Navigating MAP-21 Walter Brooks
Executive DirectorRegional Planning Commission
November 2, 2012
![Page 2: Walter Brooks Executive Director Regional Planning Commission November 2, 2012](https://reader036.vdocuments.us/reader036/viewer/2022081518/551a2b605503463e778b4758/html5/thumbnails/2.jpg)
Moving Ahead for Progressin the 21st. Century Act
Map-21
(October 1, 2012 thru December 31, 2014)
![Page 3: Walter Brooks Executive Director Regional Planning Commission November 2, 2012](https://reader036.vdocuments.us/reader036/viewer/2022081518/551a2b605503463e778b4758/html5/thumbnails/3.jpg)
U.S. DOT Priorities
•PERFORMANCE MANAGEMENT APPROACH
•Identifies National Goals (23 USC 150 (b))
1. Safety2. Infrastructure Conditions3. Congestion Reduction4. System Reliability5. Freight Movement and Economic Vitality 6. Environmental Sustainability 7. Reduced Project Delivery Delays
![Page 4: Walter Brooks Executive Director Regional Planning Commission November 2, 2012](https://reader036.vdocuments.us/reader036/viewer/2022081518/551a2b605503463e778b4758/html5/thumbnails/4.jpg)
Metropolitan Transportation Planning Metropolitan Transportation Plan (MTP)
((23 U.S.C. 134(i)(2)(A)(i))
• “Shall include identification of transportation facilities (including major roadways, transit, multimodal and intermodal facilities, nonmotorized transportation facilities, and intermodal connectors) that should function as an integrated metropolitan transportation system, giving emphasis to those facilities that serve important national and regional transportation functions.”
![Page 5: Walter Brooks Executive Director Regional Planning Commission November 2, 2012](https://reader036.vdocuments.us/reader036/viewer/2022081518/551a2b605503463e778b4758/html5/thumbnails/5.jpg)
MAP-21
• Performance – Based Federal Program• Emphasis on Multimodal Investments
(Retain “Flexing” Provision)• Corridor Planning with Environmental Linkages
![Page 6: Walter Brooks Executive Director Regional Planning Commission November 2, 2012](https://reader036.vdocuments.us/reader036/viewer/2022081518/551a2b605503463e778b4758/html5/thumbnails/6.jpg)
Roles & Responsibilities• US DOT Establishes Performance Standards and Measures (13 hwy. and 2 transit areas)
•State DOT’s and MPO’s set Measurable Targets for each Performance Measure
•Conduct Sound Multimodal Planning Process
•Develop Plans and Programs and Select Projects to Demonstrate Target Acheivement
•US DOT to Track State and MPO Progress in Achieving Performance Targets (7/6/17)
![Page 7: Walter Brooks Executive Director Regional Planning Commission November 2, 2012](https://reader036.vdocuments.us/reader036/viewer/2022081518/551a2b605503463e778b4758/html5/thumbnails/7.jpg)
RPC as the Metropolitan Planning Organization
Long Range Transportation Plan (MTP)
Short Range Transportation Pan (TIP)
![Page 8: Walter Brooks Executive Director Regional Planning Commission November 2, 2012](https://reader036.vdocuments.us/reader036/viewer/2022081518/551a2b605503463e778b4758/html5/thumbnails/8.jpg)
Transportation InvestmentsAverage Annual Investments1999 – Current $239M/year
2040 Plan• System Preservation 42%• Safety & Operations 27%• Bike/Ped 10%• New Capacity 21%
Transit• Discretionary $ Competitive Pot• New Starts 50% Local Share• Operating Cost TMAs 100% Local
Small Urbans 50/50%• Inter-City Rail FRA (not FTA)
![Page 9: Walter Brooks Executive Director Regional Planning Commission November 2, 2012](https://reader036.vdocuments.us/reader036/viewer/2022081518/551a2b605503463e778b4758/html5/thumbnails/9.jpg)
Transportation Investments – FY-09
Preser-vation49.9%
($220 m)
Capacity28.8% ($127m)
Safety & Op-
erations 3.2%
($14m)
Transit14.4% ($64m)
Bike/Ped3.3% ($15m)
Enhancements 0.4% ($2m)
Total Investments $442m134 Projects
![Page 10: Walter Brooks Executive Director Regional Planning Commission November 2, 2012](https://reader036.vdocuments.us/reader036/viewer/2022081518/551a2b605503463e778b4758/html5/thumbnails/10.jpg)
Transportation Investments – FY-10
Preserva-tion37%
($75M)
Capacity4.5% ($9M)
Safety & Operations17.7% ($36M)
Transit36.1%
($73M)
Bike/Ped1.3% ($3M)
