Page 1: WATER & ENVIRONMENT NSU - sunjin.co.kr · Sewerage 10. River Engineering 11. Storm Water Pump Station ... Water & Sewerage ... Qatar Romania Russia S. Korea

NIHON SUIDOSUNJINWWATEER && ENVVIROONMEENT

NSUNIHON SUIDO CONSULTANTS SUNJIN UNITED

N I H O N S U I D O C o n s u l t a n t s S U N J I N U n i t e d

COMPANY PROFILE & PROJECT BOOK

Page 2: WATER & ENVIRONMENT NSU - sunjin.co.kr · Sewerage 10. River Engineering 11. Storm Water Pump Station ... Water & Sewerage ... Qatar Romania Russia S. Korea

CONTENTS

About United01. About NSU (Nihon Suido Consultants & SUNJIN United)

02. United Service Area

03. Synergy Advantage

04. Organization

05. Manpower

06. License

07. Global Networks

��

������������

Portfolio08. Water Supply

09. Sewerage

10. River Engineering

1 1 . Storm Water Pump Station

1 2 . Major Project Lists

�������

Page 3: WATER & ENVIRONMENT NSU - sunjin.co.kr · Sewerage 10. River Engineering 11. Storm Water Pump Station ... Water & Sewerage ... Qatar Romania Russia S. Korea

01

02

ABOUT NSU SUNJINKOREA

Nihon Suido ConsultantsJAPAN

NSU Message

The collaboration between Nihon Suido Consultants Co., Ltd. a Japanese company with world-class technology and experience in waterworks & sewerage field and Sunjin Engineering & Architecture, a Korean company with experience and know-how in the field of water treatment plant, intake facilities, transmission-distribution pipe, advanced treatment process, sewerage treatment plant, rainwater pump station and reservoir creates a synergy effect to provide high-quality service for customer satisfaction.

Nihon Suido Consultants Sunjin United

Company Name

President

Head Office

Establishment

Employees

Type of Business

Website

Tel.

SUNJIN Engineering & Architecture co., Ltd.

Yoo, Sang Chun

Korea (Seoul)

1975. 6

1,272

Civil & Architecture Engineering Service,

Design & Supervision

www.sunjin.co.kr

+82-2-6333-3339

Nihon Suido Consultants co., Ltd.

Yoshikazu NOMURA

Japan (Tokyo)

1959

Water Supply System for Municipal & Industrial Purposes

Sewerage & Drainage System with Water Reuse & Recycle System

Human Waste Disposal

Water Pollution Control & Process Development

www.nissuicon.co.jp

+81-3-5323-6200

Company Profile

2

NIHON SUIDO CONSULTANTS SUNJIN UNITED

About United

One stop service by integrated engineering management throughout the entire process in waterworks & sewerage.

Research and Feasibility Study → Basic Design → Detailed Design → System engineering → Supervision → CM → Management / Training / Education

Provide high quality service so that the quality of life will be improved, and offer cultural space for local people on its surface space through underground sewerage treatment plant.

NSU Agreement

Page 4: WATER & ENVIRONMENT NSU - sunjin.co.kr · Sewerage 10. River Engineering 11. Storm Water Pump Station ... Water & Sewerage ... Qatar Romania Russia S. Korea

Water SupplyWater Supply System improvement Master PlanWater Treatment Facility, Water IntakeTransmission and Distribution FacilityRiverside Filtration System Development

Water & SewerageSewerage Master PlanSewer line Improvement Master PlanWastewater Treatment FacilityDrainage Pumping-Station & FacilityUnderground Sewage Treatment Plant

Water RecycleTreatment Water Recycle Facility

Water PurificationWater Pollution Control & Process Development

O&M (Operation & Maintenance)System Engineering

River EngineeringComprehensive Development Plan of River AreaMaintenance and Improvement Project Plan of RiverMaintenance and Improvement Project of Environmental River

Water ResourceDevelopment of Dam and CanalForming of Ecology Water ParkComprehensive Reduction plan of Damage from Storm and FloodInfluence Assessment on Advance Disaster

EnvironmentEnvironmental Impact Assessment(EIA)Preliminary Environment ReviewPost-EIA(Environmental Impact Assessment)Design for Non-Point Pollution Treatment FacilitiesDesign for Waste Incinerator and Landfill FacilitiesDesign for Food Waste Composting Facility

LandscapePark & Open Space PlanningWater Front plan of Utilization Water SpaceRecreation & Tourism IndustryUrban Beau

Electrical DesignGeneration, Transmission and Distribution of ElectrictityElectrical Facilities for ConstructionElectrical Design in PlantRenewable Energy

Mechanical FacilitiesMechanical Engineering

Mechanical Design in Plant

Architecture EngineeringPublic and commercial facilities Cultural exhibition facilitiesEducational and research facilities Residential facilitiesSports facilitiesMedical facilities

Urban PlanningLand Use PlanningNational Land Use Planning & Regional Land Use PlanningMetropolitan City PlanningDistrict Unit PlanningUrban Development & Complex Design

02

04

UNITED SERVICE AREA

About United

Nihon Suido Consultants Sunjin United

Page 5: WATER & ENVIRONMENT NSU - sunjin.co.kr · Sewerage 10. River Engineering 11. Storm Water Pump Station ... Water & Sewerage ... Qatar Romania Russia S. Korea

Making facilities underground, we can arrange the facilities underground and can assign surface space to sports facilities space, waterfront and etc for people around area, with an emphasis on eco-friendly resource such as renewable energy and recycling treated water.

“ Collaboration between Nihon Suido in Japan Consultants and Sunjin in Korea will provide customer satisfaction in waterworks & sewage services through the synergy effect.”

Technology

NSU SYNERGY EFFECT

Value

Manpower Reference

EPC (Engineering - Procurement - CM)

FS (Feasibility Study), Design, Supervision, PM, CM

Experts and Engineers

Interface and One-stop services

Economical Design & Services

System Engineering

Operation & Maintenance

Water treatment plant, domestic and overseas

Sewage treatment plant, Rainwater pump station, etc

Nihon Suido Consultants Co.,Ltd.

03

06

SYNERGY

Nihon Suido Consultants Sunjin United

ADVANTAGE

About United

Page 6: WATER & ENVIRONMENT NSU - sunjin.co.kr · Sewerage 10. River Engineering 11. Storm Water Pump Station ... Water & Sewerage ... Qatar Romania Russia S. Korea

���132

257

23

57

126

�����

��

���

���

���

��

��

���

����

Personnel

Waterworks

Mechanical/Electrical EngineeringEnvironment

Total

Landscape Engineers

Architecture Engineers

Urban(& Transportation) Planning Engineers

Road & Railway Engineers

PCM & Supervision Engineers

System Engineers

Administration and Economists

N S UWater Supply Dept.

Transmission and Distribution Facility

Water Supply System

Water Treatment Plant

Wastewater Treatment Plant

Water Resource

Environmental Assessment

Project Construction Management

Administration

Environment Plant

Supervision

Finance

Sewer line Improvement

Sewage Works Dept.

Water Resource Dept.

Environment Engineering Dept.

PCM & Supervision Dept.

Management Dept.

Mechanical/Electrical Engineering Dept.

River Engineering

Operation & Maintenance Dept.

Architecture & Landscape Dept.

Road & Railway Dept.

Urban(& Transportation) Planning Dept.

