Walla Walla Valley Metropolitan and Sub-Regional Transportation Planning Organization

Metropolitan and Regional Transportation Improvement Program 2019-2024

Final Draft – September 27, 2018

Attachment VII.1.A

Acknowledgements This report is the product of a study financed in part by the U.S. Department of Transportation (Federal Highway Administration and Federal Transit Administration), the Oregon and Washington State Departments of Transportation, and local government contributions. The contents of this report reflect the views of the Walla Walla Valley Metropolitan Planning Organization/ Sub-Regional Transportation Planning Organization (WWVMPO/SRTPO), which is responsible for the facts and the accuracy of the data presented herein. The contents do not necessarily reflect official views or policy of the U.S. Department of Transportation. Approval of the report by federal or state agencies constitutes acceptance of the report as evidence of work performed, but does not imply endorsement of the report’s findings or recommendations. This report does not constitute a standard, specification, or regulation.

Title VI Assurance The WWVMPO/SRTPO hereby gives public notice that it is the organization’s policy to assure full compliance with Title VI of the Civil Rights Act of 1964, the Civil Rights Restoration Act of 1987, and related statutes and regulations in all programs and activities. Title VI requires that no person shall, on the grounds of race, color, sex, or national origin be excluded from the participation in, be denied the benefits of, or be otherwise subjected to discrimination under any Federal Aid Highway program or other activity for which the WWVMPO/SRTPO receives Federal financial assistance. Any person who believes they have been aggrieved by an unlawful discriminatory practice under Title VI has a right to file a formal complaint with the WWVMPO/SRTPO. Any such complaint must be in writing and filed with the WWVMPO/SRTPO Title VI Coordinator within one hundred, eighty (180) days following the date of the alleged discriminatory occurrence. Title VI Discrimination Complaint Forms may be obtained from the WWVMPO/SRTPO Office, on the website at http://wwvmpo.org/plans--programs.html at no cost to the complainant, by calling Andrea Weckmueller-Behringer at (509) 876-8002, or by faxing to (509) 876-8003.

Please Contact the WWVMPO/SRTPO for Questions, Concerns, or Comments 107 South Third Avenue Walla Walla, WA 99362 Phone 509-876-8001 Fax 509-876-8003 wwvmpo.org

Placeholder for: 2019-2024 Metropolitan and Regional Transportation Improvement Program – Adoption Resolution

Walla Walla Valley Metropolitan Planning Organization/Sub-Regional Transportation Planning Organization Membership and Committee Roster Walla Walla Valley Metropolitan Planning Organization (WWVMPO) Member Agencies City of College Place (WA) • City of Milton-Freewater (OR) • City of Prescott (WA) • City of Waitsburg (WA) • City of Walla Walla (WA) • Umatilla County (OR) • Walla Walla County (WA) • Port of Walla Walla (WA) • Valley Transit (WA) • Oregon Department of Transportation (OR) • Washington State Department of Transportation (WA)

Walla Walla Sub-Regional Transportation Planning Organization (SRTPO) Member Agencies City of College Place (WA) • City of Prescott (WA) • City of Waitsburg (WA) • City of Walla Walla (WA) • Port of Walla Walla (WA) • Valley Transit (WA) • Walla Walla County (WA) • Washington State Department of Transportation (WA)

WWVMPO/SRTPO Policy Board (PB) Harvey Crowder, Mayor, City of College Place Linda Hall, City Manager, City of Milton-Freewater Steve Heimbigner, Mayor, City of Prescott Randy Hinchliffe, City Administrator, City of Waitsburg Riley Clubb, Council Member, City of Walla Walla Larry Givens, County Commissioner, Umatilla County James (Jim) Johnson, County Commissioner, Walla Walla County Ron Dunning, Commissioner, Port of Walla Walla Dick Fondahn, General Manager, Valley Transit Craig Sipp, Region Manager, ODOT Region 5 Todd Trepanier, Regional Administrator, WSDOT South Central Region

WWVMPO/SRTPO Technical Advisory Committee (TAC) Robert Gordon, City Engineer, City of College Place Laurel Sweeney, City Planner, City of Milton-Freewater Steve Heimbigner, Mayor, City of Prescott Randy Hinchliffe, City Administrator, City of Waitsburg Neal Chavre, City Engineer, City of Walla Walla Robert (Bob) Waldher, Land Use Planning Department Director, Umatilla County Tony Garcia, Public Works Director, Walla Walla County J.D. Tovey, Planning Director, Confederated Tribes of the Umatilla Indian Reservation Paul Gerola, Economic Development Director, Port of Walla Walla Jesse Kinney, Head Accountant, Valley Transit Teresa Penninger, Planning and Program Manager, ODOT Paul Gonseth, Planning Engineer, WSDOT

Bi-State Coordination Workgroup Sharleen Bakeman Federal Highway Administration Jeremy Borrego, Federal Transit Administration Teresa Penninger, Planning and Program Manager, ODOT Linda Howell, Public Transportation Community Liaison, WSDOT Paul Gonseth, Planning Engineer, WSDOT Doug Cox, Tribal and Regional Coordination Liaison, WSDOT

WWVMPO/SRTPO Staff Andrea Weckmueller-Behringer, Executive Director Elaine Dawson, Planning Assistant

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

i

Table of Contents

Table of Contents ......................................................................................................................................... i Introduction ................................................................................................................................................ 1

Walla Walla Valley Metropolitan Planning Organization .......................................................................................1 Walla Walla Sub-Regional Transportation Planning Organization .........................................................................1

Program Overview and Summary ............................................................................................................... 3

Regulatory Background ............................................................................................................................... 4 Federal Requirements ............................................................................................................................................4 State Requirements ................................................................................................................................................4 Public Involvement .................................................................................................................................................4 Title VI Assurance ...................................................................................................................................................5

Program Purpose and Scope ....................................................................................................................... 5 M/RTIP Purpose and Scope in Washington State...................................................................................................5 MTIP Purpose and Scope in Oregon State ..............................................................................................................6 Intermodal/Multimodal Provisions ........................................................................................................................6 NHS Facility Certification ........................................................................................................................................6

Performance Management ......................................................................................................................... 6 Safety and Highway Safety Improvement Program ...............................................................................................8 Pavement and Bridges ............................................................................................................................................8 System Performance ..............................................................................................................................................8 Transit Asset Management .....................................................................................................................................9 Progress Towards Achievement of Performance Targets ......................................................................................9

Major Projects Implemented Since the Previous TIP ............................................................................... 10

Financial Plan ............................................................................................................................................ 10 Funding Sources .................................................................................................................................................. 10 Financial Constraint ............................................................................................................................................. 10

M/RTIP Amendment Process .................................................................................................................... 11 Amendment to WA MPO/SRTPO Projects........................................................................................................... 11 Amendment to OR MPO Projects ........................................................................................................................ 13

M/RTIP Projects ........................................................................................................................................ 14 Funded Projects ................................................................................................................................................... 14 List of Illustrative Projects (Planned - Funding is not Secured) ........................................................................... 16

Appendices Appendix A - WA MPO/SRTPO Funding Summary by Source Appendix B - WA MPO/SRTPO Fiscal Constraint Overview by Year Appendix C - WA MPO/SRTPO Projects, Cost and Funding Appendix D - OR MPO Projects, Cost and Funding Appendix E - TIP Policies as Adopted by the WWVMPO/SRTPO Policy Board on August 1, 2018 Appendix F - Criteria and Process Used for Prioritization of Projects Appendix G - Current Performance Targets Appendix H - Project Funding Source Overview Appendix I - Public Comments

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

1

Introduction Metropolitan and regional transportation planning organizations facilitate the coordinated planning and implementation of a seamless transportation system for all users. This effort requires cooperation and close collaboration among all entities involved in implementing, maintaining, and improving individual network segments.

In the Walla Walla Valley, this facilitation responsibility is assigned to the Walla Walla Valley Metropolitan Planning Organization and Sub-Regional Transportation Planning Organization (WWVMPO/SRTPO), which includes representation from Oregon and Washington State, Valley Transit, the Port of Walla Walla, as well as the cities and counties in the region.

Walla Walla Valley Metropolitan Planning Organization Established on March 27, 2013, the Walla Walla Valley Metropolitan Planning Organization (WWVMPO) is a bi-state transportation planning agency located in the Walla Walla Valley region. As the federally designated MPO for an urbanized area with a population greater than 50,000, the WWVMPO carries out the continuing, cooperative, and comprehensive (3C) multimodal transportation planning process that encourages and promotes the safe and efficient development, management, and operation of surface transportation systems to serve the mobility needs of people and freight, and to foster economic growth and development, while minimizing transportation-related fuel consumption and air pollution. (23 USC 134)

Federal regulations require the WWVMPO to develop a regionally coordinated long-range transportation plan and short-range improvement program to ensure consistency and efficient use of federal transportation funds. The MPO’s bi-state planning area, shown in the figure on Page 2, was expanded in early 2017 and includes the cities of College Place, Milton-Freewater, Prescott, Waitsburg, and Walla Walla, and portions of the counties of Umatilla and Walla Walla.

The majority of funding for the WWVMPO is provided through transportation planning grants from the Federal Highway Administration (FHWA) and Federal Transit Administration (FTA), administered and supported by the Oregon and Washington State Departments of Transportation (ODOT and WSDOT).

Walla Walla Sub-Regional Transportation Planning Organization The Walla Walla Sub-Regional Transportation Planning Organization (SRTPO) was created by an agreement, effective July 1, 2013, between the Benton-Franklin-Walla Walla Regional Transportation Planning Organization (RTPO) and the WWVMPO as a means to make regional planning efforts with the new MPO more efficient. The SRTPO boundary, also shown in the figure on Page 2, assigns almost all of Walla Walla County to the WWVMPO, as the area covered under the newly established SRTPO. The Burbank area, a small portion of western Walla Walla County, is by U.S. Census determination within the Kennewick-Pasco-Richland urbanized area. Therefore, this portion of Walla Walla County is part of the Benton-Franklin RTPO and MPO planning area.

The Walla Walla SRTPO activities comply with Washington State’s RTPO requirements (RCW 47.80), which call for transportation planning, at all jurisdictional levels, to be coordinated with local comprehensive plans in order to achieve both statewide and local transportation goals.

Instead of creating a separate Policy Board and Technical Advisory Committee (TAC) for the SRTPO, the WWVMPO chose to expand the current MPO Policy Board and TAC to include additional members. Agencies participating as members of the SRTPO include the MPO members in Washington State and representatives from the cities of Prescott and Waitsburg.

State funding for the SRTPO, appropriated through WSDOT, is used to carry out the regional transportation planning activities.

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

2

Figure: Walla Walla Valley MPO and SRTPO Study Area

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

3

Program Overview and Summary Federal and state regulations require the WWVMPO/SRTPO to develop a short-term Transportation Improvement Program (TIP) for its metropolitan and regional study areas. Federal requirements call for a four-year, financially constrained list of projects, whereas Washington State regulations stipulate a six-year list of projects.

In lieu of producing two separate documents, the combined Walla Walla Valley Metropolitan and Regional Transportation Improvement Program (M/RTIP) is a six-year programming document, which demonstrates financial constraint for federal funds throughout the first four years of the integrated financial plan.

The projects within the M/RTIP are derived from the WWVMPO/SRTPO managed call for federally funded transportation improvements; the cities’ and county’s six-year Comprehensive Transportation Programs, developed and adopted by each of the local Washington State member entities; the Transportation System Plans, developed by Oregon member entities; the six-year Transit Development Plan, developed and adopted by the local public transportation agency; and the project lists developed by the Departments of Transportation with jurisdiction in the planning area. All projects contained in the M/RTIP must be consistent with policy and project recommendations included in the Walla Walla Valley Metropolitan and Regional Transportation - 2040 Plan.

The M/RTIP is updated annually and functions as a project programming document and financial plan that identifies all federally funded and prioritized projects, as well as other transportation improvements of regional significance, regardless of their funding source. General steps in the development of the M/RTIP include:

• The WWVMPO/SRTPO issues a Call for Projects, based on anticipated federal funding availability. Member entities select projects from the fiscally constrained project list contained in the 2040 Plan

for consideration in the M/RTIP. The submitted projects are prioritized using the adopted project selection process and criteria. Projects are awarded within the limits of available federal funding.

• Local city and county governments and public transportation agencies prepare and submit their local six-year programs to WSDOT and the WWVMPO/SRTPO. Based on local comprehensive plans, these programs also contain non-federally funded, but regionally

significant projects.

• The WWVMPO/SRTPO coordinates with ODOT and WSDOT regarding anticipated state-managed projects. • The public and interested parties are afforded early and reasonable opportunity for involvement and a

public hearing is held to obtain the views of the public on the proposed program of projects. • Prior to program adoption, the WWVMPO/SRTPO reviews the projects to ensure the following – All projects scheduled for federal funding are included in the TIP; Federally funded projects are fiscally constrained by year and funding source; All regionally significant projects are included, regardless of funding source; and The M/RTIP projects are consistent with the current metropolitan and regional transportation plan.

