WBS Structure
C%
Bulks (C.1.1%)
A% B% D%
E.2%
Finance & Accounts
Legal & Admin
D.2%
E.3%
Planning/Scheduling (A.2.4%)
B.2%
Construction Support (B.2.1%)
As Built Engg/Suppo rt (B.2.2%) Priority 2 (D.2.2%)
Priority 3 (D.2.3%)
Priority 4 (D.2.4%)
Priority 1 (D.2.1%)
A.2%
A.3%
B.1%
Cost Control (A.2.1%)
Business Services (A.2.2%)
Document Control (A.2.3%)
A.1%
Date
MC (E.3.1%)
Area 2 (E.3.2%)
Rev Prep. By App. ByXYZ Project
F.1%
System 7 (F.1.7%)
System 2 (F.1.2%)
System 3 (F.1.3%)
C.2%
Engineering (A.1.1%)
HSE (A.1.2%)
Const. Coord. (A.1.3%)
Area 1 (E.1.1%)
Area 2 (E.1.2%)PAU 2 (D.1.2%)
PAU 3 (D.1.3%) Area 3 (E.1.3%)
Equip. (Ex.PAU Scope) (C.1.2%)
Speciality Item (C.1.3%)
System 1 (F.1.1%)
System 8 (F.1.8%)
Flare Package (B.1.7%)
Incineration (B.1.3%)
Flue Gas Treatment (B.1.4%)
Utility Systems (B.1.5%)
Seawater Pipelines (B.1.6%)
PAU 4 (D.1.4%)
PAU 5 (D.1.5%)
System 6 (F.1.6%)
E.1%
C.1%
D.1%
PAU 6 (D.1.6%)
TEG Dehydration (B.1.2%)
Acid Gas Removal (B.1.1%) PAU 1 (D.1.1%)
F%E%
Work breakdown Structure
Area 6 (E.1.6%)
System 4 (F.1.4%)
System 5 (F.1.5%)
Area 4 (E.1.4%)
Area 5 (E.1.5%)
Constr. Contracts (C.2.3%)
PAU 7 (D.1.7%)
PAU Fabrication (C.2.1%)
PAU Installation (C.2.2%)
EPCStage
XYZ Project
XYZProject
EngineeringOffsite Fabrication &
Transport
Installation /
Construction
Commissioning/ Start
up
Engineering
Packages
Pre-Assembled Units
(PAU's) Fab
SVT Area /
Sub PackageSystem / Area /
Package
Engineering Office
Support
Level 1
(Phase)
Level 0
(Project)
Level 2
(Discipline)
Level 3
(Packages/PAU /Area/System)
Procurement
Subcontract Award
Procure/
Subcontract AwardProject Management
Project Engineering
Project Services
Others
Inter-connects/
Interface
Mechanical
Completion
Level 4 (Not included in this chart) :
Deliverables by Disci pline/PAU/
Area/System
Transport/
Delivery