04 05ORGANIZATION MANPOWER

About United About United

Water Supply Engineers

Wastewater Engineers

River Engineers

Water Resource Engineers

Supervision

08 Nihon Suido Consultants Sunjin United

Page 7: WATER & ENVIRONMENT NSU - sunjin.co.kr · Sewerage 10. River Engineering 11. Storm Water Pump Station ... Water & Sewerage ... Qatar Romania Russia S. Korea

Overseas Offices

Project Experiences

Dubai, UAE

Abu Dhabi, UAE

Albania

Bandladesh

Bolivia

Bosnia Herzegovina

Brazil

Cambodia

Canada

China

Colombia

Cuba

Denmark

Dominican Republic

Ecuador

Egypt

El Salvador

Ethiopia

France

Germany

Guam

Honduras

India

Iran

Jamaica

Japan

Jordan

Kazakhstan

Kenya

Kuwait

Kyrgyzstan

Laos

Libya

Madagascar

Mauritius

Mexico

Morroco

Myanmar

Nepal

Nicaragua

Nigeria

Norway

Oman

Pakistan

Palestine

Philippines

Qatar

Romania

Russia

S. Korea

Saipan l.

Saudi Arabia

Seychells

Singapore

South Africa

Sudan

Syria

Taiwan

Thailand

Trinidad &Tobago

Tunisia

U.S.A

UAE

UK

Vietnam

Yemen

Jordan

Libya

Vietnam

Indonesia

Laos

Sri Lanka

06 07LICENSE GLOBAL

About United

10 Nihon Suido Consultants Sunjin United

Waterworks & Sewerage, EnvironmentEngineering worksEngineering & Construction of waste water facilitiesEngineering & Construction work of general waste treatment facilitiesWater Supply SewageRiver EngineeringWater Resources DevelopmentWater Pollution Environment Water Pollution Control Water pollution prevention facilities serviceWastes TreatmentNature Environmental Management Soil EnvironmentMunicipal & Residential environment maintenance serviceEnvironmental effects assessment serviceOperation & Maintenance

Mechanical/Electrical EngineeringGeneral planning and supervision of electric power facilitiesEnergy Management Building Electrical Facilities Generation Transmission and Distribution Electric Application

Architecture & LandscapeArchitecture design & Construction supervision serviceConstruction & Architecture procedures service in accordance with related laws and regulationsLandscape design & assessment service

Urban PlanningNational Land Planning / Land Development / Urban planningSurveying service / Energy usage planning service

PM, CM, SupervisionConstruction Management ProfessionalGeneral/Project supervision and construction servicesFire-fighting facilities design & construction supervision serviceLease & Sale of real estate and other real estate related service, real estate development

Road & RailwayGeological servey / Tunnel / Steel Structure & Concrete / Soil & FoundationTraffic impact assessment serviceRoad & Railway design / Railway Track & Vehicles MaintenanceProduction and design GIS map

Etc.Quality management system certificate (ISO 9001)Environmental management system certificate (ISO 14001)Information Security Management System Requirements(ISO 27001)Software consultancy development and supply

ihon Suido Consultants &

UNJIN

NITED

NSU

NETWORKS

Page 8: WATER & ENVIRONMENT NSU - sunjin.co.kr · Sewerage 10. River Engineering 11. Storm Water Pump Station ... Water & Sewerage ... Qatar Romania Russia S. Korea

08Portfolio

12 Nihon Suido Consultants Sunjin United

WATER SUPPLY

The Project for Rehabilitation of Water Supply Facilities in Savannakhet Area, Laos

Laos

Rehabilitation project of existing water treatment plant,

distribution reservoir, pipeline

Basic design, detailed design, and construction supervision

Client_ JICA, Government of Laos

2000-2003

Basic Design on Rehabilitation of China-Japan Friendly Purification Plant Facilities in Chang Chun, China

China

Rehabilitation of existing WTP

(300,000㎥/day) facilities Basic design

Client_ JICA

2001 - 2002

Nadi-Lautoka Water Supply Scheme, Fiji (Augmentation Works)

Fiji

Treatment plant: 23,000㎥/day, 4,000㎥/day,

9,000㎥/day Reservoir, pipeline

Detailed design and construction supervision

Client_ Government of Fiji (JBIC loan)

1999 - 2003

Preliminary and Detailed Design for Advanced Water Treatment Plant of Yeongdeungpo Water Center(#3), Korea

Korea

Activate Carbon Chamber: 225,000㎥/day,

Relay Pumping Station : 300,000㎥/day

Client_ The office of Waterworks

Seoul Metro Gov’t

2008

Page 9: WATER & ENVIRONMENT NSU - sunjin.co.kr · Sewerage 10. River Engineering 11. Storm Water Pump Station ... Water & Sewerage ... Qatar Romania Russia S. Korea

1 4

Portfolio_ 08 WATER SUPPLY

14 Nihon Suido Consultants Sunjin United

The Meru Water Supply Project, Kenya

Kenya

Rehabilitation and Improvement of raw

water main, existing treatment plant,

transmission/ distribution pipeline

Advisory service on operation and

maintenance Basic design, detailed design,

and construction supervision

Client_ JICA, JBIC loanGovernment of Kenya

1999-2004

Nhon Trach Water Supply Project Dong Nai Province, Vietnam

Vietnam

Industrial and domestic water supply;

WTP: 105,000㎥/day, Intake, pumping station, transmission

and distribution pipeline, elevated tank, power system

Detailed design and construction supervision

Client_ JBIC loan

2000-to date

Master Plan for Reduction of Water Pollution of Sava River, Croatra

Croatia

Preparation of Master Plan on water Pollution

reduction and Feasibility Study for wastewater

management in selected 5 cities Master plan

and feasibility study

Client_ JICA

2000-2001

Preliminary & Detailed Design for Construction of Advanced Water Treatment Facilities of Amsa-dong Arisu Water Center, KoreaKorea

WTP : Q=1,110,000㎥/day

Client_ Office of Waterworks, Seoul Metropolitan Government

2008

Chun Industrial Water Supply Project, China

China

Treatment Plant:

250,000㎥/day, Raw Water Pipe: D1,600mm

x L26.9km, Transmission

Pipe:D1,400mm x L10km, Distribution

Pipe:D400-1,200mm x L136km

Feasibility study, detailed design,

construction supervision, and follow-up study

Client_ Government of China (JBIC two step loan)

1994-1996

Page 10: WATER & ENVIRONMENT NSU - sunjin.co.kr · Sewerage 10. River Engineering 11. Storm Water Pump Station ... Water & Sewerage ... Qatar Romania Russia S. Korea

Portfolio_ 08 WATER SUPPLY

Beijing No.9 Waterworks Extension Project(Phase 3),

China

Bangkok Water SupplyImprovement Project (1~7th), Thailand

Jakarta Water Supply Implementation Project (Buaran- II), Indonesia

China

Expansion of Beijing No. 9 WTP (additional

500,000㎥/day)

Advisory service for detailed design and

construction supervision

Client_ Government of China(JBIC loan)

1997-2000

Thailand

Expansion of water supply facilities; Treatment

Plant:400,000㎥/day x 2 nos.,

Transmission pipe: D1,500-3,200mm x L21.2km,

Reservoir: 40,000㎥, as well as UFW reduction program

Detailed design(1999-2000), Construction supervision and

UFW reduction pilot project(2001-2005)

Expansion of water supply facilities from 2,800,000㎥/day

to 3,200,000㎥/day

Construction supervision

Client_ Government of Thailand(JBIC loan, OECF loan)

1995-1999

Indonesia

(OECF loan)

Construction of Buaran-II water treatment plant

producing 259,200㎥/day of potable water to

distribute it to eastern part of Jakarta city

Detailed design

Client_Government of Indonesia

1987-1988

Detailed Design and Supervision Service for Advanced Water Treatment Plant of Gwangam Arisu Water Center, Korea

Korea

WTP : Q=250,000㎥/day

Client_ Office of Waterworks, Seoul Metropolitan Government

Capacity Development Project for Non-Revenue Water Reduction

in Jordan

Jordan

Master planning and feasibility study of the wastewater

management for the Guatemala Metropolitan area

Master plan and feasibility study

Client_ JICA

1995-1996

16 Nihon Suido Consultants Sunjin United

Page 11: WATER & ENVIRONMENT NSU - sunjin.co.kr · Sewerage 10. River Engineering 11. Storm Water Pump Station ... Water & Sewerage ... Qatar Romania Russia S. Korea