Tables 1 and 2 show a summary of funding included in the 2019-2024 M/RTIP for projects within the Washington State MPO and SRTPO area as well as the Oregon MPO area, respectively.

Table 1. TIP Summary on Secured Projects (Washington) Projects Federal Funds State Funds Local Funds TOTAL MPO/SRTPO 30 $35,085,091 $162,881,071 $10,356,909 $208,323,071 MPO - Public Transportation 3 $892,800 $753,200 $1,646,000 Total Projects 33 Total Funding $209,969,071

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

4

Table 2. TIP Summary on Secured Projects (Oregon) Projects Federal Funds State Funds Local Funds TOTAL

MPO - Public Transportation 5 (TBD) (TBD) (TBD) Total Projects Total Funding

Once adopted, the M/RTIP is included in the respective Statewide Transportation Improvement Programs (STIP). ODOT and WSDOT are responsible for the statewide coordination of their STIPs. Following federal approval of the STIPs, local jurisdictions may begin obligating federal funds for their projects.

Regulatory Background WWVMPO/SRTPO staff assembles the M/RTIP in full compliance with the following federal and state laws.

Federal Requirements According to 23 USC 134 (j), the Metropolitan Transportation Improvement Program must –

• Be cooperatively developed by the MPO, cities, counties, transit agencies, and state DOT;• Include regionally significant and all federally funded transportation capital and non-capital projects;• List prioritized projects with description, total cost, and implementing agency;• Encompass four years of programmed projects;• Be updated regularly – at least once every four years;• Include cooperatively determined funding estimates;• Demonstrate fiscal constraint by year and funding source;• Be consistent with the adopted Metropolitan Transportation Plan; and• May include a list of illustrative (unfunded) projects.

In compliance with 49 USC 5307 (b), the WWVMPO/SRTPO M/RTIP also satisfies the public participation requirements pertaining to urbanized area formula grant funding received from the Federal Transit Administration.

State Requirements According to RCW 47.80.023 (5), the Regional Transportation Improvement Program must –

• Be cooperatively developed by the RTPO, cities, counties, transit agencies, and state DOT;• Include regionally significant transportation projects and programs, transportation demand

management (TDM) measures, as well as projects that advance special needs coordinationtransportation as identified by the Agency Council on Coordinated Transportation;

• Provide a priority list of projects, programs, and TDM measures;• Encompass six years of programmed projects;• Be updated at least every two years;• Include a financial plan that demonstrates how programmed projects can be funded;• Be based on the local six-year programs, projects, and TDM measures of regional significance identified

by transit agencies, cities, and counties, as well as WSDOT; and• Be consistent with the adopted Regional Transportation Plan.

Public Involvement Citizens and interested parties are provided opportunity to comment on the draft M/RTIP as required under the Fixing America’s Surface Transportation (FAST) Act. The public review period for the draft 2019-2024 M/RTIP

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

5

was held from September 4, 2018 through September 17, 2018. Furthermore, a public hearing, conducted as part of the regular Policy Board meeting on October 3, 2018, will provide an additional opportunity to obtain the views of the public on the proposed projects.

Public notices announcing the availability of the draft were published in the newspaper of record and on the WWVMPO/SRTPO website. A copy of the draft 2019-2024 M/RTIP was also available for public viewing at three locations in Walla Walla County and one location in Umatilla County: the Milton-Freewater Library, the Walla Walla Library, Waitsburg City Hall, and the WWVMPO/SRTPO office. An electronic copy was posted on the WWVMPO/SRTPO website at http://wwvmpo.org/public-participation.html. All public comments received were included in Appendix I of the final document.

It is important to note that public involvement activities and time established for public review and comment on the M/RTIP satisfy Program of Projects (POP) public involvement requirements of the Federal Transit Administration Section 5307 Program as they relate to Valley Transit and Milton-Freewater public transportation projects.

Title VI Assurance As a recipient of federal funds, the WWVMPO/SRTPO is subject to the provisions of Title VI of the Civil Rights Act of 1964 and the Civil Rights Restoration Act of 1987. In compliance with the requirements, the agency assures that no person shall, on the grounds of race, color, national origin, or sex, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any program or activity conducted by the WWVMPO/SRTPO.

The agency has an approved Title VI Plan on file. Any Title VI issues discovered during the development of the 2019-2024 M/RTIP will be corrected in the first available amendment cycle in January 2019.

Program Purpose and Scope Each year the WWVMPO/SRTPO prepares the M/RTIP in coordination with local jurisdictions, public transportation agencies, ODOT, and WSDOT. All projects in the 2019-2024 M/RTIP have been reviewed and found to be consistent with the goals and objectives in local comprehensive plans, the 2040 Plan, and the respective State Transportation Plans.

M/RTIP Purpose and Scope in Washington State The Metropolitan and Regional Transportation Improvement Program aids in the coordination of transportation investments throughout the region. The program provides the public, elected officials, state and local staff, transit providers, tribes, and other interested parties the opportunity to review projects for consistency with regional and local plans, goals, and policies. The M/RTIP requires approval by the WWVMPO/SRTPO Policy Board, the Federal Highway Administration and Federal Transit Administration, the Washington State Department of Transportation and the Washington State Governor’s Office. The approved M/RTIP is then included in the Statewide Transportation Improvement Program (STIP). WSDOT is responsible for the statewide coordination of the STIP. The Washington STIP process and project list can be found at: http://www.wsdot.wa.gov/LocalPrograms/ProgramMgmt/STIP.htm.

Once local agency projects are programmed, WSDOT manages the local portion of the federal highway funds on a first-come first-served basis. Following federal approval of the STIP, local jurisdictions may begin obligating federal funds for their projects. The regional procedures allow any federal project included in the STIP to be advanced or delayed without STIP amendment, contingent upon the financial balance being maintained for each fiscal year.

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

6

MTIP Purpose and Scope in Oregon State The Oregon-specific TIP projects require approval by the WWVMPO/SRTPO Policy Board, the Federal Highway Administration and Federal Transit Administration, as well as the Oregon Department of Transportation and the Oregon Governor’s Office. However, the timing for the Washington State and Oregon Statewide Transportation Improvement Program (STIP) development activities are generally not concurrent.

• The current 2018-2021 TIP for WWVMPO Oregon members was developed ahead of the WWVMPO/SRTPO 2019-2021 M/RTIP, and the Oregon-specific projects are included in this M/RTIP to inform the public.

• The development of the 2021-2024 STIP began in July 2017. Completion of the new STIP is anticipated in summer of 2020.

ODOT is responsible for the statewide coordination of the Oregon STIP. The Oregon STIP process and project list can be found at: http://www.oregon.gov/odot/stip/pages/index.aspx.

Once local agency projects are programmed, ODOT manages the local portion of the federal highway funds on a first-come first-served basis and, in coordination with local jurisdictions, may choose to exchange the federal funds for state funds. If local jurisdictions are recipients of federal funds, following federal approval of the STIP, local jurisdictions may begin obligating federal funds for their projects. The regional procedures allow any federal project included in the STIP to be advanced or delayed without STIP amendment, contingent upon the financial balance being maintained for each fiscal year.

Intermodal/Multimodal Provisions The WWVMPO/SRTPO and its member entities recognize that quality of life, which is highly valued by regional stakeholders and the public, is inherently improved through the advancement of pedestrian and bicycle related transportation projects. Therefore, all projects listed in the 2019-2024 M/RTIP considered context-sensitive provisions for pedestrian and bicycle transportation modes to the extent possible.

NHS Facility Certification Following the adoption of the Moving Ahead for Progress in the 21st Century (MAP-21) Act in 2012, the National Highway System (NHS) was greatly expanded. Accounting for 37.99 miles in the WWVMPO/SRTPO area, local agencies with NHS routes are responsible for maintaining those roadway segments. Because of their national and strategic significance, NHS routes are deemed to be of greater importance than non-NHS routes.

The WWVMPO/SRTPO certifies that NHS routes have been given priority by agencies throughout their six-year programming process.

Performance Management Performance-based planning, programming, and management, focused on national transportation goals, provides the means to the most efficient investment of federal transportation funds, improves project decision-making, and increases accountability and transparency. (23 USC 150)

In 2012, the passage of the Moving Ahead for Progress in the 21st Century (MAP-21) Act first instituted this requirement for performance-based transportation planning. The Fixing America’s Surface Transportation (FAST) Act, signed into law in December 2015, continues MAP-21’s overall performance management approach, requiring States and Metropolitan Planning Organizations (MPOs) to undertake performance-based planning and programming to collectively make progress toward identified national goals.

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

7

These national performance goals have been established for the following seven key areas:

• Safety - To achieve a significant reduction in traffic fatalities and serious injuries on all public roads• Infrastructure Condition - To maintain the highway infrastructure asset system in a state of good repair• Congestion Reduction - To achieve a significant reduction in congestion on the National Highway System• System Reliability - To improve the efficiency of the surface transportation system• Freight Movement and Economic Vitality - To improve the national freight network, strengthen the

ability of rural communities to access national and international trade markets, and support regionaleconomic development

• Environmental Sustainability - To enhance the performance of the transportation system whileprotecting and enhancing the natural environment

• Reduced Project Delivery Delays - To reduce project costs, promote jobs and the economy, and expeditethe movement of people and goods by accelerating project completion through eliminating delays in theproject development and delivery process, including reducing regulatory burdens and improvingagencies' work practices

State DOTs and MPOs are required to a) establish select performance targets and b) track progress towards achieving these national goals. The promulgation of rules and associated performance measures began in 2012; the first proposed rules were published in 2014; and the first final rules were established in early 2016. The following table provides an overview of transportation system performance related rulemaking:

Performance Areas Notice of Proposed Rule Making

Final Rule Published

Final Rule Effective

MPO Action to Date

Safety March 11, 2014 March 15, 2016 April 14, 2016 MPO supports 2018 state targets1

Highway Safety Improvement Program

March 28, 2014 March 15, 2016 April 14, 2016

Statewide & Metro Planning; Non-Metro Planning

June 2, 2014 May 27, 2016 June 27, 2016 2040 Plan is undergoing review and will be revised in 2018

Transit Asset Management September 30, 2015 July 26, 2016 October 1, 2016 Assist Valley Transit

Pavement and Bridge Performance Measures

January 5, 2015 January 18, 2017 May 20, 2017 Set target or support DOT1

System Performance Measures

April 22, 2016 January 18, 2017 May 20, 20172 Set target or support DOT1

Asset Management Plan February 20, 2015 October 24, 2016 October 2, 2017 Assist DOT

1 Targets have been set by the Oregon and Washington State Departments of Transportation. MPO targets are due November 16, 2018. 2 The portions of the rule related to tailpipe CO2 emissions (GHG measure) were repealed on May 31, 2018

Within the M/RTIP, federal rules call for an assessment of the anticipated performance effects of investments into the transportation system.

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

8

Safety and Highway Safety Improvement Program The final rulemaking for safety has two components: Safety Performance Management Measures and the Highway Safety Improvement Program (HSIP). Five performance measures were established to assess safety performance (5-year rolling average) and carry out the HSIP. (23 CFR 490.207(a))

• Number of fatalities • Rate of fatalities per vehicle miles traveled (VMT)

• Number of serious injuries • Rate of serious injuries per VMT

• Number of combined non-motorized fatalities and non-motorized serious injuries

On February 7, 2018, the WWVMPO/SRTPO Policy Board agreed to support ODOT’s and WSDOT’s 2018 targets for the five safety performance targets.

Pavement and Bridges The final pavement and bridge condition rule outlines measures to assess pavement and bridge conditions on the National Highway System (NHS). (23 CFR 490.307(a) and 23 CFR 490.407(a))

• Pavement Percent of Pavements of the Interstate System in “Good” and “Poor” condition1 Percent of Pavements of the non-Interstate NHS in “Good” and “Poor” condition

• Measured as: Four condition metrics for each pavement section – International Roughness Index (IRI), rutting, faulting, and cracking percent; and three inventory data elements - through lanes, surface type, and structure type.

• Bridge Percent of NHS bridges in “Good” AND “Poor” condition

• Measured as: Good, Fair, Poor classification related to the minimum [lowest] condition rating of the deck, superstructure, substructure, and culverts (National Bridge Inventory (NBI) items 58, 59, 60, and 62, respectively)

Ahead of the November 16, 2018 deadline, the WWVMPO/SRTPO will take formal action to support ODOT and WSDOT targets for applicable pavement and bridge performance measures.

