wassim banani architect - urbanist portfolio

99
PORTFOLIO WASSIM BANANI ARCHITECT 23, Jephson House Doddington Grove SE17 3TF London Email: [email protected] Mob: +44 7881695961 Wassim Banani Email: [email protected] Mob: +44 7881695961

Upload: wassimbanani

Post on 29-Jul-2016

246 views

Category:

Documents


1 download

DESCRIPTION

 

TRANSCRIPT

  • Wassim Banani Email: [email protected] Mob: +44 7881695961

    PORTFOLIOWASSIM BANANI ARCHITECT

    23, Jephson HouseDoddington GroveSE17 3TF London Email: [email protected]: +44 7881695961

    Wassim Banani Email: [email protected] Mob: +44 7881695961

  • RESIDENTIAL PROJECTS

  • Wassim Banani Email: [email protected] Mob: +44 7881695961

    Dar Essalam Terraces

    FACTS:Client : Groupe Alliances

    Selection method : Direct

    Architect : Fikri Benabdallah Agency

    Program : Residential Real Estate

    Net surface area : 58.500 sqm

    POSITION

    ARCHITECTURAL ASSISTANT

    RESPONSABILITIES Worked with project architect to design

    drawings, and contributed to the preparation of

    construction documents in all phases.

    Prepared technical drawings for construction

    (plans, sections, and details).

    Presented project to stakeholders.

    Worked closely with a team of professionals

    such as building service engineers,

    construction managers and quantity surveyors.

    Modi ed plans according to the circumstances

    and resolved problems that occured during the

    construction.