The Project for Rehabilitation ofWater Supply Facilities in Seven Districts,

Dominica

The Project for Improvement of Water Supply System for the City of Huaquillas and Arenillas, Ecuador

The Rural Water Supply Project in Sulawesi Island, Indonesia

Indonesia

Rural water supply system for 19 core areas of subdistricts: Intake, Pipe, Reservoir

Basic design, detailed design, and construction supervision (2000-2004) Small and Medium Sized Towns Water Supply,

Sulawesi, Indonesia Study for five towns in Sulawesi in frame work of PELITA III (the Third 5 year Development Plan 1979-1984)

Feasibility studies and preliminary design

Clinet_ JICA, Government of Indonesia

1980

Dominica

Rehabilitation of 7 water treatment plants, reservoirs, and

pipelines Basic design, detailed design, & construction

supervision

Clinet_ JICA, Government of Dominican Republic

2001-2004

Ecuador

Construction of intake, pipelines, water

treatment plant, and distribution reservoir

Basic design, detailed design,

and construction supervision

Clinet_ JICA, Government of Ecuador

2004-2006

18 Nihon Suido Consultants Sunjin United

Portfolio_ 08 WATER SUPPLY

Utilization of Additional Production Capacity on Ujung Pandang Water Supply Development Project, Indonesia

Astana City Water Supply and Sewerage Project, Kazakhstan

Indonesia

Construction of distribution network system; Pipe D150-

1,000mm x L4.02km,

Distribution main, Service main Feasibility study, detailed

design, and construction supervision (1999)

Improvement of water supply facilities; Treatment Plant: 86,400㎥/day,

Pipe: D150-1,100mm x L79km PumpConstruction supervision

Client_ Government of Indonesia (JBIC loan)

1995-2000

Kazakhstan

Construction of 210,000㎥/day intake, 100,000㎥/day

treatment plant, 5.6 km distribution pipelines, replacement

of 100 km existing pipelines. Construction of rehabilitation

of the 136,000㎥/day sewage and sludge treatment facility,

rehabilitation of 17 pump stations, replacement of 20.6 km

of sewers, and replacement of 5,300 manhole covers.

Construction supervision

Client_ Government of Kazakhstan (JBIC Loan)

2004-2008

India

Master plan for augmentation of water supply and sanitation

in Goa State. The target year of the master plan is 2020;

& a feasibility study for priority project Master plan up to

2020, feasibility studies and preliminary design

Client_ JICA

2005-2006

India Study on Augmentation of Water Supply and Sanitation for the

Goa State, India

Page 12: WATER & ENVIRONMENT NSU - sunjin.co.kr · Sewerage 10. River Engineering 11. Storm Water Pump Station ... Water & Sewerage ... Qatar Romania Russia S. Korea

Preliminary & Detailed Design forImprovement Works of Seonam Sewage Treatment Plant, Korea

Preliminary Design for Improvement Works and Advanced Treatment Process(T/K), Seonam Sewage Treatment Plant, Korea

Korea

STP Capacity : Q=2,000,000㎥/day

Clinet_ Seoul Metro Gov’t

2003

Korea

STP Modernization Works : Q=360,000㎥/day,

Advanced Treatment Process Improvement :

Q=1,150,000㎥/day

Clinet_ Daewoo E&C Co., LTD.

2008

1 420 Nihon Suido Consultants Sunjin United

09Portfolio

SEWERAGE Master Plan for Rehabilitation & Expansion of Existing WTP, Santiago

Detailed Design of Kandy City Wastewater Plant, Sri Lanka

Santiago

Preparation of Master Plan for rehabilitation

and expansion of existing wastewater

treatment plant and pipelines

Master plan and feasibility study

Clinet_ JICA

2000-2002

Sri Lanka

Construction of collection system, sewerage

treatment plant, branch sewer pipe Detailed

design and tender assistance

Clinet_ Government of Sri Lanka (JBIC loan)

2008 - to date

Singapore The Covering of Existing Treatment Units and Extension works at Kranji Sewage Treatment works, Singapore

Singapore

Covering of existing treatment units (76,000㎥/day)

Extension works of 76,000㎥/day sewage

treatment plant Basic design, detailed design

& construction supervision

Clinet_ Government of Singapore

1992-1994

B1F Basement O&M Space

B2F Basement Treatment Space

Page 13: WATER & ENVIRONMENT NSU - sunjin.co.kr · Sewerage 10. River Engineering 11. Storm Water Pump Station ... Water & Sewerage ... Qatar Romania Russia S. Korea

Design for Sewage Facilites of Andong Imha Dam, Korea

Feasibility Study and Master Plan for Advanced Treatment Process of 4 Sewage Treatment Plants, Korea

Detailed Design for BTO of Geomdan Sewage Treatment Plant, Korea

Preliminary and Detailed Design for Ganam-myeon Sewage Treatment Plant, Yeoju-gun, Korea

Master Plan & Bidding Document for Advanced Treatment Process of Jeonju Sewage Treatment Plant, Korea

Korea

Total Capacity of 4 STP in Seoul City : Q=5,810,000㎥/day

Clinet_ Seoul

2001

Korea

STP Capacity : Q=120,000㎥/day,

Sewerage Pipe : L=30,477m

Clinet_ Hanwha Engineering & Construction Corp.

2000

Korea

STP Capacity : Q=4,000㎥/day, Sewerage Pipe : Φ300

~Φ500mm, L=20.6km

Clinet_ Yeoju-gun

Korea

STP Capacity : Q=303,000㎥/day

Clinet_ Jeonju-si

Korea

3 STP, Community STP : New 30, Retrofitting 17,

Sewerage Pipe : Φ80~Φ350mm, L=163.0km, 98 Pump Sta.

Clinet_ Hanwha Engineering & Construction Corp.

2005

Portfolio_ 09 SEWERAGE

22 Nihon Suido Consultants Sunjin United

Page 14: WATER & ENVIRONMENT NSU - sunjin.co.kr · Sewerage 10. River Engineering 11. Storm Water Pump Station ... Water & Sewerage ... Qatar Romania Russia S. Korea

Southern Binh Duong Province Water Environment Improvement Project, Vietnam

The Development Study on the Improvement of Sewerage and Drainage System for the Havana Bay, Cuba

Cuba

The estimated population within the

Havana Bay basin is about 800,000 in 2000.

The objectives of the Study includes; to

formulate a master plan for improving

sewerage and drainage system for the Havana

Bay, & to conduct a feasibility study for the

priority project(s). feasibility study

Clinet_ JICA

2002-2003

Vietnam

Construction of Sewerage treatment plant (17,650㎥/day),

Pumping stations, and Trunk sewer and branch sewer

Detailed design and construction supervision

Clinet_ Southern Binh Duong Province,Vietnam (JBIC loan)

2008 - to date

Portfolio_ 09 SEWERAGE

24 Nihon Suido Consultants Sunjin United

Bidding Document of T/K Project for Water Treatment Plant of Seoho River, Suwon City, Korea

Preliminary Design of T/K Project for Yeongjong Water Restoration Center, Yeongjong Sky City, Incheon Free Economic Zone, Korea

Preliminary & Detailed Design for Sojeong-myeon Sewage Treatment Plant & Community Sewer System Management, Yeongi-gun, Korea

Korea

STP Capacity : Q=47,000㎥/day

Clinet_ DAEWOO Engineering & Construction Co., Ltd.

Korea

STP : Q=24,000㎥/day

Treated Sewage Facility : Q=18,000㎥/day

Clinet_ DaeLim Industrial Co., LTD.

