water quality improvements riverglen subdivision valve replacements april 4, 2013

10
Water Quality Water Quality Improvements Improvements Riverglen Subdivision Riverglen Subdivision Valve Replacements Valve Replacements April 4, 2013 April 4, 2013

Upload: salvatore-gulick

Post on 16-Dec-2015

223 views

Category:

Documents


1 download

TRANSCRIPT

Water Quality Water Quality ImprovementsImprovements

Riverglen Subdivision Valve Riverglen Subdivision Valve ReplacementsReplacements

April 4, 2013April 4, 2013

The Infrastructure The Infrastructure ResponseResponse

Master ProjectMaster Project

Hillsborough County Public Utilities Hillsborough County Public Utilities DepartmentDepartment

Countywide Potable Water Lines Countywide Potable Water Lines Renewal and Replacement ProgramRenewal and Replacement Program

This program is to improve water This program is to improve water quality and service by replacing quality and service by replacing valves and undersized lines, and valves and undersized lines, and connecting water lines to remove connecting water lines to remove “dead ends”.“dead ends”.

Infrastructure and Development ServicesInfrastructure and Development ServicesPublic Utilities Department Public Utilities Department

Project BenefitsProject Benefits

Reduction of number of locations Reduction of number of locations taken out of service during line taken out of service during line repairs.repairs.

Maintaining fire protection.Maintaining fire protection.

Infrastructure and Development ServicesInfrastructure and Development ServicesPublic Utilities Department Public Utilities Department

Construction Work Construction Work SummarySummary

Replace:Replace: Fifteen (15) 12-inch valves on Donneymoor DriveFifteen (15) 12-inch valves on Donneymoor Drive

One (1) 4-inch valve and one (1) 6-inch valve on One (1) 4-inch valve and one (1) 6-inch valve on Sunnyoak DriveSunnyoak Drive

Seven (7) 6-inch valves on Shady Forest DriveSeven (7) 6-inch valves on Shady Forest Drive

One (1) 4-inch Valve and Six (6) 6-inch valves on One (1) 4-inch Valve and Six (6) 6-inch valves on Glenpointe DriveGlenpointe Drive

Infrastructure and Development Services Infrastructure and Development Services Public Utilities DepartmentPublic Utilities Department

Construction Work Construction Work Summary (continued)Summary (continued)

One (1) 4-inch valve and two (2) 6-inch One (1) 4-inch valve and two (2) 6-inch valves on Glenox Lanevalves on Glenox Lane

Two (2) 6-inch valves on Kelp LaneTwo (2) 6-inch valves on Kelp Lane

One (1) 6-inch valve on Racine PlaceOne (1) 6-inch valve on Racine Place

Two (2) 6-inch valves on Clover Glen Two (2) 6-inch valves on Clover Glen DriveDrive

Infrastructure and Development Services Infrastructure and Development Services Public Utilities DepartmentPublic Utilities Department

Construction ScheduleConstruction Schedule

Jul-13 Aug-13

Jun-13Begin Donneymoor Dr.

and Racine Pl. Installations

Jul-13End Donneymoor Dr. andRacine Pl. Installations;

Begin Shady Forest Dr., Glenpointe Dr.,and Kelp Ln. Installations

Aug-13End Shady Forest Dr., Glenpointe Dr.,

and Kelp Ln. InstallationsBegin Sunnyoak Dr., Glenox Ln.,and Clover Glen Dr. Installations

Sep-13End Sunnyoak Dr., Glenox Ln.,

And Clover Glen Dr. Installations

Impacts to ResidentsImpacts to Residents

Construction work will be done Construction work will be done between 8 a.m. and 4 p.m. weekdays.between 8 a.m. and 4 p.m. weekdays.

Occasional closures of sections of Occasional closures of sections of Donneymorr Drive, Sunnyoak Drive, Donneymorr Drive, Sunnyoak Drive, Shady Forest Drive, Glenpointe Drive, Shady Forest Drive, Glenpointe Drive, Glenox Lane, Kelp Lane, Racine Place, Glenox Lane, Kelp Lane, Racine Place, and Clover Glen Drive.and Clover Glen Drive.

Areas impacted will be fully restored.Areas impacted will be fully restored.Infrastructure and Development Services Infrastructure and Development Services

Public Utilities DepartmentPublic Utilities Department

Contact InformationContact Information

During regular business hours:During regular business hours:

Cindy Hutchens, Project ManagerCindy Hutchens, Project Manager813-209-3095813-209-3095

After Hours Emergency Line:After Hours Emergency Line:813-744-5600813-744-5600