  • 0DLQFRXUDQWHHQERLVGXURFP

    6XSSRUWJDUGHFRUSV

    0DLQFRXUDQWHHQERLVGXURFP

    6XSSRUWJDUGHFRUSV

    6XSSRUWJDUGHFRUSV

    0DLQFRXUDQWHHQERLVGXURFP

    0DLQFRXUDQWHHQERLVGXURFP

    6XSSRUWJDUGHFRUSV

    6XSSRUWJDUGHFRUSV

    6XSSRUWJDUGHFRUSV

    0DLQFRXUDQWHHQERLVGXURFP

    6XSSRUWJDUGHFRUSV

    0DLQFRXUDQWHHQERLVGXURFP

    0DLQFRXUDQWHHQERLVGXURFP

    6XSSRUWJDUGHFRUSV

    6XSSRUWJDUGHFRUSV

    6XSSRUWJDUGHFRUSV

    6XSSRUWJDUGHFRUSV

    0DLQFRXUDQWHHQERLVGXURFP

    0DLQFRXUDQWHHQERLVGXURFP

    0DLQFRXUDQWHHQERLVGXURFP

    0DLQFRXUDQWHHQERLVGXURFP

    0DLQFRXUDQWHHQERLVGXURFP

    0DLQFRXUDQWHHQERLVGXURFP

    0DLQFRXUDQWHHQERLVGXURFP

    0DLQFRXUDQWHHQERLVGXURFP

    0DLQFRXUDQWHHQERLVGXURFP

    0DLQFRXUDQWHHQERLVGXURFP

    0DLQFRXUDQWHHQERLVGXURFP

    0DLQFRXUDQWHHQERLVGXURFP

    6XSSRUWJDUGHFRUSV

    0DLQFRXUDQWHHQERLVGXURFP

    0DLQFRXUDQWHHQERLVGXURFP

    YLWUDJH

    YLWUDJH

    YLWUDJH

    YLWUDJH

    P

    P

    F

    1

    /

    2

    h

    +

    F

    P

    *7

    B-301 B-302

    +0.78

    VHXLOFPVHXLOFP

    ,00%

    Vitrage PF 1/2h

    ( (

    PDUFKHVGH[

    *7

    +4.30

    +4.32

    VHXLOFP

    +4.32

    ( (

    PDUFKHVGH[

    B-322 B-321

    *7

    B-332 B-331

    *7

    B-342 B-341

    *7

    +7.52

    VHXLOFPVHXLOFP VHXLOFPVHXLOFP

    VHXLOFPVHXLOFP

    Vitrage PF 1/2h Vitrage PF 1/2h

    Vitrage PF 1/2h

    P

    P

    F

    1

    /

    2

    h

    +

    F

    P

    P

    P

    F

    1

    /

    2

    h

    +

    F

    P

    +7.54+7.54

    +10.76+10.76

    +10.74

    +13.98+13.98

    +13.96

    ( ( ( (

    ( (

    $UULYpHGXHU(7$*(

    9HUVqPH(7$*(

    $UULYpHGXqPHpWDJH

    9HUVqPHpWDJH

    $UULYpHGXqPHpWDJH

    PDUFKHVGH[

    PDUFKHVGH[

    SOUS SOL REZ DE CHAUSSEE

    1er ETAGE 2me ETAGE

    3me ETAGE 4me ETAGE

    B-342 B-341

    *7

    VHXLOFPVHXLOFP

    Vitrage PF 1/2h

    P

    P

    F

    1

    /

    2

    h

    +

    F

    P

    ( ($UULYpHGX

    qPHpWDJH

    9HUVqPHpWDJH

    YHUVqPHpWDJH

    -3.02sous sol

    -2.87

    rez de chaussee+0.80

    0.00

    1er tage

    +0.78

    +4.32 +4.30

    3me tage

    4me tage

    Terrasse

    GpVHQIXPDJH[

    2me tage+7.54

    +10.76

    +13.98

    +17.13

    COUPE E-E

    +10.74

    +13.96

    +3.18

    +9.452

    +12.672

    ,00%

    ,00% ,00%

    9HUV5'&

    9HUVHU(7$*(

    $UULYpH5'&

    P

    P

    F

    1

    /

    2

    h

    +

    F

    P

    P

    P

    F

    1

    /

    2

    h

    +

    F

    P

    P

    P

    F

    1

    /

    2

    h

    +

    F

    P

    PPF 1/2h+FP

    P

    P

    F

    1

    /

    2

    h

    +

    F

    P

    ,00%,00%

    SOUS SOL R D C

    1er ETAGE 2me ETAGE

    3me ETAGE 4me ETAGE

    PDUFKHVGH[

    PDUFKHVGH[

    -2.87

    +7.52

    PDUFKHVGH[

    PDUFKHVGH[

    PDUFKHVGH[

    PDUFKHVGH[

    PDUFKHVGH[

    (FK(FK

    (FK(FK

    (FK(FK

    0DLQFRXUDQWHHQERLVGXURFP

    0DLQFRXUDQWHHQERLVGXURFP

  • 9RQWHDXHQ$OXPLQLXPYLWUpFRXOLVVDQW

    3OLQWKH

    WHUUDVVH

    DOOqJH

    FP

    P

    a

    r

    o

    i

    C

    F

    1

    h

    DOO

    DOOqJH

    FP

    detail separation entre chambre

    voir.dtail A

    DETAIL AEch: 1/20

    Ech: 1/50

    WHUUDVVH

    /LVVHKRUL]RQWDOHHQLQR[EURVVpPPPP

    *DUGHFRUSVHQYHUUHVpFXULWHIHXLOOHWpHS PP

    0RQWDQWHQLQR[EURVVpPPPP

    3LqFHGDVVHPEODJHHQLQR[EURVVp

    &ROpUWWHHQLQR[EURVVp

    3DWWHjVFHOOHPHQWHQPpWDOJDOYDQLVp

    %DQGHDX

    +DELOODJHHQ$/8&2%21'

    *XLGHYROHWURXODQW

    9ROHWURXODQW

    9LWUDJH

    -

    7UDSSHGHYLVLWHFDLVVRQYRXOHWURXODQW

    /DUPLHU

    0RQWDQWVXSSRUWJXLGHYROHWURXODQW

    -RLQWFUHX[[FP

    +0.80

    +4.32

    7HUUDVVH-DUGLQ

    )DX[SODIRQGWHUUDVVH

    COUPE AA

    *DUGHFRUSV9,75((

    %DOFRQ

    *DUGHFRUSVHQ%$

    )DX

  • Wassim Banani Email: [email protected] Mob: +44 7881695961

    RABAT OCEAN : MASTERPLANING AND RESIDENTIAL

    FACTS :Client : Groupe Alliances

    Selection method : Direct

    Architect : Fikri Benabdallah Agency

    Program : Residential real estate, social and

    intermediate housing and equipment program.

    land area : 32 ha

    Net surface area : 400,000 sqm

    POSITION

    PROJECT ARCHITECT

    RESPONSABILITIES Prepared project masterplan in coordination

    with the program manager.

    Liaised with the program manager to ensure all

    open issues are handled correctly.

    Prepared design reports and technical

    speci cation reports.

    Calculated density through massing studies.

    Drew and designed hand sketched and digital

    for residential building.

    Planned meetings and organised workshops

    with consultants and client.

    Coordinated junior sta where needed.

    Ensured all work is carried out to the speci c

    requirements of the client.