System Performance FHWA released the Final Rule for System Performance (23 CFR 490.507), Freight1 (23 CFR 490.607), and Congestion Mitigation and Air Quality (CMAQ)2 (23 CFR 490.707 and 23 CFR 490.807).

• National Highway Performance Program (NHPP) – Percent of Person-Miles Traveled on the Interstate System that are reliable Percent of Person-Miles Traveled on the non-Interstate NHS that are reliable

• Measured as: All traffic/vehicles data in National Performance Management Research Data Set (NPMRDS) or Equivalent (15-minute interval data)

• Freight movement on the Interstate System (NHFP) – Truck Travel Time Reliability Index

• Congestion Mitigation and Air Quality (CMAQ) – Annual Hours of Peak Hour Excessive Delay per Capita Percent of Non-SOV Travel Total Emissions Reduction

Ahead of the November 16, 2018 deadline, the WWVMPO/SRTPO will also take formal action to support ODOT and WSDOT targets for applicable system performance measures.

1 It is important to note that there is no Interstate highway located within the WWVMPO/SRTPO area, and thus Interstate related performance measures are not applicable. 2 The WWVMPO/SRTPO is not currently located within an air quality non-attainment area.

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

9

Transit Asset Management Becoming effective on October 1, 2016, the final rule required that all recipients of federal financial assistance under 49 USC Chapter 53, who own, operate, or manage public transportation capital assets, must develop and implement Transit Asset Management (TAM) plans. A TAM plan must include an asset inventory, condition assessments of inventoried assets, a decision-support tool, and a prioritized list of investments to improve the “State of Good Repair” (SGR) levels of their capital assets. The final rule (49 CFR 625) also established SGR standards and four associated SGR performance measures; required coordination of the performance targets with the state DOTs and MPOs; and called for the reporting of asset inventories, conditions, and performance measures through the National Transit Database. The FTA is implementing the TAM requirements using a two-tiered approach, in order to reduce associated resource obligations for agencies operating smaller fleets:

• Tier I – A Tier I provider is a recipient who owns, operates, or manages 101 or more vehicles in revenue service during peak-time regular service across all fixed route modes or in any one non-fixed route mode; or a provider who operates rail transit.

• Tier II – A Tier II provider is a recipient who owns, operates, or manages 100 or fewer vehicles in revenue service during peak -time regular service across all non-rail fixed route modes or in any one non-fixed route mode; a sub-recipient under the 5311 Rural Area Formula program; a sub-recipient under the 5310 Seniors and Individuals with Disabilities program who operates an open-door service; or any American Indian tribe.

Within the WWVMPO/SRTPO, Valley Transit and Milton-Freewater Public Transportation are classified as Tier II operators. The final SGR performance measures that all Tier II Locally Operated Transit Services (LOTS) are required to adopt are:

• Equipment (Non-revenue vehicles) – % of non-revenue vehicles that have met or exceeded their useful life benchmark

• Rolling Stock (Revenue Vehicles) – % of revenue vehicles that have met/exceeded their useful life benchmark

• Infrastructure (Guideway)3 – % of track segments with performance restrictions

• Facilities – % of facilities with a rating below 3.0 on the FTA Transit Economic Requirements Model (TERM) scale

In compliance with the requirements of the final TAM rule, the WWVMPO/SRTPO closely coordinates with the public transportation providers located within the region.

Progress Towards Achievement of Performance Targets Since its establishment in 2013, the WWVMPO/SRTPO has independently been implementing elements of performance-based planning as part of its planning and programming activities. Collision data, associated collision rates, and pavement conditions have been an integral part to regional project selection as can be seen in the detailed project selection criteria contained in Appendix F. The WWVMPO/SRTPO also acknowledges that transit projects selected for inclusion in the TIP help achieve regional SGR targets.

However, in response to the federal requirements, the program of projects included in the 2019-2024 M/RTIP, now also encompasses the anticipated effects on transportation performance, and the complete set of MPO-specific targets – adopted through September 2018 – is contained in Appendix G.

3 As this asset class includes rail fixed-guideway, track, signals, and systems, it is not applicable to Valley Transit or Milton-Freewater Public Transportation.

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

10

Major Projects Implemented Since the Previous TIP Since the previous M/RTIP was approved, the following projects have obligated all associated funding and, either are still under construction, or have recently been completed:

• 4th Street/Academy Way (West Side School District Bicycle and Pedestrian Improvements) • Blue Creek Bridge on Mill Creek Road MP 6.3 • Second Avenue Improvements – Rose to US 12 • US 12/Old Highway 12 to E Isaacs Ave Bridge – Chip Seal & Joint Repair

Financial Plan Fiscal feasibility is a significant priority in determining the final list of 2019-2024 M/RTIP transportation improvements. Federal and state requirements mandate that this document be fiscally constrained and only include projects that can reasonably be expected to have adequate funding

Funding Sources The 2019-2024 M/RTIP is funded from a variety of federal, state, and local sources. A list of the most common funding programs is shown in Appendix H. It is important to note that not all state and locally funded projects have to be programmed in the M/RTIP, unless one or more of the following conditions apply:

• State or local funds are used to match federal dollars; • Projects that require federal approval or other formal federal action; or • The state or locally funded projects are of regional significance.

Financial Constraint The M/RTIP covers six years of projects from 2019 to 2024. Placement of M/RTIP projects is based on priority; projects to be obligated in 2019 are the highest priority. Carry-over projects from 2018 are included with the high priority projects.

The financial constraint for federal Surface Transportation Block Grant (STBG) and Transportation Alternatives (TA, an STBG set-aside) funding is tied directly to the anticipated allocations to the WWVMPO/SRTPO provided through WSDOT. Close coordination between WSDOT and the agency allowed the estimation of STBG and TA funding from 2019 through 2022. The table below summarizes the associated funding assumptions, which are based on final allocations received in federal fiscal year (FFY) 2018.

Table 3. WWVMPO/SRTPO STBG and TA Projected Allocations (for WA projects) STBG (WA) 2019 2020 2021 2022 Total 2019-2022 Urban $598,111 $598,111 $598,111 $598,111 $2,392,444 Rural $488,562 $488,562 $488,562 $488,562 $1,954,248 Any Area $205,333 $205,333 $205,333 $205,333 $821,332 Yearly Total $1,292,006 $1,292,006 $1,292,006 $1,292,006 $5,168,024 Funding Carry-Over to 2019 + $757,209 + $757,209 2018-2021 Carry-over Projects

- $2,846,690 - $2,846,690 STBG Not Yet Programmed $3,078,543 TA (WA) 2019 2020 2021 2022 Total 2019-2022 Urban $33,875 $33,875 $33,875 $33,875 $135,500 Rural $7,258 $7,258 $7,258 $7,258 $29,032 Any Area $23,308 $23,308 $23,308 $23,308 $93,232 Yearly Total $64,441 $64,441 $64,441 $64,441 $257,764 Funding Carry-Over to 2019 - $31,245 - $31,245 2018-2021 Carry-over Projects

TA Not Yet Programmed

$226,519 Source of financial data: WSDOT

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

11

STBG and TA funding not tied to 2018-2021 M/RTIP carry-over projects, was assigned to new projects through a regionwide STBG and TA call for projects, which took place in April and May of 2018. Placement of the projects within the first four years of the M/RTIP is based on project priority as well as available funding for the respective urban, rural, and any area categories; carry-over projects retain their original timing whenever possible.

Appendix A provides a funding summary by source for all projects within the MPO/SRTPO area in Washington State. Appendix B expands upon this financial information and demonstrates fiscal constraint for each source of federal funding by year.

Appendix C provides detailed project descriptions and financial information by project phase and source for all projects within the MPO/SRTPO area in Washington State, whereas detailed information on Oregon MPO area projects is shown in Appendix D. It is important to note that although this M/RTIP discloses project description and financial details for all WWVMPO/SRTPO projects, it does not include Oregon-specific project funding in the fiscal constraint calculation, as the current ODOT STIP has already gone through the required review and approval process.

M/RTIP Amendment Process The WWVMPO/SRTPO will develop the calendar year (CY) 2019 internal amendment schedule for Washington State and Oregon projects by November 2018. Each member agency’s request for an M/RTIP amendment must include the project title, description, cost, funding sources, implementation schedule, and reason for the amendment. The project amendment will undergo the same review process required of the original project submission to assure compliance with federal and state laws and consistency with the 2040 Plan.

Amendment to WA MPO/SRTPO Projects Local jurisdictions or agencies located in Washington may submit a request for an M/RTIP amendment according to the internal schedule, which is based on guidance given by WSDOT.

The M/RTIP is required to be amended for a project within Washington State, if it meets any of the conditions listed in the table on the following page. (Please note, the table has been extracted from Appendix C of WSDOT’s current STIP document: http://www.wsdot.wa.gov/LocalPrograms/ProgramMgmt/STIPDoc.htm.)

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

12

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

13

Amendment to OR MPO Projects Local jurisdictions or agencies located in Oregon may submit a request for an M/RTIP amendment according to the internal schedule. Although ODOT accepts amendments to the STIP on a daily basis, the WWVMPO must follow the established schedule prior to the ODOT STIP submission process to allow for public review and subsequent approval of TIP amendments by its Technical Advisory Committee and Policy Board.

The M/RTIP is required to be amended for an Oregon project, if it meets any of the conditions in the following amendment categories listed below. (Please note, the figure has been extracted from ODOT’s current 2018-2021 STIP: https://www.oregon.gov/ODOT/STIP/Documents/2018-2021-Final-STIP.pdf.)

** Non-Exempt: Projects that are not included in 40 CFR 93.126, 40 CFR 93.127 and 40CFR 93.128

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

14

M/RTIP Projects The 2019-2024 M/RTIP list4 of projects contains all federally funded or regionally significant transportation improvements in the WWVMPO/SRTPO area. Details for each project are found in Appendices C and D for Washington State and Oregon projects, respectively.

Funded Projects WA MPO/SRTPO Area Regionally Significant Projects Locally-Sponsored

Safe

ty

Pave

men

t

Brid

ge

Syst

em P

M3

Tran

sit S

GR

Project

Anticipated Impact ++ / + / o / - / --

++ ++ 2019 Sidewalk Remediation Project (WA-11552) – City of Walla Walla – 2019

++ + ++ 9th Ave and Plaza Way/Dalles Military Intersection and Street Improvements (WA-02008) – City of Walla Walla – 2020-2022

+ + o Byrnes Road MP 1.78 to MP 1.95 (WA-11618) – Walla Walla County – 2019

++ o o Dodd Road Railroad Crossing (WA-10969) – Walla Walla County – 2019

+ ++ o Flood Repair CRP 17-03 (WA-10487) – Walla Walla County – 2019

++ ++ ++ Isaacs Avenue Improvements (401WWC01.2 / WA-09465) – City of Walla Walla – 2019-2020

++ + o Middle Waitsburg Road MP 6.10 to MP 7.92 (WA-02121) – Walla Walla County – 2019-2020

+ ++ o Mill Creek Road MP 1.10 to MP 3.96 (401WCR14 / WA-09572) – Walla Walla County – 2020

+ + + Mill Race Rd Grade Crossing (Waitsburg6) – City of Waitsburg – 2019-2022

++ + o Peppers Bridge Road MP 0.36 to MP 1.61 (WA-01920) – Walla Walla County – 2019-2021

++ o o Port Kelly Railroad Crossing (WA-10417) – Walla Walla County – 2019

o + ++ o Rose Street Bridge Replacement at Mill Creek (WA-10901) – City of Walla Walla – 2020-2021

+ + ++ School Avenue Improvement – Alder to Bryant (WA-10598) – City of Walla Walla – 2023-2024 (Locally Funded)

o + ++ o Spokane Street Bridge Replacement at Mill Creek (WA-10601) – City of Walla Walla – 2019

+ o o Taggart Road Extension (WA-08036) – City of Waitsburg – 2019-2020

++ + o Wallula Avenue MP 2.00 to MP 2.20 (WA-09564) – Walla Walla County – 2019-2020

++ o ++ Whitman Drive W MP 1.01 To MP 3.14 (Whitman Drive W Bike Path) (WA-04764) – Walla Walla County – 2019

4 Projects (or phases) planned for implementation in 2023 and 2024 extend beyond the 2019-2022 fiscally constrained TIP.

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

15

WSDOT-Sponsored Sa

fety

Pave

men

t

Brid

ge

Syst

em P

M3

Tran

sit S

GR

Project

Anticipated Impact ++ / + / o / - / --

o ++ o Asphalt/Chip Seal Preservation Walla Walla Valley Metropolitan Planning Organization (BPWWV) – WSDOT – 2019-2024

+ ++ SR 125/Oregon State Line to 12th Ave N – ADA Compliance (512501Y36) – WSDOT – 2020

++ + ++ SR 125/Plaza Way Intersection Improvements (512502C36) – WSDOT – 2020

+ ++ SR 125 Spur/N 13th Ave to Myra Rd – ADA Compliance (512501Z36) – WSDOT – 2020

