Seattle Public Utilities Water Capital Improvement Program History and Status June 10, 2011

Upload: others

Post on 31-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Water Capital Improvement Program History and Statusclerk.ci.seattle.wa.us/~public/meetingrecords/2011/... · 6/10/2011  · 1975 1977 1979 1981 1983 1985 1987 1989 1991 1993 1995

Seattle Public Utilities

Water Capital Improvement Program

History and Status

June 10, 2011

Page 2: Water Capital Improvement Program History and Statusclerk.ci.seattle.wa.us/~public/meetingrecords/2011/... · 6/10/2011  · 1975 1977 1979 1981 1983 1985 1987 1989 1991 1993 1995

Looking BackwardSPU Water System (circa 1990)

Two large, unfiltered surface supplies

10 open distribution reservoirs

Single pipeline from Tolt watershed

1950s water quality lab

1970s control center

Potential ESA listings (Chinook Salmon, Marbled Murrelet,

Northern Spotted Owl)

Projected need for new supply

2

Page 3: Water Capital Improvement Program History and Statusclerk.ci.seattle.wa.us/~public/meetingrecords/2011/... · 6/10/2011  · 1975 1977 1979 1981 1983 1985 1987 1989 1991 1993 1995

SPU Water System

Supply Certainty

Water Quality and Treatment

Transmission

Distribution

Four Major Investment Areas

3

Page 4: Water Capital Improvement Program History and Statusclerk.ci.seattle.wa.us/~public/meetingrecords/2011/... · 6/10/2011  · 1975 1977 1979 1981 1983 1985 1987 1989 1991 1993 1995

Supply Certainty Cedar River Watershed HCP

Provides legal certainty under the Endangered Species Act

for the City’s continued operations within the Cedar River

Watershed.

• $100 million over 50 years -- $60 million in the first

decade

• Approximately 30 capital projects and 60 O&M activities

in three areas:

o Management of instream flows for people and fish

o Forest and land conservation activities

o Mitigation for the blockage of salmon and steelhead

4

Page 5: Water Capital Improvement Program History and Statusclerk.ci.seattle.wa.us/~public/meetingrecords/2011/... · 6/10/2011  · 1975 1977 1979 1981 1983 1985 1987 1989 1991 1993 1995

Drinking Water Quality Water Quality Lab (1999)

5

New lab in SODO area(former Starbucks warehouse)

Old lab (Beacon Hill Reservoir)

Page 6: Water Capital Improvement Program History and Statusclerk.ci.seattle.wa.us/~public/meetingrecords/2011/... · 6/10/2011  · 1975 1977 1979 1981 1983 1985 1987 1989 1991 1993 1995

Drinking Water QualityReservoir Covering Program

Drivers: State Dept of Health Regulations (1994)

Post 9/11 Security

Secondary benefit – 70 acres with park and open space

potential

6

Beacon Reservoir

Constructed in 1911

Beacon Reservoir

Covering Completed 2009

Page 7: Water Capital Improvement Program History and Statusclerk.ci.seattle.wa.us/~public/meetingrecords/2011/... · 6/10/2011  · 1975 1977 1979 1981 1983 1985 1987 1989 1991 1993 1995

Drinking Water QualityReservoir Covering Program Status

7

Project Completion Cost

Magnolia 1994 $8 Million

Lake Forest Park 2001 $4 Million

Bitter Lake 2002 $19 Million

Lincoln 2004 $8 Million

Beacon 2010 $42 Million

Myrtle 2010 $12 Million

West Seattle 2011 $33 Million

Maple Leaf 2012 $47 Million

Volunteer 2016 TBD

Page 8: Water Capital Improvement Program History and Statusclerk.ci.seattle.wa.us/~public/meetingrecords/2011/... · 6/10/2011  · 1975 1977 1979 1981 1983 1985 1987 1989 1991 1993 1995

0

10

20

30

40

50

60

70

80

90

100

1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Number of Positive Fecal Coliform Samplesfrom Seattle's Open Reservoirs

West Seattle (2008)

Volunteer

Myrtle (2006)

Maple Leaf (2009)

Lincoln (2002)

Lake Forest (2002)

Roosevelt

Beacon (2006)

Bitter Lake (2001)

Sampling frequency was doubled to more closely

monitor impact of drought management practices on the

reservoirs.

