irrespective of whether or not such work is undertaken by persons falling into the category for principals or associates and managers.7 Where an employee of the firm is seconded for extended inspection, the annual reimbursement shall be the total cost of employment plus percent.

Engineering 1 The fee for services rendered in accordance with the Scope of Work shall be calculated in accordance with the GUIDELINE SCOPE OF SERVICES AND TARIFF OF FEES FOR PERSONS REGISTERED IN TERMS OF THE ENGINEERING PROFESSION ACT, 2000, published in terms of Board Notice … of ….. (Tariff of Fees), based on ………………. (insert description of the works to enable the factor by which the basic fee is to be multiplied – see Board Notice). 2 The fee payable shall be calculated in accordance with the following formula:

Fee payable = ( 1 ± FA) × FC where FC is the fee calculated in accordance with the Tariff of Fees and FA is the Fee Adjustment contained in the Pricing Schedule. 3 The fee payable in terms of 2 shall include all expenses referred to in the Tariff of Fees relating to work remunerated on such a basis, save those for the cost of printing drawings and documents. 4 Fees for additional services, which cannot be calculated as a fee in accordance with the Tariff of Fees, shall be either paid for on a lump sum basis if scheduled as such in the Pricing Schedule, or on a time and expenses basis in accordance with the Tariff of Fees.5 The time based fee shall be calculated in accordance with the following formula:

Time based fee payable = ( 1 ±TFA) × h x Rwhere TFA is the Time Based Fee Adjustment provided for in the Pricing Schedule, h is the number of hours spent in providing the applicable time related service and R is the applicable time based fee in accordance with the provisions of the Tariff of Fees. 6 Work of a routine nature undertaken on a time basis shall be paid for under the category C, irrespective of whether or not such work is undertaken by persons falling into Category B.7 Costs that may be recovered in terms of the Tariff of Fees are:(List items eg traffic surveys, geotechnical investigations, laboratory testing, topographical and land surveys etc if not included in the lump sum fees for additional services)

1 Fee Adjustment (FA)

Plus +………. % or minus -………..% (complete or delete that which is not applicable)

2 Lump sum fees for additional services

. . . . . . . . . . . . . . . : R . . .

. . . . . . . . . . . . . . . : R . . . . . . . . . . . . . . . . . .: R. . . Total R . . . .

3 Time Based Fee Adjustment (TFA)

Plus +………. % or minus -………..% (complete or delete that which is not applicable)

Contract 61Part C2: Pricing Data

Page 72: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Service Pricing DataPricing Instructions Pricing Schedule

Quantity surveying

1The fee for services rendered in accordance with the Scope of Work shall be calculated in accordance with the TARIFF OF PROFESSIONAL FEES, effective 1 January 20..., issued in terms of the Quantity Surveying Profession Act, 2000 (Tariff of Fees). 2 The fee payable shall be calculated in accordance with the following

formula:Fee payable = ( 1 ± PFA) × FC

where FC is the fee calculated in accordance with the Tariff of Fees and FA is the Fee Adjustment contained in the Pricing Schedule. 3 The fee payable in terms of 2 shall include all disbursements and travelling expenses referred to in the Tariff of Fees relating to work remunerated on such a basis, save those for the cost of printing drawings and documents. 4 Fees for supplementary services, which cannot be calculated as a fee in accordance with the Tariff of Fees, shall be either paid for on a lump sum basis if scheduled as such in the Pricing Schedule, or as a time charge for national and provincial departments in accordance with the Tariff of Fees.5 The time charge shall be calculated in accordance with the following formula:

Time based fee payable = ( 1 ±TCA) × h x Rwhere TFA is the Time Charge Adjustment provided for in the Pricing Schedule, h is the number of hours spent in providing the applicable time related service and R is the applicable time charge for national and provincial departments in accordance with the provisions of the Tariff of Fees. 6 Remuneration for the time expended by principals where time charges apply shall be limited to 5 percent of the total time charges for the project.

1 Fee Adjustment (FA)

Plus +………. % or minus -………..% (complete or delete that which is not applicable)

2 Lump sum fees for supplementary services

2.1. . . . . . . . . . . . . . . : R . . . . 2.2. . . . . . . . . . . . . . . : R . . . . Total R . . . . . . . . .