++ o o SR 128 Et Al/SE Washington – Centerline Rumble Strips (500000G36) – WSDOT – 2021-2022

++ + + US 12/Nine Mile Hill to Frenchtown Vic – Build New Highway (501213X36) – WSDOT – 2019-2021

+ o + US 12/US 730 Junction – Wallula Weigh Station Improvements (501218I36) – WSDOT – 2019

o o ++ o US 12/Walla Walla River Bridge – Scour Repair (501207O36) – WSDOT – 2024

++ + + US 12/Wallula to Nine Mile Hill – Build New Highway (501203A36) – WSDOT – 2019-2023

++ o o SR 730/3.0 miles North of Oregon Border – Rockfall Prevention (573001G36) – WSDOT – 2019-2021

++ o o SR 730/4.1 miles North of Oregon Border – Rockfall Prevention (573001H36) – WSDOT – 2019-2020

++ o o SR 730/4.4 miles North of Oregon Border – Rockfall Prevention (573001I36) – WSDOT – 2019-2020

++ o o SR 730/5.2 miles North of Oregon Border – Rockfall Prevention (573001J36) – WSDOT – 2019-2020

Public Transportation

Safe

ty

Pave

men

t

Brid

ge

Syst

em P

M3

Tran

sit S

GR

Project

Anticipated Impact ++ / + / o / - / --

++ o General Labor Operating (1907) – Valley Transit – 2019

+ ++ Purchase Replacement Compressed Natural Gas Dispenser and Monitoring System (1908) – Valley Transit – 2019

++ o Real-Time Passenger Information Display System for Market Station (FFY 2015) (1808) – Valley Transit – 2019

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

16

Oregon MPO Area Public Transportation

Safe

ty

Pave

men

t

Brid

ge

Syst

em P

M3

Tran

sit S

GR

Project

Anticipated Impact ++ / + / o / - / --

++ o Milton-Freewater Public Transit – General Operations (5307) FFY15 (New) – City of Milton-Freewater – 2019-2020

++ o Milton-Freewater Public Transit – General Operations (5307) FFY16 (New) – City of Milton-Freewater – 2019-2020

++ o Milton-Freewater Public Transit – General Operations (5307) FFY17 (New) – City of Milton-Freewater – 2019-2020

++ o Milton-Freewater Public Transit – Senior/Disabled Taxi Service (5310) (New) – City of Milton-Freewater – 2019-2020

++ o Capital construction project – ADA Accessible Elevator/City Hall (19121) – City of Milton-Freewater – 2019-2020

List of Illustrative Projects (Planned - Funding is not Secured) WA MPO/SRTPO Area

• Berney Drive MP 0.00 to MP 0.75 (WA-01879) – Walla Walla County – 2019-2022 (Prioritized) • 3rd Avenue South MP 1.66 to MP 1.90 (WA-02312) – Walla Walla County – 2024 • 3rd Avenue South Paxton Bridge MP 2.30 to MP 2.77 (WA-01944) – Walla Walla County – 2024 • 4th Street/Academy Way – Phase 2 (4BIKES Project) (WA-11670) – City of College Place – 2019-2020 • Adair Road (B) MP 0.00 to MP 0.27 (WA-10446) – Walla Walla County – 2024 • Alder Street and Poplar Street – Merriam to Colville (WA-11547) – City of Walla Walla – 2019-2020 • Ash Street (B) MP 0.00 to MP 0.18 (WA-10453) – Walla Walla County – 2024 • Beet Road MP 0.71 to MP 1.41 (WA-06146) – Walla Walla County – 2023 • Birch Street (B) MP 0.00 to MP 0.25 (WA-10451) – Walla Walla County – 2024 • Bolles Road Overlay (WA-08037) – City of Waitsburg – 2024 • “C” Street & Myra Road Intersection (WA-11692) – City of College Place – 2022-2024 • C Street Reconstruction Project (WA-11668) – City of College Place – 2019 • Cherry Street (B) MP 0.00 to MP 0.25 (WA-10450) – Walla Walla County – 2024 • CM Rice Road MP 6.40 to MP 6.80 (WA-10421) – Walla Walla County – 2021-2022 • Cochran Street (D) Culvert Replacement (WA-10461) – Walla Walla County – 2024 • College Ave/SR125 Intersection (WA-11690) – City of College Place – 2019-2021 • College/Southside Development Intersection #1 (WA-11687) – City of College Place – 2019 • College/Southside Development Intersection #2 (WA-11688) – City of College Place – 2019 • Columbia Road (B) MP 0.00 to MP 0.27 (WA-08502) – Walla Walla County – 2024 • Columbia School Road N. (B) MP 0.00 to MP 0.17 (WA-08478) – Walla Walla County – 2024 • Coppei Creek Bridge Replacement (Waitsburg7) – City of Waitsburg – 2022-2023 • Coppei Road MP 1.20 to MP 1.70 (WA-10429) – Walla Walla County – 2024 • Dague Road MP 0.00 to MP 0.25 (WA-10436) – Walla Walla County – 2023 • Depping Road MP 0.00 to MP 0.75 (WA-08477) – Walla Walla County – 2024 • Depping Road MP 0.30 to MP 0.60 (Culvert) (WA-11620) – Walla Walla County – 2024

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

17

• Dodd Road MP 6.30 to MP 10.28 (WA-10458) – Walla Walla County – 2024 • Edith Street (B) Stormwater MP 0.54 (WA-10454) – Walla Walla County – 2024 • Electric Avenue MP 0.00 to MP 1.07 (WA-11619) – Walla Walla County – 2024 • Eureka North Road MP 2.80 to MP 3.50 (WA-10431) – Walla Walla County – 2024 • Fern Avenue MP 1.10 (Decommission Stormwater Outfall) (WA-08500) – Walla Walla County – 2024 • Fifth Avenue (B) MP 0.00 to MP 0.05 (WA-10447) – Walla Walla County – 2024 • Fishhook Park Road MP 0.00 to MP 1.28 (WA-06922) – Walla Walla County – 2020-2021 • Fishhook Park Road MP 1.40 to MP 2.92 (WA-10407) – Walla Walla County – 2021-2022 • Fletcher Road MP 0.00 to MP 0.10 (WA-08467) – Walla Walla County – 2020 • Fourth Avenue (B) MP 0.00 to MP 0.21 (WA-08532) – Walla Walla County – 2024 • Fredrickson Road/Bridge MP 0.90 to MP 1.21 (WA-02325) – Walla Walla County – 2023 • Harvey Shaw Road Drainage MP 3.35 to MP 3.60 (WA-02094) – Walla Walla County – 2021-2022 • Harvey Shaw Road MP 0.03 to MP 2.00 (WA-10414) – Walla Walla County – 2021-2022 • Harvey Shaw Road MP 2.00 to MP 3.35 (WA-01935) – Walla Walla County – 2020-2021 • Harvey Shaw Road MP 5.43 to MP 8.05 (WA-10409) – Walla Walla County – 2020-2021 • Howard Street - Park to Tietan (WA-11550) – City of Walla Walla – 2021-2022 • Humorist Road E. At Slough MP 2.20 to MP 2.78 (WA-10412) – Walla Walla County – 2021-2022 • Humorist Road W. MP 0.19 to MP 0.89 (WA-08499) – Walla Walla County – 2024 • J B George Road MP 0.10 to MP 0.74 (WA-01883) – Walla Walla County – 2021-2022 • Lake Road MP 0.00 to MP 1.00 (WA-10440) – Walla Walla County – 2024 • Lambert (Rose to C Street) (WA-11695) – City of College Place – 2022-2024 • Largent Road (B) MP 0.00 to MP 0.27 (WA-10443) – Walla Walla County – 2024 • Last Chance Road MP 1.00 to MP 1.50 (WA-10439) – Walla Walla County – 2024 • Lewis Peak Road MP 0.00 to MP 9.24 (WA-01939) – Walla Walla County – 2023 • Lovers Lane MP 0.00 to MP 1.25 (WA-10422) – Walla Walla County – 2023 • Lower Dry Creek Road MP 1.10 to MP 2.50 (WA-02120) – Walla Walla County – 2021-2022 • Lower Hogeye Road, Substation Bridge MP 0.00 to MP 0.25 (WA-10438) – Walla Walla County – 2024 • Lower Monumental Road MP 6.30 to MP 7.60 (WA-10428) – Walla Walla County – 2024 • Lower Waitsburg Road MP 11.40 to MP 12.40 (WA-08530) – Walla Walla County – 2023 • Lower Waitsburg Road MP 13.50 to MP 14.78 (WA-02115) – Walla Walla County – 2021-2022 • Lower Waitsburg Road MP 4.23 to MP 6.25 (WA-02119) – Walla Walla County – 2020-2021 • Lower Whetstone Road MP 0.00 to MP 2.20 (WA-10437) – Walla Walla County - 2024 • Lucas Road (B) MP 0.00 to MP 0.27 (WA-10456) – Walla Walla County – 2024 • Luckenbill Road, Marbach Corner Bridge MP 1.80 to MP 2.20 (WA-09561) – Walla Walla County – 2024 • Lyons Ferry Road MP 0.20 to MP 2.81 (WA-01926) – Walla Walla County – 2020-2021 • Lyons Ferry Road MP 14.20 to MP 14.60 (WA-10423) – Walla Walla County - 2023 • Main Street (B) MP 0.00 to MP 0.21 (WA-10448) – Walla Walla County – 2024 • Main Street (T) MP 0.06 to MP 0.30 (WA-10444) – Walla Walla County – 2024 • Maple Street W (B) MP 0.00 to MP 0.42 (WA-10449) – Walla Walla County – 2024 • McDonald Road MP 0.00 to MP 1.30 (WA-10426) – Walla Walla County – 2023 • McKay Alto Road MP 0.00 to MP 1.28 (WA-10406) – Walla Walla County – 2020-2021 • Middle Waitsburg Road MP 11.65 to MP 13.00 (WA-08475) – Walla Walla County – 2020-2021 • Middle Waitsburg Road MP 14.40 to MP 16.41 (WA-10411) – Walla Walla County – 2020-2021 • Mission Road MP 0.00 to MP 1.51 (WA-08479) – Walla Walla County – 2021-2022 • Mojonnier Road MP 0.14 to MP 1.40 (WA-01889) – Walla Walla County – 2020-2021

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

18

• Mojonnier Road MP 1.40 to MP 2.30 (WA-01932) – Walla Walla County – 2023 • Mojonnier Road Reconstruction (WA-11693) – City of College Place – 2019-2021 • Mud Creek Road MP 3.00 to MP 3.50 (WA-10420) – Walla Walla County – 2024 • Myra Rd, SR 125 to Taumarson (WA-10606) – City of Walla Walla – 2019-2020 • Peppers Bridge Road MP 1.67 to MP 2.28 (WA-10434) – Walla Walla County – 2024 • Pettyjohn Road, Dell Sharp Bridge MP 5.20 to MP 5.80 (WA-10425) – Walla Walla County – 2023 • Plaza Way – Village to Hedine (WA-11549) – Walla Walla County – 2022-2023 • Plaza Way MP 0.00 to MP 0.34 (WA-02323) – Walla Walla County – 2023 • Plaza Way MP 0.25 to MP 0.82 (WA-02321) – Walla Walla County – 2021-2022 • Pleasant Street MP 1.46 to MP 1.56 WA-10419 – Walla Walla County – 2021-2022 • Poplar Street – 5th to 11th IRRP (WA-11551) – City of Walla Walla – 2022-2023 • Poplar Street – Colville to 5th (WA-11548) – City of Walla Walla – 2020-2021 • Poplar Street (B) MP 0.00 to MP 0.25 (WA-10452) – Walla Walla County – 2024 • Poplar Street Signals Coordination – City of Walla Walla – 2020 • Reinken Blvd. MP 0.00 to MP 0.42 (WA-08463) – Walla Walla County – 2024 • Reser Road MP 0.49 to MP 0.97 (Fern to Wilbur) (WA-04766) – Walla Walla County – 2023 • Reser Road MP 0.97 to MP 1.22 (WA-01888) – Walla Walla County – 2024 • Reser Road MP 3.29 to MP 5.19 (WA-01922) – Walla Walla County – 2021-2022 • Russell Creek Road MP 0.0 to MP 0.86 (WA-02112) – Walla Walla County – 2024 • Russell Creek Road MP 2.90 to MP 3.60 (WA-10432) – Walla Walla County – 2024 • Scenic Loop Road MP 1.47 to MP 2.00 (WA-04645) – Walla Walla County – 2023 • Scenic Loop Road MP 2.00 to MP 4.17 (WA-04644) – Walla Walla County – 2019-2020 • School Avenue Improvement – Alder to Bryant (WA-10598) – City of Walla Walla – 2023-2024 • School Avenue MP 0.00 to MP 1.11 (WA-08469) – Walla Walla County – 2020-2021 • School Avenue MP 0.96 (Decommission Stormwater Outfall) (WA-10442) – Walla Walla County – 2024 • SE 12th St & SE Larch Avenue Intersection (WA-11676) – City of College Place – 2021-2023 • SE 12th St (Date to Myra) (WA-11696) – City of College Place – 2021-2023 • SE 12th St (College to Date) (WA-11672) – City of College Place – 2021-2023 • SE Ash Ave (Whitman to 4th) (WA-11680) – City of College Place – 2019-2021 • SE Lamperti St (WA-11686) – City of College Place – 2019 • SE Meadowbrook (WA-11683_ – City of College Place – 2019 • Second Avenue (B) MP 0.00 to MP 0.61 (WA-08466) – Walla Walla County – 2023 • Second Avenue Bridge at Mill Creek (WA-11553) – City of Walla Walla – 2023-2024 • Seven Mile Road, Seven Mile Bridge MP 2.20 to MP 2.40 (WA-06919) – Walla Walla County – 2021-2022 • Shea Road MP 0.00 to MP 0.18 (WA-08494) – Walla Walla County – 2024 • Sheffler Road MP 3.90 to MP 5.39 (WA-10430) – Walla Walla County – 2024 • Sheffler Road MP 7.30 to MP 9.40 (WA-10418) – Walla Walla County – 2021-2022 • Sheffler Road MP 9.40 to MP 10.60 (WA-10455) – Walla Walla County – 2024 • Sheffler Road MP 11.20 to MP 11.90 (WA-10435) – Walla Walla County – 2024 • Smith Road MP 0.74 to MP 1.24 (WA-10424) – Walla Walla County – 2024 • Smith Spring Road Ken Noble Bridge MP 3.30 to MP 3.60 (WA-02123) – Walla Walla County – 2023 • South Fork Coppei MP 0.06 to MP 0.25 Ganguet Bridge (WA08498) – Walla Walla County – 2024 • Southside Development Clarence Extension (WA-11689) – City of College Place – 2022-2024 • Southside Development East-West Corridor (WA-11671) – City of College Place – 2019 • Spring Creek Road MP 3.85 to MP 4.30 (WA-08480) – Walla Walla County – 2023

