water histograms 18 dec 2003

Upload: john-barry

Post on 03-Apr-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/28/2019 Water Histograms 18 Dec 2003

    1/60

    0

    2000

    4000

    6000

    8000

    10000

    12000

    14000

    16000

    18000

    20000

    1.00 1.07 1.14 1.21 2.04 2.11 2.18 3.01 3.08 3.15 3.22 4.05 4

  • 7/28/2019 Water Histograms 18 Dec 2003

    2/60

    0

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    1.00 1.07 1.14 1.21 2.04 2.11 2.18 3.01 3.08 3.15 3.22 4.05

  • 7/28/2019 Water Histograms 18 Dec 2003

    3/60

    W

    0

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    1 8 15 22 29 36 43 50 57 64 71 78 85

  • 7/28/2019 Water Histograms 18 Dec 2003

    4/60

    Purified Water SystemsHistograms: Typical

    Uses

  • 7/28/2019 Water Histograms 18 Dec 2003

    5/60

    Histogram of Softe

    Sizing Assumptions 1 2 3

    RO/DI skid drawoff 445.63 445.63 445.63

    HVAC: Humidification, non-cGMP areas 358 358 358

    HVAC: Boiler makeup 1517 1517 1517

    (NOTE: RO/DI skid drawoff feeds USP PW tank. USP PW tank feeds WFI still,

    clean steam generator, and CIP skids. Demands are not simultaneous.)

    Total Soft Water Usage liter per hour 2320.6 2320.6 2320.6

    Time (Day. Hour) 1.00 1.01 1.02

    Tank Volume @Start of Hour 15000 15000 15000

    Make-Up Volume 2320.6 2320.6 2320.6

    Minimum tank inventory: 15000.0 L

    100%

    User Selectable

    Initial Tank Volume 15000 L

    Make-Up Rate 7500 Lph

    Tank Working Volume 15000 L

    Total weekly makeup 504706.22

  • 7/28/2019 Water Histograms 18 Dec 2003

    6/60

    Histogram of Softe

    Sizing Assumptions

    RO/DI skid drawoff

    HVAC: Humidification, non-cGMP areas

    HVAC: Boiler makeup

    (NOTE: RO/DI skid drawoff feeds USP PW tank. USP PW tank feeds WFI still,

    clean steam generator, and CIP skids. Demands are not simultaneous.)

    Total Soft Water Usage liter per hour

    Time (Day. Hour)

    Tank Volume @Start of Hour

    Make-Up Volume

    Minimum tank inventory: 15000.0

    100%

    User Selectable

    Initial Tank Volume 15000

    Make-Up Rate 7500

    Tank Working Volume 15000

    Total weekly makeup 504706.22

    1 2 3

    445.63 445.63 445.63

    358 358 358

    1517 1517 1517

    2320.6 2320.6 2320.6

    2.00 2.01 2.02

    15000 15000 15000

    2320.6 2320.6 2320.6

  • 7/28/2019 Water Histograms 18 Dec 2003

    7/60

    Histogram of Softe

    Sizing Assumptions

    RO/DI skid drawoff

    HVAC: Humidification, non-cGMP areas

    HVAC: Boiler makeup

    (NOTE: RO/DI skid drawoff feeds USP PW tank. USP PW tank feeds WFI still,

    clean steam generator, and CIP skids. Demands are not simultaneous.)

    Total Soft Water Usage liter per hour

    Time (Day. Hour)

    Tank Volume @Start of Hour

    Make-Up Volume

    Minimum tank inventory: 15000.0

    100%

    User Selectable

    Initial Tank Volume 15000

    Make-Up Rate 7500

    Tank Working Volume 15000

    Total weekly makeup 504706.22

    1 2 3

    445.63 445.63 445.63

    358 358 358

    1517 1517 1517

    2320.6 2320.6 2320.6

    3.00 3.01 3.02

    15000 15000 15000

    2320.6 2320.6 2320.6

  • 7/28/2019 Water Histograms 18 Dec 2003

    8/60

    Histogram of Softe

    Sizing Assumptions

    RO/DI skid drawoff

    HVAC: Humidification, non-cGMP areas

    HVAC: Boiler makeup

    (NOTE: RO/DI skid drawoff feeds USP PW tank. USP PW tank feeds WFI still,

    clean steam generator, and CIP skids. Demands are not simultaneous.)

    Total Soft Water Usage liter per hour

    Time (Day. Hour)

    Tank Volume @Start of Hour

    Make-Up Volume

    Minimum tank inventory: 15000.0

    100%

    User Selectable

    Initial Tank Volume 15000

    Make-Up Rate 7500

    Tank Working Volume 15000

    Total weekly makeup 504706.22

    1 2 3

    445.63 445.63 445.63

    358 358 358

    1517 1517 1517

    2320.6 2320.6 2320.6

    4.00 4.01 4.02

    15000 15000 15000

    2320.6 2320.6 2320.6

  • 7/28/2019 Water Histograms 18 Dec 2003

    9/60

    Histogram of Softe

    Sizing Assumptions

    RO/DI skid drawoff

    HVAC: Humidification, non-cGMP areas

    HVAC: Boiler makeup

    (NOTE: RO/DI skid drawoff feeds USP PW tank. USP PW tank feeds WFI still,

    clean steam generator, and CIP skids. Demands are not simultaneous.)

    Total Soft Water Usage liter per hour

    Time (Day. Hour)

    Tank Volume @Start of Hour

    Make-Up Volume

    Minimum tank inventory: 15000.0

    100%

    User Selectable

    Initial Tank Volume 15000

    Make-Up Rate 7500

    Tank Working Volume 15000

    Total weekly makeup 504706.22

    1 2 3

    445.63 445.63 445.63

    358 358 358

    1517 1517 1517

    2320.6 2320.6 2320.6

    5.00 5.01 5.02

    15000 15000 15000

    2320.6 2320.6 2320.6

  • 7/28/2019 Water Histograms 18 Dec 2003

    10/60

    Histogram of Softe

    Sizing Assumptions

    RO/DI skid drawoff

    HVAC: Humidification, non-cGMP areas

    HVAC: Boiler makeup

    (NOTE: RO/DI skid drawoff feeds USP PW tank. USP PW tank feeds WFI still,

    clean steam generator, and CIP skids. Demands are not simultaneous.)

    Total Soft Water Usage liter per hour

    Time (Day. Hour)

    Tank Volume @Start of Hour

    Make-Up Volume

    Minimum tank inventory: 15000.0

    100%

    User Selectable

    Initial Tank Volume 15000

    Make-Up Rate 7500

    Tank Working Volume 15000

    Total weekly makeup 504706.22

    1 2 3

    445.63 445.63 445.63

    358 358 358

    1517 1517 1517

    2320.6 2320.6 2320.6

    6.00 6.01 6.02

    15000 15000 15000

    2320.6 2320.6 2320.6

  • 7/28/2019 Water Histograms 18 Dec 2003

    11/60

    Histogram of Softe

    Sizing Assumptions

    RO/DI skid drawoff

    HVAC: Humidification, non-cGMP areas

    HVAC: Boiler makeup

    (NOTE: RO/DI skid drawoff feeds USP PW tank. USP PW tank feeds WFI still,

    clean steam generator, and CIP skids. Demands are not simultaneous.)

