waste-to-wheels, a circular solution to convert waste into...

26
RESTRICTED PUBLIC INTERNAL CONFIDENTIAL ©spc01-adobe-stock.com 13 th of June 2019 Waste-to-Wheels, a circular solution to convert waste into renewable fuel

Upload: others

Post on 30-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Waste-to-Wheels, a circular solution to convert waste into ...pomwvl.be/sites/default/files/uploads/europese... · Waste-to-Wheels, a circular solution to convert waste into renewable

RESTRICTEDPUBLIC INTERNAL CONFIDENTIAL

©spc01-a

dobe-s

tock.c

om

13th of June 2019

Waste-to-Wheels, a circular solution to convert waste into renewable fuel

Page 2: Waste-to-Wheels, a circular solution to convert waste into ...pomwvl.be/sites/default/files/uploads/europese... · Waste-to-Wheels, a circular solution to convert waste into renewable

Shaping our world

Together with our clients it’s our

mission to shape the world of tomorrow.

Backed by 150 years of experience in

energy, water and urban, we can

provide you engineering, advisory

and project management services

and be your partner in innovative

solutions, the energy transition & digital

transformation.ZERO CARBON AS A SERVICE

Page 3: Waste-to-Wheels, a circular solution to convert waste into ...pomwvl.be/sites/default/files/uploads/europese... · Waste-to-Wheels, a circular solution to convert waste into renewable

PU

BL

IC

Page 4: Waste-to-Wheels, a circular solution to convert waste into ...pomwvl.be/sites/default/files/uploads/europese... · Waste-to-Wheels, a circular solution to convert waste into renewable

Your partner in energy and beyond

• Renewables

• Energy System Consulting

• Digital & Decentralized Energy Solutions

• Hydropower

• Nuclear

• Thermal Energy

• Transmission & Distribution

• Gas & LNG

• Coasts & Estuaries • Reservoirs & Dams • Flood Protection • Water Transfer • Water Treatment and Supply • Irrigation • Dredging Consultancy • Offshore Infrastructures

• Smart & Complex Buildings• Transport & Mobility• Urban Design & Master Planning• Energy Efficiency• Environmental, Sanitation & Social Programs

WATER

URBAN

ENERGY

Page 5: Waste-to-Wheels, a circular solution to convert waste into ...pomwvl.be/sites/default/files/uploads/europese... · Waste-to-Wheels, a circular solution to convert waste into renewable

PU

BL

IC

Offering you an A-Z value proposition

June 19

STRATEGY PRE-INVESTMENT

DECOMMISSIONING OPERATION IMPLEMENTATION

→ →

Planning, Project Management & Operation, Sustainable Development, Risk Management & Safety Consulting

• Due Diligence

• Pre-Feasibility & Feasibility Studies

• Conceptual Design

• Power System Development & Economics

• Environmental Impact Assessment & Licensing

• Digital Tools

• Master Plans

• TCO* – infrastructures & fleets

• Road maps

• Technical & Regulatory

Consultancy

• Strategic O&M Engineering

• Simulators & Training

• Operation Support Solutions

• Modification, Renovation,

Lifetime Extension

• Power System Operation & Control

• Dismantling

• Waste Management

• Soil Remediation

• Site Redevelopment

• Support to permitting

• Front-End Engineering Design

• Basic & Detailed Design

• Complete tendering & bid comparison

• EPC / EPC-Management

• Owner’s or Lender’s Engineering

• HAZOP – HAZID

• Quality Assurance & Quality Control

• Project & Contract Management

• Site Supervision & Commissioning

Hydrogen competences & references 5

*TCO : Total Cost of Ownership

Page 6: Waste-to-Wheels, a circular solution to convert waste into ...pomwvl.be/sites/default/files/uploads/europese... · Waste-to-Wheels, a circular solution to convert waste into renewable

©m

alp

-sto

ck.a

do

be.c

om

Hydrogen vision

Docum

ent re

fere

nces

Page 7: Waste-to-Wheels, a circular solution to convert waste into ...pomwvl.be/sites/default/files/uploads/europese... · Waste-to-Wheels, a circular solution to convert waste into renewable