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

19

• Spring Valley Road MP 6.60 to MP 6.73 (WA-10427) – Walla Walla County – 2024 • Stateline Road Pine Creek No. 2 Bridge MP 2.10 to MP 2.63 (WA-01942) – Walla Walla County – 2024 • Stovall Road MP 0.90 to MP 2.00 (WA-10413) – Walla Walla County – 2021-2022 • Sudbury Road MP 11.60 to MP 17.00 (WA-10459) – Walla Walla County – 2023 • Taumarson/Peppers Bridge Intersection (WA-11691) – City of College Place – 2019-2021 • Teri Road (B) MP 0.00 to MP 0.20 (WA-10457) – Walla Walla County – 2024 • Tietan Sidewalks – 4th Avenue to Plaza Way (WA-10607) – City of Walla Walla – 2019 • Touchet North Road MP 2.40 to MP 2.90 (WA-10441) – Walla Walla County – 2024 • Touchet North Road MP 5.03 to MP 6.00 (WA-10460) – Walla Walla County – 2023 • Wallula Ave. MP 0.00 to MP 1.84 – Stormwater (WA-08460) – Walla Walla County – 2021-2022 • Walnut Street (B) MP 0.00 to MP 0.25 (WA-10445) – Walla Walla County – 2024 • Whitely Road MP 0.20 to MP 0.40-Stormwater (WA-08471) – Walla Walla County – 2024 • Whitman Drive & Larch Avenue Intersection (new signal) (WA-11694) – City of College Place – 2021-

2023 • Wilbur Avenue MP 0.50 to MP 0.75 (WA-10433) – Walla Walla County – 2023

Public Transportation • Replace up to Five (5) Heavy-Duty Transit Buses (1204) – Valley Transit – 2021 • Facility Renovation and Energy Efficiency Improvements (1304) – Valley Transit – 2023 • Replace up to Five (5) Vanpool Vehicles (1502) – Valley Transit – 2019 • Maintenance Facility Improvements – CNG Mitigation and Energy Improvements (1511) – Valley Transit

– 2019 • Replace Fuel and Waste Oil Underground Storage Tanks (1705) – Valley Transit – 2020 • Valley Transit Main Facility Security Fence (1707) – Valley Transit – 2019 • Purchase One (1) Compressed Natural Gas Compressors and Control Equipment (1803) – Valley Transit –

2020 • Dial-A-Ride Storage Facility Expansion (1804) – Valley Transit – 2019 • Expand the Main Facility Parking Lot (1806) – Valley Transit – 2019 • Replace up to Three (3) Paratransit Vehicle (1901) – Valley Transit – 2022 • Replace One (1) Heavy-Duty Transit Bus (1902) – Valley Transit – 2019 • Replace Four (4) Heavy-Duty Transit Bus (1904) – Valley Transit – 2020 • Senior and Disabled Mobility Enhancement thru Expanded Demand Response and Route Deviated

Service (1906) – Valley Transit – 2020-2021 • Develop a Transit Network Plan (1909) – Valley Transit – 2019 • General Labor Operating (2001) – Valley Transit – 2024 • Replace up to Two (2) Heavy Duty Transit Bus (2202) – Valley Transit – 2022 • Replace up to Three (3) Paratransit Vehicles (2203) – Valley Transit – 2024 • Purchase (1) Paratransit Vehicle (2205) – Valley Transit – 2023 • General Labor Operating (2206) – Valley Transit – 2022 • Replace up to Three (3) Heavy-Duty Transit Buses (2302) – Valley Transit - 2023 • General Labor Operating (2303) – Valley Transit – 2023

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

Appendices Appendix A - WA MPO/SRTPO Funding Summary by Source

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

Source: September 27, 2018 excerpt of the WSDOT online Statewide Transportation Improvement Program (STIP) database

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

Appendix B - WA MPO/SRTPO Fiscal Constraint Overview by Year The M/RTIP for the WWVMPO/SRTPO demonstrates that it is a financially realistic program. Projected revenues by program are equal to or greater than the estimated cost of programmed projects for each year.

Table: 2019-2022 Financial Feasibility Summary Table (WA)

Fund Type* Year Starting Balance (carryover)

Annual Allocation

Total Available Revenue

Total Amount Programmed

Ending Balance (carryover)

STBG Regional (US, R, Any Area)

2019 $757,209 $1,292,006 $2,049,215 $123,831 $1,925,384

2020 $1,925,384 $1,292,006 $3,217,390 $3,194,041 $23,349

2021 $23,349 $1,292,006 $1,315,355 $950,000 $365,355

2022 $365,355 $1,292,006 $1,657,361 $1,657,362 $0

TA Regional (US, R, Any Area)

2019 $(31,245) $64,441 $33,196 $33,196

2020 $33,196 $64,441 $97,637 $97,637

2021 $97,637 $64,441 $162,078 $136,000 $26,078

2022 $26,078 $64,441 $90,519 $49,461 $41,058

FTA 5307 2019 $700,000 $700,000 $700,000 $0

2020

2021

2022

FTA 5310 2019

2020

2021

2022

FTA 5339 2019 $192,800 $192,800 $192,800 $0

2020

2021

2022

Discretionary 2019

2020

2021

2022

HSIP 2019 $977,330 $977,330 $977,330 $0

2020 $1,070,000 $1,070,000 $1,070,000 $0

2021 $27,468 $27,468 $27,468 $0

2022 $111,400 $111,400 $111,400 $0

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

Fund Type* Year Starting Balance (carryover)

Annual Allocation

Total Available Revenue

Total Amount Programmed

Ending Balance (carryover)

NHPP 2019 $4,756,956 $4,756,956 $4,756,956 $0

2020 $3,421,175 $3,421,175 $3,421,175 $0

2021 $5,456,173 $5,456,173 $5,456,173 $0

2022 $46,282 $46,282 $46,282 $0

STBG WSDOT 2019 $441,035 $441,035 $441,035 $0

2020 $1,722,129 $1,722,129 $1,722,129 $0

2021 $1,613,810 $1,613,810 $1,613,810 $0

2022 $4,165,438 $4,165,438 $4,165,438 $0

STBG (BR) 2019 $1,520,200 $1,520,200 $1,520,200 $0

2020 $3,645,000 $3,645,000 $3,645,000 $0

2021

2022

WFL 2019

2020

2021

2022

TIB, CRAB 2019

2020 $1,701,869 $1,701,869 $1,701,869 $0

2021

2022

State, CWA 2019 $16,871,330 $16,871,330 $16,871,330 $0

2020 $80,226,586 $80,226,586 $80,226,586 $0

2021 $60,608,798 $60,608,798 $60,608,798 $0

2022 $3,472,488 $3,472,488 $3,472,488 $0

Local (includes match)

2019 $2,939,611 $2,939,611 $2,939,611 $0

2020 $6,967,901 $6,967,901 $6,967,901 $0

2021 $831,392 $831,392 $831,392 $0

2022 $371,205 $371,205 $371,205 $0

*Refer to Appendix H for detailed information on funding sources

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

Appendix C - WA MPO/SRTPO Projects, Cost and Funding The detailed project information, shown on the following pages, is an extract of WSDOT’s online STIP database.

Source: September 27, 2018 excerpt of the WSDOT online Statewide Transportation Improvement Program (STIP) database

Agency: Valley Transit

County: Walla Walla

MPO/RTPO: WWV Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

00 1901 1808 07/19/18 07/19/18 2018-11 23 P CE No

Real-Time Passenger Information Display System for Market Station (FFY 2015)

N/A

N/A to N/A

Purchase and installation of two electronic passenger information displays providing real-time bus location and schedules. One larger display will be installed on the Market Station customer service building, and one smaller display will be installed near the Main Street multi-modal shelter.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S ALL 2019 5339 20,800 0 5,200 26,000

Totals 20,800 0 5,200 26,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 26,000 0 0 0 0

Totals 26,000 0 0 0 0

Report Date: September 27, 2018 Page 1

Six Year Transportation Improvement ProgramFrom 2019 to 2024

Agency: Valley Transit

County: Walla Walla

MPO/RTPO: WWV Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

00 1903 N/A 1907 07/19/18 07/19/18 2018-11 23 0.000 CE No

General Labor Operating

N/A

N/A to N/A

Provide general labor for operations. N/A

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S ALL 2019 5307 700,000 0 700,000 1,400,000

Totals 700,000 0 700,000 1,400,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 1,400,000 0 0 0 0

Totals 1,400,000 0 0 0 0

Report Date: September 27, 2018 Page 2

Six Year Transportation Improvement ProgramFrom 2019 to 2024

Agency: Valley Transit

County: Walla Walla

MPO/RTPO: WWV Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

00 1907 N/A 1908 07/19/18 07/19/18 2018-11 23 G P 0.000 CE No

Purchase Replacement Compressed Natural Gas Dispenser and Monitoring System

N/A

N/A to N/A

Purchase and install a new CNG dispenser pump and monitoring system for the CNG fueling station.

