waterfront presentation - dover, new hampshire...chamber of commerce waterfront presentation...
TRANSCRIPT
![Page 1: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/1.jpg)
Greater Dover Chamber of Commerce
Greater Dover Chamber of Commerce
Waterfront Presentation
September 18, 2002
![Page 2: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/2.jpg)
Greater Dover Chamber of Commerce
Introduction
“Along the entire seaboard, communities have capitalized on a potent combination of water, boats, retailing, residential units, and office space…Dover has a strong opportunity to attract an appealing mix of shops, offices and residential units along its downtown Cochecho waterfront.”
- 1988 City of Dover Master Plan
![Page 3: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/3.jpg)
Greater Dover Chamber of Commerce
Waterfront Location
![Page 4: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/4.jpg)
Greater Dover Chamber of Commerce
Chamber Goals For Waterfront Development
• Place waterfront property back on the tax rolls with mixed use development
• Provide opportunity for greater public activity and waterfront access
![Page 5: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/5.jpg)
Greater Dover Chamber of Commerce
1984 Pacific Mills Master Plan
• Promote private development of and public access to the Cochecho riverfront, including new waterfront park and marina with public boat access.
• Market the city-owned land for residential and mixed-use development.
• Relocate sewage treatment plant and department of public works facilities.
• Construct new Washington Street bridge over the river.
![Page 6: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/6.jpg)
Greater Dover Chamber of Commerce
1988 City of Dover Master Plan
• Restore Cochecho waterfront to optimize open space, recreation, and water access with private development.
• Relocate sewage treatment plant and department of public works facilities.
• Establish task force to develop strategy for land development.
![Page 7: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/7.jpg)
Greater Dover Chamber of Commerce
1991 Cochecho Waterfront Master
Plan
• Relocate public works facility
• Provide boat access and marina facilities
• Create new access to the parcel
• Feature mixed-use development
![Page 8: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/8.jpg)
Greater Dover Chamber of Commerce
1994 RiverwalkIn 1994 a Chamber/city partnership was created to construct a riverfront walk along the downtown portions of the Cochecho River
• Phase I (1994): Included clean-up of the grounds in Henry Law Park and new landscaping, new fencing along the river's bend, picnic canopies, tables and grills, park lighting, benches and the cantilevered outlook along the paved Riverwalk
• Phase II (1998): Involved the brick paving and curbing for the Riverwalk plaza, plaza lighting and fencing, plaza benches and landscaping
• Phase III (future): Extend Riverwalk
![Page 9: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/9.jpg)
Greater Dover Chamber of Commerce
1994 Cochecho Riverfront
Partnership
• In December, 1994 the Dover City Council created the Cochecho Riverfront Partnership to coordinate the redevelopment effort.
• The Partnership organized a charette team of local and outside design experts to develop a design vision for the property.
![Page 10: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/10.jpg)
Greater Dover Chamber of Commerce
1995 Design Charette
The charette developed several design concepts and a list of design guidelines to be used by a prospective developer. The design guidelines are being incorporated into the protective covenants for the City-owned parcel.
![Page 11: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/11.jpg)
Greater Dover Chamber of Commerce
Early Design Concepts
• Waterfront Task Force• Design Charette Plan A• Design Charette Plan B
These concepts provided a number of ideas for features that might be incorporated into the final plan for the development of the waterfront.
![Page 12: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/12.jpg)
Greater Dover Chamber of Commerce
Waterfront Task Force Design
![Page 13: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/13.jpg)
Greater Dover Chamber of Commerce
Design Charette Plan A
![Page 14: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/14.jpg)
Greater Dover Chamber of Commerce
Design Charette Plan B
![Page 15: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/15.jpg)
Greater Dover Chamber of Commerce
Common Design Features
• Mix of commercial and residential uses (shops, restaurants, offices, apartments)
• Emphasis upon waterfront history
• Expansion of marine uses
• Creation of a formal walkway, or riverwalk
• Creation of an open community amphitheater
• Vehicular or pedestrian linkage between waterfront and downtown Dover
![Page 16: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/16.jpg)
Greater Dover Chamber of Commerce
As part of the ongoing effort to refine and update the community vision for the Waterfront, the Chamber has partnered with AG Architects, PC to depict the Chamber’s vision for the Waterfront property directly along the Cochecho River.
Chamber/AG Architects Design Concepts
![Page 17: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/17.jpg)
Greater Dover Chamber of Commerce
All of the earlier design concepts featured only aerial views of the projected development. The concepts that you are about to see start with an aerial view and transition to a street level view.
Chamber/AG Architects Design Concepts
![Page 18: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/18.jpg)
Greater Dover Chamber of Commerce
Chamber/AG Architects Design Concepts
These designs are not intended to present an exact representation of the finished waterfront development. The designs are intended to continue and refine earlier waterfront design efforts. Features of these designs can be mixed and should not be viewed as “either/or” options.