Engie vision on Hydrogen

Hydrogen

Electricity

Heat & cold

Chemical carrier

Multifluid

Local multi-usage

business : elec, heat, cold,

process, transport, storage

Massive green H2

production through

cheap RES

Multi-usage green offer

Transport of green

energy to regions with

limited RES energy

1 4

2

3

Energy intensive as

mines, ammoniac,

steel, cement…

Page 8: Waste-to-Wheels, a circular solution to convert waste into ...pomwvl.be/sites/default/files/uploads/europese... · Waste-to-Wheels, a circular solution to convert waste into renewable

A Renewable Hydrogen SOLUTION Provider

Building integrated solutions

Covering the whole value chain

Supporting you at each step of your project

Master

Plan

Renewable

Generation

Transmission

& Distribution

Power

to H2

Compression &

StorageTransport

Mobility

Power & Heat

Industry

Chemicals

H2

H2

H2

H2

CH4 (green methane)

NH3 (green ammonia)

CH3OH (green methanol)

Page 9: Waste-to-Wheels, a circular solution to convert waste into ...pomwvl.be/sites/default/files/uploads/europese... · Waste-to-Wheels, a circular solution to convert waste into renewable

Strategy - A 360° ApproachTechno-economic assessment for multi-fluid & fleet complex energy applications

• Investment Costs

• Operational Costs

• Potential synergies

• RES Availability

• Supply Contracts

• Regulatory Context

• Metering Rules

• Feed-in Tariffs

• Availability

• Flexibility

• Time shifting

• Buffering

Energy needs

• Electricity

• Heat/Cool

• Steam

STEP 1

NEEDS

STEP 2

AVAILABLE OPTIONS

STEP 3

OPERATION

STEP 4

CONTEXT

IN-HOUSE TOOL & APPROVED METHODOLOGY

PVs, WIND & INVERTERS

DC (or AC) Inverter optimisation

Subsidies & support schemes

BATTERIES & HYDROGEN

Fixed costs for engineering,

cooling system, electronics,

hardware, container.

Grid stability module

GENSETS

Optimal combination between

gensets sizes, Efficiency

curves, Start-up costs

ACCESS TO THE GRID

Buy/Sell Electricity

Services to grid operator

Or off-grid

ONE SINGLE SITE APPROACH

OUTCOMES

• Optimal size, RES share, LCOEs, Heat cost

• Investments needed (on or off site)

• ROI, Payback, NPV,…

• Savings on energy bill

• Avoided CO2 emissions

• Operating regimes

INCLUDING NEIGHBORHOOD SYNERGIES

Page 10: Waste-to-Wheels, a circular solution to convert waste into ...pomwvl.be/sites/default/files/uploads/europese... · Waste-to-Wheels, a circular solution to convert waste into renewable

©m

alp

-sto

ck.a

do

be.c

om

Waste-to-wheels

Docum

ent re

fere

nces

Page 11: Waste-to-Wheels, a circular solution to convert waste into ...pomwvl.be/sites/default/files/uploads/europese... · Waste-to-Wheels, a circular solution to convert waste into renewable

Waste-to-wheel business model

Generation of green hydrogen at waste

incineration plants, using refuse trucks

to create an early demand

HRS Network MethanolMethanationIndustryPassenger

transport

Public

transport

Other

transport

Zero Emission

Waste Collection

H2

H2

Grid

Power

to H2

Grid Services

« Flex »Local station

Generation of

Green Energy

Page 12: Waste-to-Wheels, a circular solution to convert waste into ...pomwvl.be/sites/default/files/uploads/europese... · Waste-to-Wheels, a circular solution to convert waste into renewable

PU

BL

IC

REVIVE

Refuse Vehicle Validation

June 19

CLIENT FCH-JU (European Commission)

LOCATION Brussels, Belgium

PERIOD 2017-2022

SERVICES PROVIDED Creation and Coordination of the Consortium: 8 cities and 8 industrial partners

Goal of the project

• Bridge the gap in maturity for trucks vs

cars/buses by developing a high performance

fuel cell refuse truck

• Trial the trucks in their operating environment

• Compile the evidence base for continued rollout

of the technology

Hydrogen competences & references

Page 13: Waste-to-Wheels, a circular solution to convert waste into ...pomwvl.be/sites/default/files/uploads/europese... · Waste-to-Wheels, a circular solution to convert waste into renewable

PU

BL

IC

⚫ Delayed start-up of the project:

— Refueling Infrastructure is outside scope of REVIVE

⚫ European Fuel Cell supply chain catching up

— Still development efforts needed to reach same level

as more mature non-EU suppliers.