Korea

PhaseⅠ : STP Q=468㎥/day, PhaseⅡ : STP

Q=1,070㎥/day

Clinet_ Yeongi-gun

Page 15: WATER & ENVIRONMENT NSU - sunjin.co.kr · Sewerage 10. River Engineering 11. Storm Water Pump Station ... Water & Sewerage ... Qatar Romania Russia S. Korea

Preliminary & Detailed Design for Waste Water Treatment Plant of Geomdan Industrial Estate, Korea

Korea

STP : Q=9,000㎥/day, Interceptor : L=227.7m

Clinet_ Hyosung Ebara Engineering Co., LTD.

Preliminary & Detailed Design for Tongil-Dongsan Sewage Treatment Plant,

Paju, Korea

Korea

Extension of STP : Q=6,000㎥/day

Clinet_ Cheil Engineering Co., LTD. Detailed Design for Advanced Treatment Process and Extention of

Gwangyeong Sewage Treatment Plant, Gwangyang, Korea

Korea

Target Year : 2025

Project Area : 428.4ha

Target Population : 21,562

Clinet_ Hae Dong Construction Co., LTD.

2008

Detailed Design for Advanced Treatment Process(T/K) of Gajwa Sewage Treatment Plant, Korea

Korea

STP Capacity : Q=350,000㎥/day

Clinet_ Posco Construction Corp.

2007

Feasibility Study on the Wastewater Treatment along the Danube River Downstream Reach, Romania

Romania

Feasibility Study on wastewater management in

seven cities Feasibility study

Clinet_ JICA

1999-2000

26 Nihon Suido Consultants Sunjin United

Portfolio_ 09 SEWERAGE

Page 16: WATER & ENVIRONMENT NSU - sunjin.co.kr · Sewerage 10. River Engineering 11. Storm Water Pump Station ... Water & Sewerage ... Qatar Romania Russia S. Korea

Transmigrate and Underground Project of Sinanha Sewage Treatment Plant in Yeondae

City, China

Underground Project of Tujaman Sewage Treatment Plant in Yeondae City, China

China

STP Capacity : Q=120,000㎥/day

Project site area: 130,000㎡ Treated Water Reuse

2011

China

STP Capacity : Q=500,000㎥/day

- Construction & Architecture : 500,000㎥/day

- Mechanic, Electric, Instrument : 400,000㎥/day

- Treated Water Reuse: 100,000㎥/day

2011

Portfolio_ 09 SEWERAGE

28 Nihon Suido Consultants Sunjin United

Dubai Waterfront Project Proposal Design (STP/PP), Dubai UAE

Doha South Sewage Treatment Works Project, Qatar

Proposal Design for Dubai International City STP, Dubai UAE

T/K Project for Advanced Treatment Process of Sewage Treatment Plant, Suwon, Korea

Dubai UAE

STP : Q=114,000㎥/day, L=2.0km

Clinet_ GS E&C Co., LTD.

2008

Korea

STP Capacity : Q=220,000㎥/day

Clinet_ Samsung Engineering Corp.

2005

Qatar

STP : Q=80,400㎥/day

Clinet_ Daewoo E&C Co., LTD.

2008

Dubai UAE

STP : Q=44,000㎥/day

Project Area : 67,584㎡

Clinet_ Samsung Engineering Co., LTD.

2008

����������������� ��

������� ��

������������������

���������������������������������������������������

����������������������������������������

������� ��

Page 17: WATER & ENVIRONMENT NSU - sunjin.co.kr · Sewerage 10. River Engineering 11. Storm Water Pump Station ... Water & Sewerage ... Qatar Romania Russia S. Korea

Detailed Design of Natural River for Hakeui Stream, Korea

Basic Design for Revival of Nakdong River(23rd Section, T/K), Korea

Detailed Design of Restoration for Gwangju Stream, Korea

Basic Design for Han River Restoration(6th Section), Korea

Detailed Design of Natural River of Sungnae Stream, Korea Korea

Natural Stream Detail Design, Sungnae Stream : 3.2km, Gami Stream : 0.4km

Clinet_ Songpa-gu

2006

Korea

Natural River Detail Design, Length : 3.97km

Clinet_ Anyang-si

2002

Kora

Design for Soil & Foundation of Nakdong River Gangjeong Weir

Clinet_ Daelim Industrial Company

2009

Korea

Design, Length : 4.530km

Clinet_ Gwangju-si

2002

Korea

- Water supply and Measure of the flood response

- Composition of Hydrophilic environment and promote

Activation of regional development

Place : Yeoju Yeojueup Sangri ~ Jomdongmyeon

Samhapri Construction range : 17.5km

(Hydrological Equipment, Small hydropower plants,

Pumping Station, Drainage Station)

Clinet_ SK E&C

2009

10

30 Nihon Suido Consultants Sunjin United

RIVER ENGINEERING

Portfolio

Page 18: WATER & ENVIRONMENT NSU - sunjin.co.kr · Sewerage 10. River Engineering 11. Storm Water Pump Station ... Water & Sewerage ... Qatar Romania Russia S. Korea

Detailed Design for Improvement Works of Sinjeong3 Stormwater Pump Sta., Korea

Preliminary and Detailed Design for Extention of Yangpyeong Pump Sta., Korea

Korea

Total Pumping Capacity : 560㎥/min

Clinet_ Yangcheon-gu

2002

Korea

Extention of P/S (Q=397㎥/min,Q=450㎥/min)

Clinet_ Yeongdeungpo-gu

2007

Yangpyeong pump sta. Dorim pump sta.

11Portfolio

32 Nihon Suido Consultants Sunjin United

STORM WATER PUMP STATION

Preliminary andDetailed Design for Extention of

Daechi Pump Sta., Korea

Korea

Extention of P/S (Q=362㎥/min)

Clinet_ Gangnam-gu

2007

Preliminary & Detailed Design (Extension 1 Area) for Improvement in Facility Capacity of Stormwater Pump Sta., Korea

Korea

Total Detention Reservoir : 420,600㎥

Clinet_ Seoul

2008

Page 19: WATER & ENVIRONMENT NSU - sunjin.co.kr · Sewerage 10. River Engineering 11. Storm Water Pump Station ... Water & Sewerage ... Qatar Romania Russia S. Korea

12

34 Nihon Suido Consultants Sunjin United

Major Project Lists

MAJOR PROJECT LISTS

Preliminary Design for Industrial Waterworks of Gunjang Industrial

Complex

Pipe Line L=37.1km

Korea Water Resources Corp.

