Water balances between upper dam and lower estuary reservoir in South Korea
– Case of Boryeong dam and Busa esturary reservoir
Jaekyoung Noh, Daesik Kim, Jaenam Lee
Irrigation Australia / 7th Asian Regional Conference, ICIDDroughts, Floods, Environment: Managing Consumptive Water Needs Sus-tainably
27 June 2012
Dept. of Agricultural and Rural Engineering, Chungnam National University
![Page 2: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/2.jpg)
Background and objective
• High salinity of the Busa estuary reservoir in Korea, from which are being irrigated to upper paddy fields in transplanting period.
• Inflow to Busa reservoir are restricted to outflows from upper Boryeong dam.
• To develop models for water balances of Boryeong dam and Busa estuary reservoir, from which will be used to plan counter measures on high salinity in Busa reservoir.
![Page 3: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/3.jpg)
Sites
![Page 4: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/4.jpg)
Land uses
![Page 5: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/5.jpg)
DEMs
![Page 6: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/6.jpg)
Area capacity curves
![Page 7: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/7.jpg)
Boryeong multipurpose dam on 18:30 14 June 2012
Busa estuary reservoir on 15:40 14 June 2012
![Page 8: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/8.jpg)
Meteorological Data
![Page 9: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/9.jpg)
Rainfalls (1973-2011)
![Page 10: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/10.jpg)
Weirs for irrigation and thermal power plant
![Page 11: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/11.jpg)
Weirs for suppling water to thermal power plant
Boryeong power plant
Seocheon power plant
![Page 12: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/12.jpg)
Salinity (ppm)
Year 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011
April 4,300 100 400 1,200 800 1,200 1,500 2,100 1,400 4,800
May 790 150 550 850 1,000 1,500 1,800 2,400 1,400 1,900
![Page 13: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/13.jpg)
2009
![Page 14: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/14.jpg)
2010
![Page 15: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/15.jpg)
2011
![Page 16: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/16.jpg)
Water levels in Busa
![Page 17: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/17.jpg)
Inflows
DAWAST model (Noh, 1991)
TPHM model (Kim, 2002)
Parameter: UMAX, LMAX, FC, CP, CE
Parameter: Smax, α
![Page 18: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/18.jpg)
S
Q
ETa
P
Q = f(e-k2 Sα) S
Eta = f(e-k1 S) ETo
One parameter : α
ONE(One parameter New Exponential) Hydrologic Model
![Page 19: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/19.jpg)
General one parameter equation of ONE hydrologic model
![Page 20: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/20.jpg)
Daily inflows using general one pa-rameter (Daecheong dam, 1981-2001)
![Page 21: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/21.jpg)
One year (Daecheong dam, 1998)
![Page 22: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/22.jpg)
Comparison of dekadal inflows (Daecheong dam, 1981-2001)
![Page 23: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/23.jpg)
Water balance in Boryeong dam
• S(i) = S(i-1) + Q(i) – EW(i) – SQ(i)• SQ(i) = DW(i) + IW(i)+ AW(i) + MW(i)
– S: water storage– O: inflow– SQ: water supply– EW: evaporation in water surface– DW: domestic water– IW: industrial water– AW: agricultural water– MW: instreamflow
• OV(i) = S(i) – FS, if H(i)>FH– OV: overflow– FS: full water storage– FH: full water level
![Page 24: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/24.jpg)
Daily operation result of Boryeong dam
![Page 25: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/25.jpg)
Daily inflow to Boryeong dam (1998-2011)
![Page 26: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/26.jpg)
Comparison of daily inflows
![Page 27: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/27.jpg)
Comparison of dekadal inflows to Boryeong dam (1998-2011)
![Page 28: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/28.jpg)
Domestic water 200,000 m3/d, paddy field area 1039.5 ha, industrial water 15000 m3/d, instream-
flow 0.38 m3/s
Daily irrigation water (1966-2011) from Boryeong dam
![Page 29: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/29.jpg)
Domestic water 200,000 m3/d, paddy field area 1,039.5 ha, industrial water 15,000
m3/d, instreamflow 0.38 m3/s
Reliability 95.6%
![Page 30: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/30.jpg)
Domestic water 226,100 m3/d, paddy field area 1,039.5 ha, industrial water 79,100
m3/d, instreamflow 0.38 m3/s – present con-dition
Reliability 79.6 %
![Page 31: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/31.jpg)
Water balance of Busa reservoir
• Inflow to Busa (QIbs) = SQ from Bo-ryeong (SQbr)+ QI from lateral
• SQ from Boryeong = IW + AW + MW + FW + OV
• QI from lateral = Q – IW + DWr – AWbr + AWrbr + AWrbs
• IW = IWsh (Seohae) + IWbr (Bo-ryeong)
![Page 32: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/32.jpg)
• S(i) = S(i-1) + QIbs(i) + SQbr(i) – SQbs(i) - EWbs(i) – GW(i) – AWbs(i) – AWnp(i)
• SQbs = 1000×(-385.2 + 3527.9 (h + 1.5)) – h: water level of
Busa (EL.m)
![Page 33: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/33.jpg)
Water level to outflow of Busa
![Page 34: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/34.jpg)
Dropped water level to Outflow from Busa
![Page 35: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/35.jpg)
Water levels in Busa reservoir
![Page 36: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/36.jpg)
Inflow to Busa reservoir- Outflow from Boryeong dam
![Page 37: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/37.jpg)
Lateral inflow
![Page 38: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/38.jpg)
Inflow to Busa
![Page 39: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/39.jpg)
Comparison of irrigated waters from Busa
![Page 40: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/40.jpg)
Daily simulated water storages in Busa (2009-2011)
![Page 41: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/41.jpg)
Case of 2011
![Page 42: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/42.jpg)
Long term simulation in Busa- inflow (1966-2011)
![Page 43: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/43.jpg)
Inflow (1998-2011)
![Page 44: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/44.jpg)
Water storages (1998-2011)
![Page 45: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/45.jpg)
Salinity to inflow
![Page 46: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/46.jpg)
Inflows during salinity data period
![Page 47: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/47.jpg)
Comparison of salinities in Busa
![Page 48: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/48.jpg)
Water storages during salinity data period
![Page 49: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/49.jpg)
Water storage to salinity
![Page 50: Water balances between upper dam and lower estuary reservoir in South Korea – Case of Boryeong dam and Busa esturary reservoir Jaekyoung Noh, Daesik Kim,](https://reader036.vdocuments.us/reader036/viewer/2022062511/5517b5d0550346892b8b4649/html5/thumbnails/50.jpg)
Conclusion
• Water balance models were con-structed.
• Upper Boryeong dam had not enough capacity to supply various waters.
• Water storages of lower Busa reser-voir were well fitted to observed data.
• Using these developed models, up-per dam and lower reservoir will be able to operate effectively in high salinity period.