waller creek intake cfd modeling and simulation alden research laboratory inc. 30 shrewsbury st.,...

26
Waller Creek Intake CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September 18, 2009 Flood Control Turning Vane Design

Upload: parker-perrow

Post on 01-Apr-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Waller Creek Intake CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September 18, 2009

Waller Creek IntakeCFD Modeling and Simulation

ALDEN Research Laboratory Inc.30 Shrewsbury St., Holden, MA 01520

Preliminary Results

September 18, 2009

Flood Control Turning Vane Design

Page 2: Waller Creek Intake CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September 18, 2009

CFD model geometry with proposed flood control turning vane

Flood control turning vane Flood control turning vane

Isometric view 1 Isometric view 2

Page 3: Waller Creek Intake CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September 18, 2009

CFD model geometry with proposed flood control turning vane

Flood control turning vane

Page 4: Waller Creek Intake CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September 18, 2009

V6 = 3.32 ft/s

V5 = 3.14 ft/s

V4 = 2.04 ft/s V3 = 3.63 ft/s

V2 = 3.07 ft/s

V1 = 3.4 ft/s

Average velocity (in the bar screen area)

Time = 2540 sec.

1

2

34

5

6

(velocity color scale is the actual velocity )

Page 5: Waller Creek Intake CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September 18, 2009

88.76 %

98.6 %

100 % 80.13 %

95.19 %

80.12 %

Percent of bar screen area at or below 4 ft/s

1

2

34

5

6

Time = 2540 sec.

(velocity color scale is the actual velocity )

Page 6: Waller Creek Intake CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September 18, 2009

1

23

4

5

6

Velocity contour through each bar screen

Time = 2540 sec.

(velocity color scale is the actual velocity )

Iso-view 1

Page 7: Waller Creek Intake CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September 18, 2009

1

234

5

6

Velocity contour through each bar screen

Time = 2540 sec.

(velocity color scale is the actual velocity )

Iso-view 2

Page 8: Waller Creek Intake CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September 18, 2009

1

2

3

45

6

Velocity contour through each bar screen

Time = 2540 sec.

(velocity color scale is the actual velocity )

Iso-view 3

Page 9: Waller Creek Intake CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September 18, 2009

Velocity contour at different locations with different color scales

Time = 2540 sec.

Page 10: Waller Creek Intake CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September 18, 2009

Plot of velocity contours with vectors(slice plane cut at elevation 476 ft.)

Isometric View

Same with slide 10 with different color scale

Time = 2540 sec.

Page 11: Waller Creek Intake CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September 18, 2009

Time = 2540 sec.

Iso-surface plot of water colored with velocity magnitude

Isometric View

Page 12: Waller Creek Intake CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September 18, 2009

Iso-surface plot of water colored with velocity magnitude

Isometric View

Same with slide 10 with different color scale

Time = 2540 sec.

same with slide 11 but different color scale

Page 13: Waller Creek Intake CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September 18, 2009
Page 14: Waller Creek Intake CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September 18, 2009
Page 15: Waller Creek Intake CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September 18, 2009
Page 16: Waller Creek Intake CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September 18, 2009
Page 17: Waller Creek Intake CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September 18, 2009
Page 18: Waller Creek Intake CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September 18, 2009
Page 19: Waller Creek Intake CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September 18, 2009
Page 20: Waller Creek Intake CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September 18, 2009
Page 21: Waller Creek Intake CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September 18, 2009
Page 22: Waller Creek Intake CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September 18, 2009
Page 23: Waller Creek Intake CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September 18, 2009
Page 24: Waller Creek Intake CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September 18, 2009
Page 25: Waller Creek Intake CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September 18, 2009
Page 26: Waller Creek Intake CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September 18, 2009