N/A

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S ALL 2019 5339 172,000 0 48,000 220,000

Totals 172,000 0 48,000 220,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 220,000 0 0 0 0

Totals 220,000 0 0 0 0

Federal Funds State Funds Local Funds Total Funds

Grand Totals for Valley Transit 892,800 0 753,200 1,646,000

Report Date: September 27, 2018 Page 3

Six Year Transportation Improvement ProgramFrom 2019 to 2024

Agency: Waitsburg

County: Walla Walla

MPO/RTPO: WWV Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

07 3 Waitsburg6 06/20/18 06/20/18 2018-685 28 C P T 0.200 CE No

Mill Race Rd Grade Crossing

Millrace

Main Street to City Limits

Reconstruction of Mill Race Road and corresponding grade crossing for improved heavy truck and vehiclular traffic. Project also includes sidewalk work from Main Street Bridge to intersection of Front Street and Millrace Road.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S PE 2019 0 0 50,000 50,000

S CN 2022 STP(R) 390,362 0 70,638 461,000

S CN 2022 TAP(R) 49,461 0 14,539 64,000

Totals 439,823 0 135,177 575,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 50,000 0 0 0 0

CN 0 0 0 525,000 0

Totals 50,000 0 0 525,000 0

Report Date: September 27, 2018 Page 4

Six Year Transportation Improvement ProgramFrom 2019 to 2024

Agency: Waitsburg

County: Walla Walla

MPO/RTPO: WWV Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

07 4 WA-08036 06/20/18 06/20/18 2018-685 03 C T W 1.000 CE No

Taggart Road Extension

Taggart

Mill Race to Hwy 12

Extension of Taggart Road in order to straighten out the road as means of traffic flow improvements along Taggart Road to Hwy 12

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S PE 2019 0 0 45,000 45,000

P CN 2020 STP(R) 350,325 0 54,675 405,000

Totals 350,325 0 99,675 450,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 45,000 0 0 0 0

CN 0 405,000 0 0 0

Totals 45,000 405,000 0 0 0

Federal Funds State Funds Local Funds Total Funds

Grand Totals for Waitsburg 790,148 0 234,852 1,025,000

Report Date: September 27, 2018 Page 5

Six Year Transportation Improvement ProgramFrom 2019 to 2024

Agency: Walla Walla

County: Walla Walla

MPO/RTPO: WWV Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

14 WA-10901 06/25/18 06/25/18 2018-69 11 0.060 CE Yes

Rose Street Bridge Replacement at Mill Creek

Rose Street

Intersection to Intersection

Replace structurally deficient bridge. 08535100

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S PE 2020 STP(BR) 350,000 0 87,500 437,500

S RW 2020 STP(BR) 100,000 0 25,000 125,000

S CN 2020 STP(BR) 3,195,000 0 498,642 3,693,642

Totals 3,645,000 0 611,142 4,256,142

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 437,500 0 0 0

RW 0 125,000 0 0 0

CN 0 3,693,642 0 0 0

Totals 0 4,256,142 0 0 0

Report Date: September 27, 2018 Page 6

Six Year Transportation Improvement ProgramFrom 2019 to 2024

Agency: Walla Walla

County: Walla Walla

MPO/RTPO: WWV Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 WA-11552 06/25/18 06/25/18 2018-69 44 CE No

2019 Sidewalk Remediation Project

Various to Various

Construct missing sidewalk segments, remove and replace hazardous sidewalk defects, and construct ADA ramps in high volume pedestrian corridors.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S CN 2021 TAP(US) 136,000 0 35,000 171,000

Totals 136,000 0 35,000 171,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 0 0 171,000 0 0

Totals 0 0 171,000 0 0

Report Date: September 27, 2018 Page 7

Six Year Transportation Improvement ProgramFrom 2019 to 2024

Agency: Walla Walla

County: Walla Walla

MPO/RTPO: WWV Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

14 WA-02008 06/25/18 06/25/18 2018-69 03 C G O P S T W

0.100 CE Yes

9th Ave and Plaza Way/Dalles Miltary Intersection and Street Improvements

9th Avenue (SR 125)

Plaza Way to Dalles Military Road

Analyze and implement safety and capacity improvements with an updated traffic signal or round-a-bout at this intersection, consider bicycle accommodation, and improve Plaza Way corridor south through Village Way.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S PE 2020 STP(US) 229,000 0 36,000 265,000

S RW 2020 0 0 50,000 50,000

S CN 2022 STP(US) 1,267,000 0 198,000 1,465,000

Totals 1,496,000 0 284,000 1,780,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 265,000 0 0 0

RW 0 50,000 0 0 0

CN 0 0 0 1,465,000 0

Totals 0 315,000 0 1,465,000 0

Report Date: September 27, 2018 Page 8

Six Year Transportation Improvement ProgramFrom 2019 to 2024

Agency: Walla Walla

County: Walla Walla

MPO/RTPO: WWV Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

14 / 7214(005) WA-09465 06/08/16 06/08/16 2016-76 04 C G P S T W

1.830 DCE Yes

Isaacs Avenue Improvements

7214

Division Street to Tausick Way

WWV ID 401WWC01.2The project will reconstruct East Isaacs Avenue between North Division Street and North Wilbur Avenue, and will place a maintenance seal on East Isaacs Avenue from North Wilbur Avenue to Tausick Way. Includes: bike lanes, traffic signals with audible pedestrian signals, pedestrian crossing improvements, sidewalks, ADA upgrades, and LED illumination.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S CN 2019 0 Ped/Bike Program 865,720 0 865,720

S CN 2020 STP(US) 2,000,559 0 4,753,409 6,753,968

Totals 2,000,559 865,720 4,753,409 7,619,688

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 865,720 6,753,968 0 0 0

Totals 865,720 6,753,968 0 0 0

Report Date: September 27, 2018 Page 9

Six Year Transportation Improvement ProgramFrom 2019 to 2024

Agency: Walla Walla

County: Walla Walla

MPO/RTPO: WWV Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 WA-10598 06/25/18 06/25/18 2018-69 04 G P S T W 0.760 DCE No

School Avenue Improvement - Alder to Bryant

Alder Street to Bryant Avenue

Reconstruct School Avenue from Pleasant Street to Bryant Avenue, including pedestrian improvements.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2023 0 0 250,000 250,000

S RW 2023 0 0 100,000 100,000

P CN 2024 0 0 1,650,000 1,650,000

Totals 0 0 2,000,000 2,000,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 0 0 250,000

RW 0 0 0 0 100,000

CN 0 0 0 0 1,650,000

Totals 0 0 0 0 2,000,000

Report Date: September 27, 2018 Page 10

Six Year Transportation Improvement ProgramFrom 2019 to 2024

Agency: Walla Walla

County: Walla Walla

MPO/RTPO: WWV Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

00 / 1365(005) WA-10601 06/25/18 06/25/18 2018-69 11 0.110 CE Yes

Spokane Street Bridge Replacement at Mill Creek

Spokane Street

Main Street to Alder Street

Replace structurally deficient bridge.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S RW 2019 STP(BR) 25,000 0 6,250 31,250

S CN 2019 STP(BR) 1,495,200 0 233,355 1,728,555

Totals 1,520,200 0 239,605 1,759,805

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

RW 31,250 0 0 0 0

CN 1,728,555 0 0 0 0

Totals 1,759,805 0 0 0 0

Federal Funds State Funds Local Funds Total Funds

Grand Totals for Walla Walla 8,797,759 865,720 7,923,156 17,586,635

Report Date: September 27, 2018 Page 11

Six Year Transportation Improvement ProgramFrom 2019 to 2024

Agency: Walla Walla Co.

County: Walla Walla

MPO/RTPO: WWV Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

08 1 WA-04764 07/23/18 07/23/18 18 184 04 C G P T 2.130 CE Yes

Whitman Drive W MP 1.01 To MP 3.14 (Whitman Drive W Bike Path)

92220

1.01 to 3.14

Construct shared use path and widen Whitman Drive West to provide dedicated bicycle lanes on both sides of the road.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S CN 2019 0 Ped/Bike Program 1,331,000 603,890 1,934,890

Totals 0 1,331,000 603,890 1,934,890

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 1,934,890 0 0 0 0

Totals 1,934,890 0 0 0 0

Report Date: September 27, 2018 Page 12

Six Year Transportation Improvement ProgramFrom 2019 to 2024

Agency: Walla Walla Co.

County: Walla Walla

MPO/RTPO: WWV Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

07 2 / C360(003) WA-10969 07/23/18 07/23/18 18 184 22 P T 0.000 CE No

Dodd Road Railroad Crossing

13000

0.80 to 0.80

Upgrade active warning devices to shoulder mounted LED lights and gates.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S CN 2019 HSIP 436,030 0 43,603 479,633

Totals 436,030 0 43,603 479,633

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 479,633 0 0 0 0

Totals 479,633 0 0 0 0

Report Date: September 27, 2018 Page 13

Six Year Transportation Improvement ProgramFrom 2019 to 2024

Agency: Walla Walla Co.

County: Walla Walla

MPO/RTPO: WWV Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

09 3 / 2036(033) WA-10417 07/23/18 07/23/18 18 184 22 P T 0.000 CE No

Port Kelly Railroad Crossing

10100

0.02 to 0.02

Install active warning devices consisting of shoulder-mounted LED lights and gates.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S CN 2019 HSIP 541,300 0 54,130 595,430

Totals 541,300 0 54,130 595,430

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 595,430 0 0 0 0

Totals 595,430 0 0 0 0

Report Date: September 27, 2018 Page 14

Six Year Transportation Improvement ProgramFrom 2019 to 2024

Agency: Walla Walla Co.

County: Walla Walla

MPO/RTPO: WWV Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

07 4 WA-09572 07/23/18 07/23/18 18 184 04 P T W 2.860 CE No

Mill Creek Road MP 1.10 to MP 3.96

97330

1.10 to 3.96

WWV ID 401WCR14Realign and reconstruct Mill Creek Road from MP 1.10 to MP 1.96. Extending 5 Mile Road approx. 1000-ft to its new intersection of Mill Creek Road, PE/RW done under federal project K364(004). Mill Creek Road MP 1.96 to MP 3.96-Widen shoulder and pave full width of roadway. Place edge stripe and provide clear zone. PE/RW done under federal project K364(003).

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S CN 2019 STP(R) 73,831 0 11,523 85,354

S CN 2020 0 CRAB 1,701,869 210,953 1,912,822

S CN 2020 STP(R) 772,300 0 120,532 892,832

Totals 846,131 1,701,869 343,008 2,891,008

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 85,354 2,805,654 0 0 0

Totals 85,354 2,805,654 0 0 0

Report Date: September 27, 2018 Page 15

Six Year Transportation Improvement ProgramFrom 2019 to 2024

Agency: Walla Walla Co.

County: Walla Walla

MPO/RTPO: WWV Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

08 6 / 36WW(003) WA-02121 07/23/18 07/23/18 18 184 04 P T 1.820 CE Yes

Middle Waitsburg Road MP 6.10 to MP 7.92 (Walla Walla Co. 2017 Safety Program Project)

96230

6.10 to 7.92

Realign existing road to remove substandard horizontal and vertical curves. Widen road to provide paved shoulders and remove deficient guardrail. Flatten slopes and provide clear zone, provide delineation with edge stripe.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S RW 2019 0 0 40,000 40,000

S CN 2020 HSIP 1,070,000 0 600,000 1,670,000

Totals 1,070,000 0 640,000 1,710,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

RW 40,000 0 0 0 0

CN 0 1,670,000 0 0 0

Totals 40,000 1,670,000 0 0 0

Report Date: September 27, 2018 Page 16

Six Year Transportation Improvement ProgramFrom 2019 to 2024

Agency: Walla Walla Co.

County: Walla Walla

MPO/RTPO: WWV Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

07 7 WA-01920 07/23/18 07/23/18 18 184 04 C P T 1.250 CE Yes

Peppers Bridge Road MP 0.36 to MP 1.61

50130

0.36 to 1.61

The road will be widened and overlaid to provide paved shoulders and reconstruct two vertical curves to meet current sight distance standards. Culverts will be lengthened and/or beveled with proper end treatments. Clear zone will be provided with delineation.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S PE 2019 STP(R) 50,000 0 32,000 82,000

S RW 2020 0 0 100,000 100,000

S CN 2021 STP(R) 950,000 0 650,000 1,600,000

Totals 1,000,000 0 782,000 1,782,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 82,000 0 0 0 0

RW 0 100,000 0 0 0

CN 0 0 1,600,000 0 0

Totals 82,000 100,000 1,600,000 0 0

Report Date: September 27, 2018 Page 17

Six Year Transportation Improvement ProgramFrom 2019 to 2024

Agency: Walla Walla Co.

County: Walla Walla

MPO/RTPO: WWV Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 8 WA-09564 07/23/18 07/23/18 18 184 04 P T 0.200 CE Yes

Wallula Avenue MP 2.00 to MP 2.20

92440

2.00 to 2.20

Reconstruct intersection to include compact roundabout.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S PE 2019 0 0 50,000 50,000

S RW 2019 0 0 25,000 25,000

S CN 2020 STP(US) 192,182 0 377,818 570,000

Totals 192,182 0 452,818 645,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 50,000 0 0 0 0

RW 25,000 0 0 0 0

CN 0 570,000 0 0 0

Totals 75,000 570,000 0 0 0

Report Date: September 27, 2018 Page 18

Six Year Transportation Improvement ProgramFrom 2019 to 2024

Agency: Walla Walla Co.

County: Walla Walla

MPO/RTPO: WWV Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

09 9 WA-10487 07/23/18 07/23/18 18 184 17 P T 0.600 CE No

Flood Repair CRP 17-03

76200, 76830, 92440

0.15/0.99/0.08 to 0.75/0.9/0.08

There are 3 different flood damage projects. Mud Creek Road 76200 MP 0.15 to MP 0.75, South Fork Coppei Road 76830 MP 0.99, Wallula Avenue 92440 MP 0.08.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S CN 2019 0 0 478,000 478,000

Totals 0 0 478,000 478,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 478,000 0 0 0 0

Totals 478,000 0 0 0 0

Report Date: September 27, 2018 Page 19

Six Year Transportation Improvement ProgramFrom 2019 to 2024

Agency: Walla Walla Co.