3 Time Charge Adjustment (TCA)

Plus +………. % or minus -………..% (complete or delete that which is not applicable)

Contract 62Part C2: Pricing Data

Page 73: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

C2.1 Pricing Instructions

Guidance notes

Develop pricing instructions around the pricing strategy that is adopted and the method of measurement, if any that is adopted. (See examples)

Contract 63 C2.1Part C2: Pricing Data Pricing Instructions

Page 74: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Document number

C2.2

Title Activity Schedule / Pricing Schedules

Function and broad outline of contents

Records the contractor's prices for providing works which are described elsewhere in a specification within the Scope of Work section of the contract.

Notes The Standard for Uniformity in Construction Procurement does not have any requirements for Activity Schedules or Pricing Schedules.

Example : Activity Schedule

Contract 64 C2.2Part C2: Pricing Data Bills of Quantities / Activity Schedules

ItemNo.

Programme Reference

Activity description Price

Page 75: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

C2.2 Activity Schedules / Schedules of Prices

Guidance notes

Develop suitable schedules. (See examples)

Contract 65 C2.2Part C2: Pricing Data Bills of Quantities / Activity Schedules

Page 76: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Part C3: Scope of work

Contract 66Part C3: Scope of work

Page 77: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Document number

C3

Title Scope of work

Function and broad outline of contents

Specifies and describes the services which are to be provided and any other requirements and constraints relating to the manner in which the contract work is to be performed.

NotesThe Standard for Uniformity in Construction Procurement requires that where quality is addressed in the scope of work (see sub-clause 4.3), it may be done so by:

a) specifying the requirements fully and unambiguously; orb) requiring tenderers to submit plans for monitoring and applying quality

management principles in the performance of their contracts.

The Standard also requires in 4.4.7.1 that the scope of work shall, wherever possible be:

a) described in terms of performance rather than the design or descriptive characteristics, and

b) based on national or international standards, where such exist.

Commentary

1 Quality measures must not promote captive markets and should result in quality that is appropriate to comply with user requirements as opposed to the best quality available.

2 The requirements for the scope of work to be described in terms of performance rather than the design of descriptive characteristics and to be based on national or international standards, where such exist, is in accordance with international best practice and aligns with South Africa’s undertakings to the World Trade Organisation regarding technical barriers to trade. It should be noted that recently published Supply Chain Management Regulations issued in terms of the Municipal Finance Management Act, 2003, require that specifications:

(a) must be drafted in an unbiased manner to allow all potential suppliers to offer their goods and services; (b) must take account of any accepted standards such as those issued by Standards South Africa, the

International Standards Organisation, or an authority accredited or recognized by the South African, or an authority accredited or recognized by the South African National Accreditation System, with which the equipment or material or workmanship should comply;

(c) where possible, be described in terms of performance required rather than in terms of descriptive characteristics for design;

(d) may not create trade barriers in contract requirements in the forms of specifications, plans, drawings, designs, testing and test methods, packaging, marking or labeling or conformity certification;

(e) may not make reference to any particular trade mark, name, patent, design, type, specific origin or producer unless there is no other sufficiently precise or intelligible way of describing the characteristics of the work, in which case such reference must be accompanied by the words equivalent”.

Contract 67 C3Part C3: Scope of work Scope of work

Page 78: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

3 The scope of work must be commensurate with the available budget. It is no use developing a scope of work which cannot be satisfied within the available budget. At the same time, the scope of work needs to take into account the employer’s capability and capacity to manage the contract and its outcomes.

There are two basic approaches to the scope of work when soliciting tender offers for professional services. The employer can establish:

Type 1: a comprehensive or generic scope of work which a tenderer can price; or

Type 2: a scope of work, which establishes overarching employer objectives and provides further information as to what the professional service provider is expected to provide in relation to specific tasks or functions.

There is no need for the tenderer to submit an approach paper which responds to or proposes modifications to the scope of work where a type 1 scope of work is developed. An approach paper is essential where a type 2 scope of work is prepared as the scope of work that is incorporated in the contract with the successful tenderer will be based on the scope of work included in the documentation issued to tenderers and the modifications or amendments proposed in his approach paper.