![Page 19: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/19.jpg)
Greater Dover Chamber of Commerce
Chamber/AG Architects Design Concepts
Version 1: Aerial View
![Page 20: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/20.jpg)
Greater Dover Chamber of Commerce
Version 1: Street Level View
Chamber/AG Architects Design Concepts
![Page 21: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/21.jpg)
Greater Dover Chamber of Commerce
Version I1: Aerial View
Chamber/AG Architects Design Concepts
![Page 22: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/22.jpg)
Greater Dover Chamber of Commerce
Version I1: Street Level View
Chamber/AG Architects Design Concepts
![Page 23: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/23.jpg)
Greater Dover Chamber of Commerce
Both Design Concepts Feature
Significant public green space. Out of the 35 acre parcel, the buildings, parking and landscaping will occupy less than half the total area.
Clustered buildings of architectural styles consistent with others in downtown Dover
Mixed-use development
![Page 24: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/24.jpg)
Greater Dover Chamber of Commerce
Both Design Concepts Feature
• Pedestrian and/or vehicular linkage between waterfront and downtown Dover
• Onsite parking
• River walk extension
• Public boat launch
![Page 25: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/25.jpg)
Greater Dover Chamber of Commerce
Proposed Footprint
Less than half the total Waterfront area is capable of sustaining development.
![Page 26: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/26.jpg)
Greater Dover Chamber of Commerce
Public Green Space
Out of the 35 acre parcel, the buildings, parking and landscaping will occupy less than half the total area.
![Page 27: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/27.jpg)
Greater Dover Chamber of Commerce
Incremental Development
Development can occur in phases.
(show maps with examples of proposed phase 1, phase II)??????????????????????????????????
![Page 28: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/28.jpg)
Greater Dover Chamber of Commerce
Projected Economic Impact
• Both layouts would provide a total of 200,000 to 300,000 square feet of retail/ office/residential space on 3-4 stories.
• Estimated tax revenue from a fully completed project would be between $500,000 and $700,000 per year.
![Page 29: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/29.jpg)
Greater Dover Chamber of Commerce
Action Plan Status
Task
Demolish old sewage treatment plant
Conduct Phase II environmental site assessment
Finalize site development guidelines
Status
Complete
Complete
In progress
![Page 30: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/30.jpg)
Greater Dover Chamber of Commerce
Action Plan Status
Task
Pursue maintenance dredging of Cochecho River
Extend Riverwalk and trail network
Conduct traffic study re: vehicular bridge vs. Henry Law Ave. upgrade
Status
In progress
In progress
In progress
![Page 31: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/31.jpg)
Greater Dover Chamber of Commerce
Action Plan Status
Task
Remove public works facility
Rezone w/protective covenants for site
Design and engineer bridge
Status
Complete
In progress
In progress
![Page 32: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/32.jpg)
Greater Dover Chamber of Commerce
Public Participation
• Citizen-based Cochecho Waterfront Task Force devoted thousands of volunteer hours
• More than 600 residents and businesses contributed to the Cochecho Riverwalk between 1994-98
• The Design Charette in 1996 was composed of a guest team of experts and a local team of residents
• In 1999 Dover residents spoke in support of the City plan to redevelop the waterfront during public Speak Out Dover sessions held in advent of the recent updates to the Master Plan
![Page 33: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/33.jpg)
Greater Dover Chamber of Commerce
Next Steps
• Resolve parking needs for One Washington Center, downtown, and Pacific Mills
• Perform additional traffic analysis
• Reconstruct Henry Law Ave. or vehicular bridge
• Acquire cost estimates for additional infrastructure
![Page 34: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/34.jpg)
Greater Dover Chamber of Commerce
Next Steps
• Relocate lot line between Waterfront property and Maglaras Park.
• Rezone Waterfront property from industrial to mixed-use.
• Establish protective covenants.
![Page 35: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/35.jpg)
Greater Dover Chamber of Commerce
Next Steps
• Study alternative funding, i.e., tax increment financing, 108 loans, grants etc.
• Decide how and to whom will DEDC market property
• Establish primary decision-maker empowered to take action regarding property.
![Page 36: Waterfront Presentation - Dover, New Hampshire...Chamber of Commerce Waterfront Presentation September 18, 2002 Greater Dover Chamber of Commerce Introduction “Along the entire seaboard,](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0aedea7e708231d42e08fc/html5/thumbnails/36.jpg)
Greater Dover Chamber of Commerce
Parting Thought
“The land…affords a unique opportunity to craft an inviting mix of marina, retail, office and residential space. In doing so, it would draw an important entertainment component to the downtown scene, place excess public lands on the local tax roll, and recapture the flavor of the City’s historic past.”
- 1988 City of Dover Master Plan