    Total Soft Water Usage liter per hour

    Time (Day. Hour)

    Tank Volume @Start of Hour

    Make-Up Volume

    Minimum tank inventory: 15000.0

    100%

    User Selectable

    Initial Tank Volume 15000

    Make-Up Rate 7500

    Tank Working Volume 15000

    Total weekly makeup 504706.22

    1 2 3

    445.63 445.63 445.63

    358 358 358

    1517 1517 1517

    2320.6 2320.6 2320.6

    7.00 7.01 7.02

    15000 15000 15000

    2320.6 2320.6 2320.6

  • 7/28/2019 Water Histograms 18 Dec 2003

    12/60

    0

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    8000

    9000

    10000

    SystemMak

    eup,LPH

    Time (Day. Hour)

    Soft Water Tank Volume and Makeup

  • 7/28/2019 Water Histograms 18 Dec 2003

    13/60

    Histogram

    System Ma

    Sizing Assumptions 1 2 3 4 5 6

    WFI feed 0 0 0 0 0 1413

    Clean steam generation 445.625 445.625 445.625 445.625 534.175 445.625 4

    CIP skid, suite 1 (all except final rinse) 2149 1153

    Total USP Purified Water Usage liter per hour 445.625 445.625 445.625 445.625 534.175 3011.63 1

    Time (Day. Hour) 1.00 1.01 1.02 1.03 1.04 1.05 Tank Volume @Start of Hour 3000 3000 3000 3000 3000 3000 2

    Make-Up Volume 445.625 445.625 445.625 445.625 534.175 3000 1

    Minimum tank inventory: 1534.0 L

    51%

    Average

    User Selectable Maximum

    Initial Tank Volume 3000 L Maximum

    Make-Up Rate 3000 Lph Total Us

    Tank Working Volume 3000 L

  • 7/28/2019 Water Histograms 18 Dec 2003

    14/60

    Histogram

    System Mak

    Sizing Assumptions

    WFI feed

    Clean steam generation

    CIP skid, suite 1 (all except final rinse) 2149

    Total USP Purified Water Usage liter per hour

    Time (Day. Hour)

    Tank Volume @Start of Hour

    Make-Up Volume

    Minimum tank inventory: 1534.0

    51%

    User Selectable

    Initial Tank Volume 3000

    Make-Up Rate 3000

    Tank Working Volume 3000

    1 2 3 4 5 6

    0 0 0 0 0 0

    445.625 445.625 445.625 445.625 445.625 445.625 52

    445.625 445.625 445.625 445.625 445.625 445.625 52

    2.00 2.01 2.02 2.03 2.04 2.05 2

    3000 3000 3000 3000 3000 3000 3

    445.625 445.625 445.625 445.625 445.625 445.625 52

  • 7/28/2019 Water Histograms 18 Dec 2003

    15/60

    Histogram

    System Mak

    Sizing Assumptions

    WFI feed

    Clean steam generation

    CIP skid, suite 1 (all except final rinse) 2149

    Total USP Purified Water Usage liter per hour

    Time (Day. Hour)

    Tank Volume @Start of Hour

    Make-Up Volume

    Minimum tank inventory: 1534.0

    51%

    User Selectable

    Initial Tank Volume 3000

    Make-Up Rate 3000

    Tank Working Volume 3000

    1 2 3 4 5 6

    0 0 0 0 0 0

    445.625 445.625 445.625 445.625 445.625 736.575 52

    445.625 445.625 445.625 445.625 445.625 736.575 52

    3.00 3.01 3.02 3.03 3.04 3.05 3

    3000 3000 3000 3000 3000 3000 3

    445.625 445.625 445.625 445.625 445.625 736.575 52

  • 7/28/2019 Water Histograms 18 Dec 2003

    16/60

    Histogram

    System Mak

    Sizing Assumptions

    WFI feed

    Clean steam generation

    CIP skid, suite 1 (all except final rinse) 2149

    Total USP Purified Water Usage liter per hour

    Time (Day. Hour)

    Tank Volume @Start of Hour

    Make-Up Volume

    Minimum tank inventory: 1534.0

    51%

    User Selectable

    Initial Tank Volume 3000

    Make-Up Rate 3000

    Tank Working Volume 3000

    1 2 3 4 5 6

    0 0 0 0 0 0 4

    445.625 445.625 445.625 445.625 445.625 445.625 44

    445.625 445.625 445.625 445.625 445.625 445.625 84

    4.00 4.01 4.02 4.03 4.04 4.05 4

    3000 3000 3000 3000 3000 3000 3

    445.625 445.625 445.625 445.625 445.625 445.625 84

  • 7/28/2019 Water Histograms 18 Dec 2003

    17/60

    Histogram

    System Mak

    Sizing Assumptions

    WFI feed

    Clean steam generation

    CIP skid, suite 1 (all except final rinse) 2149

    Total USP Purified Water Usage liter per hour

    Time (Day. Hour)

    Tank Volume @Start of Hour

    Make-Up Volume

    Minimum tank inventory: 1534.0

    51%

    User Selectable

    Initial Tank Volume 3000

    Make-Up Rate 3000

    Tank Working Volume 3000

    1 2 3 4 5 6

    0 0 0 0 0 0

    445.625 445.625 445.625 445.625 445.625 445.625 44

    445.625 445.625 445.625 445.625 445.625 445.625 44

    5.00 5.01 5.02 5.03 5.04 5.05 5

    3000 3000 3000 3000 3000 3000 3

    445.625 445.625 445.625 445.625 445.625 445.625 44

  • 7/28/2019 Water Histograms 18 Dec 2003

    18/60

    Histogram

    System Mak

    Sizing Assumptions

    WFI feed

    Clean steam generation

    CIP skid, suite 1 (all except final rinse) 2149

    Total USP Purified Water Usage liter per hour

    Time (Day. Hour)

    Tank Volume @Start of Hour

    Make-Up Volume

    Minimum tank inventory: 1534.0

    51%

    User Selectable

    Initial Tank Volume 3000

    Make-Up Rate 3000

    Tank Working Volume 3000

    1 2 3 4 5 6

    0 0 0 0 0 0

    445.625 445.625 445.625 445.625 445.625 445.625 445

    445.625 445.625 445.625 445.625 445.625 445.625 445

    6.00 6.01 6.02 6.03 6.04 6.05 6

    3000 3000 3000 3000 3000 3000 30

    445.625 445.625 445.625 445.625 445.625 445.625 445

  • 7/28/2019 Water Histograms 18 Dec 2003

    19/60

    Histogram

    System Mak

    Sizing Assumptions

    WFI feed

    Clean steam generation

    CIP skid, suite 1 (all except final rinse) 2149

    Total USP Purified Water Usage liter per hour

    Time (Day. Hour)

    Tank Volume @Start of Hour

    Make-Up Volume

    Minimum tank inventory: 1534.0

    51%

    User Selectable

    Initial Tank Volume 3000

    Make-Up Rate 3000

    Tank Working Volume 3000

    1 2 3 4 5 6

    0 0 0 0 0 0

    445.625 445.625 445.625 445.625 445.625 445.625 445

    445.625 445.625 445.625 445.625 445.625 445.625 445

    7.00 7.01 7.02 7.03 7.04 7.05 7

    3000 3000 3000 3000 3000 3000 30

    445.625 445.625 445.625 445.625 445.625 445.625 445

  • 7/28/2019 Water Histograms 18 Dec 2003

    20/60

    0

    1500

    3000

    4500

    6000

    7500

    1.

    00

    1.

    03

    1.

    06

    1.

    09

    1.

