  • WaveRollerPresent And Future Developments

    Jussi Åkerberg / CTO AW-Energy Oy

  • WaveRoller

    Panel

    PTO

    Foundation

  • https://youtu.be/-Z94liCl9pI

  • AW-Energy, Finland, Since 2003

  • Coherent Development & Significant milestones

    Grid connected sea

    trials

    Performance verified by

    DNV GL

    Full scalePTO test facility

    Technology qualified

    Company ISO 9001

    EiB financing through InnovFin

    programme

    Lloyd’s Register certified

    design and manufacture

    WaveRoller assembled and

    deployed

    Bankable insurance

    criteria met

    2014 2015 2016 2016 2018 20192019

    WaveRoller awarded Solar Impulse Label

    = both ecological &

    profitable

  • Sea Trials, Demonstration Unit 2012-14In Peniche, Portugal

  • WaveRoller Test Facility for PTO

  • WaveRoller First-Of-A-Kind Manufacturing

  • Foundation Manufacturing in Portugal

  • Panel and PTO transportation to Portugal

  • STRICTLY CONFIDENTIAL

    11

    Panel and PTO Unloading in Peniche

  • Final Assembly in Peniche

  • Final Assembly in Peniche

  • Shore Substation in Peniche

  • Subsea Cable Assembly

  • Installation in Peniche

  • Installation in Peniche

  • Working Together, Time for a Toast

  • Grid Connected, CommissioningOptimise settings & power performance

  • Artificial Reef Created by the Foundation

  • Low Visual Impact

  • 2/2014

    Validation of power

    performance

    9/2015

    Endorsement of TQ plan

    2/2015

    Statement of Feasibility

    11/2014

    Inspection after operation ISO 9001

    9/20166/2016

    Technology Qualification

    certificate

    8/2017

    Design appraisal certificate

    2/2019

    Manufacturing certificate

    Third Party Validation

    Third Party Certification

    Efficient Insurance Efficient FinanceMet criteria for Business Interruption Insurance

    5/2019

  • 58/21

    79

  • MegaRoller -Project▪ EU funded Horizon 2020 –project

    ▪ Designing, building and testing the Power-Take-Off of the first megawatt-level Oscillating Wave Surge Converter

    24

    Research institute SME Large enterpriseUniversity

    In-Kind contributions

    This project has received funding from the European Union's Horizon 2020 research and innovation programme under grant agreement No 763959

  • Process Innovation

    This project has received funding from the European Union's Horizon 2020 research and innovation programme under grant agreement No 763959

  • YES WE CAN!

    26This project has received funding from the European Union's Horizon 2020 research and innovation programme under grant agreement No 763959

  • Total theoretical wave

    energy potential:

    32 000 TWh / year

    Wave energy potential at US coast

    is 64% of 2018 electricity generation

    Several sites under development ~65MW

    Customer financed studies & development

    Many other projects in discussion globally

    This