Detailed Design for Interceptor, Seoho River

Interceptor : L=1.6km

Suwon-si

Survey and Master Plan for Sewer System of Jungnang River

Project Area : 5,666.39ha, Pipe Line : Φ250~Φ1500mm, L=31,300m,

Culvert : L=2,660m

Seoul

Preliminary Design for Punggi-eup Sewage Treatment Plant

STP Capacity : Q=10,000㎥/day, Interceptor : Φ500~Φ1350mm,

L=20.75km

Ministry of Environment

Preliminary Design for Paengseong Sewage Treatment Plant,

Pyeongtaek

STP Capacity : Q=7,000㎥/day, Interceptor : Φ800~Φ1100mm,

L=3,990m

Ministry of Environment

Preliminary & Detailed Design for Mt. Wau Distribution Reservoir

Distribution Reservoir : V=60,000㎥

The Office of Waterworks Seoul

Detailed Design for Extension of Dongducheon Sewage Treatment

Plant

STP Capacity : Q=21,000㎥/day, Interceptor : L=19.85km

Dongducheon-si

Preliminary & Detailed Design for Waterworks of Jucheon-myeon &

Jinan-eup, Jinan-gun

Distribution Reservoir : 640㎥, Pipe Line : 15km

Jinan-gun

Preliminary Design for Jeonui Sewage Treatment Plant, Yeongi-gun

1st stage : 2,000㎥/day, 2nd stage : 1,000㎥/day,

Pipe Line : Φ300~500mm, L=4.0km

Ministry of Environment

Detailed Design for Interceptor of Woncheon River

Interceptor : Φ350~▣1.8×1.8, L=16.096km, Pump Sta : 1EA

Suwon-si

Preliminary & Detailed Design for Waterworks of Sillim-myeon

WTP Capacity : Q=1,000㎥/day, Transmission Pipe : L=13.8km

Wonju-si

Survey & Preliminary Design for Sewer System, Anyang River

Project Area : 2,624.79ha, Pipe Line : L=449.914km

Seoul

Master Plan for Sewer System, Seoul

Project Area : 605.9㎢, Design Population : 12 Million Persons,

STP Capacity : Q=7,555,000㎥/day, Interceptor : L=383km

Seoul

Detailed Design for Paengseong Sewage Treatment Plant

STP Capacity : Q=7,000㎥/day, Main Process : Oxidation Ditch,

Interceptor : L=2.7km

Pyungtaek-si

Preliminary and Detailed Design for Interceptor Facilities

Pipe line : Φ200~Φ500mm, L=12.9km

Dongducheon-si

Preliminary Design for Jeonui Sewage Treatment Plant and Master

Plan for Sewer System, Yeongi-gun

STP Capacity : Q=2,000㎥/day, Interceptor : Φ300~Φ500mm,

L=4.36km, Sewerage Pipe : L=2,100km

Yeongi-gun

Preliminary and Detailed Design for Pump Sta. and Sewer System of

Jisan-dong

Interceptor : Φ300~Φ800mm, L=4.62km,

Pump Sta. : Q=22,700㎥/day

Gumi-si

Survey & Preliminary Design for Sewer System of Deungchon

Project Area : 748.5ha, Survey of Sewer : L=153.33km

Seoul

Master Plan for Sewer System of Yongsu River, Banpo-myeon

STP Capacity : Q=11,000㎥/day, Pipe Line : L=80.3km,

Interceptor : L=10.14km

Gongju-si

Survey and Detailed Design for Industrial Waterworks, Daejeon

L=0.5km / Distribution Reservoir : V=21,100㎥,

Distribution Pipe Line : Φ900~Φ1200mm,

L=6.0km, Raw Water Pipe Line : Φ1,100mm, L=0.5km

Daejeon City Waterworks Authority

Master Plan for Sewer System, IncheonProject Area : 456.1㎢, Design Population : 2,967,000,STP Capacity : Q=2,941,000㎥/day,Sewerage Pipe : L=3,571km, Interception : L=95.4kmIncheon-si

Preliminary and Detailed Design for Interceptor of Hwangguji-RiverInterceptor : Φ500mm~▣3.0×2.5, L=17.5kmSuwon-si

T/K Project for Heunghae Sewage Treatment PlantSTP Capacity : Q=25,000㎥/dayHanwha Engineering & Construction Corp.

Preliminary Design for BTO of Geomdan Sewage Treatment PlantSTP Capacity : Q=120,000㎥/day, Sewerage Pipe : L=30,477mHanwha Engineering & Construction Corp.

Detailed Design for Distribution Pipe of Mt. Acha Water Distribution Reservoir, Etc.Transmission & Distribution Pipe Line : Φ500~Φ900mm, L=17,402mThe Office of Waterworks Seoul City

Preliminary and Detailed Design for Ganam-myeon Sewage Treatment Plant, Yeoju-gunSTP Capacity : Q=4,000㎥/day, Sewerage Pipe : Φ300~Φ500mm, L=20.6kmYeoju-gun

Detailed Design for Geumsa & Sanbuk Sewerage Treatment Plant, Yeoju-gunSTP Capacity : Q=1,000㎥/day,Sewerage Pipe : Φ80~Φ300, L=8.9kmYeoju-gun

Master Plan for Sewer System, IcheonDrainage Area : 46,393ha, Project Area: 6,851ha,Sewerage Pipe : L=186.11km, Interceptor : L=155.1km,STP Extension : 4 Points(Q=1,400~3,300㎥/day)Icheon-si

Preliminary & Detailed Design for Bogwang Storm Water Pump Sta.Suction Well : V=2,300㎥, Pump Sta : Q=606㎥/minYongsan-gu

Detailed Design for Separate Sewer SystemSewerage Pipe : Φ100~Φ400mm, L=68.34kmCheonan-si

Feasibility Study and Master Plan for Advanced Treatment Process

of 4 Sewage Treatment Plants

Total Capacity of 4 STP in Seoul City : Q=5,810,000㎥/day

Seoul

Feasibility Study for Sewer System, Suwon

Survey Area : 3,158ha

Suwon-si

Preliminary and Detailed Design for Waterworks of Seokbo

WTP Capacity : Q=1,000㎥/day, Conveying Pipe : L=760m,

Distribution Pipe : L=28,229m, Service Pipe : L=2,669m

Yeongyang-gun

Preliminary & Detailed Design for Dongryang Sewage Treatment

Plant, Chungju

STP Capacity : Q=400㎥/day, Sewerage Pipe : 13.7km

Chungju-si

Prevention Program of Flood Damage, Garibong Sta. Area

Ronovation & Sewerage Pipe : L=1,076.4m

Geumcheon-gu

Master Plan & Bidding Document for Advanced Treatment Process

of Jeonju Sewage Treatment Plant

STP Capacity : Q=303,000㎥/day

Jeonju-si

Detailed Design for Banghwa Stormwater Pump Sta.

Detention Reservoir : 8,200㎥, Total Pumping Capacity : 670㎥/min

Gangseo-gu

Preliminary Design for Incheongyo Pump Sta.

Sewerage Pipe : L=9,747m, Renovation Pipe : L=3,219m,

Pump Capacity : Φ700×42㎥/min×55kw×2EA

Incheon-si

1995

2000

1999

2001

2002

1998

1996

1997

Page 20: WATER & ENVIRONMENT NSU - sunjin.co.kr · Sewerage 10. River Engineering 11. Storm Water Pump Station ... Water & Sewerage ... Qatar Romania Russia S. Korea

36 Nihon Suido Consultants Sunjin United

Major Project Lists

Preliminary Design for Pumping Station as the Analysis of 2001

Flooding in Gangnam-gu

Detention Reservoir : 99,450㎥

Seoul

Detailed Design for Improvement Works of Sinjeong3 Stormwater

Pump Sta.

Total Pumping Capacity : 560㎥/min

Yangcheon-gu

Preliminary and Detailed Design for Advanced Treatment Process of

Seobu Sewage Treatment Plant, Seogwipo

STP Capacity : Q=15,000㎥/day, Facility : BNR (B3 Process), Filtration

Seogwipo-si

Detailed Design for Retrofitting of Advanced Treatment System,

Jochiwon Sewage Treatment Plant

STP Capacity : Q=20,000㎥/dau, Facility : BNR, Filtration, isinfection

Yeongi-gun

Preliminary & Detailed Design for Jeongsan Sewage Treatment Plant

STP Capacity : Q=800㎥/day, Sewerage Pipe : L=9,010m

Cheongyang-gun

Preliminary & Detailed Design for Improvement Works of Seonam

Sewage Treatment Plant

STP Capacity : Q=2,000,000㎥/day

Seoul

Master Plan for Sewer System, Yeongi-gun

2 STP, 5 Sewerage P/S, 10 Community STP (8 New, 2 Extension),

Interceptor : L=20,440m

Yeongi-gun

Feasibility Study & Master Plan for Reuse Program of Storm Water

WTP Capacity : Q=3,500㎥/day, Pipe Line : L=4.22km

Sudokwon Landfill Site Management Corp.

Feasibility Study & Master Plan for Improvement Works of Sewer

System, Ganghwa-gun

Project Area : 3,170㎢, Sewerage pipe : L=42.040km,

Pipe Renovation : L=9,889m

Environmental Management Corp.