Drinking Water QualityReservoir Covering Program

8

Page 9: Water Capital Improvement Program History and Statusclerk.ci.seattle.wa.us/~public/meetingrecords/2011/... · 6/10/2011  · 1975 1977 1979 1981 1983 1985 1987 1989 1991 1993 1995

Source Water TreatmentTolt Treatment Facility ($91 Million)

9

120 MGD ozonation & high-rate direct filtration

Page 10: Water Capital Improvement Program History and Statusclerk.ci.seattle.wa.us/~public/meetingrecords/2011/... · 6/10/2011  · 1975 1977 1979 1981 1983 1985 1987 1989 1991 1993 1995

Source WaterTreatmentTolt Turbidity: Before & After

10

Page 11: Water Capital Improvement Program History and Statusclerk.ci.seattle.wa.us/~public/meetingrecords/2011/... · 6/10/2011  · 1975 1977 1979 1981 1983 1985 1987 1989 1991 1993 1995

TreatmentCedar Water Treatment Plant ($101 Million)

180 MGD ozonation & UV disinfection

11 Intake structure at Lake Youngs

Ultraviolet Treatment

Page 12: Water Capital Improvement Program History and Statusclerk.ci.seattle.wa.us/~public/meetingrecords/2011/... · 6/10/2011  · 1975 1977 1979 1981 1983 1985 1987 1989 1991 1993 1995

TreatmentCedar Finished Water Taste & Odor

I can’t stand this water in my mouth and I could never drink it.

I would be very happy to accept this water as my everyday drinking water

Page 13: Water Capital Improvement Program History and Statusclerk.ci.seattle.wa.us/~public/meetingrecords/2011/... · 6/10/2011  · 1975 1977 1979 1981 1983 1985 1987 1989 1991 1993 1995

Transmission and Distribution Control Center (2007)

13

1970s Control Center

New Control Center (Capacity to add DWW)

Page 14: Water Capital Improvement Program History and Statusclerk.ci.seattle.wa.us/~public/meetingrecords/2011/... · 6/10/2011  · 1975 1977 1979 1981 1983 1985 1987 1989 1991 1993 1995

Transmission Tolt Pipeline #2 ($100 Million)

Drivers TPL1 burst in 1987, undermining confidence in the Tolt supply and

reducing the capacity of the Tolt system

Revised growth projections for East side communities

SolutionConstruct 16-mile TPL2 and replace key sections of TPL1. Cost:

$100M

14

BenefitsTolt transmission system is highly

reliable and interconnected, with

capacity for decades into the

future (given demand reductions in recent years).

Page 15: Water Capital Improvement Program History and Statusclerk.ci.seattle.wa.us/~public/meetingrecords/2011/... · 6/10/2011  · 1975 1977 1979 1981 1983 1985 1987 1989 1991 1993 1995

Controlling CIP Costs

15

Avoiding development of new supply

Downsizing water storage and retiring facilities

Deferring projects

Taking advantage of bidding climate

Applying asset management

Using innovative contractingo Design-Build-Operate

o General Contracting/Construction Management

Page 16: Water Capital Improvement Program History and Statusclerk.ci.seattle.wa.us/~public/meetingrecords/2011/... · 6/10/2011  · 1975 1977 1979 1981 1983 1985 1987 1989 1991 1993 1995

Controlling CIP Costs

Asset Management

16

Benefits

Increases value of SPU’s CIP portfolio

Increases benefits and reduces costs

Strong focus on customer service levels

Fosters clear accountability and transparency

Increases confidence in SPU’s ability to choosing the right

projects at the right time

Cultivates a data-driven culture with emphasis on measurement

and continuous improvement

Page 17: Water Capital Improvement Program History and Statusclerk.ci.seattle.wa.us/~public/meetingrecords/2011/... · 6/10/2011  · 1975 1977 1979 1981 1983 1985 1987 1989 1991 1993 1995