  • V2: Les voies pntrantes :

    Voies dcoulant des artres principales ( V1 ), elles permettent de relier les quartiers de la ville tout en traversant le nouveau secteur de ville RabatOcan. Des voies pntrantes, faciliteront laccs des habitants du site vers les quartiers centraux. Zone dAmnagement concerte

    V1 : Les grands axes de dessertes :Le nouveau secteur de ville Ocan est desservi par des voies ( V1 ) qui sont des artres principales lchelle de la ville de Rabat. Ces V1, seront larmature du schma viaire du nouveau secteur de quartier Ocan. Zone dAmnagement

    concerte

    V4: Les voies douces :

    Circulation douce vlo pitons, voies qui permettent aux usagers de traverser le quartier vers la mer. Connexion pietonne entre la ville et son littoral.

    TRAME PAYSAGERE STRUCTURANTE

    Zone dAmnagement concerte

    V3: Agraphes de liaison :

    Voies reliant une des V1 et le futur secteur de ville Ocan. la V3 assure les liaisons secondaires avec les artres principales ( V1 ).

    Zone dAmnagement concerte

    OCCUPATION ACTUELLE DU SITE LIAISONS FONCTIONNELLES

    Le quartier de lOcan Rabat constitue lun des secteurs de ville les mieux desservis de la capitale. Il est desservi directement depuis Sal, Temara et les quartiers priphriques de la ville grce la prsence de la voie ctire. Il est li aux voies structurantes de la ville comme lavenue de Sidi Mohammed Benabdallah, et rattach directement lavenue de la Victoire qui traverse toute la ville.

    LA SITUATION DANS RABAT

  • Espaces verts privatifs:

    Chaque groupement dimmeuble profi te dun espace vert non accessibleau public, autour desquels des jardins privs sarticulent, cela accentue laspect vert du quartier.

    Zone dAmnagement concert

    Commerces et Animation :

    On relve quatre espanades importantes dans le quartier, entoures de bandes commerciales, qui les dynamisent:

    1- Les commerces front de mer animant lesplanade Menzeh Al Mohit.2- La bande de commerces qui forme la faade du cot de la ville. 3- La place centrale est borde de commerces qui implique mixit et changes.

    Zone dAmnagement concerte

    Les placettes:

    Chaque ilt est un quartier en soi, disposant dune placette anime par quelques commerces, raccorde aux voies douces pitonnes, ces placettes sont des points de rassemblement des sous quartiers, des points de repres pour les habitants qui distinguent un ilt dun autre.La conception de structuration du quartier par le vide, sillustre par ce maillage vert dont les placettes font partie.

    Zone dAmnagement concerte

    Epine dorsale des quipements:

    Une bande dquipements publics traverse le quartier de lest louestformant une pine dorsale traverse par les alles douces.

    Zone dAmnagement concerte

    Ilots ouverts:

    Lilot ouvert permet sa traverse, il est compos par un plein qui est le bti, et le vide ouvert et lumineux, constitu despaces verts publics/privs.

    Chaque lot se dmarque dun autre de part la hauteur de ses btiments et de son centre (autrement appel : coeur dlot). Lidentit de chaque lot est lie larticulation cre entre les espaces publics, les espaces de transition et les espaces privs.

    Zone dAmnagement concerte

    Emergence:

    Les mergences sous forme dimmeuble de R+8 ( + attique ) considres commeatout majeur du nouveau secteur de ville Rabat Ocan :

    - Sur le plan orientation : Repres dans le quartier. - Sur le plan paysager : Une dmarcation des squences paysagres. - Elles permettent la cration dun skyline interessant.

    Zone dAmnagement concerte

    FORMALISATION DE LA PROPOSITION DAMNAGEMENT

  • Wassim Banani Email: [email protected] Mob: +44 7881695961

    SOCIAL HOUSING BOUKNADEL

    FACTS:Client : M2B SAKAN

    Selection method : Direct

    Architect : Fikri Benabdallah Agency

    Program : Social housing

    Net surface area : 28.000 sqm

    POSITION

    PROJECT ARCHITECT

    RESPONSABILITIES Created preliminary designs in order to move

    forward with the preparation of architectural

    plans.

    Consulted the client and considered his

    requirements and requests regarding the

    project.

    Managed the design process and promoted the

    integration of disciplines.

    Supervised details, budget and time frame of

    architectural projects.

    Provided design progress reports to client and

    dealt with local authorities.

  • 1 ER ETAGE 2 EME ETAGE

  • FACADE PRINCIPALE

    FACADE ARRIERE

    FACADE LATERALE 1

    FACADE LATERALE 2

  • Wassim Banani Email: [email protected] Mob: +44 7881695961

    FACTS:Client : CDG

    Selection method : Direct

    ARCHITECT : ARCHIDESIGN

    Program : Residential building, underground parking

    Net surface area : 9.500 sqm

    POSITIONPROJECT ARCHITECT

    RESPONSABILITIES Developped project objectives, program, schedule, and budget in

    cordination with project director.