Master Plan for Sewage System, Incheon

Project Area = 30,592ha, Indoor Modeling Study

Incheon-si

T/K Project for Advanced Treatment Process of Sewage Treatment

Plant, Suwon

STP Capacity : Q=220,000㎥/day

Samsung Engineering Corp.

T/K Project for Sewage Facilites for the Upper of Soyanggang Dam

4 STP, Community STP : New 28, Retrofitting 68, 11 WTP,

Sewerage Pipe : Φ80~Φ400mm, L=143.2km, 100 Pump Sta.

Bumyang Construction Corp.

Design for Sewage Facilites of Andong Imha Dam

3 STP, Community STP : New 30, Retrofitting 17,

Sewerage Pipe : Φ80~Φ350mm, L=163.0km, 98 Pump Sta.

Hanwha Engineering & Construction Corp.

Preliminary & Detailed Design for Sewer System, Yeongi-gun

Drainage Area : 762.08ha, Project Area: 179.18ha, Sewerage Pipe :

Φ200~Φ 500mm, L=33.34km, Pipe Renovation : Φ300mm~▣1.2

×1.2m, L=12.33km,

Sewage Pump Sta. 1 point

Yeongi-gun

Detailed Design for Filtration & Disinfection Facilities of Gyeongju

Sewage Treatment Plant

STP : Q=110,000/day, Filtration Facility : Φ1,500mm×H3,000mm×

15(Fibered sand Filtration), Disinfection Facility : 500A×1.5m×3(UV

Disinfection)

Gyeongju-si

Detailed Design for Filtration & Disinfection Facilities of Gyeongju

Sewage Treatment Plant

STP : Q=110,000/day, Filtration Facility : Φ1,500mm×H3,000mm×

15(Fibered sand Filtration), Disinfection Facility : 500A×1.5m×3(UV

Disinfection)

Gyeongju-si

Preliminary & Detailed Design for Community Water Supply Facilites

Preliminary & Detailed Design for Sorae & Nonhyeon Sewage

Treatment Plant

Design for Sewer System of Songbang River & Waste Water

Treatment Plant of Jeongsan Agricultural & Industrial Complex

Cheongyang-gun

Bidding Document & Master Plan for Sewer System of Han River

Project Area : 5,430ha, Sewerage Pipe : L=210.91km, Pipe

Renovation : L=16.17km

nvironmental Management Corp.

Basic Design for Retrofitting of Advanced Treatment Process, Gajwa

Sewage Treatment Plant

STP Capacity : Q=90,000㎥/day

Posco Construction Corp.

Survey & Preliminary Design for Sewer System, Ganghwa-eup,

Ganghwa-gun

Project Area : 358.1ha, Sewerage Pipe : L=47.11km,

Pipe Renovation : L=4.12km, 6 Pump Sta.

Posco Engineering & Construction Corp.

Preliminary Design for BTL Project of Sewer System, Gimhae-si

Project Area : 30.07㎢, Sewerage Pipe : Φ80~Φ900mm,

L=92.42km, Pipe Renovation : L=9.25km, 16 Sewage Pump Sta.

SK Engineering & Construction Corp.

Detailed Design for Sewer Renovation

Preliminary Design for Extension of Myeonmok Stormwater Pump

Sta. Jungnang-gu

Preliminary & Detailed Design for Sewer System of Doksan-1Dong

Sewerage Pipe : Φ250~Φ300mm, L=2.27km,

Drainage pipe : Φ300~Φ800mm, L=1.906km

Geumcheon-gu

Bidding Document & Master Plan for Seoho River Sewage Treatment

Plant Suwon-si

Basic Design T/K Project for Seongnam Pangyo Water Restoration

Center

STP Capacity : Q=47,000㎥/day, Pump Sta. Q=35,000㎥/day

Sambu Construction Corp.

Master Plan & EIA for BTL Project of Sewer System, Seoguipo

Project Area : 12.23ha, Sewerage Pipe : L=101.6km,

Pipe Renovation : L=10.4km, 41 Pump Sta.

Environmental Management Corp.

Preliminary Design for BTL Project of Sewer System, Geumsan-gun

Sewerage Pipe : L=62.02km,

Pipe Renovation : L=3.97km, 3 Pump Sta.

Sungwon Corp.

Preliminary Design for T/K Project of Sewer Pipe, Suwon City

Project Area : 9.84㎢, Sewerage Pipe : L=1.7km,

Pipe Renovation : L=48.15km

Taeyoung Construction Corp.

Preliminary Design of BTL Project for Sewer System, Wanju-gun

Ultra Construction & Engineering Co. Ltd

Examination for the Construction Proposal of Gangdong & Gulhwa

Sewage Treatment Plant, Ulsan

Korea Development Institute

Preliminary Design for BTL Project of Sewer Facilities Extension,

Incheon

Hanwha Engineering & Construction Corp.

Preliminary Design for BTL Project of Sewer System, Jeju City

Project Area : 0.214㎢, Sewerage Pipe : Φ200mm~▣0.5×0.5m,

L=52.46km, Pipe Renovation : L=32.29km, 2 Sewage Pump Sta.

SK Engineering & Construction Corp.

Detailed Design for Sewer System of Han River

Daewoo Engineering Construction Co. Ltd

Detailed Design for Sewer System of Ganghwa

Project Area : 358.1ha, Sewerage Pipe : 48,644m,

Renovation Pipe : 2,532m

Posco Construction Corp.

EIA & Feasibility Study and BTL Project for Sewer System of Wonju

& Boryeong City and Seocheon-Gun

Project Area : 347.4ha, Swerage Pipe : 52,910m,

Renovation Pipe : 11,742m

Environmental Management Corp.

Detailed Design for Advanced Treatment Process(T/K) of Gajwa

Sewage Treatment Plant

STP Capacity : Q=350,000㎥/day

Posco Construction Corp.

Making a White Paper for Sewer System of the Area Which are

Supplied Water from Han River

Environmental Management Corp.

2002 2004

2005

2006

2003

2007

Page 21: WATER & ENVIRONMENT NSU - sunjin.co.kr · Sewerage 10. River Engineering 11. Storm Water Pump Station ... Water & Sewerage ... Qatar Romania Russia S. Korea

38 Nihon Suido Consultants Sunjin United

Major Project Lists

Master Plan for Water Supply & Water Demand Management,

Yoengi-gun

Project Area : 174.58㎢, Target year : 2025

Yoengi-gun

CCTV Survey & Watertight Test

CCTV Survey : L=32.7km, Watertight Test : 590 Pts.

Public Procurement Service

Bidding Document & Master Plan for Sewage Treatment Plant of

Bupil, Ichon

STP Capacity : Q=5,000㎥/day, Q=600㎥/day, Q=400㎥/day,

Target Year : 2011

Environmental Management Corp.

Feasibility Study for Water Supply and Sewage of Subic Bay,

Philippines

WTP Capacity : Q=50,000㎥/day, Water Pipe : L=26km,

Target Year : 2020

Environmental Management Corp.

Bidding Document of T/K Project for Water Treatment Plant of Seoho

River, Suwon City

STP Capacity : Q=47,000㎥/day

DAEWOO Engineering & Construction Co., Ltd.

Preliminary & Detailed Design for Interceptor of Wolmi, Incheon

Pump sta. : Q=12,000㎥/day, Intercepting Sewer Network : L=3.5km

Incheon-si

Detailed Design of BTL Project for Sewer System, Gimhae

Project Area : 30㎢, Sewer Network : L=92.42km,

Renovation : L=12.45km

SK Engineering & Construction Co., Ltd.