Asset Management Business Cases

17

Example: Cedar River Watershed Road Abandonment

and Bridge Replacement Program

Developed transportation strategic plan

Clarified road standards

Increased number of roads to be abandoned

Reduced number of bridges to be replaced

Benefits: improved water quality and lower costs

Page 18: Water Capital Improvement Program History and Statusclerk.ci.seattle.wa.us/~public/meetingrecords/2011/... · 6/10/2011  · 1975 1977 1979 1981 1983 1985 1987 1989 1991 1993 1995

Innovative Contracting Models

18

Design-Build-Operate (Tolt & Cedar) – Allocates risk to

contractor best able to manage all project phases.

Tolt Treatment Facility total cost reduction estimated at $56M

over 25 years. Cedar Treatment Facility cost savings estimated

at $45M.

General Contracting Construction Management

(Landsburg Fish Passage) – Provides cost and schedule

certainty.

Allowed selection of firm with strong experience with in-stream

construction, resolving constructability and construction

sequencing issues and cost savings to project.

Page 19: Water Capital Improvement Program History and Statusclerk.ci.seattle.wa.us/~public/meetingrecords/2011/... · 6/10/2011  · 1975 1977 1979 1981 1983 1985 1987 1989 1991 1993 1995

Water Fund CIP

19

$0

$20

$40

$60

$80

$100

$120

19

85

19

86

19

87

19

88

19

89

19

90

19

91

19

92

19

93

19

94

19

95

19

96

19

97

19

98

19

99

20

00

20

01

20

02

20

03

20

04

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

20

13

20

14

20

15

20

16

20

17

20

18

20

19

20

20

20

21

20

22

20

23

20

24

20

25

20

26

20

27

20

28

20

29

20

30

$ in

mil

lio

ns

CIP vs. Annual Debt Service1985 - 2030

Tolt Filtration$91M

Cedar UV$101M

HCP$54M

ReservoirCovering$125M

Outstanding debt retired starting 2030

Annual DebtService

CIP

Page 20: Water Capital Improvement Program History and Statusclerk.ci.seattle.wa.us/~public/meetingrecords/2011/... · 6/10/2011  · 1975 1977 1979 1981 1983 1985 1987 1989 1991 1993 1995

Future Water CIP Spending

Priorities

20

Focus on distribution system

□ Most asset intensive: 1600 miles of watermain,15 pump

stations, 21,000 valves,18,000 fire hydrants,180,000 water

service connections and meters.

□ Continue achieving core customer service expectations –

quality, pressure, reliability; continuous analysis to optimize

investments.

Address renovation/replacement needs of

facilities

Morse Lake pumping

Support transportation projects

Page 21: Water Capital Improvement Program History and Statusclerk.ci.seattle.wa.us/~public/meetingrecords/2011/... · 6/10/2011  · 1975 1977 1979 1981 1983 1985 1987 1989 1991 1993 1995

Questions?

21

Page 22: Water Capital Improvement Program History and Statusclerk.ci.seattle.wa.us/~public/meetingrecords/2011/... · 6/10/2011  · 1975 1977 1979 1981 1983 1985 1987 1989 1991 1993 1995

Seattle Regional Water System

0

50

100

150

200

0

100,000

200,000

300,000

400,000

500,000

600,000

700,000

800,000

900,000

1,000,000

1,100,000

1,200,000

1,300,000

1975

1977

1979

1981

1983

1985

1987

1989

1991

1993

1995

1997

1999

2001

2003

2005

2007

2009

Growth in Population and Water ConsumptionSeattle Regional Water System: 1975-2009

Per Capita Consumptionin GPD

Total Consumptionin MGD

P

Population

Po

pu

lati

on

To

tal C

on

su

mp

tio

n in

MG

DP

er

Cap

ita C

on

su

mp

tio

n in

GP

D

22