⚫ First trucks in construction

— First deployment expected October 2019 (Breda)

Revive: Status today

June 19 Hydrogen competences & references 13

Page 14: Waste-to-Wheels, a circular solution to convert waste into ...pomwvl.be/sites/default/files/uploads/europese... · Waste-to-Wheels, a circular solution to convert waste into renewable

PU

BL

IC

⚫ Investigate techno-economics of

— Production of low carbon H2 (Focus on electrolysis, eventually including gasification)

— Distribution of this fuel versus local retailing

— Operations of H2 fueled garbage trucks

⚫Develop business model tool

⚫Evaluate the market potential for rollout of these models in EU countries

Revive: Waste-to-wheel business model validation

June 19 Hydrogen competences & references 14

Good combination for low H2

cost.

Captive fleet

Baseload

Power

Large Scale

(MW+)

Off- taker

limited HRS

infrastructure

High asset

usage

Drive Down

Cost per kg

Page 15: Waste-to-Wheels, a circular solution to convert waste into ...pomwvl.be/sites/default/files/uploads/europese... · Waste-to-Wheels, a circular solution to convert waste into renewable

©m

alp

-sto

ck.a

do

be.c

om

W2W Project references

Docum

ent re

fere

nces

Page 16: Waste-to-Wheels, a circular solution to convert waste into ...pomwvl.be/sites/default/files/uploads/europese... · Waste-to-Wheels, a circular solution to convert waste into renewable

PU

BL

IC

Waste to wheels Wallonia

CLIENT ENGIE BENELUX

LOCATION Walloon region - Belgium

PERIOD 2018 - 2019

SERVICES PROVIDED Pre-Feasibility for a Waste-to-wheels project

• 1MW elecrolyzer installed at incinerator site to supply hydrogen for a bus fleet

• Preliminary Layout in Brown Field and design of the facilities: electrolyzer, balance of plant, hydrogen supply (cylinders) and hydrogen refueling station.

• Supplier market analysis, CAPEX estimates

• Capex/ Opex estimation

• Optimization of the LCOH & LCOE using multiple parameters. Financial model

Waste to wheels project

Page 17: Waste-to-Wheels, a circular solution to convert waste into ...pomwvl.be/sites/default/files/uploads/europese... · Waste-to-Wheels, a circular solution to convert waste into renewable

PU

BL

IC

REFUEL1

Waste to wheels project

CLIENT Rijksdienst voor Ondernemend Nederland

LOCATION Roosendaal – Netherlands

PERIOD 2018-2019

SERVICES PROVIDED Pre-Feasibility study

• The project performed in partnership with TNO, Odura and Suez

• Includes the entire value chain for renewable waste to low carbon hydrogen, transport fuels and chemical feedstocks

• Capex/ Opex estimation

• Overview of market applications (transport fuels, chemical feedstock and regional market opportunities

Page 18: Waste-to-Wheels, a circular solution to convert waste into ...pomwvl.be/sites/default/files/uploads/europese... · Waste-to-Wheels, a circular solution to convert waste into renewable

PU

BL

IC

Brussel Energy

Waste to wheels project

CLIENT Engie –Brussel Energy

LOCATION Brussel – Belgium

PERIOD 2019

SERVICES PROVIDED Feasibility study

• Design basis of hydrogen production and

transportation

• Safety studies

• CAPEX/ OPEX estimation

Page 19: Waste-to-Wheels, a circular solution to convert waste into ...pomwvl.be/sites/default/files/uploads/europese... · Waste-to-Wheels, a circular solution to convert waste into renewable

©m

alp

-sto

ck.a

do

be.c

om

Other project references

Docum

ent re

fere

nces

Page 20: Waste-to-Wheels, a circular solution to convert waste into ...pomwvl.be/sites/default/files/uploads/europese... · Waste-to-Wheels, a circular solution to convert waste into renewable