Detailed Design for Public Information Facilities of Songdo Waste

Water Reclamation and Reusing Plant

MF/RO Facility : Q=100㎥/day, Audio-Visual Room,

Streamlet : L=125m

IFEZA

Design of BTL Project for Sewer System, Boryeong

Project Area : 987ha, Sewrage Pipe : 52.3km, Renovation : 12.3km

Korea Developmet Corp. Co.,Ltd

Detaild Design of BTL Project for Sewer System of Geumsan-gun

Prject Area : 360.79ha, Sewer Network : L=62km

SUNGWON Corp.

Preliminary & Detailed Design of Sewage Treatment Plant &

Community Sewage Facility of Sojeong, Yeongi-gun

STP Capacity : Q=800㎥/day, Sewer Network : 41.8km

Public Procurement Service

Preliminary and Detailed Design for Extention of Daechi Pump Sta.

Extention of P/S (Q=362㎥/min)

Gangnam-gu

Preliminary and Detailed Design for Extention of Yangpyeong Pump

Sta.

Extention of P/S (Q=397㎥/min,Q=450㎥/min)

Yeongdeungpo-gu

Technical Consulting Services of Lake Water Purification and

Building an Artificial Lake for the Giang Vo and Me Tri Development

Project in Hanoi, Vietnam

Lake Purification System (Giang Vo Q=5,000㎥/day,

Me Tri Q=10,000 ㎥/day)

Geumho Industrial Co., Ltd

Preliminary and Detailed Design for Extention of Daechi Pump

Station (Technical Service)

Expansion Capacity of Pumping Stations (Q=3,120㎥/min)

Gangnam-gu

Detailed Design for Sewer System in Deungchon 1 Cathment

Project Area : 1.67㎢, Sewer Network : 28.26㎞

Gangseo-gu

Preliminary and Detailed Design for Advanced Water Treatment Plant

of Yeogdeungpo Water Center(#3)

Activate Carbon Chamber: 225,000㎥/day,

Relay Pumping Station : 300,000㎥/day

The office of Waterworks Seoul Metro Gov’t

Master Plan for Sewerage System, Ongjin-gun

Project Area : 164.28㎢, Target Year : 2025

Environmental Management Corp.

Master Plan for Sewerage System(Technical Support Serviece),

Ongjin-gun

Project Area : 164.28 ㎢, Target Year : 2025

Wetech

Detailed Design for Sewer System in Jong-Am Cathment, Seoul

D300mm∼□1.8×2.0m, L=8.34㎞ Sewer Network : L=8.34 km

Seongbuk-gu

Preliminary and Detailed Design Agricltural Village Sewerage

System, Cheongyang-gun

Small Scale Sewerage System(7 Areaes), Target Year : 2010

Cheongyang-gun

Master Plan, Environmental Impact Assessment, and Feasibility

Study of BTL Project for Sewer System

Project Area : Jinju-si (463.5ha), Jinan-gun (193.5ha),

Sewer Network : Jinju-si (57.2km), Jinan-gun (32.2km)

Environmental Management Corp.

Preliminary and Detailed Design for Domestic Water Development in

Agriculture Area and Rehabilitation of Small Scale Water Supply

System, Hwasung

Water Reservior(V=2,000㎥), Distribution System, Rehabilitation of

Small-Scale Water Supply Facilities (28 areaes)

Cheongyang-gun

Al Dhakhira Sewage Treatment Project

STP, Sanitary Pump Station, Sewer Network : Rising Main(70.54km),

Gravity(4,26km)

Daewoo E&C

Preliminary & Detailed Design for Rural Water Supply Development

Project in Agriculture Area, Walha-Bongsan

Distribution Reservoir : V=600㎥/day, Transmission & Distribution

Pipe : L=9.315km, Water Pipe : L=9.899km

Yeongi-gun

Preliminary and Detailed Design for Domestic Water Development in

Agriculture Area and Rehabilitation of Small Scale Water Supply System

Distribution Reservoir : V=2,000㎥/day, Distribution Pipe : L=69.7km

Korea Engineering Consultants Corp.

Preliminary & Detailed Design for Construction of Advanced Water

Treatment Facilities of Amsa-dong Arisu Water Center

WTP : Q=1,110,000㎥/day

Office of Waterworks, Seoul Metropolitan Government

Preliminary & Detailed Design for Sojeong-myeon Sewage

Treatment

Plant & Community Sewer System Management, Yeongi-gun

PhaseⅠ : STP Q=468㎥/day, PhaseⅡ : STP Q=1,070㎥/day

Yeongi-gun

Dubai Waterfront Project Proposal Design (STP/PP)

STP : Q=114,000㎥/day, L=2.0km

GS E&C Co., LTD.

Preliminary Design of T/K Project for Youngjong Water Restoration

Center, Youngjong Sky City

STP : Q=24,000㎥/day, Treated Sewage Facility : Q=18,000㎥/day

DaeLim Industrial Co., LTD.

Detailed Design and Supervision Service for Advanced Water

Treatment Plant of Gwangam Arisu Water Center

WTP : Q=250,000ton/day

Office of Waterworks, Seoul Metropolitan Government

Feasibility Study and Conceptual Planning for Multi-Functional

Tunnel of Seoul

Multifunctional Tunnel : L=17.6km, Road : L=10.6km,

Storage Tank : L=8.2km, ø=12.75m

Seoul

Preliminary Design of T/K Project for Yeongjong Water Restoration

Center, Youngjong Sky City, Incheon Free Economic Zone

STP : Q=24,000㎥/day, Treated Sewage Facility : Q=18,000㎥/day

DaeLim Industrial Co., LTD.

Detailed Design for Sewer System in Jong-am Catchment

Pipe Renovation : L=9,186m, Circular Pipe Renovation : L=2,525m,

Sewer Pipe : L=1,109m

Seongbuk-gu

Detailed Design for Geomdan Sewerage Treatment Plant

STP : Q=40,000㎥/day, Project Area : 449.98ha,

Target Population : 122,796

Hanwha Engineering&Construction Co., LTD.

Master Plan and Bidding Document for Stream-Improvement and

Effluent Reuse, Iksan

STP : Q=20,000㎥/day, Project Area : 1,470㎡

Environmental Management Corp.

Modification of Water Supply Master Plan and Establishment of

Water Demand Management, Cheongyang-gun

Facility : Q=33,000㎥/day, Water Pipe : L=121km

Yeongi-gun

Preliminary & Detailed Design for Cheongyang Sewer System

Management(PhaseⅢ) and Community Sewer System Improvement

STP : Q=770㎥/day, Sewer Pipe : L=28.445km

Cheongyang-gun

Preliminary & Detailed Design for Myeongseong-ri Sewerage

Treatment Facilities Construction

Facility : Q=150㎥/day, Sewer Pipe : L=11.0km

Yangpyeong Environment Affairs Agency

2007

2008

2009

Page 22: WATER & ENVIRONMENT NSU - sunjin.co.kr · Sewerage 10. River Engineering 11. Storm Water Pump Station ... Water & Sewerage ... Qatar Romania Russia S. Korea

40 Nihon Suido Consultants Sunjin United

Major Project Lists

Preliminary & Detailed Design for Sewer System, Jangnim Service Area

Sewer Pipe : L=16.89km, Manhole : 503EA, House-inlet : 1,532EA

Busan-si

Detailed Design for Removing Box Construction, Yeoksam-dong 662

Pipe Line Survey : L=0.33km

Gangnam-gu

Master Plan of Pilot Project for Integrated Operating System of Rural

Water Supply in Jeollanam-do Province

STP : Q=491,550㎥/day, Population Plan : 678,236,

Target Population : 446,289

Environmental Management Corp.

Detailed Design for Sewerage System, Cheongyang-gun

STP : Q=50㎥/day, Sewerage Pipe : L=1.094km

Cheongyang-gun

Preliminary & Detailed Design for Cheongyang Sewer System

Management(PhaseⅢ) and Community Sewer System Improvement

STP : Q=770㎥/day, Sewer Pipe : L=28.445km

Sahmyook Engineering Co., LTD.