    De ned and developped functional and spatial requirements of

    project, and prepared information regarding design, speci cations

    and materials.

    Designed layout of the project, and coordinated with other disciplines

    to integrate all project elements into uni ed design for client review

    and approval.

    Assembled and submitted bid packages to obtain bid and building

    permits.

    SOCIAL HOUSING IN BOUSKOURA

  • OFFICE BUILDINGS

  • Wassim Banani Email: [email protected] Mob: +44 7881695961

    MARINA ILOT A05

    FACTS:Client : Al Manar CGI

    Selection method : Direct

    TEAM : Groupe 3 + Omar Alaoui

    Program : O ces, shops, underground parking

    Net surface area : 51.600 sqm

    Construction costs : 350 .000.000 MAD

    POSITION

    ARCHITECTURAL ASSISTANT

    RESPONSABILITIES Participated to develop project objectives,

    program, schedule, and budget in cordination

    with project director..

    Prepared and developed drawings under the

    guidance of the project leader

    Developed representations of design options for

    further discussion by the design team.

    Researched materials and innovative

    construction techniques.

  • Wassim Banani Email: [email protected] Mob: +44 7881695961

    CDM ROOSVELTFACTS:Client : BANK OF MOROCCO CREDIT

    Selection method : Architectural competition

    ARCHITECT : Archidesign

    Program : O ces, shops, underground parking

    Net surface area : 1.500 sqm

    Construction costs : 7.000.000 MAD

    POSITION

    PROJECT ARCHITECT

    RESPONSABILITIES Determined the resources and objectives of project by consulting with client.

    Built Digital models of spaces for presentation to client.

    Prepared project estimates.

    Directed the production of construction documents, drawings and speci cations.

    Coordinated schedules and workloads.

    Reviewed architectural documents for potential con ict with other disciplines.

    Managed the subcontractors and monitored their progress for technical

    submissions.

  • Wassim Banani Email: [email protected] Mob: +44 7881695961

    THE SAUDI-MOROCCAN COMPANY OF INVESTMENT AND DEVELOPMENT

    FACTS:Client : ASMA INVEST

    Selection method : Architectural competition

    ARCHITECT: Archidesign

    Program : O ces, shops, underground parking

    Net surface area : 6.500 sqm

    Construction costs : 30.000.000 MAD

    POSITIONPROJECT ARCHITECT

    RESPONSABILITIES Consulted with client to determine objective and resources of project.

    Acted as responsible for development of project in specific regard to

    architectural scope of work, budget, and schedule.

    Directed preparation of architectural and engineering contract documents,

    following established o ce standards.

    Designed layout of the project, and coordinated with other disciplines to

    integrate all project elements into uni ed design for client review and approval.

    Assembled and submitted bid packages to obtain bid and building permits.

    Oversaw approval of construction period submittals.

  • Wassim Banani Email: [email protected] Mob: +44 7881695961

    CASANEARSHORE

    FACTS:Client : Casanearshore

    Selection method : Direct

    TEAM : Groupe 3 + Taou k El Ou r + Omar Alaoui

    Program : O ces, shops, underground parking

    Net surface area : 77.000 sqm

    Construction costs : 300.000.000 MAD

    POSITION

    ARCHITECTURAL ASSISTANT

    RESPONSABILITIES Assisted the project director on proposals and

    on design needs.

    Developed creative designs and that use

    innovative techniques.

    Developed design drawings, such as plans,

    sections, elevations and models using

    advanced AutoCad and 3D softwares.

    Produced and presented design panels.

    Researched materials and innovative

    construction techniques.

  • HEALTHCARE PROJECT

  • Wassim Banani Email: [email protected] Mob: +44 7881695961

    INTERNATIONAL COMPETITION WINNER: HEALTH CENTRE

    FACTS:Client : DEP Agadir Morocco

    Selection method : International competition

    Team : Groupe-6 Architectes, Fikri Benabdallah,

    Rachid Andaloussi, ARTELIA (engineering) and

    CID (engineering)

    Competition : 2014 (winner)

    Net surface area : 120,000 sqm

    Number of beds : 800

    Construction costs : 1,200,000,000 DH

    POSITION

    PROJECT ARCHITECT AND REPRESENTATIVE OF THE CONSORTIUM LEADER

    RESPONSABILITIES Coordinated with internal and external project

    teams and conducted meetings.

    Acted as point of contact for the client project

    team.

    Conducted studies on space planning,

    structural analysis, design feasibility and other

    related architectural engineering issues.

    Checked plans and managed workloads.

    Acted as team member in the project drafting

    using REVIT and AutoCad.

    Prepared project presentation materials,

    diagrams, renderings and graphics.

    Prepared design reports and statements.