    12

    1.

    15

    1.

    18

    1.

    21

    2.

    00

    2.

    03

    2.

    06

    2.

    09

    2.

    12

    2.

    15

    2.

    18

    2.

    21

    3.

    00

    3.

    03

    3.

    06

    3.

    09

    3.

    12

    3.

    15

    3.

    18

    3.

    21

    4.

    00

    4.

    03

    4.

    06

    4.

    09

    4.

    12

    4.

    15

    4.

    18

    4.

    21

    5.

    00

    5.

    03

    5.

    06

    5.

    09

    5.

    12

    5.

    15

    5

    1 8

    SystemMakeup,LPH

    Time (Day. Hour)

    USP PW Tank Volume and Makeup

  • 7/28/2019 Water Histograms 18 Dec 2003

    21/60

    Sizing Assumptions

    1500 L Mammalian Media Prep

    1500 L Mammalian Buffer Prep

    Suite 1 Washer

    Fill/finish: Dirty Parts Washer

    Fill / finish: Vial Washer

    Fill / finish: Clean Parts Washer

    Fill / finish: CIP

    Fill / finish: Lyophilizer Wash-Out

    1780.00 Use points

    1413.00 (max. consumption)

    1780.00 Mam Suite 1, Cell Culture 25 lpm max per drop

    1166.00 Mam Suite 1, V+ Purification 25 lpm max per drop

    0.00 Mam Suite 1, V- Purification 25 lpm max per drop

    1413.00 Suite 1 Media Preparation 25 lpm max per drop

    400.00 Suite 1 Buffer Preparation 25 lpm max per drop

    #REF! Suite 1 Washer

    #REF!

    150.00 Utility area: COP 959 l per run

    500.00 Fill / finish: Dirty Parts Washer 150 l per run

    500.00 Fill / finish: Vial Washer 500 l per run

    706.00 Fill / finish: Clean Parts Washer 500 l per run

    200.00 Fill / finish: CIP (WFI Rinse Only) 706 l per run

    Fill / finish: Lyophilizer Wash-Out 200 l per run

    0.00

    Total WFI Water Usage liter per hour

    Time (Day. Hour)

    Tank Volume @Start of Hour

    Make-Up Volume 463.0 (time-averaged)

    Minimum tank inventory: 1250.4

    42%

    User Selectable

    Initial Tank Volume 3000Make-Up Rate 1650

    Tank Working Volume 3000

    1500L Mammalian Purification Process Train #1 Starts on Monday

  • 7/28/2019 Water Histograms 18 Dec 2003

    22/60

    Sizing Assumptions

    1500 L Mammalian Media Prep

    1500 L Mammalian Buffer Prep

    Suite 1 Washer

    Fill/finish: Dirty Parts Washer

    Fill / finish: Vial Washer

    Fill / finish: Clean Parts Washer

    Fill / finish: CIP

    Fill / finish: Lyophilizer Wash-Out

    1780.00 Use points

    1413.00 (max. consumption)

    1780.00 Mam Suite 1, Cell Culture 25 lpm max per drop

    1166.00 Mam Suite 1, V+ Purification 25 lpm max per drop

    0.00 Mam Suite 1, V- Purification 25 lpm max per drop

    1413.00 Suite 1 Media Preparation 25 lpm max per drop

    400.00 Suite 1 Buffer Preparation 25 lpm max per drop

    #REF! Suite 1 Washer

    #REF!

    150.00 Utility area: COP 959 l per run

    500.00 Fill / finish: Dirty Parts Washer 150 l per run

    500.00 Fill / finish: Vial Washer 500 l per run

    706.00 Fill / finish: Clean Parts Washer 500 l per run

    200.00 Fill / finish: CIP (WFI Rinse Only) 706 l per run

    Fill / finish: Lyophilizer Wash-Out 200 l per run0.00

    Total WFI Water Usage liter per hour

    Time (Day. Hour)

    Tank Volume @Start of Hour

    Make-Up Volume 463.0 (time-averaged)

    Minimum tank inventory: 1250.4

    42%

    User Selectable

    Initial Tank Volume 3000

    Make-Up Rate 1650Tank Working Volume 3000

    1500L Mammalian Purification Process Train #1 Starts on Monday

  • 7/28/2019 Water Histograms 18 Dec 2003

    23/60

    Sizing Assumptions

    1500 L Mammalian Media Prep

    1500 L Mammalian Buffer Prep

    Suite 1 Washer

    Fill/finish: Dirty Parts Washer

    Fill / finish: Vial Washer

    Fill / finish: Clean Parts Washer

    Fill / finish: CIP

    Fill / finish: Lyophilizer Wash-Out

    1780.00 Use points1413.00 (max. consumption)

    1780.00 Mam Suite 1, Cell Culture 25 lpm max per drop

    1166.00 Mam Suite 1, V+ Purification 25 lpm max per drop

    0.00 Mam Suite 1, V- Purification 25 lpm max per drop

    1413.00 Suite 1 Media Preparation 25 lpm max per drop

    400.00 Suite 1 Buffer Preparation 25 lpm max per drop

    #REF! Suite 1 Washer

    #REF!

    150.00 Utility area: COP 959 l per run

    500.00 Fill / finish: Dirty Parts Washer 150 l per run

    500.00 Fill / finish: Vial Washer 500 l per run

    706.00 Fill / finish: Clean Parts Washer 500 l per run

    200.00 Fill / finish: CIP (WFI Rinse Only) 706 l per run

    Fill / finish: Lyophilizer Wash-Out 200 l per run

    0.00

    Total WFI Water Usage liter per hour

    Time (Day. Hour)

    Tank Volume @Start of Hour

    Make-Up Volume 463.0 (time-averaged)

    Minimum tank inventory: 1250.4

    42%

    User Selectable

    Initial Tank Volume 3000

    Make-Up Rate 1650

    Tank Working Volume 3000

    1500L Mammalian Purification Process Train #1 Starts on Monday

  • 7/28/2019 Water Histograms 18 Dec 2003

    24/60

    Sizing Assumptions

    1500 L Mammalian Media Prep

    1500 L Mammalian Buffer Prep

    Suite 1 Washer

    Fill/finish: Dirty Parts Washer

    Fill / finish: Vial Washer

    Fill / finish: Clean Parts Washer

    Fill / finish: CIP

    Fill / finish: Lyophilizer Wash-Out

    1780.00 Use points

    1413.00 (max. consumption)

    1780.00 Mam Suite 1, Cell Culture 25 lpm max per drop

    1166.00 Mam Suite 1, V+ Purification 25 lpm max per drop

    0.00 Mam Suite 1, V- Purification 25 lpm max per drop

    1413.00 Suite 1 Media Preparation 25 lpm max per drop

    400.00 Suite 1 Buffer Preparation 25 lpm max per drop

    #REF! Suite 1 Washer

    #REF!

