water supply in thailand - encourage private sector involvement - improve environmental standards -...
TRANSCRIPT
- ENCOURAGE PRIVATE SECTOR INVOLVEMENT
- IMPROVE ENVIRONMENTAL STANDARDS
- PROVIDE BASIC NEED IN POVERTY AREAS
- UTILIZE LOW-COST AND APPROPRIATE TECHNOLOGY
SECTOR POLICY
WATER URBAN AREAS MWA,PWA,MUNICIPALITIES
RURAL AREAS
PIPED PWA,LOCALAUTHORITIES
NON-PIPED PWD,DOH,ARD,DMR,..
SEWERAGE BANGKOK BMA
OTHER URBAN AREAS
PCD,PWD,WMAMUNICIPALITIES
SECTOR INSTITUTIONS
SECTOR SITUATIONSECTOR SITUATION
AGENCY COVERAGE CAPACITYAGENCY COVERAGE CAPACITY
URBAN AREASURBAN AREASMWA 75% OF 8 MILLION 3.2 MCMD MWA 75% OF 8 MILLION 3.2 MCMD PWA 72% OF 12 MILLION 2.98 MCMDPWA 72% OF 12 MILLION 2.98 MCMD
(225 WW’S) (225 WW’S)OTHERS 70% OF 3 MILLION 0.2 MCMDOTHERS 70% OF 3 MILLION 0.2 MCMD INDUSTRIAL AREASINDUSTRIAL AREASEAST WATER EASTERN SEABOARDEAST WATER EASTERN SEABOARDIEAT 18 INDUSTRIAL ESTATESIEAT 18 INDUSTRIAL ESTATESRURAL AREASRURAL AREASGOV’T DEPT’S PIPED SUPPLY IN 8,000 VILLAGES GOV’T DEPT’S PIPED SUPPLY IN 8,000 VILLAGES
NON-PIPED IN 56,000 VILLAGES NON-PIPED IN 56,000 VILLAGES
WATER SUPPLYWATER SUPPLY
SEWESEWERRAGEAGE
AGENCY COVERAGE CAPACITYAGENCY COVERAGE CAPACITY
BMA 90% OF GREATER 1 MCM / DBMA 90% OF GREATER 1 MCM / D BANGKOK (158 SQ KM)BANGKOK (158 SQ KM) BY 2000BY 2000
LOCAL GOV. OTHER CITIESLOCAL GOV. OTHER CITIESPWD, PCDPWD, PCD
IEAT INDUSTRIAL ESTATESIEAT INDUSTRIAL ESTATES
SECTOR SITUATIONSECTOR SITUATION
MWA
73 PROVINCES647 MUNICIPAL AREAS6,946 SQ.KM.8.6 MILLION POPULATION SERVED
PWA
3 PROVINCES1,621 SQ.KM.
PWAMAP
AREAS
MWA OPERATION HIGHLIGHT YR 2001 WATER PRODUCTION (Mill.cu.m.) 1,415
WATER SALES (Mill.cu.m.) 857
SERVICE AREA (Sq.km.) 1,148
NO.OF CONNECTION 1,384,958
AVERAGE MONTHLY WATERCONSUMPTION PER CUSTOMER(cu.m / Month ) 51.6
AVERAGE WATER CHARGE(Baht/cu.m.) 10.42
NO.OF STAFF 5,312
PWA population servedyr 2001
PWAcustomers8.62 mill.
population in
urban areas23 Mill.
population in
Thailand 62 Mill
population in service
areas 11.93 Mill.