Many professional bodies, employers and statutory bodies have prepared schedules of generic tasks linked to the activities associated with the delivery of projects using the design by employer contracting strategy to facilitate the establishment of requirements in the scope of work as indicated below:

Name of document Outline of standard stages and tasksGuideline Scope of Services and Tariff of Fees for Persons Registered in terms of the Engineering Profession Act, 2000, (Act No. 46 of 2000)

The Guideline Scope of Services makes provision for the following services:Normal services Report stage Preliminary design stage Design and tender stage Working drawings Construction stage Targeted procurement

Additional Services Additional services pertaining to all

stages of the project Construction monitoring Occupational Health and Safety Act Quality assurance system Lead consulting engineer Principal agent of the client Engineering management services Mediation, arbitration and litigation

proceedings and similar servicesRecommended Tariff of Fees in respect of Services rendered by a person Registered in terms of Section 19(2) of the Act in Private Consulting Practice, issued in terms of the Architectural Profession Act, 2000.

The appointment makes provision for the following services:Standard Services Stage 1: Appraisal and Definition of the

Project Stage 2: Design Concept Stage 3: Design Development Stage 4: Technical Documentation

Stage 5: Contract Administration and Inspection

Supplementary Services Special studies and designs Existing premises Special administrative services Supplementary or revised

documentation Other services

Tariff of Professional Fees, effective 1 January 2005, issued in terms of the Quantity Surveying Profession Act, 2000

The appointment makes provision for the following services relating to: Estimating and cost advice or equivalent stage Documentation and procurement or equivalent stage Contract administration or equivalent stage Final account or equivalent stage Affordable housing Material source handling and control Supplementary services

- cost norms- locational bills of quantities- targeted procurement

Financial viability studies Tenant requirements Value management Miscellaneous dispute related services

Contract 68 C3Part C3: Scope of work Scope of work

Page 79: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

4 The following topics should be considered in the development of a Scope of Work for professional services, based on the recommended topics contained in SANS 10403, Formatting and compilation of construction procurement documents.

Topic CommentaryClient’s / employer’s objectives

Describe the client’s / employer’s overarching objectives for the project, including if necessary, the time frames for completion and expected outcomes.

Background Describe the background to the project where the service provider is required to submit an approach paper. The background should contextualise the project and provide sufficient background information and available data for the service provider to respond to stated and perceived requirements.OrDescribe, where necessary or appropriate, the background to enable the service provider to have a better understanding of the client’s objectives.The background should include, as relevant and appropriate, the rationale of the project, the project history (what has been done so far and by whom), a list of relevant studies and basic data, the need for a consultancy and an outline of the issues which the consultancy should resolve.

Management / Oversight structures for the project

Describe any structures that have been put in place, if any, to exercise overall oversight and management of the project and indicate how the consultant is to interface / interact with such structures. Indicate if relevant, the role and responsibilities of everybody involved; and specify the type, timing, and relevance of everyone’s participation.Clarify institutional arrangements for the supervision of consulting work, if not adequately addressed in the contract data.

Description of the services

Provide a short description / outline of the extent of the services and outline what the consultant is to provide / key deliverables. The descriptions should indicate the nature and broad scope of the services to be performed.

Requirements The requirements should state that the service must satisfy the stated objectives of the employer in relation to the services identified in the description of services.Reference should thereafter be made to minimum requirements i.e. what the service provider is expected to provide in relation to specific tasks or functions in relation to the services that are to be provided to achieve the expected results. Reference can be made to generic scopes of work to establish minimum requirements. Alternatively, minimum requirements should be stated to ensure that the required outputs and deliverables are achieved. The requirements should generally not describe the approach or methodology by which the results are to be achieved, since these are the task of the consultancy. Where appropriate acceptance criteria should be stated; the desired level of detail; main issues to be addressed; alternatives to be considered; necessary surveys, special analyses, and models; special equipment requirements; institutional and legal framework of the project; language requirements; and quality management requirements (if needed). It may also be necessary to establish time frames for deliverables, and reporting requirements (format, frequency, and content of reports as well as the number of copies, the language, and the names of the prospective recipients of the reports).

Co-operation with other services providers

Identify other service providers on the project and establish how interactions are to take place.

Facilities and equipment to provided by the employer

Describe the facilities, office space, equipment, software, vehicles, telecommunication systems etc which the employer will provide.

Reference data State the reports, surveys, agreements, etc upon which the service provider is to base his service, if any. This information may include past studies, aerial photographs, maps, or records of surveys carried out in the assignment area.

Applicable national and international standards

List all applicable national, regional and international standards and all values pertaining to specific attributes relating thereto.

Particular/Generic specifications

Attach or make reference to particular (purpose written) or generic (standard inhouse) specifications (purpose written for the project or specifications) which are applicable to the services. Specifications should, wherever possible, be structured as follows:

Approvals Identify all those parties from whom the service provider has to obtain approvals and outline the procedures that are to be followed.