    150.00 Utility area: COP 959 l per run

    500.00 Fill / finish: Dirty Parts Washer 150 l per run

    500.00 Fill / finish: Vial Washer 500 l per run

    706.00 Fill / finish: Clean Parts Washer 500 l per run

    200.00 Fill / finish: CIP (WFI Rinse Only) 706 l per run

    Fill / finish: Lyophilizer Wash-Out 200 l per run

    0.00

    Total WFI Water Usage liter per hour

    Time (Day. Hour)

    Tank Volume @Start of Hour

    Make-Up Volume 463.0 (time-averaged)

    Minimum tank inventory: 1250.4

    42%

    User Selectable

    Initial Tank Volume 3000

    Make-Up Rate 1650

    Tank Working Volume 3000

    1500L Mammalian Purification Process Train #1 Starts on Monday

  • 7/28/2019 Water Histograms 18 Dec 2003

    25/60

    Sizing Assumptions

    1500 L Mammalian Media Prep

    1500 L Mammalian Buffer Prep

    Suite 1 Washer

    Fill/finish: Dirty Parts Washer

    Fill / finish: Vial Washer

    Fill / finish: Clean Parts Washer

    Fill / finish: CIP

    Fill / finish: Lyophilizer Wash-Out

    1780.00 Use points

    1413.00 (max. consumption)

    1780.00 Mam Suite 1, Cell Culture 25 lpm max per drop

    1166.00 Mam Suite 1, V+ Purification 25 lpm max per drop

    0.00 Mam Suite 1, V- Purification 25 lpm max per drop

    1413.00 Suite 1 Media Preparation 25 lpm max per drop

    400.00 Suite 1 Buffer Preparation 25 lpm max per drop

    #REF! Suite 1 Washer

    #REF!

    150.00 Utility area: COP 959 l per run

    500.00 Fill / finish: Dirty Parts Washer 150 l per run

    500.00 Fill / finish: Vial Washer 500 l per run

    706.00 Fill / finish: Clean Parts Washer 500 l per run

    200.00 Fill / finish: CIP (WFI Rinse Only) 706 l per run

    Fill / finish: Lyophilizer Wash-Out 200 l per run0.00

    Total WFI Water Usage liter per hour

    Time (Day. Hour)

    Tank Volume @Start of Hour

    Make-Up Volume 463.0 (time-averaged)

    Minimum tank inventory: 1250.4

    42%

    User Selectable

    Initial Tank Volume 3000

    Make-Up Rate 1650Tank Working Volume 3000

    1500L Mammalian Purification Process Train #1 Starts on Monday

  • 7/28/2019 Water Histograms 18 Dec 2003

    26/60

    H

    Sizing Assumptions

    1500 L Mammalian Media Prep

    1500 L Mammalian Buffer Prep

    Suite 1 Washer

    Fill/finish: Dirty Parts Washer

    Fill / finish: Vial Washer

    Fill / finish: Clean Parts Washer

    Fill / finish: CIP

    Fill / finish: Lyophilizer Wash-Out

    1780.00 Use points

    1413.00 (max. consumption)

    1780.00 Mam Suite 1, Cell Culture 25 lpm max per drop1166.00 Mam Suite 1, V+ Purification 25 lpm max per drop

    0.00 Mam Suite 1, V- Purification 25 lpm max per drop

    1413.00 Suite 1 Media Preparation 25 lpm max per drop

    400.00 Suite 1 Buffer Preparation 25 lpm max per drop

    #REF! Suite 1 Washer

    #REF!

    150.00 Utility area: COP 959 l per run

    500.00 Fill / finish: Dirty Parts Washer 150 l per run

    500.00 Fill / finish: Vial Washer 500 l per run

    706.00 Fill / finish: Clean Parts Washer 500 l per run

    200.00 Fill / finish: CIP (WFI Rinse Only) 706 l per run

    Fill / finish: Lyophilizer Wash-Out 200 l per run

    0.00

    Total WFI Water Usage liter per hour

    Time (Day. Hour)

    Tank Volume @Start of Hour

    Make-Up Volume 463.0 (time-averaged)

    Minimum tank inventory: 1250.4

    42%

    User Selectable

    Initial Tank Volume 3000

    Make-Up Rate 1650

    Tank Working Volume 3000

    1500L Mammalian Purification Process Train #1 Starts on Monday

    1

    0

    6.00

    3000

    0

  • 7/28/2019 Water Histograms 18 Dec 2003

    27/60

    H

    Sizing Assumptions

    1500 L Mammalian Media Prep

    1500 L Mammalian Buffer Prep

    Suite 1 Washer

    Fill/finish: Dirty Parts Washer

    Fill / finish: Vial Washer

    Fill / finish: Clean Parts Washer

    Fill / finish: CIP

    Fill / finish: Lyophilizer Wash-Out

    1780.00 Use points

    1413.00 (max. consumption)

    1780.00 Mam Suite 1, Cell Culture 25 lpm max per drop

    1166.00 Mam Suite 1, V+ Purification 25 lpm max per drop

    0.00 Mam Suite 1, V- Purification 25 lpm max per drop

    1413.00 Suite 1 Media Preparation 25 lpm max per drop

    400.00 Suite 1 Buffer Preparation 25 lpm max per drop

    #REF! Suite 1 Washer

    #REF!

    150.00 Utility area: COP 959 l per run

    500.00 Fill / finish: Dirty Parts Washer 150 l per run

    500.00 Fill / finish: Vial Washer 500 l per run

    706.00 Fill / finish: Clean Parts Washer 500 l per run

    200.00 Fill / finish: CIP (WFI Rinse Only) 706 l per run

    Fill / finish: Lyophilizer Wash-Out 200 l per run

    0.00

    Total WFI Water Usage liter per hour

    Time (Day. Hour)

    Tank Volume @Start of Hour

    Make-Up Volume 463.0 (time-averaged)

    Minimum tank inventory: 1250.4

    42%

    User Selectable

    Initial Tank Volume 3000

    Make-Up Rate 1650

    Tank Working Volume 3000

    1500L Mammalian Purification Process Train #1 Starts on Monday

    1

    0

    7.00

    3000 3

    0

  • 7/28/2019 Water Histograms 18 Dec 2003

    28/60

    0

    150

    300

    450

    600

    750

    900

    1050

    1200

    1350

    1500

    1650

    1800

    SystemMakeu

    p,LPH

    Time (Day. Hour)

    Water for Injection System:System Make-Up and Tank Volume

    Tank Volume WFI Makeup

  • 7/28/2019 Water Histograms 18 Dec 2003

    29/60

    Sizing Assumptions 1 2

    Suite 1 Media Prep

    Suite 1 Buffer Prep

    500 L Mammalian Cell Culture Process Suite 2 Starts on Monday

    Use points

    Rooms (max. consumption)

    Building 1C

    M1-CC-1 Mam Suite 1, Cell Culture SIP: 0.0803 kg/liter M1-P1 Mam Suite 1, V+ Purification SIP: 0.0803 kg/liter

    M1-P2 Mam Suite 1, V- Purification SIP: 0.0803 kg/liter

    Mam Suite 1 Buffer Preparation SIP: 0.0803 kg/liter

    FF-Auto Filling Suite Autoclave 230 kg/load

    End user load excluding HVAC 0 0

    AHU (humidification) 352.27 352.27

    Line Loss 10% 35.227 35.227

    Total Pure Steam Usage kg/hr 387.5 387.5

    USP Water Supply, LPH 782.285775 445.63 445.63

    Time (Day. Hour) 1.00 1.01

    Time-averaged production 407.5

    Maximum Pure Steam Load 680 kg/hr

    Line loss, maximum 68.0

    Blowdown 102.0

    Safety factor 20%

    Pure steam generator 1100 kg/hr

    Pure Steam Pressure 2.4 bar

    Blowdown percentage 15%

    Minimum load 35%

    1500L Mammalian Purification Process Suite 1 Starts on Monday

  • 7/28/2019 Water Histograms 18 Dec 2003

    30/60

    Sizing Assumptions

    Suite 1 Media Prep

    Suite 1 Buffer Prep

    500 L Mammalian Cell Culture Process Suite 2 Starts on Monday

    Use points

    Rooms (max. consumption)