Detailed Design for Sewer System in Dorim Catchment 1

Total Pipe Line : L=57km (Pipe Renovation : L=5.294km,

Sewer Pipe : L=1.999km, Change Pipe : L=84.946km)

Yeongdeungpo-gu

Preliminary & Detailed Design for Tongil-Dongsan Sewage

Treatment Plant, Paju

Extension of STP : Q=6,000㎥/day

Hyosung Ebara Engineering Co., LTD.

Proposal Design for Dubai International City STP

STP : Q=44,000㎥/day, Project Area : 67,584㎡

Samsung Engineering Co., LTD.

Preliminary & Detailed Design for Tongil-Dongsan Sewage

Treatment Plant, Paju

Extension of STP : Q=6,000㎥/day

Cheil Engineering Co., LTD.

Preliminary and Detailed Design for Namyang and Bibong Domestic

Water Supply Development in Agriculture Area

Transmission Pipe : L=100km, ø=200~50mm

Cheongyang-gun

Preliminary & Detailed Design for Stormwater Storage Tank

Construction of Nokbeon-dong Athletic Park

Project Area : 1,250㎡, V=6,875㎥(4,875㎥)

Eunpyeong-gu

Preliminary & Detailed Design for Stormwater Reduction Facillities in

Mugungwha Park

Storage Tank : V=2,530㎥

Gangseo-gu

Preliminary & Detailed Design for Treated Sewage Effluent Facilities

of Gulpo Sewage Treatment Plant

STP : Q=75,000㎥/day, Pipe Line : L=1.08km

Incheon-si

Preliminary Design for Improvement Works and Advanced Treatment

Process(T/K), Seonam Sewage Treatment Plant

STP Modernization Works : Q=360,000㎥/day,

Advanced Treatment Process Improvement : Q=1,150,000㎥/day

Daewoo E&C Co., LTD.

Preliminary & Detailed Design (Extension 1 Area) for Improvement in

Facility Capacity of Stormwater Pump Sta.

Total Detention Reservoir : 420,600㎥

Seoul

Detailed Design for Advanced Treatment Process and Extention of

Gwangyeong Sewage Treatment Plant, Gwangyang

Target Year : 2025, Project Area : 428.4ha, Target Population : 21,562

Hae Dong Construction Co., LTD.

Preliminary Design for Bupil, Sogo and Songgye Public Sewage

Project, Icheon

Project Area : 776.11ha, Target Population : 21,307

Facility : Q=6,000㎥/day

Sungjee Construction

Master Plan for Sewerage System, Boryeong

Project Area : 569.01㎢, Target year : 2025

Boryeong-si

Master Plan, EIA and Feasibility Study of BTL Project for Sewer

System, Chuncheon

Project Area : 605.38ha, Sewer Pipe : L=84.946km,

Pipe Renovation : L=18.674km

Environmental Management Corp.

Doha South Sewage Treatment Works Project

STP : Q=80,400ton/day

Daewoo E&C Co., LTD.

Preliminary & Detailed Design for Treated Sewage Effluent Facilities

of Gulpo Sewage Treatment Plant

STP : Q=75,000㎥/day, Sewer Pipe : L=1.08km

Sejong Engineering Co., LTD.

Preliminary & Detailed Design for Bodeok and Yucheon 2-ri

Community Sewage Facilities, Yeongi-gun

Bodeok : STP Q=151㎥/day, Sewer Pipe L=4,641m

Yucheon : STP Q=200㎥/day, Sewer Pipe L=4,098m

Yeongi-gun

Preliminary & Detailed Design for Improvement & Extention of

Cheongyang Sewage Treatment Plant

Improvement of STP : Q=3,200㎥/day,

Extension of STP : Q=1,800㎥/day

Cheongyang-gun

CCTV Survey and Water Tightness of Sewer Pipe in Cheongtong

Service Area

CCTV Sewer Pipe Survey : L=26,801m,

Water Tightness Survey : ø=200, 573 Points

Public Procurement Service

Detailed Design for Tongil-Dongsan Sewage Treatment Plant,

Paju City

Extension of STP : Q=6,000㎥/day

Preliminary & Detailed Design for Extention and Advanced Treatment

Facilities Installation of Gwangyang Sewage Treatment Plant

Target Year : 2025, Project Area : 428.4ha,

Target Population : 21,562

Hae Dong Construction Co., LTD.

Preliminary & Detailed Design for Community Sewage Facilities of

Bodeok, Yucheon 2-ri, Yeongi-gun

Bodeok : STP Q=151㎥/day, Sewer Pipe L=4.64km,

Yucheon : STP Q=200㎥/day, Sewer Pipe L=4.01km

Yeongi-gun

Modification of Water Supply Master Plan and Establishment of

Water Demand Management, Cheongyang-gun

Facility : Q=3,650㎥/day, Water Pipe : L=84.6km

Cheongyang-gun

Examination for Construction Proposal of Reusing Sewage of

Dalseong Industrial Complex Waste Water Treatment Plant

Storage Tank : W6.95 X L24.7 X H6.0 X 2EA

Korea Development Institute

Master Plant for Sewer System, Boryeong

Project Area : 569.01㎢, Target Year : 2025

Kyongdong Engineering Co., LTD.

Preliminary & Detailed Design for Extension and Improvement of

Cheongyang Sewage Treatment Plant

Improvement of STP : Q=3,200㎥/day,

Extension of STP : Q=1,800㎥/day

Cheongyang-gun

Master Plan(Revise) for Water Supply System & Water Demand

Management, Cheongyang-gun

Facility : Q=3,650㎥/day, Water Pipe : L=84.6km

Cheongyang-gun

Basic & Detailed Design for Development Works of Water in Rural

Area, Namyang & Bibong Area

Transmission Pipe : L=100km, ø=200~50mm

Korea Engineering Consultants Corp.

Oman New Darsait STP Project

Proposal Design for Project of Oman New Darsait STP

STP : Q=45,000㎥/day

GS E&C Co., LTD.

Master Plan for Livestock Manure Management, Gwangju City

Target Year : 2019, Proposal for Reuse Method of Livestock Manure

Gwangju City, Gyeonggi-do

Preliminary & Detailed Design for Waste Water Treatment Plant of

Geomdan Industrial Estate

STP : Q=9,000㎥/day, Interceptor : L=227.7m

Hyosung Ebara Engineering Co., LTD.

Basic & Detailed Design for rain water retaining facility project in

Nokbeon sports park

Retaining facility : V=6,875㎥, Area : 1,250㎡

Eun-pyoung District

Detailed Design for rain water retaining facility in Mugunghwa park

Retaining facility : V=2,530㎥, Area : 506㎡

Gang-seo District

Preliminary & Detailed Design for Biological Reactor Cover of Suwon

Sewage Treatment Plant

Cover : W6.75 X L40.5 X H1.2 X 32EA,

Vacreator : 450(㎥/min) X 2EA

Suwon Environment Affairs Agency

Environment Management Master Plan in the Kingdom of Cambodia

Plan for Environment Facility in 3 Cieies

(Phnom Penh, Siem Reap, Preah Sihanouk)

Cambodia Government

Master Plan for Sewer System, Yangpyeong-gun

Project Area : 877.81km2, Target Year : 2025

Yangpyeong-gun

Preliminary & Detailed Design for Development Works of Water in

Rural Area, Yeolha & Bongsan Area

Bongsan : V=600㎥/day, Transmission Pipe : L=9,315m

D=75~350mm, Water pipe : L=9,879m D=16~75mm

Yeonggi-gun

2009

2010

Page 23: WATER & ENVIRONMENT NSU - sunjin.co.kr · Sewerage 10. River Engineering 11. Storm Water Pump Station ... Water & Sewerage ... Qatar Romania Russia S. Korea