County: Walla Walla

MPO/RTPO: WWV Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

08 10 WA-11618 07/23/18 07/23/18 18 184 04 P 0.170 CE Yes

Byrnes Road MP 1.78 to MP 1.95

17080

1.78 to 1.95

Shifting the roadway away from river.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S RW 2019 0 0 5,000 5,000

S CN 2019 0 0 65,000 65,000

Totals 0 0 70,000 70,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

RW 5,000 0 0 0 0

CN 65,000 0 0 0 0

Totals 70,000 0 0 0 0

Federal Funds State Funds Local Funds Total Funds

Grand Totals for Walla Walla Co. 4,085,643 3,032,869 3,467,449 10,585,961

Report Date: September 27, 2018 Page 20

Six Year Transportation Improvement ProgramFrom 2019 to 2024

Agency: WSDOT - SC

County:

MPO/RTPO: WWV Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

00 BPWWV BPWWV 06 CE No

Asphalt/Chip Seal Preservation Walla Walla Valley Metropolitan Planning

Varies

Varies to Varies

Resurface the roadway with chip seal or hot mix asphalt to preserve the structural integrity of the roadway and extend the service life of the pavement. This record is for chip seal/asphalt paving projects within Walla Walla county. For a list of included projects, go to www.wsdot.wa.gov/projects/search.

Report Date: September 27, 2018 Page 21

Six Year Transportation Improvement ProgramFrom 2019 to 2024

Agency: WSDOT - SC

County:

MPO/RTPO: WWV Y Inside N Outside

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S PE 2019 STP 29,889 0 0 29,889

S PE 2019 NHPP 35,232 0 2,605 37,837

S PE 2020 NHPP 173,273 0 6,931 180,204

S PE 2021 STP 162,804 0 6,512 169,316

S PE 2022 STP 29,736 0 0 29,736

S PE 2022 NHPP 46,282 0 3,041 49,323

S PE 2023 NHPP 29,322 0 1,982 31,304

S PE 2023 STP 20,231 0 0 20,231

S PE 2024 STP 50,454 0 3,128 53,582

S PE 2024 NHPP 27,749 0 0 27,749

S CN 2019 NHPP 4,574,724 0 91,494 4,666,218

S CN 2020 NHPP 390,305 0 15,372 405,677

S CN 2020 STP 378,297 0 0 378,297

S CN 2021 NHPP 5,456,173 0 109,123 5,565,296

S CN 2022 STP 4,135,702 0 82,714 4,218,416

S CN 2023 NHPP 507,142 0 14,281 521,423

S CN 2023 STP 206,912 0 0 206,912

S CN 2024 NHPP 553,067 0 20,673 573,740

S CN 2024 STP 480,560 0 0 480,560

Totals 17,287,854 0 357,856 17,645,710

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 4,733,944 964,178 5,734,612 4,297,475 1,915,501

Totals 4,733,944 964,178 5,734,612 4,297,475 1,915,501

Report Date: September 27, 2018 Page 22

Six Year Transportation Improvement ProgramFrom 2019 to 2024

Agency: WSDOT - SC

County:

MPO/RTPO: WWV Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

14 512501Z / 0125(010) 512501Z36 21 0.610 CE No

SR 125 Spur/N 13th Ave to Myra Road - ADA Compliance

125 SP

6.09 to 6.70

Upgrade existing curb ramps to meet ADA Compliance. Pedestrian ADA curb ramps at various intersections on SR 125 Spur in the city of Walla Walla do not fully meet ADA standards. This project will upgrade the curb ramps to meet current standards, improving accessibility for all pedestrians.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S CN 2020 NHPP 102,561 0 2,093 104,654

Totals 102,561 0 2,093 104,654

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 104,654 0 0 0

Totals 0 104,654 0 0 0

Report Date: September 27, 2018 Page 23

Six Year Transportation Improvement ProgramFrom 2019 to 2024

Agency: WSDOT - SC

County:

MPO/RTPO: WWV Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

14 512501Y / 0125(010) 512501Y36 21 6.020 CE No

SR 125/Oregon State Line to 12th Ave N - ADA Compliance

125

0.00 to 6.02

Upgrade existing curb ramps to meet ADA Compliance. Pedestrian ADA curb ramps at various intersections on SR 125 in the cities of College Place and Walla Walla do not fully meet ADA standards. This project will upgrade the curb ramps to meet current standards, improving accessibility for all pedestrians.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S CN 2020 NHPP 550,635 0 11,238 561,873

Totals 550,635 0 11,238 561,873

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 561,873 0 0 0

Totals 0 561,873 0 0 0

Report Date: September 27, 2018 Page 24

Six Year Transportation Improvement ProgramFrom 2019 to 2024

Agency: WSDOT - SC

County:

MPO/RTPO: WWV Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

14 512502C 512502C36 21 0.350 CE Yes

SR 125/Plaza Way - Intersection Improvements

125

4.30 to 4.65

Construct intersection improvements. The intersection at SR 125 and Plaza Way experiences congestion due to heavy vehicle traffic. This project will construct a roundabout or other improvements to improve traffic flow and reduce the risk of crashes.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S CN 2020 0 CWA 3,229,782 0 3,229,782

Totals 0 3,229,782 0 3,229,782

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 3,229,782 0 0 0

Totals 0 3,229,782 0 0 0

Report Date: September 27, 2018 Page 25

Six Year Transportation Improvement ProgramFrom 2019 to 2024

Agency: WSDOT - SC

County:

MPO/RTPO: WWV Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

00 500000G 500000G36 21 CE No

SR 128 Et Al/SE Washington - Centerline Rumble Strips

Varies

Varies to Varies

These sections of state routes 125, 128, 225, and 240 are two-lane roadways with a high potential for crossover collisions. By installing centerline rumble strips, this project will reduce the risk of this type of collision and improve safety. Shoulder rumble strips may also be considered if warranted. This record is for the Walla Walla county portion of the project.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S PE 2021 HSIP 27,468 0 1,144 28,612

S CN 2022 HSIP 111,400 0 2,273 113,673

Totals 138,868 0 3,417 142,285

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 6,794 118,210 17,281

Totals 0 0 6,794 118,210 17,281

Report Date: September 27, 2018 Page 26

Six Year Transportation Improvement ProgramFrom 2019 to 2024

Agency: WSDOT - SC

County:

MPO/RTPO: WWV Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

02 501213X 501213X36 01 12.580 EA Yes

US 12/Nine Mile Hill to Frenchtown Vic - Build New Highway

US 12

315.58 to 328.16

Build new highway. The existing two lane section of US 12 between Nine Mile Hill and Frenchtown experiences congestion and has a history of collisions. This project will reconstruct US 12 as a four lane highway to add capacity, reduce the risk of collisions, and improve economic vitality.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S RW 2019 0 CWA 6,725,806 0 6,725,806

S CN 2019 0 CWA 7,000,000 0 7,000,000

S CN 2020 0 CWA 75,000,000 0 75,000,000

S CN 2021 0 CWA 55,071,220 0 55,071,220

Totals 0 143,797,026 0 143,797,026

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 13,725,806 75,000,000 55,071,220 0 0

Totals 13,725,806 75,000,000 55,071,220 0 0

Report Date: September 27, 2018 Page 27

Six Year Transportation Improvement ProgramFrom 2019 to 2024

Agency: WSDOT - SC

County:

MPO/RTPO: WWV Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

02 501218I 501218I36 25 1.000 CE No

US 12/US 730 Junction - Wallula Weigh Station Improvements

US 12

307.06 to 308.06

Install a virtual weigh-in-motion system and repair building. The existing Wallula weigh station does not have weigh-in-motion capabilities and the existing building is in need of repair. This project will repair the existing building and install a virtual weigh-in-motion system.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S CN 2019 0 0 335,680 335,680

Totals 0 0 335,680 335,680

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 335,680 0 0 0 0

Totals 335,680 0 0 0 0

Report Date: September 27, 2018 Page 28

Six Year Transportation Improvement ProgramFrom 2019 to 2024

Agency: WSDOT - SC

County:

MPO/RTPO: WWV Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

02 501207O 501207O36 40 0.040 CE No

US 12/Walla Walla River Bridge - Scour Repair

US 12

313.97 to 314.01

Bridge scour repairs Bridge 12/619. WSDOT Bridge Office has identified this bridge over the Walla Walla River on US 12 east of Wallula as requiring repairs due to water erosion. This project will protect bridge abutments to maintain the structural integrity of the bridge by installing rock for erosion control and scour prevention.

12/619

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S PE 2024 NHPP 71,159 0 2,965 74,124

Totals 71,159 0 2,965 74,124

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 15,621

Totals 0 0 0 0 15,621

Report Date: September 27, 2018 Page 29

Six Year Transportation Improvement ProgramFrom 2019 to 2024

Agency: WSDOT - SC

County:

MPO/RTPO: WWV Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

02 501203A 501203A36 01 11.410 EA Yes

US 12/Wallula to Nine Mile Hill - Build New Highway

012

304.17 to 315.58

Build new highway. The existing two lane section of US 12 between Wallula and Nine Mile Hill experiences congestion and has a history of collisions. This project will complete the four-laning of US 12 from Tri-Cities to Walla Walla adding capacity, reducing the risks of collisions, and improving economic vitality.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S PE 2019 0 CWA 948,804 0 948,804

S PE 2020 0 CWA 936,804 0 936,804

S PE 2021 0 CWA 905,578 0 905,578

S PE 2022 0 CWA 794,488 0 794,488

S PE 2023 0 CWA 8,065 0 8,065

S RW 2020 0 CWA 1,060,000 0 1,060,000

S RW 2021 0 CWA 4,632,000 0 4,632,000

S RW 2022 0 CWA 2,678,000 0 2,678,000

S RW 2023 0 CWA 30,000 0 30,000

Totals 0 11,993,739 0 11,993,739

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 948,804 1,996,804 5,537,578 3,472,488 38,065

Totals 948,804 1,996,804 5,537,578 3,472,488 38,065

Report Date: September 27, 2018 Page 30

Six Year Transportation Improvement ProgramFrom 2019 to 2024

Agency: WSDOT - SC

County:

MPO/RTPO: WWV Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

06 573001G 573001G36 21 0.210 DCE No

US 730/3.0 Miles N of Oregon Border - Rockfall Prevention

730

2.90 to 3.11

Scale slopes, install rockfall fence, netting, bolts, barrier; Slope 551. WSDOT's geotechnical division has identified this unstable slope as a potential hazard to the traveling public based on recorded vehicle/ rock collisions and repeated call-outs to remove rocks from the roadway. This project will remove loose rocks, install rock bolts, wire mesh, concrete barrier, and flexible rockfall fence. These measures will reduce the potential for collisions by minimizing the risk of rocks reaching the roadway.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S PE 2019 STP 117,146 0 4,881 122,027

S CN 2021 STP 1,451,006 0 29,613 1,480,619

Totals 1,568,152 0 34,494 1,602,646

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 64,359 60,351 1,455,229 22,707 0

Totals 64,359 60,351 1,455,229 22,707 0

Report Date: September 27, 2018 Page 31

Six Year Transportation Improvement ProgramFrom 2019 to 2024

Agency: WSDOT - SC

County:

MPO/RTPO: WWV Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

06 573001H / 0730(005) 573001H36 21 0.070 DCE Yes

US 730/4.1 Miles N of Oregon Border - Rockfall Prevention

730

4.09 to 4.16

Scale slopes, install netting and permanent ground anchors; Slope 549. WSDOT's geotechnical division has identified this unstable slope as a potential hazard to the traveling public based on recorded vehicle/ rock collisions and repeated call-outs to remove rocks from the roadway. This project will remove loose rocks and install permanent ground anchors and slope protection netting. These measures will reduce the potential for collisions by reducing the risk of rocks reaching the roadway.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S RW 2019 STP 147,000 0 3,000 150,000

S CN 2020 STP 398,813 0 8,139 406,952

Totals 545,813 0 11,139 556,952

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 150,000 395,622 11,330 0 0

Totals 150,000 395,622 11,330 0 0

Report Date: September 27, 2018 Page 32

Six Year Transportation Improvement ProgramFrom 2019 to 2024

Agency: WSDOT - SC

County:

MPO/RTPO: WWV Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

06 573001I / 0730(005) 573001I36 21 0.350 DCE Yes

US 730/4.4 Miles N of Oregon Border - Rockfall Prevention

730

4.27 to 4.62

Scale slopes, install permanent ground anchors and netting; Slope 548 WSDOT's Geotechnical Division has prioritized this unstable slope as a potential hazard to the traveling public based on recorded vehicle/rock collisions and repeated call-outs to remove rocks from the roadway. This project will remove loose rocks and install permanent ground anchors and slope protection netting. These measures will reduce the potential for collisions by reducing the risk of falling rocks reaching the roadway.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S RW 2019 NHPP 147,000 0 3,000 150,000

S CN 2020 NHPP 2,204,401 0 44,988 2,249,389

Totals 2,351,401 0 47,988 2,399,389

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 150,000 2,207,332 42,057 0 0

Totals 150,000 2,207,332 42,057 0 0

Report Date: September 27, 2018 Page 33

Six Year Transportation Improvement ProgramFrom 2019 to 2024

Agency: WSDOT - SC

County:

MPO/RTPO: WWV Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

06 573001J / 0730(005) 573001J36 21 0.220 DCE Yes

US 730/5.2 Miles N of Oregon Border - Rockfall Prevention

730

5.05 to 5.27

Scale slope, install anchors and slope protection netting; Slope 546. WSDOT's geotechnical division has identified this unstable slope as a potential hazard to the traveling public based on recorded vehicle/rock collisions and repeated call-outs to remove rocks from the roadway. This project will remove loose rocks and install permanent ground anchors and slope protection netting. These measures will reduce the potential for collisions by minimizing the risk of falling rocks reaching the roadway.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S RW 2019 STP 147,000 0 3,000 150,000

S CN 2020 STP 945,019 0 19,286 964,305

Totals 1,092,019 0 22,286 1,114,305

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 150,000 935,337 28,968 0 0

Totals 150,000 935,337 28,968 0 0

Federal Funds State Funds Local Funds Total Funds

Grand Totals for WSDOT - SC 23,708,462 159,020,547 829,156 183,558,165

Report Date: September 27, 2018 Page 34

Six Year Transportation Improvement ProgramFrom 2019 to 2024

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

Appendix D - OR MPO Projects, Cost and Funding This is a placeholder for detailed project information from ODOT’s online STIP, which will be added after successful project inclusion of the Milton-Freewater public transportation projects.