    Building 1C

    M1-CC-1 Mam Suite 1, Cell Culture SIP: 0.0803 kg/liter

    M1-P1 Mam Suite 1, V+ Purification SIP: 0.0803 kg/liter M1-P2 Mam Suite 1, V- Purification SIP: 0.0803 kg/liter

    Mam Suite 1 Buffer Preparation SIP: 0.0803 kg/liter

    FF-Auto Filling Suite Autoclave 230 kg/load

    End user load excluding HVAC

    AHU (humidification)

    Line Loss 10%

    Total Pure Steam Usage kg/hr

    USP Water Supply, LPH 782.285775

    Time (Day. Hour)

    Time-averaged production 407.5

    Maximum Pure Steam Load 680

    Line loss, maximum 68.0

    Blowdown 102.0

    Safety factor 20%

    Pure steam generator 1100

    Pure Steam Pressure 2.4

    Blowdown percentage 15%

    Minimum load 35%

    1500L Mammalian Purification Process Suite 1 Starts on Monday

    1 2

    0 0

    352.27 352.27 3

    35.227 35.227 3

    387.5 387.5 3

    445.63 445.63 4

    2.00 2.01

  • 7/28/2019 Water Histograms 18 Dec 2003

    31/60

    Sizing Assumptions

    Suite 1 Media Prep

    Suite 1 Buffer Prep

    500 L Mammalian Cell Culture Process Suite 2 Starts on Monday

    Use points

    Rooms (max. consumption)

    Building 1C

    M1-CC-1 Mam Suite 1, Cell Culture SIP: 0.0803 kg/liter

    M1-P1 Mam Suite 1, V+ Purification SIP: 0.0803 kg/liter M1-P2 Mam Suite 1, V- Purification SIP: 0.0803 kg/liter

    Mam Suite 1 Buffer Preparation SIP: 0.0803 kg/liter

    FF-Auto Filling Suite Autoclave 230 kg/load

    End user load excluding HVAC

    AHU (humidification)

    Line Loss 10%

    Total Pure Steam Usage kg/hr

    USP Water Supply, LPH 782.285775

    Time (Day. Hour)

    Time-averaged production 407.5

    Maximum Pure Steam Load 680

    Line loss, maximum 68.0

    Blowdown 102.0

    Safety factor 20%

    Pure steam generator 1100

    Pure Steam Pressure 2.4

    Blowdown percentage 15%

    Minimum load 35%

    1500L Mammalian Purification Process Suite 1 Starts on Monday

    1 2

    0 0

    352.27 352.27 35

    35.227 35.227 35

    387.5 387.5 38

    445.63 445.63 44

    3.00 3.01 3

  • 7/28/2019 Water Histograms 18 Dec 2003

    32/60

    H

    Sizing Assumptions

    Suite 1 Media Prep

    Suite 1 Buffer Prep

    500 L Mammalian Cell Culture Process Suite 2 Starts on Monday

    Use points

    Rooms (max. consumption)

    Building 1C

    M1-CC-1 Mam Suite 1, Cell Culture SIP: 0.0803 kg/liter

    M1-P1 Mam Suite 1, V+ Purification SIP: 0.0803 kg/liter

    M1-P2 Mam Suite 1, V- Purification SIP: 0.0803 kg/liter Mam Suite 1 Buffer Preparation SIP: 0.0803 kg/liter

    FF-Auto Filling Suite Autoclave 230 kg/load

    End user load excluding HVAC

    AHU (humidification)

    Line Loss 10%

    Total Pure Steam Usage kg/hr

    USP Water Supply, LPH 782.285775

    Time (Day. Hour)

    Time-averaged production 407.5

    Maximum Pure Steam Load 680

    Line loss, maximum 68.0

    Blowdown 102.0

    Safety factor 20%

    Pure steam generator 1100

    Pure Steam Pressure 2.4

    Blowdown percentage 15%

    Minimum load 35%

    1500L Mammalian Purification Process Suite 1 Starts on Monday

    1 2 3

    0 0 0

    352.27 352.27 352.27

    35.227 35.227 35.227

    387.5 387.5 387.5

    445.63 445.63 445.6

    4.00 4.01 4.02

  • 7/28/2019 Water Histograms 18 Dec 2003

    33/60

    Hi

    Sizing Assumptions

    Suite 1 Media Prep

    Suite 1 Buffer Prep

    500 L Mammalian Cell Culture Process Suite 2 Starts on Monday

    Use points

    Rooms (max. consumption)

    Building 1C

    M1-CC-1 Mam Suite 1, Cell Culture SIP: 0.0803 kg/liter

    M1-P1 Mam Suite 1, V+ Purification SIP: 0.0803 kg/liter

    M1-P2 Mam Suite 1, V- Purification SIP: 0.0803 kg/liter

    Mam Suite 1 Buffer Preparation SIP: 0.0803 kg/liter

    FF-Auto Filling Suite Autoclave 230 kg/load

    End user load excluding HVAC

    AHU (humidification)

    Line Loss 10%

    Total Pure Steam Usage kg/hr

    USP Water Supply, LPH 782.285775

    Time (Day. Hour)

    Time-averaged production 407.5

    Maximum Pure Steam Load 680

    Line loss, maximum 68.0Blowdown 102.0

    Safety factor 20%

    Pure steam generator 1100

    Pure Steam Pressure 2.4

    Blowdown percentage 15%

    Minimum load 35%

    1500L Mammalian Purification Process Suite 1 Starts on Monday

    1 2 3

    0 0 0

    352.27 352.27 352.27

    35.227 35.227 35.227

    387.5 387.5 387.5

    445.63 445.63 445.63

    5.00 5.01 5.02

  • 7/28/2019 Water Histograms 18 Dec 2003

    34/60

    H

    Sizing Assumptions

    Suite 1 Media Prep

    Suite 1 Buffer Prep

    500 L Mammalian Cell Culture Process Suite 2 Starts on Monday

    Use points

    Rooms (max. consumption)

    Building 1C

    M1-CC-1 Mam Suite 1, Cell Culture SIP: 0.0803 kg/liter

    M1-P1 Mam Suite 1, V+ Purification SIP: 0.0803 kg/liter

    M1-P2 Mam Suite 1, V- Purification SIP: 0.0803 kg/liter Mam Suite 1 Buffer Preparation SIP: 0.0803 kg/liter

    FF-Auto Filling Suite Autoclave 230 kg/load

    End user load excluding HVAC

    AHU (humidification)

    Line Loss 10%

    Total Pure Steam Usage kg/hr

    USP Water Supply, LPH 782.285775

    Time (Day. Hour)

    Time-averaged production 407.5

    Maximum Pure Steam Load 680

    Line loss, maximum 68.0

    Blowdown 102.0

    Safety factor 20%

    Pure steam generator 1100

    Pure Steam Pressure 2.4

    Blowdown percentage 15%

    Minimum load 35%

    1500L Mammalian Purification Process Suite 1 Starts on Monday

    1 2 3

    0 0 0

    352.27 352.27 352.27

    35.227 35.227 35.227

    387.5 387.5 387.5

    445.63 445.63 445.63

    6.00 6.01 6.02

  • 7/28/2019 Water Histograms 18 Dec 2003

    35/60

    His

    Sizing Assumptions

    Suite 1 Media Prep

    Suite 1 Buffer Prep

    500 L Mammalian Cell Culture Process Suite 2 Starts on Monday

    Use points

    Rooms (max. consumption)