Procurement State requirements appropriate to the methodology and procedures that are to be followed. (See Annex A of SANS 10396) Make reference to Preference Schedules, if any.State the number, title and edition of SANS 1914 series of resource specifications applicable to the contract and all data and definitions required e.g. definitions of target groups, weighting factors, etc. (Refer to SANS 10396 for specific guidance)State the variations, if any, to the SANS 1914 resource specification.

Access to land / buildings / sites

Describe arrangements for access to land / buildings / sites and any restrictions relating thereto.

Contract 69 C3Part C3: Scope of work Scope of work

Page 80: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Topic CommentaryPlanning and programming

State requirements for format of programme, level of detail, critical path activities and their dependencies, frequency of updating, key dates, etc. Provide particulars of phased completion, programme constraints, milestone dates for completion etc., as necessary.List the activities to be carried out by the employer/client or by others which are to be included in the service provider’s programme.

Software application for programming

State any requirements.

Quality management Briefly describe- what quality management systems the consultant will be required to operate- the intention of the employer / client in terms of the monitoring of quality management, who will

carry out such monitoring (employer / client or agent) and if the monitoring forms part of a quality management system or will require only an occasional verification.

Format of communications

State formats of different types of communications and attach pro formas of such documents as an annexure to the Scope of Work. Also state requirements for the format of documents which are to be retained, e.g. microfilm, computer tapes / CDs or original form.

Key personnel State requirements for a schedule of key personnel / schedule of contact particulars of key personnel, if required, and state when the schedule is to be submitted. Attach pro formas of such documents to the end of the Scope of Work, if not provided for in the contract data.

Management meetings Provide particulars of times, days, location, attendance requirements, etc., as required, and state requirements for representatives having the necessary delegated authority.

Forms for contract administration

State requirements, if any, for use of standard forms for contract administration purposes and attach pro formas of such documents at the end of the Scope of Work. Also state if forms are available in electronic format.

Electronic payments State details required / procedures to obtain electronic payments, as relevant.Daily records State requirements for daily records of time spent, if not provided for in the contract data.Professional indemnity insurances

State number of copies and the place where policies are to be presented if not stated in the contract data.

Payment certificates State requirements for substantiation of claims in payment certificates to expedite verification and certification by employer’s / client’s representative, if not provided for in the contract data.

Use of documents by the employer

State the purpose for which the employer / client will be using any documents provided by the consultant e.g., construction, maintenance, extension, rebuilding, etc.

Property provided for the Consultant’s use

List all property to be provided by the employer / client and others for the consultants use.

Proof of compliance with the law

State specific documents / methods by which compliance with any legislation is to be verified, as necessary.

ANNEXESList by title Provide data sheets, completed returnable schedules, pro forma documents, particular specifications,

drawings, sketches etc. which are referred to in this document.

5 The following wording is suggested where reference to made to a generic scope of work published by a statutory body.

Service Scope of work

Architectural RequirementsArchitectural services shall satisfy the stated objectives of the Employer in relation to the construction works identified in the description of the services. The consultancy shall, as a minimum, in order to satisfy these objectives provide the standard services* set out in the RECOMMENDED TARIFF OF FEES IN RESPECT OF SERVICES RENDERED BY A PERSON REGISTERED IN TERMS OF SECTION 19(2) OF THE ACT IN PRIVATE CONSULTING PRACTICE, published in terms of Board Notice 161 of 2001, issued in terms of the Architectural Profession Act, 2000, and the following supplemental and other services:

1) ………..2) ……….. (compile as necessary from Board Notice)

The consultancy may not, without the prior written approval of the employer, proceed from one stage of the project to another.

Contract 70 C3Part C3: Scope of work Scope of work

Page 81: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Service Scope of work

Engineering RequirementsThe civil / mechanical / electrical engineering services shall satisfy the stated objectives of the Employer in relation to the construction works identified in the description of the services.

The consultancy shall, as a minimum, in order to satisfy these objectives provide the normal services set out in the GUIDELINE SCOPE OF SERVICES AND TARIFF OF FEES FOR PERSONS REGISTERED IN TERMS OF THE ENGINEERING PROFESSION ACT, 2000, published in terms of Board Notice … of ……, and the following additional services:

1) ………..2) ……….. (compile as necessary from Board Notice)

The consultancy may not, without the prior written approval of the employer, proceed from one stage of the project to another.