PU

BL

IC

Green Hydrogen Production for Ammonia plant

June 19

CLIENT ENGIE YARA

LOCATION Australia

PERIOD 2019

SERVICES PROVIDED Pre-Feasibility and feasibility study

• Define the optimal configuration and perform the site select

• Define the basis of design and execution strategy

• Safety studies

• Capex/ Opex estimation

• Financial model

Hydrogen competences & references

Page 21: Waste-to-Wheels, a circular solution to convert waste into ...pomwvl.be/sites/default/files/uploads/europese... · Waste-to-Wheels, a circular solution to convert waste into renewable

PU

BL

IC

HyNetherlads - Green H2 North Netherlands

June 19

CLIENT GASUNIE - ENGIE

LOCATION Eemshaven – THE NETHERLANDS

PERIOD 2019

CAPACITY 100 MW

SERVICES PROVIDED Feasibility study

• Design basis of hydrogen production and

transportation

• Safety studies

• CAPEX/ OPEX estimation

Hydrogen competences & references

Gasunie -Engie intend to develop the first step (demonstration -

pilot phase) of a future large scale green hydrogen production at

Eemshaven (Engie Eemscentrale)

Page 22: Waste-to-Wheels, a circular solution to convert waste into ...pomwvl.be/sites/default/files/uploads/europese... · Waste-to-Wheels, a circular solution to convert waste into renewable

PU

BL

IC

Region REN Master Plan

Masterplan – Mining, Industry & Transport

June 19

CLIENT CORFO – Comité Solar

LOCATION Atacama & Antofagasta, Chile

PERIOD December 2017 – June 2018

SERVICES PROVIDED Conceptual study of energy transition for a low emission mining

Portfolio of renewable energy, solar and hydrogen opportunities to transform the Atacama and Antofagasta regions into a 100% Renewable territory by 2035.

Hydrogen competences & references

Page 23: Waste-to-Wheels, a circular solution to convert waste into ...pomwvl.be/sites/default/files/uploads/europese... · Waste-to-Wheels, a circular solution to convert waste into renewable

PU

BL

IC

RHYNO Mining Transport Decarbonization

A Proof of Concept of the H2 supply chain and one retrofitted truck

(KOM 930E) before scaling up the whole fleet of 40 trucks.

June 19 Hydrogen competences & references

CLIENT ENGIE – Anglo American

LOCATION Mogalakwena, South Africa

PERIOD 2020

SERVICES PROVIDED Preliminary Business Modelling

• Definition, sizing and optimization of the entire hydrogen supply chain (LCOH)

• Support to the client on the scale-up project financial valuation

Proof of Concept - Conceptual Engineering

• Protocols and optimization strategy for heavy duty refueling

• Development of a flexible internal transportation technology

Page 24: Waste-to-Wheels, a circular solution to convert waste into ...pomwvl.be/sites/default/files/uploads/europese... · Waste-to-Wheels, a circular solution to convert waste into renewable

PU

BL

IC

REIDS

Renewable Energy Integration Demonstrator Singapore

June 19

CLIENT ENGIE Singapore

LOCATION Singapore

PERIOD 2016-2017

SERVICES PROVIDED Micro-grid on island

• REN + Batteries

• Electrolyser + Fuel Cell (50 kW)

• Hydrogen Refueling station

Pre-feasibility

• Evaluate 100% RES scenario

• Brownfield vs greenfield comparison when

sizing

Implementation

• System Integrator

• Vendors follow-up

• Support for permitting

Hydrogen competences & references

Page 25: Waste-to-Wheels, a circular solution to convert waste into ...pomwvl.be/sites/default/files/uploads/europese... · Waste-to-Wheels, a circular solution to convert waste into renewable

CONFIDENTIALRESTRICTEDPUBLIC INTERNAL

CONTACTS

Jean-Paul Mossoux

Innovation Manager Tractebel Belgium

mob. +32 473 69 07 44

[email protected]

tractebel-engie.com

Dimitri Van den Borre

REVIVE coordinator

mob. +32 479 35 87 12

[email protected]

Page 26: Waste-to-Wheels, a circular solution to convert waste into ...pomwvl.be/sites/default/files/uploads/europese... · Waste-to-Wheels, a circular solution to convert waste into renewable

RESTRICTEDPUBLIC INTERNAL CONFIDENTIAL

©spc01-a

dobe-s

tock.c

om

Thank you for your attention