    Building 1C

    M1-CC-1 Mam Suite 1, Cell Culture SIP: 0.0803 kg/liter

    M1-P1 Mam Suite 1, V+ Purification SIP: 0.0803 kg/liter

    M1-P2 Mam Suite 1, V- Purification SIP: 0.0803 kg/liter

    Mam Suite 1 Buffer Preparation SIP: 0.0803 kg/liter FF-Auto Filling Suite Autoclave 230 kg/load

    End user load excluding HVAC

    AHU (humidification)

    Line Loss 10%

    Total Pure Steam Usage kg/hr

    USP Water Supply, LPH 782.285775

    Time (Day. Hour)

    Time-averaged production 407.5

    Maximum Pure Steam Load 680

    Line loss, maximum 68.0Blowdown 102.0

    Safety factor 20%

    Pure steam generator 1100

    Pure Steam Pressure 2.4

    Blowdown percentage 15%

    Minimum load 35%

    1500L Mammalian Purification Process Suite 1 Starts on Monday

    1 2 3

    0 0 0

    352.27 352.27 352.27

    35.227 35.227 35.227

    387.5 387.5 387.5

    445.63 445.63 445.63

    7.00 7.01 7.02

  • 7/28/2019 Water Histograms 18 Dec 2003

    36/60

    Histogram of

    Sizing Assumptions 1 2 3 4 5

    Suite 1 biowaste 2957 70

    Total biowaste liter per hour 0 0 0 0 70

    Time (Day. Hour) 1.00 1.01 1.02 1.03 1.04

    Tank Volume @ End of Hour 0 0 0 0 0

    Throughput rate 1800 1800 1800 1800 1800

    Tank Working Volume 2500 2500 2500 2500 2500

    % of working volume 46% 0.00% 0.00% 0.00% 0.00% 0.00%

    User Selectable

    Initial Tank Volume 2500 L

    Make-Up Rate 1800 Lph

    Tank Working Volume 2500 L

    Max inflow 2957 Lph

    49.28 liter/min

    4

  • 7/28/2019 Water Histograms 18 Dec 2003

    37/60

    Histogram of C

    Sizing Assumptions

    Suite 1 biowaste 2957

    Total biowaste liter per hour

    Time (Day. Hour)

    Tank Volume @ End of Hour

    Throughput rate

    Tank Working Volume

    % of working volume 46%

    User Selectable

    Initial Tank Volume 2500

    Make-Up Rate 1800

    Tank Working Volume 2500

    Max inflow 2957

    49.28

    1 2 3 4 5

    0 0 0 0 0

    2.00 2.01 2.02 2.03 2.04

    0 0 0 0 0

    1800 1800 1800 1800 1800

    2500 2500 2500 2500 2500

    0.00% 0.00% 0.00% 0.00% 0.00%

  • 7/28/2019 Water Histograms 18 Dec 2003

    38/60

    Histogram of C

    Sizing Assumptions

    Suite 1 biowaste 2957

    Total biowaste liter per hour

    Time (Day. Hour)

    Tank Volume @ End of Hour

    Throughput rate

    Tank Working Volume

    % of working volume 46%

    User Selectable

    Initial Tank Volume 2500

    Make-Up Rate 1800

    Tank Working Volume 2500

    Max inflow 2957

    49.28

    1 2 3 4 5

    0 0 0 0 0

    3.00 3.01 3.02 3.03 3.04

    0 0 0 0 0

    1800 1800 1800 1800 1800

    2500 2500 2500 2500 2500

    0.00% 0.00% 0.00% 0.00% 0.00%

  • 7/28/2019 Water Histograms 18 Dec 2003

    39/60

    Histogram of C

    Sizing Assumptions

    Suite 1 biowaste 2957

    Total biowaste liter per hour

    Time (Day. Hour)

    Tank Volume @ End of Hour

    Throughput rate

    Tank Working Volume

    % of working volume 46%

    User Selectable

    Initial Tank Volume 2500

    Make-Up Rate 1800

    Tank Working Volume 2500

    Max inflow 2957

    49.28

    1 2 3 4 5

    0 0 0 0 0

    4.00 4.01 4.02 4.03 4.04

    0 0 0 0 0

    1800 1800 1800 1800 1800

    2500 2500 2500 2500 2500

    0.00% 0.00% 0.00% 0.00% 0.00%

  • 7/28/2019 Water Histograms 18 Dec 2003

    40/60

    Histogram of C

    Sizing Assumptions

    Suite 1 biowaste 2957

    Total biowaste liter per hour

    Time (Day. Hour)

    Tank Volume @ End of Hour

    Throughput rate

    Tank Working Volume

    % of working volume 46%

    User Selectable

    Initial Tank Volume 2500

    Make-Up Rate 1800

    Tank Working Volume 2500

    Max inflow 2957

    49.28

    1 2 3 4 5

    0 0 0 0 0

    5.00 5.01 5.02 5.03 5.04

    0 0 0 0 0

    1800 1800 1800 1800 1800

    2500 2500 2500 2500 2500

    0.00% 0.00% 0.00% 0.00% 0.00%

  • 7/28/2019 Water Histograms 18 Dec 2003

    41/60

    Histogram of C

    Sizing Assumptions

    Suite 1 biowaste 2957

    Total biowaste liter per hour

    Time (Day. Hour)

    Tank Volume @ End of Hour

    Throughput rate

    Tank Working Volume

    % of working volume 46%

    User Selectable

    Initial Tank Volume 2500

    Make-Up Rate 1800

    Tank Working Volume 2500

    Max inflow 2957

    49.28

    1 2 3 4 5

    0 0 0 0 0

    6.00 6.01 6.02 6.03 6.04

    0 0 0 0 0

    1800 1800 1800 1800 1800

    2500 2500 2500 2500 2500

    0.00% 0.00% 0.00% 0.00% 0.00%

  • 7/28/2019 Water Histograms 18 Dec 2003

    42/60

    Histogram of C

    Sizing Assumptions

    Suite 1 biowaste 2957

    Total biowaste liter per hour

    Time (Day. Hour)

    Tank Volume @ End of Hour

    Throughput rate

    Tank Working Volume

    % of working volume 46%

    User Selectable

    Initial Tank Volume 2500

    Make-Up Rate 1800

    Tank Working Volume 2500

    Max inflow 2957

    49.28

    1 2 3 4 5

    0 0 0 0 0

    7.00 7.01 7.02 7.03 7.04

    0 0 0 0 0

    1800 1800 1800 1800 1800

    2500 2500 2500 2500 2500

    0.00% 0.00% 0.00% 0.00% 0.00%

  • 7/28/2019 Water Histograms 18 Dec 2003

    43/60

    0

    200

    400

    600

    800

    1000

    1200

    1400

    1600

    1800

    2000

    Biowaste,liters

    Time (Day. Hour)

    Cell Culture Biowaste Surge and Throughput Th

  • 7/28/2019 Water Histograms 18 Dec 2003

    44/60

    Histo

    Sizing Assumptions 1 2 3 4 5 6

    Suite 1 biowaste 2957 0 0 0 0 70 1153

    Total biowaste liter per hour 0 0 0 0 70 1153

    Time (Day. Hour) 1.00 1.01 1.02 1.03 1.04 1.05

    Tank Volume @ End of Hour 0 0 0 0 0 0Throughput rate 1800 1800 1800 1800 1800 1800