    Managed the design process and promoted

    integration of disciplines.

    Provided technical support to the bid process.

  • PP

    9

    0

    P

    O

    9

    0

    P

    O

    9

    0

    PO 90

    PP 50

    PO 90

    PO 90PO 90

    PO 90

    PO 90

    PP 50

    PO 90

    PP 50

    PO 90

    PO 90

    P

    P

    9

    0

    P

    P

    9

    0

    P

    P

    9

    0

    PP 120

    P

    P

    9

    0

    PP 120

    PP 90

    PP 90

    PP 90

    PP 90

    PP 90

    PP 120

    LB

    PP 120

    PP 120

    PP 120

    P

    P

    9

    0

    P

    P

    9

    0

    P

    P

    9

    0

    P

    P

    9

    0

    PP 120

    PP 120

    PP 110

    P

    P

    1

    2

    0

    P

    P

    9

    0

    PP 120

    PP 120PP 120

    PP 120

    PP 120

    P

    P

    1

    2

    0

    P

    P

    1

    2

    0

    P

    P

    1

    2

    0

    P

    P

    1

    2

    0

    PP 80

    PP 80

    PP 120

    PP 80

    PP 110

    P

    O

    9

    0

    P

    O

    9

    0

    PP 120

    MM 182000kg

    MM 172000kg

    MC 272000kg

    8g

    MC 252000kg

    MC 262000kg

    PO 90

    PO 90

    PO 90

    PO 90PO 90

    PO 90

    PO 90

    PO 90PO 90

    PO 90

    FM

    R

    I

    A

    R

    I

    A

    PP 90

    PP 120

    PP 120PP 120

    PP 120

    PO 90

    PO 90

    P

    O

    9

    0

    P

    P

    5

    0

    P

    O

    9

    0

    P

    P

    5

    0

    P

    O

    9

    0

    P

    P

    5

    0

    P

    O

    9

    0

    P

    P

    5

    0

    PP 120

    PC MEDICAL CONSULTATIONEDICAL CONSULTATION

    CONS

    ULTA

    TIO

    NCH

    IRUR

    GIE

    S2

    CONS

    ULTA

    TIO

    NPR

    E LEV

    EME N

    T

    CONS

    ULTA

    TIO

    NAU

    TRES

    C ONS

    ULTA

    TIO

    NM

    E DEC

    INE

    S 2

    C ONS

    ULTA

    TIO

    NM

    E DEC

    INE

    S 1

    MP 15800kg

    MP 16800kg

    PP 90

    PP 50PP 90

    D

    F

    RIA

    DF

    FM

    A

    F

    A

    F

    DFD

    F

    RIA

    DF

    A

    F

    A

    F

    DF

    D

    F

    RIA

    DF

    FM

    A

    F

    A

    F

    DF

    R

    I

    A

    PP 120

    PP 120

    PP 120

    PP 120

    PP70

    PP 120

    PP 120

    PP 120

    PP 80

    PP 90

    PP 90

    PP 90

    PP 90

    PP 120

    PP 120

    PP 90

    P

    O

    9

    0

    P

    P

    5

    0

    P

    P

    1

    2

    0

    P

    P

    1

    2

    0

    PP 90PP 90

    PP 90

    PP 90

    PP 90

    PP 90

    PP 120

    PP 120

    PP 120

    PP 120

    PP 120

    PP 90

    P

    O

    9

    0

    P

    O

    5

    0

    P

    P

    1

    2

    0

    P

    P

    1

    2

    0

    P

    P

    1

    2

    0

    P

    P

    1

    2

    0

    P

    P

    1

    2

    0

    P

    P

    9

    0

    AF DF

    AF DF DF

    DF

    AF

    AFDF

    DF DF

    DF

    AF DF

    DF

    DF

    DFAF

    AF

    PP90 PP

    90

    P

    P

    9

    0

    P

    P

    9

    0

    PP90

    P

    P

    9

    0

    PP 90PP 90

    PP 90

    P

    P

    9

    0

    P

    O

    9

    0

    P

    O

    9

    0

    P

    O

    9

    0

    P

    O

    9

    0

    P

    P

    1

    2

    0

    P

    P

    1

    2

    0

    PP 120

    P

    P

    9

    0

    PP 90

    PP 90

    PP 90 PO 90

    PP 50

    PO 90

    PO 90

    P

    O

    9

    0

    P

    O

    9

    0

    P

    O

    9

    0

    P

    O

    9

    0

    P

    P

    9

    0

    P

    P

    9

    0

    PP90

    P

    P