Enhancements3.4% ($7M)
Total Investments $203M - 87 Projects
![Page 11: Walter Brooks Executive Director Regional Planning Commission November 2, 2012](https://reader036.vdocuments.us/reader036/viewer/2022081518/551a2b605503463e778b4758/html5/thumbnails/11.jpg)
HOW WE MAKE DECISIONS
Technical Advisory Committee
• Parish & Planning Directors• Parish Department of Public Works• Parish & City Chief Administrative Officers• Local Transit Operators• Louisiana DOTD• New Orleans Public Belt Railroad• Port of New Orleans• LA Motor Transport Association• Louisiana Airport Authority• National Safety Council• Greater New Orleans Expressway Commission• Crescent City Connection Commission• U.S. Housing and Urban Development (HUD)• Federal Highway Administration (FHWA)• Federal Transit Administration (FTA)
Advisory Councils• Complete Streets Advisory Council• Transit Advisory Council• Freight Advisory Council• Regional Livability Advisory Council
The General Public
RPC Staff
RPC Staff
RPC Transportation Policy Committee
![Page 12: Walter Brooks Executive Director Regional Planning Commission November 2, 2012](https://reader036.vdocuments.us/reader036/viewer/2022081518/551a2b605503463e778b4758/html5/thumbnails/12.jpg)
RPC’s Pedestrian and Bicycle Program Has Trained
250+ Engineers and Planners
40+ Police in 8 Jurisdictions
![Page 13: Walter Brooks Executive Director Regional Planning Commission November 2, 2012](https://reader036.vdocuments.us/reader036/viewer/2022081518/551a2b605503463e778b4758/html5/thumbnails/13.jpg)
RPC’s Pedestrian and Bicycle Program Effectiveness
Bicycle fatalities are 27%
Pedestrian fatalities 15%
![Page 14: Walter Brooks Executive Director Regional Planning Commission November 2, 2012](https://reader036.vdocuments.us/reader036/viewer/2022081518/551a2b605503463e778b4758/html5/thumbnails/14.jpg)
Making Livable Communities Happen
The Magazine Street Example
![Page 15: Walter Brooks Executive Director Regional Planning Commission November 2, 2012](https://reader036.vdocuments.us/reader036/viewer/2022081518/551a2b605503463e778b4758/html5/thumbnails/15.jpg)
![Page 16: Walter Brooks Executive Director Regional Planning Commission November 2, 2012](https://reader036.vdocuments.us/reader036/viewer/2022081518/551a2b605503463e778b4758/html5/thumbnails/16.jpg)
![Page 17: Walter Brooks Executive Director Regional Planning Commission November 2, 2012](https://reader036.vdocuments.us/reader036/viewer/2022081518/551a2b605503463e778b4758/html5/thumbnails/17.jpg)
Andrew Higgins Drive
![Page 18: Walter Brooks Executive Director Regional Planning Commission November 2, 2012](https://reader036.vdocuments.us/reader036/viewer/2022081518/551a2b605503463e778b4758/html5/thumbnails/18.jpg)
Magazine Street
![Page 19: Walter Brooks Executive Director Regional Planning Commission November 2, 2012](https://reader036.vdocuments.us/reader036/viewer/2022081518/551a2b605503463e778b4758/html5/thumbnails/19.jpg)
Andrew Higgins Drive
![Page 20: Walter Brooks Executive Director Regional Planning Commission November 2, 2012](https://reader036.vdocuments.us/reader036/viewer/2022081518/551a2b605503463e778b4758/html5/thumbnails/20.jpg)
Wisner Blvd. and Trail
![Page 21: Walter Brooks Executive Director Regional Planning Commission November 2, 2012](https://reader036.vdocuments.us/reader036/viewer/2022081518/551a2b605503463e778b4758/html5/thumbnails/21.jpg)
Harrison Avenue
Harrison Avenue
![Page 22: Walter Brooks Executive Director Regional Planning Commission November 2, 2012](https://reader036.vdocuments.us/reader036/viewer/2022081518/551a2b605503463e778b4758/html5/thumbnails/22.jpg)
• Road overlay & ADA access improvements through Submerged Roads Program
• String of commercial enterprises reopened, led by banks and followed by restaurants including Reginelli's, Lakeview Deli, the Steak Knife, Lakeview Harbor and Mondo (Susan Spicer)
Harrison Ave – Land Use and Transportation Success
![Page 23: Walter Brooks Executive Director Regional Planning Commission November 2, 2012](https://reader036.vdocuments.us/reader036/viewer/2022081518/551a2b605503463e778b4758/html5/thumbnails/23.jpg)
