Water Safety Plan Model in Nepal

Gajendra Kumar Thakur

Page 2: Water Safety Plan Model in Nepal Gajendra Kumar Thakur

CONCEPT

• A management tool to achieve health based target of water supply schemes

Page 3: Water Safety Plan Model in Nepal Gajendra Kumar Thakur

WSP Model : Ten Steps• Team formation• System assessment• Hazard analysis• Control measures• Monitoring plan• Urgent corrective action• Validation of control• Verification system • Assessments of user's satisfaction• Documentation

Page 4: Water Safety Plan Model in Nepal Gajendra Kumar Thakur

Approaches for scaling up WSP

• Project wide Water Safety Plan• Community wide Water Safety Plan

Page 5: Water Safety Plan Model in Nepal Gajendra Kumar Thakur

Implementation of WSP : case in rural water supply scheme

• Jante Water Supply Scheme, Morang

Page 6: Water Safety Plan Model in Nepal Gajendra Kumar Thakur

Jante Water Supply schemeIntake- 4 nosTransmission Pipe line- 4 kmDistribution Pipeline- 20 kmStorage tanks – 3 nos ( each 100 cum capacity)Taps- 23 nos ( public tap stand)Private taps-500 nos

Page 7: Water Safety Plan Model in Nepal Gajendra Kumar Thakur

intake

Page 8: Water Safety Plan Model in Nepal Gajendra Kumar Thakur

Intake- 4 nos

Page 9: Water Safety Plan Model in Nepal Gajendra Kumar Thakur

Storage tanks – 3 nos ( each 100 cum capacity)

Page 10: Water Safety Plan Model in Nepal Gajendra Kumar Thakur

Result of WSP implementation

• Reduced concentration of E-Coli in water sample in the source( intake) ( from 100 to 10 cfu/100 ml)• The WSP team is eager to take measures

to make water E-coli free at intake sites• Chlorine is being used to make water

safe to drink

Page 11: Water Safety Plan Model in Nepal Gajendra Kumar Thakur

Challenges in WSP implementation

• Making WSP and integral part of project cycle for water supply project of various scale and settings

Page 12: Water Safety Plan Model in Nepal Gajendra Kumar Thakur

conclusion

• WSP model for urban and rural setting is being developed• Project wide and community wide

WSP implementation approach help to integrate WSP into the larger numbers of water supply projects

Page 13: Water Safety Plan Model in Nepal Gajendra Kumar Thakur