    Tank Working Volume 2000 2000 2000 2000 2000 2000

    % of working volume 58% maximum 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

    Ave

    User Selectable Max

    Initial Tank Inventory 0 L

    Make-Up Rate 1800 Lph 30 Liters/min

    Tank Working Volume 2000 L

    Maximum Inflow 2957 Lph 49.2833 Liters/min

    Time-averaged inflow 49.1 Lph 0.81776 Liters/min

  • 7/28/2019 Water Histograms 18 Dec 2003

    45/60

    Histo

    Sizing Assumptions

    Suite 1 biowaste 2957

    Total biowaste liter per hour

    Time (Day. Hour)

    Tank Volume @ End of HourThroughput rate

    Tank Working Volume

    % of working volume 58% maximum

    User Selectable

    Initial Tank Inventory 0

    Make-Up Rate 1800

    Tank Working Volume 2000

    Maximum Inflow 2957

    Time-averaged inflow 49.1

    1 2 3 4 5 6

    0 0 0 0 0 0

    0 0 0 0 0 0

    2.00 2.01 2.02 2.03 2.04 2.05

    0 0 0 0 0 01800 1800 1800 1800 1800 1800

    2000 2000 2000 2000 2000 2000

    0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

  • 7/28/2019 Water Histograms 18 Dec 2003

    46/60

    Histo

    Sizing Assumptions

    Suite 1 biowaste 2957

    Total biowaste liter per hour

    Time (Day. Hour)

    Tank Volume @ End of HourThroughput rate

    Tank Working Volume

    % of working volume 58% maximum

    User Selectable

    Initial Tank Inventory 0

    Make-Up Rate 1800

    Tank Working Volume 2000

    Maximum Inflow 2957

    Time-averaged inflow 49.1

    1 2 3 4 5 6

    0 0 0 0 0 0

    0 0 0 0 0 0

    3.00 3.01 3.02 3.03 3.04 3.05

    0 0 0 0 0 01800 1800 1800 1800 1800 1800

    2000 2000 2000 2000 2000 2000

    0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

  • 7/28/2019 Water Histograms 18 Dec 2003

    47/60

    Histo

    Sizing Assumptions

    Suite 1 biowaste 2957

    Total biowaste liter per hour

    Time (Day. Hour)

    Tank Volume @ End of HourThroughput rate

    Tank Working Volume

    % of working volume 58% maximum

    User Selectable

    Initial Tank Inventory 0

    Make-Up Rate 1800

    Tank Working Volume 2000

    Maximum Inflow 2957

    Time-averaged inflow 49.1

    1 2 3 4 5 6

    0 0 0 0 0 0

    0 0 0 0 0 0

    4.00 4.01 4.02 4.03 4.04 4.05

    0 0 0 0 0 01800 1800 1800 1800 1800 1800

    2000 2000 2000 2000 2000 2000

    0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

  • 7/28/2019 Water Histograms 18 Dec 2003

    48/60

    Histo

    Sizing Assumptions

    Suite 1 biowaste 2957

    Total biowaste liter per hour

    Time (Day. Hour)

    Tank Volume @ End of HourThroughput rate

    Tank Working Volume

    % of working volume 58% maximum

    User Selectable

    Initial Tank Inventory 0

    Make-Up Rate 1800

    Tank Working Volume 2000

    Maximum Inflow 2957

    Time-averaged inflow 49.1

    1 2 3 4 5 6

    0 0 0 0 0 0

    0 0 0 0 0 0

    5.00 5.01 5.02 5.03 5.04 5.05

    0 0 0 0 0 01800 1800 1800 1800 1800 1800

    2000 2000 2000 2000 2000 2000

    0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

  • 7/28/2019 Water Histograms 18 Dec 2003

    49/60

    Histo

    Sizing Assumptions

    Suite 1 biowaste 2957

    Total biowaste liter per hour

    Time (Day. Hour)

    Tank Volume @ End of HourThroughput rate

    Tank Working Volume

    % of working volume 58% maximum

    User Selectable

    Initial Tank Inventory 0

    Make-Up Rate 1800

    Tank Working Volume 2000

    Maximum Inflow 2957

    Time-averaged inflow 49.1

    1 2 3 4 5 6

    0 0 0 0 0 0

    0 0 0 0 0 0

    6.00 6.01 6.02 6.03 6.04 6.05

    0 0 0 0 0 01800 1800 1800 1800 1800 1800

    2000 2000 2000 2000 2000 2000

    0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

  • 7/28/2019 Water Histograms 18 Dec 2003

    50/60

    Histo

    Sizing Assumptions

    Suite 1 biowaste 2957

    Total biowaste liter per hour

    Time (Day. Hour)

    Tank Volume @ End of HourThroughput rate

    Tank Working Volume

    % of working volume 58% maximum

    User Selectable

    Initial Tank Inventory 0

    Make-Up Rate 1800

    Tank Working Volume 2000

    Maximum Inflow 2957

    Time-averaged inflow 49.1

    1 2 3 4 5 6

    0 0 0 0 0 0

    0 0 0 0 0 0

    7.00 7.01 7.02 7.03 7.04 7.05

    0 0 0 0 0 01800 1800 1800 1800 1800 1800

    2000 2000 2000 2000 2000 2000

    0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

  • 7/28/2019 Water Histograms 18 Dec 2003

    51/60

    0

    250

    500

    750

    1000

    1250

    1500

    1750

    2000

    2250

    2500

    Inventory

    ,liters

    Time (Day. Hour)

    Biowaste (Kill System) Volume and Throughput Th

  • 7/28/2019 Water Histograms 18 Dec 2003

    52/60

    Histogram of Process Waste

    Sizing Assumptions 1 2 3 4 5 6 7

    Suite 1 biowaste 2957 0 0 0 0 70 1413 1413

    Fill/finish 1459

    Clean steam condensate 266.135 0 0 0 0 70 0 0

    Total process waste liter per hour 0 0 0 0 140 1413 1413

    Time (Day. Hour) 1.00 1.01 1.02 1.03 1.04 1.05 1.06

    Tank Volume @ End of Hour 0 0 0 0 0 0 0

    Throughput rate 1800 1800 1800 1800 1800 1800 1800

    Tank Working Volume 2250 2250 2250 2250 2250 2250 2250

    % of working volume 51% maximum 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

    Average Dai

    User Selectable Maximum Da

    Initial Tank Inventory 0 L

    Throughput Rate 1800 Lph 30 Liters/min

    Tank Working Volume 2250 L

    Maximum Inflow 2957 Lph 49.283 Liters/min

    Time-averaged inflow 210.7 Lph 3.5121 Liters/min

  • 7/28/2019 Water Histograms 18 Dec 2003

    53/60

    Histogram of Process Waste

    Sizing Assumptions

    Suite 1 biowaste 2957

    Fill/finish 1459

    Clean steam condensate 266.135

    Total process waste liter per hour

    Time (Day. Hour)