    1

    1

    0

    P

    O

    9

    0

    P

    O

    9

    0

    P

    P

    9

    0

    P

    P

    9

    0

    P

    P

    1

    2

    0

    PP 120

    P

    O

    9

    0

    P

    P

    5

    0

    PP 120

    PP 90 PP 90

    AF

    PP 90

    P

    P

    1

    2

    0

    P

    P

    1

    2

    0

    P

    P

    1

    2

    0

    PP 70

    PP 90

    PP90

    PP90

    P

    P

    9

    0

    P

    P

    9

    0

    P

    P

    5

    0

    P

    P

    9

    0

    P

    P

    9

    0

    P

    P

    9

    0

    P

    P

    9

    0

    P

    P

    9

    0

    P

    P

    9

    0

    PP 90

    PP 90

    P

    P

    9

    0

    P

    P

    9

    0

    P

    P

    9

    0

    P

    P

    9

    0

    P

    P

    9

    0

    P

    P

    9

    0

    P

    O

    9

    0

    P

    P

    5

    0

    P

    O

    9

    0

    P

    O

    5

    0

    PO 90

    PO 90

    PP 90

    P

    P

    1

    2

    0

    PP 120

    burmed

    29.5 m(27)

    onm

    arch v16.0 m

    (16)

    accueilsecrt16.5 m

    (16)

    dtente15.0 m

    (16) burmajor11.0 m

    (12)

    burmajor11.0 m

    (12)

    vestsan H14.5 m

    (14)

    burmed

    30.0 m(27)

    attentevalide26.5 m

    (25)

    accueilsecrt24.0 m

    (24)

    arch v8.5 m

    (8)

    san pat4.0 m

    (4)san pat3.0 m

    (4)

    consultgyn

    19.0 m(18)

    explo fonctlithotritie

    39.0 m(40)

    desh2.5 m

    (3)

    explo fonctgyn

    22.0 m(20)

    consulturo

    19.0 m(18)

    explo foncturo

    22.5 m(20)

    consultOPH18.0 m

    (18)

    consultOPH19.5 m

    (18)

    explo fonctOPH19.5 m

    (20)

    explo fonctOPH22.0 m

    (20)

    explo fonctOPH22.0 m

    (20)

    explo fonctOPH20.0 m

    (20)

    explo fonctOPH22.5 m

    (20)

    explo fonctORL

    21.5 m(20)

    explo fonctORL

    20.0 m(20)

    explo fonctORL

    20.5 m(20)

    explo fonctORL

    22.5 m(20)

    consultORL

    19.0 m(18)

    poste inf20.5 m

    (16)

    consultmax-fac

    20.5 m(18)

    arch v8.0 m

    (8)

    accueilsecrt16.0 m

    (16)

    attentevalide10.0 m

    (20)

    consultansth16.0 m

    (16)

    consultansth16.0 m

    (16)

    attentevalide37.0 m

    (50)

    consult15.5 m

    (16)

    consult15.5 m

    (16)

    prlvallong15.5 m

    (16)

    prlvpara/myc

    14.5 m(16)

    accueilsecrt24.0 m

    (24)

    lp14.5 m

    (6)

    prlvsang6.0 m

    (6)

    prlvsang6.0 m

    (6)

    prlvsang6.0 m

    (6)

    prlvsang6.0 m

    (6)

    prlvuro/procto

    12.5 m(8)

    san pat3.5 m

    (4)

    san pat3.5 m

    (4)

    san pat3.5 m

    (4)

    san pat3.5 m

    (4)

    burprleveurs

    23.5 m(24)

    dconta13.0 m

    (12)

    arch v5.0 m

    (8)

    secrt13.5 m

    (16)

    san pat3.5 m

    (4)san pat

    3.5 m(4)

    attentevalide14.5 m

    (25)

    consult16.5 m

    (16)

    consult16.0 m

    (16)

    consult16.0 m

    (16)

    consult15.0 m

    (16)

    poste infsoins16.5 m

    (16)

    poste infsoins17.0 m

    (16)

    explo fonctEEG/EMG

    17.0 m(20)

    attente couch7.5 m

    (9)explo fonct

    rhuma19.0 m

    (20)

    lb / vid6.5 m

    (4)

    explo fonctprocto17.5 m

    (20)

    explo fonctlaser18.0 m

    (20)

    attente couch17.0 m

    (12)

    explo fonctmano19.5 m

    (20)

    soinspans18.0 m

    (20)

    explo fonctspiro19.5 m

    (20)

    explo fonctallergo36.0 m

    (20)

    explo fonctplthy19.0 m

    (20)

    consult15.5 m

    (16)

    consult15.5 m

    (16)

    consult15.5 m

    (16)

    secrt16.0 m

    (16)

    attentevalide9.0 m(22)

    consult15.5 m

    (16)lb / vid4.0 m

    (4)