PWA STATISTICS YR 2001
•NO. OF WATERWORKS 225
•NO. OF CONNECTIONS(MILL.) 1.72
MILL. PERSONS ~8.6
•NO. OF STAFF 6,458
•WATER PRODUCED(MILL.CU.M./YR) 704
•WATER SOLD (MILL.CU.M./YR) 474
•CAPACITIES(MILL. CU.M./DAY) 2.983
•CUSTOMER:POPULATION(IN SERVICE AREA) 72 %
•TARIFF RATE (SATANG/LITER) ~1
CUSTOMERS FY 1980-2001
298,495
333,534
377,241
437,357
588,801676,197
769,215864,966
960,172
1,194,7421,324,186
1,453,4851,531,186
1,585,6081,662,863
1,723,470
1,065,761
515,175
474,997
405,522
354,940
315,785
0
200,
000
400,
000
600,
000
800,
000
1,00
0,000
1,20
0,000
1,40
0,000
1,60
0,000
1,80
0,000
2,00
0,000
1980
1982
1984
1986
1988
1990
1992
1994
1996
1998
2000
FY
CASES
MAN POWER FY 1980-2001
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001
STAFF RATIO FY 1980-2001
NO.OF CONNECTIONS :STAFF
17.6516.51
15.4714.52
13.6212.64
11.8110.89
10.078.91 8.4
7.556.93 6.51
5.88 5.645.01 5.2 4.86 4.55 4.03 3.75
02
46
81
01
21
41
61
82
02
22
4
19801981
19821983
19841985
19861987
19881989
19901991
19921993
19941995
19961997
19981999
20002001
0
50
100
150
200
250
300
NO.OF STAFF :1,000 CONNECTIONS
0
100
200
300
400
500
600
700
800
0
10
20
30
40
50
60
70
80
90
100
MILLION CU.M. %
WATER PRODUCED WATER SOLD NON-REVENUE
WATER PRODUCED AND WATER SOLDFY 1980-2001
RURAL WATERWORKS ACQUISITION FY 1984-2001
353344328321312
17
305296
244
287
212
2 10 1622
67
149
112
0
50
100
150
200
250
300
35019
84
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
NO.OF WWS"
FY
PSP OPTIONS PUBLIC OWNERSHIP
1) Service contract2) Management contract3) Lease contract4) Concession
PRIVATE OWNERSHIP5) BOOT (Build-Own-Operate -Transfer)6) BOO (Build-Own-Operate)7) Reverse BOOT8) Joint ownership9) Outright sale
COMPLETED
- PATHUM THANI - BOOT- EAST WATER - SUBSIDIARY- RATCHABURI - BOO- PHUKET - BOO- SATTAHIP - LEASING CONTRACT
PWA’S PRIVATIZATION PROGRAM
COMPLETED
PWA’S PRIVATIZATION PROGRAM
- WESTERN PERIPHERY OF BANGKOK - BOO- CHACHOENG SAO - BOOT- BANGPAKONG - BOOT- NAKHON SAWAN - BOOT- PATHUM THANI - MANAGEMENT (LOSS CONTROL) CONTRACT
BOOT CONTRACT SIGNED 31 AUG 1995CONTRACT PERIOD 25 YEARS++CONTRACT VALUE 4,300 MBOPENED 25 SEPT 1998TOTAL CAPACITY 288,000 CMDMINIMUB PURCHASE 140,000 220,000 CMD
SHAREHOLDERS - THAMES WATER- CH. KARNCHANG- BERLI JUCKER- PWA- THAI CAPITAL RICE- KRUNG THAI BANK- THAI MILITARY BANK
PATHUM THANI WATERPATHUM THANI WATER
INCENTIVES . EXEMPT ON IMPORT DUTIES . TAX HOLIDAY
EVALUATION OF TENDERS . TECHNICAL ASPECT . FINANCIAL ASPECT
RATE OF RETURN . NEGOTIABLE BUT MUST BE REASONABLE
PROFIT REPATRIATION . NO RESTRICTION
EQUITY LIMIT . NO LIMIT FOR WATER & SEWERAGE SECTOR
GUARANTEES . MINIMUM PURCHASE
SOME CONSIDERATIONSSOME CONSIDERATIONS
• DEMAND ESTIMATES• QUALITY OF SERVICES• PENALTIES FOR BAD SERVICES• WORK FORCE• CAPITAL INVESTIMENT PLANS• RATES• ARBITRATION• RELATION WITH CONSUMERS
MAIN CONTRACT PROVISIONSMAIN CONTRACT PROVISIONS
Cabinet’s Resolution12 Sep 1992
The RoyalIrrigation
Department (RID)
The ProvincialWaterworks
Authority (PWA)
Eastern WaterResources Development
and ManagementCompany Limited
to continue its role as todevelop raw water resources & reservoirs
to establish a new company
to be responsible for the development and operation of the raw waterdelivery system in Thailand’s eastern seaboard
The Cabinet’s Resolution to EstablishThe Cabinet’s Resolution to EstablishEAST WATEREAST WATER
PRE
POST
PWA
EAST WATER
PWA IEAT PRIVATE LOANS
B 2,000 mEAST WATER
B 500 m
~ B 4,500 m for 3 Projects
100% (10 m B)
B 2,000 m
44% 5% 51%
East water’s Pre and Post PrivatizedEast water’s Pre and Post PrivatizedShareholding StructureShareholding Structure
THE STATE
* RELIEVED FROM FINANCIAL BURDEN
* RECEIVES “RETURN” ON INVESTMENTS
- REVENUE AND PROFIT SHARING
- TAXES
- RAW WATER FEE
* RECEIVES DIVIDEND AND OTHER PAYMENTS FOR SUPPORTING (SOCIAL) PROGRAM
THE PUBLIC
* BETTER SERVICE
* MORE RELIABLE SYSTEMS
* QUICKER IMPLEMENTATION
* POSSIBLY LOWER TARIFF
PERCEIVED BENEFITS TOPERCEIVED BENEFITS TOTHE STATE AND THE PUBLICTHE STATE AND THE PUBLIC