Quantity surveying

RequirementsQuantity surveying services shall satisfy the stated objectives of the Employer in relation to the construction works identified in the description of the services.

The consultancy shall, as a minimum, in order to satisfy these objectives provide the services set out in the TARIFF OF PROFESSIONAL FEES, effective 1 January 2005, issued in terms of the Quantity Surveying Profession Act, 2000 and the following supplementary services:1) …………2) …………(compile as necessary from Tariff of Professional Fees.)

The consultancy may not, without the prior written approval of the employer, proceed to the next stage of a project.

* Where partial services are required, replace “standard services” with partial services” and indicate the stages which are required in the description of the services

6 The following reports may be required where a type 2 approach is utilised.

Report Review CommentaryInception Report

This report should normally be submitted within six weeks after commencing the services. It should set out any major inconsistency in the Scope of Work, difficulties in executing the contract, the methodology that the consultancy is to apply in the execution of the contract, key assumptions in the development of the deliverables, etc.

This report permits the consultancy to outline the precise manner in which the project will be executed and to clarify issues identified in commencing the service that may impact on deliverables. The report also provides the employer with the confidence that the outputs of the consultancy will meet expectations and satisfy the employer’s objectives.It is an excellent tool for managing the risks of both the parties.

Progress Reports

These reports should keep the employer informed on progress. They may also provide warnings of anticipated problems and indicate changes in time frames.

These reports provide management information.

Interim Reports If the project is phased, interim reports are required to inform the employer of preliminary results, alternative solutions, and major decisions that need to be made.

The recommendations of an interim report may affect later phases of the project and even influence the results of the project.

Final Report The final report is due at the completion of the project.

It is advisable for the employer and the consultancy to discuss the report while it is still in draft form as changes may be necessary following such discussions.

7 The conditions of contract in the NEC3 Professional Services Contract refer to matters which must be covered in the Scope i.e. the document that contains the Scope of Work. The Scope of Work must accordingly, address the following matters in addition to describing what the Consultant is to provide.

Subclause Item Relevant portion of text of clause / subclause11.2(2) Identified and defined terms

Definition of completion. Subclause reads:Completion is when the Consultant has done all the work which the Scope states he is to do by the Completion Date

Contract 71 C3Part C3: Scope of work Scope of work

Page 82: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Subclause Item Relevant portion of text of clause / subclause11.2(5) Identified and defined terms

Definition of a defect Subclause reads:A Defect is a part of the services which is not in accordance with the Scope or applicable law.

11.2(11) Specifies and describes the services. States any constraints.

Subclause reads:The Scope is information which either: specifies and describes the services or states any constraints on how the Consultant provides the

Servicesand is either: in the documents which the Contract Data stats it is in or in an instruction given in accordance with the contract.

13.6 Communications Form of documents for retention.

Subclause reads:The Consultant retains copies of drawings, specifications, reports and other documents which records the services for the period of retention. The copies are retained in the form stated in the Scope.

21.1 The Consultant’s obligations

Provide the Service Subclause reads:The Consultant Provides the Service in accordance with the Scope

25.4 Other responsibilities Health and Safety Subclause reads:The Consultant Acts in accordance with the health and safety requirements stated in the Scope.

31.2 the programme Inclusions in the programme Relevant portions of the subclause reads:The Consultant shows on each programme which he submits for acceptance: the order and timing of the operations which the Consultant

plans to do in order to Provide the Services; the order and timing of the work of the Employer and Others as

last agreed with them by the Consultant or, if not agreed, as stated in the Scope.

other information which the Scope requires the Consultant to show on a programme submitted for acceptance.

40.1 Quality management system

System requirements Subclause reads:The Consultant operates a quality management system for Providing the Services as stated in the Scope. The quality management system complies with the requirements stated in the Scope.

40.2 Quality management system

Information in quality plans Subclause reads:The Consultant provides the Employer, within the period stated in the Contract Data, with a quality policy statement and a quality plan for acceptance. The quality policy statement and quality plan comply with the requirements stated in the Scope.

50.2 Assessing the amount due

Details to be provided with the Consultant’s invoices.

Subclause reads:Invoices submitted by the Consultant include the details stated in the Scope to show how the amount due has been assessed…..

60.1(1) and (5) Compensation events

Employer changes Scope.Employer or Others do not work as stated in the Scope.

Relevant portions of the subclause reads:The following are compensation events.(1) The Employer gives an instruction changing the Scope.(5) The Employer or Others do not work within the times shown on the Accepted Programme or within the conditions stated in the Scope.