    lb / vid5.0 m

    (4)

    rgtmat

    27.0 m(30) ls

    6.0 m(6)

    dchets6.5 m

    (6)

    mn7.5 m

    (6)

    rgtconso14.0 m

    (15)

    dconta12.0 m

    (12)

    dconta endoscopes30.5 m

    (30)

    burchef serv

    14.0 m(14)

    salle de cours46.0 m

    (40)

    burpaysager

    22.5 m(24)

    burpaysager

    23.5 m(24)

    desh3.0 m

    (3)

    attente couch9.0 m

    (9)

    lb / vid4.5 m

    (4)

    runion16.5 m

    (14)

    vestsan F25.5 m

    (28)

    san pe2.5 m

    (3)

    san pe2.5 m

    (3)

    san pe2.5 m

    (3)

    san pe2.5 m

    (3)

    san pat3.5 m

    (4)

    san pat3.5 m

    (4)

    san pat4.0 m

    (4)

    san pat4.5 m

    (4)

    circ76.0 m

    (0)

    circ62.0 m

    (0)

    circ60.0 m

    (0)

    circ46.5 m

    (0)circ

    53.0 m(0)

    circ81.5 m

    (0)

    circ53.5 m

    (0)circ

    53.5 m(0)

    circ88.0 m

    (0)

    circ29.5 m

    (0)

    circ58.5 m

    (0)

    circ75.0 m

    (0)

    circ81.5 m

    (0)

    circ81.5 m

    (0)

    circ61.0 m

    (0)

    accueil gneral16.0 m

    (12)

    circ56.5 m

    (0)circ

    33.0 m(0)

    consultansth15.0 m

    (16)

    poste inf16.0 m

    (16)

    attente couch25.0 m

    (9)explo fonctmal infect

    21.5 m(20)

    consultmal infctueuse

    21.5 m(16)

    attentevalide7.0 m

    (0)

    attentevalide7.5 m

    (0)

    attentevalide7.0 m

    (0)

    arch v5.0 m

    (8)

    burchef serv

    16.0 m(14)

    LT15.0 m

    (0)

    LT17.5 m

    (0)

    san pub10.5 m

    (0)

    rgtpropre7.0 m

    (8)

    circ268.0 m

    (0)

    san pub10.5 m

    (0)

    san pe2.5 m

    (3)

    san pe2.5 m

    (3)

    san pub10.5 m

    (0)

    san pub10.5 m

    (0)

    LT7.5 m

    (0)

    LT7.5 m

    (0)

    LT7.5 m

    (0)

    circ69.5 m

    (0)

  • EDUCATIONAL PROJECTS

  • Wassim Banani Email: [email protected] Mob: +44 7881695961

    EURO-MEDITERRANEAN UNIVERSITY OF FEZ

    FACTSClient : Euro-Mediterranean University of Fez

    Project : Campus of the Euro-Mediterranean

    University

    Selection method : International competition

    Team : Agency Rachid Andaloussi (architect leader,

    Groupe-6 and Fikri Benabdallah Agency

    Competition : 2014 ( nalist, non selected)

    Surface : 103 000 sqm

    Construction costs : 9 600 000 000 DH

    POSITION

    PROJECT ARCHITECT

    RESPONSABILITIES Worked e ectively in a team, both as a leader

    and a team member.

    Supervised sta in production of working drawings

    and 3D models.

    Developed creative designs and that utilize

    innovative techniques.

    Developped project objectives, program,

    schedule, and budget in cordination with project

    director.

    De ned and developped functional and spatial

    requirements of project, and prepared information

    regarding design, speci cations and materials.

    Producted architectural drawings.

  • LA VALLE DE LA CULTURE

    SCHEMA DE PROGRAMMATION

    ACCES PIETONS

    ACCES VEHICULES

  • FACADE NORD : 1/500

    FACADE EST : 1/500

    FACADE SUD PRINCIPALE : 1/500

    FACADE OUEST : 1/500

  • Wassim Banani Email: [email protected] Mob: +44 7881695961

    CENTRAL SCOOL OF CASABLANCA

    FACTS:Selection method : International competition

    Team : XDGA (Brussels) and Fikri Benabdallah

    Agency

    Competition : 2013 ( nalist, non selected)

    Surface : 30.000 sqm

    Construction costs : 100.000.000 DH

    POSITION

    PROJECT ARCHITECT

    RESPONSABILITIES Prepared information regarding site surveys

    and program analysis.

    Developed concepts for international design

    competitions.

    Produced drawings, speci cations and

    documentation for construction teams.

    Prepared project presentation materials,

    diagrams, renderings and graphics.

    Developed project schedules, budgets, and

    work plans.