    Tank Volume @ End of Hour

    Throughput rate

    Tank Working Volume

    % of working volume 51% maximum

    User Selectable

    Initial Tank Inventory 0

    Throughput Rate 1800

    Tank Working Volume 2250

    Maximum Inflow 2957

    Time-averaged inflow 210.7

    1 2 3 4 5 6 7

    0 0 0 0 0 0 0

    0 0 0 0 0 0 64.24

    0 0 0 0 0 0 64.24

    2.00 2.01 2.02 2.03 2.04 2.05 2.06

    0 0 0 0 0 0 0

    1800 1800 1800 1800 1800 1800 1800

    2250 2250 2250 2250 2250 2250 2250

    0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

  • 7/28/2019 Water Histograms 18 Dec 2003

    54/60

    Histogram of Process Waste

    Sizing Assumptions

    Suite 1 biowaste 2957

    Fill/finish 1459

    Clean steam condensate 266.135

    Total process waste liter per hour

    Time (Day. Hour)

    Tank Volume @ End of Hour

    Throughput rate

    Tank Working Volume

    % of working volume 51% maximum

    User Selectable

    Initial Tank Inventory 0

    Throughput Rate 1800

    Tank Working Volume 2250

    Maximum Inflow 2957

    Time-averaged inflow 210.7

    1 2 3 4 5 6 7

    0 0 0 0 0 0 0

    0 0 0 0 0 230 64.24

    0 0 0 0 0 230 64.24

    3.00 3.01 3.02 3.03 3.04 3.05 3.06

    0 0 0 0 0 0 0

    1800 1800 1800 1800 1800 1800 1800

    2250 2250 2250 2250 2250 2250 2250

    0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

  • 7/28/2019 Water Histograms 18 Dec 2003

    55/60

    Histogram of Process Waste

    Sizing Assumptions

    Suite 1 biowaste 2957

    Fill/finish 1459

    Clean steam condensate 266.135

    Total process waste liter per hour

    Time (Day. Hour)

    Tank Volume @ End of Hour

    Throughput rate

    Tank Working Volume

    % of working volume 51% maximum

    User Selectable

    Initial Tank Inventory 0

    Throughput Rate 1800

    Tank Working Volume 2250

    Maximum Inflow 2957

    Time-averaged inflow 210.7

    1 2 3 4 5 6 7

    0 0 0 0 0 0 0

    0 0 0 0 0 0 0

    0 0 0 0 0 0 0

    4.00 4.01 4.02 4.03 4.04 4.05 4.06

    0 0 0 0 0 0 0

    1800 1800 1800 1800 1800 1800 1800

    2250 2250 2250 2250 2250 2250 2250

    0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

  • 7/28/2019 Water Histograms 18 Dec 2003

    56/60

    Histogram of Process Waste

    Sizing Assumptions

    Suite 1 biowaste 2957

    Fill/finish 1459

    Clean steam condensate 266.135

    Total process waste liter per hour

    Time (Day. Hour)

    Tank Volume @ End of Hour

    Throughput rate

    Tank Working Volume

    % of working volume 51% maximum

    User Selectable

    Initial Tank Inventory 0

    Throughput Rate 1800

    Tank Working Volume 2250

    Maximum Inflow 2957

    Time-averaged inflow 210.7

    1 2 3 4 5 6 7

    0 0 0 0 0 0 0

    0 0 0 0 0 0 0

    0 0 0 0 0 0 0

    5.00 5.01 5.02 5.03 5.04 5.05 5.06

    0 0 0 0 0 0 0

    1800 1800 1800 1800 1800 1800 1800

    2250 2250 2250 2250 2250 2250 2250

    0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

  • 7/28/2019 Water Histograms 18 Dec 2003

    57/60

    Histogram of Process Waste

    Sizing Assumptions

    Suite 1 biowaste 2957

    Fill/finish 1459

    Clean steam condensate 266.135

    Total process waste liter per hour

    Time (Day. Hour)

    Tank Volume @ End of Hour

    Throughput rate

    Tank Working Volume

    % of working volume 51% maximum

    User Selectable

    Initial Tank Inventory 0

    Throughput Rate 1800

    Tank Working Volume 2250

    Maximum Inflow 2957

    Time-averaged inflow 210.7

    1 2 3 4 5 6 7

    0 0 0 0 0 0 0

    0 0 0 0 0 0 0

    0 0 0 0 0 0 0

    6.00 6.01 6.02 6.03 6.04 6.05 6.06

    0 0 0 0 0 0 0

    1800 1800 1800 1800 1800 1800 1800

    2250 2250 2250 2250 2250 2250 2250

    0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

  • 7/28/2019 Water Histograms 18 Dec 2003

    58/60

    Histogram of Process Waste

    Sizing Assumptions

    Suite 1 biowaste 2957

    Fill/finish 1459

    Clean steam condensate 266.135

    Total process waste liter per hour

    Time (Day. Hour)

    Tank Volume @ End of Hour

    Throughput rate

    Tank Working Volume

    % of working volume 51% maximum

    User Selectable

    Initial Tank Inventory 0

    Throughput Rate 1800

    Tank Working Volume 2250

    Maximum Inflow 2957

    Time-averaged inflow 210.7

    1 2 3 4 5 6 7

    0 0 0 0 0 0 0

    0 0 0 0 0 0 0

    0 0 0 0 0 0 0

    7.00 7.01 7.02 7.03 7.04 7.05 7.06

    0 0 0 0 0 0 0

    1800 1800 1800 1800 1800 1800 1800

    2250 2250 2250 2250 2250 2250 2250

    0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

  • 7/28/2019 Water Histograms 18 Dec 2003

    59/60

    0

    250

    500

    750

    1000

    1250

    1500

    1750

    2000

    2250

    2500

    Inventory,

    liters

    Time (Day. Hour)

    Process Waste Volume and Throughput Th

  • 7/28/2019 Water Histograms 18 Dec 2003

    60/60

    WPU Correl'n WFI Correl'n Gal/min

    25 647 294 294 353 353 8 29.41

    30 688 313 313 375 375 8 31.27

    60 867 394 394 473 473 10 39.40

    70 912 415 415 497 497 11 41.4875 934 425 424 509 509 11 42.44

    100 1028 467 467 561 560 12 46.71

    150 1176 535 535 641 641 14 53.49

    200 1294 588 589 706 706 16 58.86

    250 1394 634 634 760 761 17 63.40

    300 1482 674 674 808 808 18 67.37

    350 1560 709 709 851 851 19 70.92

    400 1632 742 742 890 890 20 74.15

    450 1697 771 771 926 925 20 77.11

    500 1758 799 799 959 958 21 79.88

    600 1868 849 849 1019 1019 22 84.88

    700 1966 894 894 1072 1072 24 89.36

    750 2012 915 915 1097 1097 24 91.44

    800 2056 935 935 1121 1121 25 93.43

    1600 2590 1177 1177 1413 1413 31 117.7

    USP PW Rinse WFI Final Rinse

    Tank volume/water volum Tank volume/water volume

    correlation correlation

    Power Fit: y=ax^b Power Fit: y=ax^b

    Coefficient Data: Coefficient Data:

    a = 100.6452 a = 120.6076

    b = 0.333367 b = 0.333541

    2:1 fermentors/bioreactors

    USP PW WFI Final Rinse, L

    Total CIP

    Vessel

    Volume, L

    CIP Fluid,

    L

    (for waste

    NOTE: CIP volumes are based on an assumption of a flowrate of 3.46 liters/minute per metcycle time of 22 minutes is assumed, broken down as follows:

    Initial rinse 2 minutes USP PWCaustic wash 2 minutes USP PWSecond rinse 4 minutes USP PW

    Acid wash 2 minutes USP PWFinal rinse 12 minutes WFI