wbs & gantt chart project management (seminar). work breakdown structure similar to the assembly...

22
WBS & GANTT chart Project Management (seminar)

Upload: esther-ray

Post on 22-Dec-2015

218 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: WBS & GANTT chart Project Management (seminar). Work Breakdown Structure Similar to the assembly (Gozinto) charts. A tool used to define and group a project's

WBS & GANTT chart

Project Management

(seminar)

Page 2: WBS & GANTT chart Project Management (seminar). Work Breakdown Structure Similar to the assembly (Gozinto) charts. A tool used to define and group a project's

Work Breakdown Structure

• Similar to the assembly (Gozinto) charts.• A tool used to define and group a project's discrete work

elements (tasks) in a way that helps organize and define the total work scope of the project.

• The project is divided into hierarchical groups of tasks (work packages, and work units).

• Tasks, work packages and work units should be budgetable (money, labor hours, and other resources).

• The technique of creating a WBS is non-uniform.

Page 3: WBS & GANTT chart Project Management (seminar). Work Breakdown Structure Similar to the assembly (Gozinto) charts. A tool used to define and group a project's

Example of a WBS

Page 4: WBS & GANTT chart Project Management (seminar). Work Breakdown Structure Similar to the assembly (Gozinto) charts. A tool used to define and group a project's

Possible levels in a WBS

• Project (or sub-project)

• Deliverables

• Sub-deliverables

• Work packages

• Work units

Page 5: WBS & GANTT chart Project Management (seminar). Work Breakdown Structure Similar to the assembly (Gozinto) charts. A tool used to define and group a project's

Assembly chart (Gozinto chart) example

Page 6: WBS & GANTT chart Project Management (seminar). Work Breakdown Structure Similar to the assembly (Gozinto) charts. A tool used to define and group a project's

WBS example

Page 7: WBS & GANTT chart Project Management (seminar). Work Breakdown Structure Similar to the assembly (Gozinto) charts. A tool used to define and group a project's

Original slide is from the internet

Example of WBS: “Holiday”

holiday

travel documents

passport tickets

insurance

booking

choose resort

confirm

brochures

household

cat!

Page 8: WBS & GANTT chart Project Management (seminar). Work Breakdown Structure Similar to the assembly (Gozinto) charts. A tool used to define and group a project's

What is the greatest difference between a Gozinto and a WBS

chart?

Page 9: WBS & GANTT chart Project Management (seminar). Work Breakdown Structure Similar to the assembly (Gozinto) charts. A tool used to define and group a project's

WBS exercisePlot a Gozinto and a WBS chart for the next project:• Main task: prepare lunch with 2 dishes.• The 1st course requires 2 main groups of ingredients

(A & B) that should be bought separately (time to buy is 30 mins per ingredient-group). Cooking is 1 hr.

• The 2nd dish requires 3 group of ingredient (A, C & D), procurement time is the same). Cooking needs 1.5 hrs.

• Cleaning after cooking needs 20 mins for 1 person, 10 mins for 2 people.

Page 10: WBS & GANTT chart Project Management (seminar). Work Breakdown Structure Similar to the assembly (Gozinto) charts. A tool used to define and group a project's

GANTT charts• Named after Henry Gantt (1861 - 1919) an American

mathematical engineer.• A Gantt chart is a type of bar chart that illustrates a

project schedule. • Gantt charts illustrate the start and finish dates of

the work elements (tasks) of a project.• Elements of a GANTT chart:

– Task names– Start and finish dates of each tasks (graphically)– Dependency relationships– Task duration– Lag relationships (start-to-start, finish-to-start etc.)– Name of the project worker responsible for the task or– other resource specifications

Page 11: WBS & GANTT chart Project Management (seminar). Work Breakdown Structure Similar to the assembly (Gozinto) charts. A tool used to define and group a project's

Benefits of the GANTT chart

• Easy to read and comprehend

• Easy to create

• Identify the project network coupled with its schedule baseline

• Allow for updating and project control

• Useful for resource planning

Page 12: WBS & GANTT chart Project Management (seminar). Work Breakdown Structure Similar to the assembly (Gozinto) charts. A tool used to define and group a project's

Limitations

• can become quite unwieldy for projects with too many activities

• projects are often too complex for a Gantt chart

• Gantt charts represent only a part of the project constraints

• The technique of creating a GANTT depends on the features of the project.

Page 13: WBS & GANTT chart Project Management (seminar). Work Breakdown Structure Similar to the assembly (Gozinto) charts. A tool used to define and group a project's

GANTT chart example

ID Activities Who is responsible?

Time intervals

1. 2. 3. 4. 5. 6. 7. 8.

1.

2.

3.

4.

5.

6.

7.

8

9

10.

11.

Page 14: WBS & GANTT chart Project Management (seminar). Work Breakdown Structure Similar to the assembly (Gozinto) charts. A tool used to define and group a project's

GANTT chart example

6.

5.

4.

3.

2.

1.

timeactivities

Some Gantt charts also show the dependency relationships between activities.

Page 15: WBS & GANTT chart Project Management (seminar). Work Breakdown Structure Similar to the assembly (Gozinto) charts. A tool used to define and group a project's

GANTT chart example

Page 16: WBS & GANTT chart Project Management (seminar). Work Breakdown Structure Similar to the assembly (Gozinto) charts. A tool used to define and group a project's

GANTT chart example

6.

5.

4.

3.

2.

1.

timeActivities

today

Gantt charts can be used to show current schedule status using percent-complete shadings, or colour lines and a vertical "TODAY" line.

Page 17: WBS & GANTT chart Project Management (seminar). Work Breakdown Structure Similar to the assembly (Gozinto) charts. A tool used to define and group a project's

GANTT exercise• Given the WBS from the previous exercise

and the additional information that there are two identical project workers (X and Z) who can work simultaneously, plot a simple GANTT chart with the following content:– Task names– Time schedule

(time units are 10 minutes long)– Task durations– Denominate the person in charge for every task

• Simultaneous work is possible.

Page 18: WBS & GANTT chart Project Management (seminar). Work Breakdown Structure Similar to the assembly (Gozinto) charts. A tool used to define and group a project's

GANTT exercise 2

• How long is the full project?

• Denote the precedence relationships in the chart!

Page 19: WBS & GANTT chart Project Management (seminar). Work Breakdown Structure Similar to the assembly (Gozinto) charts. A tool used to define and group a project's

GANTT exercise 3

• Show the schedule status on the GANTT chart for the same project after 80 minutes if:

• All the A, B and C ingredients are bought, but the purchase of ingredient D is only 67% complete.

• The 1st course is already half-cooked, but the „operations” on the 2nd dish could not started yet.

Page 20: WBS & GANTT chart Project Management (seminar). Work Breakdown Structure Similar to the assembly (Gozinto) charts. A tool used to define and group a project's

GANTT exercise 4

• Plot a new chart with the same data but with real times within a day. The following information are added:

• The market, where the ingredients should be bought is open only from 8 a.m. to 10 a.m. and the earliest is the better.

• The lunch preparations (including the cleaning) should be ready exactly at noun (12 a.m.).

• Do not plot the schedule status.

Page 21: WBS & GANTT chart Project Management (seminar). Work Breakdown Structure Similar to the assembly (Gozinto) charts. A tool used to define and group a project's

Readings

• Lockyer – Gordon (2005) Chapter 4

Page 22: WBS & GANTT chart Project Management (seminar). Work Breakdown Structure Similar to the assembly (Gozinto) charts. A tool used to define and group a project's

Thanks for the attention!