    Supervised sta while preparing drawings and

    3D models.

  • Salle de formation

    Salle de formation

    Salle de formation Salle de formation Salle de formation Auditorium 01 Auditorium 02

    formation continueacceuil

    secrtariat

    salle de conseil salle de runion

    administration zone de dtente

    administration

    serveurs

    bureau admnistration

    bureau admnistration

    bureau admnistration

    administrationfinance relations entreprises directeuradjointsecrtariat

    kitchenette

    archives vives

    patio admnistration

    archives

    formation continue

    salle polyvalente

    extension recherche

    Plan des niveaux proncipaux de lcole et de lextension 1:200e

  • 4. Hall of fame, vue sur les grands amphithatres et le learning-center en dessous

    8. Patio minral de lextension des labos de recherche en phase 1 9. Patio minral de lextension des labos de recherche en phase 2 10. Cit tudiante, faades avec des accents de pierre de Bouskoura 11. le terrain de football vu dep

    5. Vue lintrieur des grands amphithatres en configuration ouverte 6. Lescalier dans le hall of fame et lentre du learning center 7. La plateforme panoramique au dessus de la to

  • Wassim Banani Email: [email protected] Mob: +44 7881695961

    MUNDIAPOLIS UNIVERSITY

    FACTS:Client : SOPRIMA

    Selection method : Direct

    Team : Fikri Benabdallah architect + LC Building

    Net surface area : 32,000 sqm

    Construction costs : 110,000,000 DH

    POSITION

    ARCHITECTURAL ASSISTANT

    RESPONSABILITIES Collated general information relating to the

    projects

    Supported architectural teams.

    Participated to the primary feasibility research

    Contributed with senior architect to design

    project and produced sections, layouts,

    elevations, working drawings and construction

    drawings.

    Participated the complete development of

    design and detailed drawings.

    Coordinated drawings with architectural &

    engineering consultants.

    Helped project architect to monitore the

    progress of the construction activities on a

    regular basis and held regular status meetings

    with the involved team members.

  • SHOPPING CENTER

  • Wassim Banani Email: [email protected] Mob: +44 7881695961

    MOROCCO MALL

    POSITION

    SITE ARCHITECT

    RESPONSABILITIES Supervised site work and led site architectural

    team.

    Worked with both builders and owners to

    develop and detail designs within speci c

    budgets.

    Provided technical support to the bid process.

    Assisted the project architect of Design

    International in design conception,

    development, production of drawings,

    documentation, and other deliverables.

    Responsible for the approval of proposed plans

    submitted by the builders.

    Mock-ups, site and materials inspection and

    supervision.

    FACTS:Client : Al Amine Invest (Groupe Aksal + Al Jedine)

    Selection method : Direct

    Team : Design International (UK, London) and

    ArchiDesign (Morocco, Casablanca)

    Program : Build Shopping Mall and Leisure Centre

    Net surface area : 200.000 sqm

    Construction costs : 250M Eur

  • URBAN PLANNING - URBAN DESIGN

  • Wassim Banani Email: [email protected] Mob: +44 7881695961

    KING MOHAMMED VI GREEN CITY

    FACTS:Client : O ce Chri en des Phosphates

    Selection method : Direct

    TEAM : Cooperation of Cardete Huet Architectes

    (France) and Saad Benkiran Agency (Morocco)

    Program : Masterplanning & Sustainable Urban

    Development

    POSITION

    ARCHITECT ASSISTANT

    RESPONSABILITIES Designed innovative Masterplan in direct

    response to unique user and programmatic

    contexts through the integration of leading-

    edge planning, engineering, and other required

    systems.

    Developed design drawings, such as plans,

    sections, elevations and models using

    advanced AutoCad and 3D softwares.

    Prepared design reports and statements.

    Calculated density through massing studies.

  • Wassim Banani Email: [email protected] Mob: +44 7881695961

    CENTRAL MAIL

    FACTS:Client : O ce Chri en des Phosphates

    Selection method : Direct

    TEAM : Cooperation of Cardete Huet Architectes

    (France) and Saad Benkiran Agency (Morocco)

    Program : Design of Urban Space

    POSITION

    ARCHITECTURAL ASSISTANT

    RESPONSABILITIES Assisted the project architect in the site

    analysis and planning, establishment of project

    programme, material development, scheme

    documentation, 2D plans, sections, elevations

    and presentations to major clients.

    Designed public spaces.

    Provided technical support to the bid process.

    Prepared progress reports of the design

    process.

  • WASSIM BANANI ARCHITECT

    Flat 23, Jephson House Doddington GroveSE17 3TF London Email: [email protected]: +44 7881695961

    Wassim Banani Email: [email protected] Mob: +44 7881695961