Weatherford Drilling with Casing
Claas Wilken
DRILLING WITH CASING
© 2016 Weatherford. All rights reserved.
Weatherford DwC Technologies
Retrievable System (June 2016)Retrievable Bits and BHA’s
Non-retrievable SystemDrillable Casing Bit
DRILLING WITH CASING 1
© 2016 Weatherford. All rights reserved. 2
There are potential DwC opportunities when …
1. I am drilling short conductor/surface casing
2. I plan to batch-drill
3. The section will encounter loss circulation and need to save mud cost
4. I have trouble getting casing or liner to TD, reaming before running casing is standard practice
5. I am drilling through high pressure zone into low pressure reservoir or weak zone
6. When running in casing to seafloor I have trouble finding the predrilled hole
7. I can use non-retrievable DwC as the section doesn’t require logging or steering
2DRILLING WITH CASING
© 2016 Weatherford. All rights reserved.
Implemented in 35 countries servicing over 134 clientsFocus on non-retrievable system
Time savingProblem resolution
Manufactured and shipped over 1,800 tools to dateDrilled over 1500 wells , 594,000m in total section lengthCasing sizes from 4-1/2” to 24”
Weatherford DwC Foot Print
DRILLING WITH CASING 3
© 2016 Weatherford. All rights reserved.DRILLING WITH CASING
4
Total Job Count
1,539
Longest Section
3,660 m
Deepest Measured Depth
9,182 m
Highest Inclination
95°
Longest Distance Drilled
1,059m
Highest On-Bottom ROP
290 m/hr
Average On-Bottom ROP
46 m/hr
String Cemented
98.1%
String Reached TD
93.8%
Total Section Length
594,087m
© 2016 Weatherford. All rights reserved.
KPI’s
© 2016 Weatherford. All rights reserved.
Non-Retrievable DwCDefyer™ Series Drillable Casing Bit
6mm round TSP embedded into the aluminum bladeInterchangeable nozzles
Steel Outer Body
Tungsten Carbide Hardfacing on Aircraft grade Aluminum nose
(fully PDC drillable)
PDC Cutters
Excellent Reaming Tools
80% less steel to drill out
Steel blade strip
Aluminum blade support
Drill up to 20,000psi Unconfined Compressive Strength (UCS) formation
PDC gage cutters
Drill up to 7,000psi Unconfined Compressive Strength (UCS)
formation
DPA Series DT Series
Ceramic Nozzle
DRILLING WITH CASING 5
© 2016 Weatherford. All rights reserved.
Weatherford Defyer DPA -Field DrilloutResult 1
DRILLING WITH CASING 6
© 2016 Weatherford. All rights reserved.77DRILLING WITH CASING
© 2016 Weatherford. All rights reserved.
WFT DwC Jobs in SEE and Black Sea Countries
DRILLING WITH CASING 8
AustriaJob Count = 312009 - 2015
RomaniaJob Count = 242010 - 2016
UkraineJob Count = 12016
© 2016 Weatherford. All rights reserved.
WFT DwC Jobs in Romania - Equipment
DRILLING WITH CASING 9
• Bit - drillable casing bit Defyer DPA4416• Float collar – single poppet value Model 402NP• Centralizer - 2x SpiralGlider HD on the 1st joint, then 1 centralizer
every 3rd joint• Connection - Tenaris ER (13-3/8”) and Tenaris XP (9-5/8”)• Casing Drive - Volant CRTi3-7.0 used to make up and drill in the
casing
9-5/8” DPA4416X Float Collar 402NP
SpiraGliderHD
DPA4416X
Volant CRTi3-7.0
© 2016 Weatherford. All rights reserved.
WFT DwC Jobs in Romania
DRILLING WITH CASING 10
• DwC in 13-3/8” and 9-5/8” sections. Best performance record achieved when drilling to 355m TD in 10.6hrs• Average on-bottom ROP was 33 m/hr and median section drilling time is 14.9hrs. • Casing bit was drilled out with conventional PDC bit in 10-15mins. Total time drilling shoe track was 30-60mins• In the last 406m interval, operator managed to complete DwC in 14.75hrs, saving 47% drilling time compare to
conventional drilling
© 2016 Weatherford. All rights reserved.
N.P.T. Performance and N.C.R. Status
DRILLING WITH CASING 11
Non-Productive Time (NPT)
2015
Q1 Q2 Q3 Q4 TOTAL
Number of Jobs 1 5 6 5 17
Operational Hours 64 139.5 123 122 447.5
NPT Hours 0 0 0 0 0
NPT Rate (%) 0 0 0 0 0
Jobs Efficiency (%) 100 100 100 100 100
Non-Conformity Reports
2015
Q1 Q2 Q3 Q4 TOTAL
Number of Jobs 1 5 6 5 17
N.C.R. 0 0 0 0 0
© 2016 Weatherford. All rights reserved.1212DRILLING WITH CASING
Case Histories and Time Savings
© 2016 Weatherford. All rights reserved.
Case Histories 1:Operational TimeOMV DwC – Vienna Basin
© 2016 Weatherford. All rights reserved.
RwC System Salvaged Client’s Well Date: 13 March 2013
Client: Shell Ukraine
Location: Kharkiv Region
Formation : Claystone & Sandstone
Hole Size: 12-1/4”
Casing: 9 7/8”, 66.9#, Q125R, Vam Top
Reaming Interval: 1800m - 3274m
Flow Rate: 194 - 211 gpm
Torque: 12 - 20k ft-lbs. (21,000 connection limit)
Value to Client
RwC™ system enabled casing to be set at planned TD where conventional methods proved unsuccessful by various operators
The client value for this project was estimated to be in excess of $1.0M, for eliminating the cost of plugging and abandoning this well and eliminating 8 months’ time for contingency operations.
14
500Ton OverDrive™
System9-7/8”x 12”
Defyer™
CleanReam
Case History 5
Previously spent over 3 months trying
unsuccessfully to complete the section,
each time TD was reached the drill string could not
be freely pulled out of the hole, requiring several days and sometimes
weeks for back-reaming.
© 2016 Weatherford. All rights reserved.
Gazprom Russia DwC (12-3/4” x 15-1/2”) Utilizing Weatherford DPA drilling with casing bits to drill through permafrost
Completed a total of 22 jobs to date. ROP averaging 20m/hr.
Saved over 5M RUB using drilling with casing technology
Case History 3 15
© 2016 Weatherford. All rights reserved.
DwC Operation Time Breakdown DwC Rate of Penetration (ROP)
Saved 23.3 days (65%)
Case History 1
Apache China Batch DwC Performance
The 13-3/8” DwC operation was carried out without incident or accident
All 24 wells reached planned casing setting depths. Drilled a total of 6149m in 12.8 days.
Average DwC distance was 256m to 296m MD.
Drilled and cemented final 8 wells totaling 2017m in the last 2.7 days, ~ 3 wells per day.
The DwC operation saved 23.3 days rig time or 65% versus plan. $1.5 MM US saved.
Cemented through the DwC spear as planned.
16
© 2016 Weatherford. All rights reserved.
0
5
10
15
20
25
30
PL1
9-3-
C23
3 6 9 12 15 18 21 24 27 30 33 36 39 42 45
TIM
E, H
RS
Average drilling operation time (including cement) : 9.26hr
Conventional drilling operation time (including cement) : 28hr
Case Histories 1:Operational TimeConocoPhillips China Batch DwC