Enhancement of existing development patternsVibrant, mixed-use neighborhood with a stable residential basePedestrian-oriented core centered on 18th Street Compatible transitions between the mixed-use core, residential
areas, and heavier commercial areas at the periphery
Fat City: Strategic Plan Vision
![Page 24: Walter Brooks Executive Director Regional Planning Commission November 2, 2012](https://reader036.vdocuments.us/reader036/viewer/2022081518/551a2b605503463e778b4758/html5/thumbnails/24.jpg)
Pedestrian Core at 18th St.• Walkable mixed-use• 18th Street as ‘Main Street’ of Fat
City • Upper floor: mix of office, lodging,
and residences• Street level: restaurants, specialty
retail, and entertainment uses• 65’ height max
![Page 25: Walter Brooks Executive Director Regional Planning Commission November 2, 2012](https://reader036.vdocuments.us/reader036/viewer/2022081518/551a2b605503463e778b4758/html5/thumbnails/25.jpg)
TULANE AVENUE
![Page 26: Walter Brooks Executive Director Regional Planning Commission November 2, 2012](https://reader036.vdocuments.us/reader036/viewer/2022081518/551a2b605503463e778b4758/html5/thumbnails/26.jpg)
Leake Avenue
![Page 27: Walter Brooks Executive Director Regional Planning Commission November 2, 2012](https://reader036.vdocuments.us/reader036/viewer/2022081518/551a2b605503463e778b4758/html5/thumbnails/27.jpg)
Sustainable Streets
![Page 28: Walter Brooks Executive Director Regional Planning Commission November 2, 2012](https://reader036.vdocuments.us/reader036/viewer/2022081518/551a2b605503463e778b4758/html5/thumbnails/28.jpg)
Phase I – I-10 East Beautification
![Page 29: Walter Brooks Executive Director Regional Planning Commission November 2, 2012](https://reader036.vdocuments.us/reader036/viewer/2022081518/551a2b605503463e778b4758/html5/thumbnails/29.jpg)
• Under construction• Overlay 8 streets• Installation of ADA
compliant ramps• Sidewalk replacement-
in-kind where needed• Improved signage and
striping for pedestrians and bicyclists
• Construction cost: $13.5M
• Work complete before Super Bowl
FRENCH QUARTER STREETS PROJECT
![Page 30: Walter Brooks Executive Director Regional Planning Commission November 2, 2012](https://reader036.vdocuments.us/reader036/viewer/2022081518/551a2b605503463e778b4758/html5/thumbnails/30.jpg)
• 5000+ ADA ramps installed through Submerged Roads
• New Orleans CBD improvements on high volume ped/transit routes
• Jefferson Parish ADA Transition Plan to identify barriers to accessibility and create a schedule for making improvements
ADA ACCESS IMPROVEMENTS
![Page 31: Walter Brooks Executive Director Regional Planning Commission November 2, 2012](https://reader036.vdocuments.us/reader036/viewer/2022081518/551a2b605503463e778b4758/html5/thumbnails/31.jpg)
• Awarded Bronze Level Bicycle Friendly Community by League of American Bicyclists
• Lane striping coordinated with Bike Master Plan
• Bike-on-bus Coordination
• Complete Streets policy• Training Workshops
BIKE AND PEDESTRIAN
![Page 32: Walter Brooks Executive Director Regional Planning Commission November 2, 2012](https://reader036.vdocuments.us/reader036/viewer/2022081518/551a2b605503463e778b4758/html5/thumbnails/32.jpg)
• 150+ yrs old & pedestrian only
• Address civil & structural needs in addition to architectural rehabilitation
• Aligns with CNO priorities of public safety, sustainable communities, and promoting family recreation areas
• $1.1M cost
MAGNOLIA BRIDGE
![Page 33: Walter Brooks Executive Director Regional Planning Commission November 2, 2012](https://reader036.vdocuments.us/reader036/viewer/2022081518/551a2b605503463e778b4758/html5/thumbnails/33.jpg)
• RPC initiated a market analysis and feasibility study based on community vision
• Army Corps of Engineers announced its intentions to locate a permanent pump station in the West End vicinity
• 1st Public Meeting held Jan 2012, 2nd Public Meeting held July
WEST END MASTER PLAN
![Page 34: Walter Brooks Executive Director Regional Planning Commission November 2, 2012](https://reader036.vdocuments.us/reader036/viewer/2022081518/551a2b605503463e778b4758/html5/thumbnails/34.jpg)