Waste Water Treatment in Scotland. Dalmarnock. Dalmarnock. Opened in 1894 Processed sewage dried and pressed Initially the processed sewage was sold as Globe fertiliser Laterally a pipeline was built connecting Dalmarnock to Shieldhall. Dalmuir. Dalmuir. Opened in 1904 - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Waste Water Treatment in Scotland](https://reader035.vdocuments.us/reader035/viewer/2022062809/56815847550346895dc59cd5/html5/thumbnails/1.jpg)
Waste Water Treatment in Scotland
![Page 2: Waste Water Treatment in Scotland](https://reader035.vdocuments.us/reader035/viewer/2022062809/56815847550346895dc59cd5/html5/thumbnails/2.jpg)
![Page 3: Waste Water Treatment in Scotland](https://reader035.vdocuments.us/reader035/viewer/2022062809/56815847550346895dc59cd5/html5/thumbnails/3.jpg)
![Page 4: Waste Water Treatment in Scotland](https://reader035.vdocuments.us/reader035/viewer/2022062809/56815847550346895dc59cd5/html5/thumbnails/4.jpg)
![Page 5: Waste Water Treatment in Scotland](https://reader035.vdocuments.us/reader035/viewer/2022062809/56815847550346895dc59cd5/html5/thumbnails/5.jpg)
Dalmarnock
![Page 6: Waste Water Treatment in Scotland](https://reader035.vdocuments.us/reader035/viewer/2022062809/56815847550346895dc59cd5/html5/thumbnails/6.jpg)
Dalmarnock
• Opened in 1894
• Processed sewage dried and pressed
• Initially the processed sewage was sold as Globe fertiliser
• Laterally a pipeline was built connecting Dalmarnock to Shieldhall.
![Page 7: Waste Water Treatment in Scotland](https://reader035.vdocuments.us/reader035/viewer/2022062809/56815847550346895dc59cd5/html5/thumbnails/7.jpg)
![Page 8: Waste Water Treatment in Scotland](https://reader035.vdocuments.us/reader035/viewer/2022062809/56815847550346895dc59cd5/html5/thumbnails/8.jpg)
Dalmuir
![Page 9: Waste Water Treatment in Scotland](https://reader035.vdocuments.us/reader035/viewer/2022062809/56815847550346895dc59cd5/html5/thumbnails/9.jpg)
Dalmuir
• Opened in 1904
• Sewage also dried and pressed
• Dumped at Sea off the tip of the Isle of Bute
• Site downstream allowed easier access for sewage ships
![Page 10: Waste Water Treatment in Scotland](https://reader035.vdocuments.us/reader035/viewer/2022062809/56815847550346895dc59cd5/html5/thumbnails/10.jpg)
![Page 11: Waste Water Treatment in Scotland](https://reader035.vdocuments.us/reader035/viewer/2022062809/56815847550346895dc59cd5/html5/thumbnails/11.jpg)
Shieldhall
![Page 12: Waste Water Treatment in Scotland](https://reader035.vdocuments.us/reader035/viewer/2022062809/56815847550346895dc59cd5/html5/thumbnails/12.jpg)
Shieldhall
• Opened in 1910
• Also followed model at Dalmarnock
• Built as the main sewage works for Glasgow
• Rebuilt in 1980 to process sewage from surrounding areas
![Page 13: Waste Water Treatment in Scotland](https://reader035.vdocuments.us/reader035/viewer/2022062809/56815847550346895dc59cd5/html5/thumbnails/13.jpg)
Shieldhall
![Page 14: Waste Water Treatment in Scotland](https://reader035.vdocuments.us/reader035/viewer/2022062809/56815847550346895dc59cd5/html5/thumbnails/14.jpg)
Shieldhall
Constant Velocity Grit Channels
The whole of the presedimentation or inlet works is fully enclosed and
incorporates 6 large automatically raked mechanical screens followed by constant velocity grit channels which are cleaned by a travelling suction
dredger. Maximum flows through this section of the plant can be 6 DWF.
![Page 15: Waste Water Treatment in Scotland](https://reader035.vdocuments.us/reader035/viewer/2022062809/56815847550346895dc59cd5/html5/thumbnails/15.jpg)
Shieldhall
![Page 16: Waste Water Treatment in Scotland](https://reader035.vdocuments.us/reader035/viewer/2022062809/56815847550346895dc59cd5/html5/thumbnails/16.jpg)
Shieldhall
Primary Sedimentation
TanksA total of 12 rectangular primary
sedimentation tanks are installed, each of which has a travelling
mechanical scraper mechanism. The capacity of these tanks provides
a 6 hour retention at the DWF of 2.53m^3/sec.
![Page 17: Waste Water Treatment in Scotland](https://reader035.vdocuments.us/reader035/viewer/2022062809/56815847550346895dc59cd5/html5/thumbnails/17.jpg)
Shieldhall
![Page 18: Waste Water Treatment in Scotland](https://reader035.vdocuments.us/reader035/viewer/2022062809/56815847550346895dc59cd5/html5/thumbnails/18.jpg)
Shieldhall
Mammoth rotor Aeration Tanks
Secondary treatment of sewage flows is provided in an activated
sludge plant in the form of 6 rectangular aeration tanks which provide 5.5 hours retention at the
design DWF.
A total of 24 Biwater horizontal Mammoth rotors are installed in the
aeration tanks to provide the required oxygen transfer and mixing necessary for the efficient operation
of the process.
![Page 19: Waste Water Treatment in Scotland](https://reader035.vdocuments.us/reader035/viewer/2022062809/56815847550346895dc59cd5/html5/thumbnails/19.jpg)
![Page 20: Waste Water Treatment in Scotland](https://reader035.vdocuments.us/reader035/viewer/2022062809/56815847550346895dc59cd5/html5/thumbnails/20.jpg)
Daldowie
![Page 21: Waste Water Treatment in Scotland](https://reader035.vdocuments.us/reader035/viewer/2022062809/56815847550346895dc59cd5/html5/thumbnails/21.jpg)
Daldowie
• In 2000, at a cost of £65million, Scottish Water had built a plant at Daldowie, near Glasgow, to process half of Scotland's sewage into fuel pellets. These are used as a coal substitute by the giant Longannet power station in Fife to produce enough "carbon-neutral" electricity to power 30,000 homes.