70.1 The Parties’ use of material

Use of material by the Employer

Subclause reads:The Employer has the right to use material provided by the Consultant for the purpose stated in the Scope. ……….

70.4 The Parties’ use of material

Consultant’s use of material for other work

Subclause reads:The Consultant may use the material provided by him under this contract for other work unless stated in the Scope.

Option X14X14.1 Parent company guarantee

Form of guarantee Relevant portions of the subclause reads:If a parent owns the Consultant, the Consultant gives to the Employer a guarantee by the Consultant’s parent company of the Consultant’s performance in the form set out in the Scope.

Option X9X9.1 Transfer of rights

Rights over material Relevant portions of the subclause reads:The Employer owns the Consultant’s rights over material prepared for this contract by the Consultant except as stated otherwise in the Scope. The Consultant obtains other rights for the Employer as stated in the Scope and obtains from a Subconsultant equivalent rights for the Employer over the material prepared by the Subconsultant. The Consultant provides to the employer the document which transfers these rights to the Employer.

Contract 72 C3Part C3: Scope of work Scope of work

Page 83: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

Subclause Item Relevant portion of text of clause / subclauseOption X13X13.1 Performance bonds

Form of bond Relevant portions of the subclause reads:The Consultant gives the employer a performance bond, provided by a bank or insurer which the employer has accepted for the amount stated in the Contract Data and in the form set out in the Scope……………

8 The conditions of contract in the CIDB Standard Professional Services contract refer to matters which must be covered in the Scope of Work. These conditions define the Scope of Work as the document which defines the Employer’s objectives and requirements and specifies the Services which must, or may, be provided under the Contract and services as the work to be performed by the Service Provider pursuant to the Contract as described in the Scope of Work. The following matters should be addressed in the scope of work in addition to describing what the service provider is to provide.

Subclause Item Relevant portion of text of clause / subclause3.12 Equipment and materials

furnished by the EmployerSubclause reads as follows:

Equipment and materials made available to the Service Provider by the Employer, or purchased by the Service Provider with funds provided by the Employer for the performance of the Services shall be the property of the Employer and shall be marked accordingly. Upon termination or expiration of the Contract, the Service Provider shall make available to the Employer an inventory of such equipment and materials and shall dispose of them in accordance with the Employer’s instructions.

3.14.1(c) Programme Subclause reads as follows:

The Service Provider shall, within the time period set out in the Contract Data, submit to the Employer a programme for the performance of the Services which shall, inter alia, include:

a) the order and timing of operations by the Service Provider and any actions required of the Employer and Others;

b) the dates by which the Service Provider plans to complete work needed to allow the Employer and Others to undertake work required of them; and

c) other information as required in terms of the Scope of Work or Contract Data.4.1.1 Information Subclause reads as follows:

The Employer shall timeously provide to the Service Provider, free of cost, all available information and data in the Employer’s possession which may be required for the performance of the Services

4.3.1 Assistance Subclause reads as follows:The Employer shall co-operate with the Service Provider and shall not interfere with or

obstruct the proper performance of the Services. The Employer shall as soon as practicable:

a) authorise the Service Provider to act as his agent insofar as may be necessary for

the performance of the Services;

b) provide all relevant data, information, reports, correspondence and the like, which become available;

c) procure the Service Provider’s ready access to premises, or sites, necessary for

the performance of the Services;

d) assist in the obtaining of all approvals, licenses and permits from state, regional

and municipal authorities having jurisdiction over the Project, unless otherwise

stated in the Contract Data.

5.1.1 Service provider’s obligations

Subclause reads as follows:The Service Provider shall perform the Services in accordance with the Scope of Work with all reasonable care, diligence and skill in accordance with generally accepted professional techniques and standards.

8.2.1 Completion. Subclause reads as follows:Unless terminated in terms of the Contract, or otherwise specified in the Contract Data, the Contract shall be concluded when the Service Provider has completed all Deliverables in accordance with the Scope of Work.

Contract 73 C3Part C3: Scope of work Scope of work

Page 84: €¦  · Web view1 Regulation 22(1)(b) of the Local Government: Municipal Finance Management Act, 2003, Municipal Supply Chain Management Regulations (Government Gazette 27636 of

C3 Scope of Work

Guidance notes

Develop suitable content

Contract 74 C3Part C3: Scope of work Scope of work