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

Appendix E - TIP Policies as Adopted by the WWVMPO/SRTPO Policy Board on August 1, 2018 1. Compliance with Regional and Local Plans Eligibility for inclusion in the Metropolitan and Regional Transportation Improvement Program (M/RTIP) is tied to FAST Act planning requirements as well as the project consistency with the adopted Walla Walla Valley Metropolitan and Regional Transportation - 2040 Plan.

• Capital improvements, roadway capacity, or general purpose roadway projects must be included in the fiscally-constrained project list.

• Projects designed to improve safety or increase multi-modal transportation opportunities may be programmed without being individually identified in the 2040 Plan, as long as – They are consistent with the established goals and objectives; and They are funded with revenues identified in the 2040 Plan - OR - new funding not previously anticipated.

Furthermore, projects must also be included in the project sponsor’s Transportation Improvement Program, Capital Improvement Plan, Transit Development Plan, and/or adopted budget. Locally adopted plans and budgets provide proof of the project sponsor’s commitment to the project, which is critical to timely implementation and prevention of loss of previously awarded funding.

2. Financial Constraint The M/RTIP will only include projects that fall within the fiscal constraint of the region’s expected four-year allocation of Surface Transportation Block Grant (STBG) and Transportation Alternatives (TA) program funds. Once funding is awarded, the respective STBG or TA project will be included in the M/RTIP - no later than the following year.

3. Prioritized, Illustrative Projects Prioritized projects that could not be included in the fiscally constrained M/RTIP list of improvements will be listed among the illustrative projects.

4. Additional Funds Should additional funding become available through higher than expected allocations, new federal grants, or deobligated funds, the additional funds may first be assigned to projects that received partial funding in the most recent project call; the assigned amount may be equal to the original shortfall, but less than 25% of the partial award or 20% of the current annual allocations for that category of funding (STBG or TA AND urban or rural), whichever is less. In the absence of eligible partially funded projects, already prioritized, illustrative projects will be used to program the additional funding. If the region has already met its obligation target for the fiscal year in which the additional funding is received, the funds may be carried forward into the next call for projects. It is important to understand that a guarantee of additional funding availability cannot be provided. In regard to partial funding awards, project sponsors have to certify increased local match availability in the interim to allow the project to move forward for inclusion in the Transportation Improvement Program at both the local and state level. It is also understood that the overall amount for a subsequent call for projects may thus be reduced.

5. Reduction in Funds In the event that programmed funding is lower than anticipated due to decreased appropriations, changes in federal grant programs, or a rescission of unobligated balances, previously awarded projects will remain a top priority to be reprogrammed as revenues are restored.

6. Carry-over of Un-Obligated Funds All previously programmed but not yet obligated projects will automatically have funds carried forward to next year’s M/RTIP, unless the project sponsor rescinds project support.

7. Reasonable Progress A. Project Tracking and Obligation Balancing In order to ensure the timely expenditure of available funding, progress tracking interviews are conducted as part of Technical Advisory Committee meetings in January/February and again in April/May. During each discussion, project sponsors provide readiness status on programmed projects and progress updates on obligated projects.

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

Guided by the region’s annual allocation of federal Surface Transportation Block Grant and TA Set-Aside funding and the associated obligation target, WWVMPO/SRTPO member entities will discuss and determine readiness of their programmed projects to balance federal obligations across the region. Should a potential shortfall of the required obligation target occur, or possibly an over-obligation of funds, WWVMPO/SRTPO staff will share this information with WSDOT and all other MPOs or RTPOS at the February and again at the May Coordinating Committee Meetings to allow for balancing of obligations at the statewide level. B. Procedures and Enforcement Based on the documented findings of the “Project Tracking and Obligation Balancing” interviews, projects that were determined to move forward, but failed to obligate programmed federal funds by the WSDOT-prescribed and Policy Board-approved suspense date of August 1, will put the federal funding at risk of forfeiture. In order to avert potential funding loss, the project sponsor will have the opportunity to ask for consideration of a “one-time extension”, which has to be made before August 1 of the current fiscal year. To be considered for this extension, the project sponsor should demonstrate:

• The delay is beyond their control and the sponsor has done due diligence in moving the project forward; • Federal funds have already been obligated for prior phases of the project, or if no federal funds are used

for PE or ROW acquisition phases, there has been significant progress toward final plan preparation; and • There is a realistic strategy in place to obligate all funds.

One-time extensions of up to three months may be granted by WWVMPO/SRTPO staff; whereas extensions greater than three months, but not beyond May 1 of the following year, will go to the Policy Board for consideration and approval. Should the project sponsor not request an extension, or the extended project does not progress to the stage of funding obligation by May 1 of the following year, the project will be removed from the M/RTIP, and the federal funds associated with the project will be returned to the regional funding pool for redistribution. In that case, the removal of projects from the TIP will require no further Policy Board action. C. Inactive Projects In line with federal and WSDOT guidance, project phases for which federal funds have been obligated, but no expenditures have been billed for at least nine months, are considered “inactive” as described in 23 CFR 630.106. Inactive projects are subject to de-obligation of awarded funds, which are then returned to the regional funding pool. 8. Cost Overruns and Increases In case of a cost increase or overrun on a programmed project, the WWVMPO/SRTPO is not responsible for awarding additional, regionally managed STBG and TA funds beyond those approved in the M/RTIP. The responsibility for increases and overruns on a project already under contract will be determined by the prevailing contractual agreement between the project sponsor and WSDOT. If awarded funds are insufficient to fulfill the scope of the project as programmed, the project sponsor may shift funding across phases and/or years to cover cost increases for the affected phase pending availability of funding. Should additional funds be required to implement the remaining phase(s), the project sponsor is responsible for securing them from an alternative source of revenue or compete for additional funds at the next call for projects. 9. Scope Changes Projects are evaluated and selected for programming based on how well they advance regional transportation goals and objectives. All scope changes for projects programmed with STBG and TA funding must be communicated to the WWVMPO/SRTPO. Any change that significantly alters the original scope, and thus affects the objective of the project, may warrant project removal from the M/RTIP. In compliance with WSDOT guidance, significant scope changes must therefore be reviewed by the Technical Advisory Committee and approved by the Policy Board through the M/RTIP amendment process. If the project is subsequently removed from the M/RTIP, it may compete in future calls for projects. 10. M/RTIP Amendment Schedule The WWVMPO/SRTPO will develop the calendar year internal amendment schedule for Washington projects by November of the preceding year.

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

Appendix F - Criteria and Process Used for Prioritization of Projects The Walla Walla Valley MPO/SRTPO conducted a competitive application cycle and issued a regional call on April 10, 2018 for Surface Transportation Block Grant (STBG) and Transportation Alternatives (TA) eligible projects for jurisdictions and agencies located in Washington State. Available funding for the call for projects included $2,762,000 in STBG and $252,000 in TA federal grants, subject to urban and rural area caps per project funding request.

• The STBG grant program provides flexible funding for roadway, bridge, safety, transit capital, planning, recreational trails, pedestrian, and bicycle projects.

• The TA grant program provides funding for bicycle and pedestrian facilities; scenic viewing areas and overlooks; and transportation-related community improvement projects such as historic preservation, wildlife mortality mitigation, and water and environmental quality improvements.

The projects included in this M/RTIP were selected as part of this competitive application process, which took place in April and May of 2018. The project selection criteria shown on the following pages are based on the region’s 2040 Plan and were adopted by the WWVMPO/SRTPO’s Policy Board on April 4, 2018.

STBG Criteria for 2018 Call for Projects

Economic Vitality, which is highly valued in the Walla Walla Valley, 

is improved through the provision of a safe and efficient multi‐modal transportation system.

Administrative Considerations Points Max Points

Project Eligibility Eligible Project Type Pass Fail

Eligible Project Sponsor Pass Fail

Project Identified in an Approved Plan Pass Fail

Project Objective Pass Fail

Anticipated Performance Improvement Pass Fail

Project Readiness Planning Completed to Date 5 ‐ Concept 10 ‐ 30%‐Design 20 ‐ Construction 

Ready

20

Detailed Cost Estimate/Financial Plan Pass Fail

Project Schedule Pass Fail

Project Management Information Info

Utility Information Info

Maintenance Information/Funding Source Info

Financial Certification of Matching Funds Pass Fail

Right‐of‐Way Acquisition Compliance Pass Fail

Reasonable Progress Certification Pass Fail

Notification of Title VI Requirements Pass Fail Subtotal 20

Project Design  Review of Alternative Design Options 10

Coordination with Neighbor Entities Pass Fail

OR Neighboring Segments Subtotal 10

Regional Transportation Goals Criteria Points

Safety Analysis of Crash Data 40

Consideration of Crash Statistics to determine weighting factor for project solution Factor

Location‐specific Crash Rate ‐ 1.5 times of regional facility average 0.25

Location‐specific Total # of Crashes ‐ 6 or more crashes over 5‐yr period 0.25

Location‐specific Presence of Preventable Fatalities or Serious Injuries (Footnote 1) 0.50

Project Design Specifically Addresses Identified Safety Issue ‐ Best Management Practices 10 Subtotal 50

System Preservation Current Pavement Rating 70% or lower (Footnote 2) 10

Recurring Maintenance Issues 10

Timing of Construction is Coordinated with Utility Work 10

Preservation Project ‐ No Additional Travel Lanes (except to turn, accelerate, or decelerate OR bus pull out) 10 Subtotal 40

Quality of Life Context‐sensitive multimodal features

Project includes additional ‐ beyond required ADA updates

Sidewalk or Pedestrian Feature (Footnote 3) 8

Bike Infrastructure 8

Bus Turn‐out or Transit preferential treatment 8 Subtotal 24

Connectivity and Efficiency Closes Infrastructure Gap/Completes Corridor (auto mode) (Footnote 4) 8

Closes Infrastructure Gap/Completes Corridor (non‐auto mode) (Footnote 4) 8

Improves Intersection Design/Control/Flow (auto mode) 8

Improves Intersection Design/Control/Flow (non‐auto mode) 8 Subtotal 32

Funding for Improvements Funding Match/Overmatch 0 ‐ Minimum 1 point for every 

6% Overmatch

8

Prior Local Investments 0 ‐ 0% of Cost 4 ‐ 10% 8 ‐ 20%+ 8

Final Phase of a Multi‐Phase Project 0 ‐ No 8 ‐ Yes 8 Subtotal 24

Footnotes:Total Points 200

1  Serious Injury Data: Provided by WSDOT ‐ reported on collisions with at least one motor vehicle (as required by RCW 46.52.070, RCW 46.52.030 and WAC 446‐85‐010)2  Pavement Rating: Where available, includes roughness, cracking, rutting, and faulting metrics consistent with collection practices outlined in the HPMS Field Manual3  Includes lighting, bulb‐outs, flashing beacons, other high visibility treatments, and/or sidewalk buffers, etc.4  For improvements that works towards completion of a corridor, any phase counts as gap closure

TA Criteria for 2018 Call for Projects

Quality of Life, which is highly valued in the Walla Walla Valley, 

is inherently improved through the advancement of pedestrian and bicycle related transportation projects.

Administrative Considerations Points Max Points

Project Eligibility Eligible Project Sponsor Pass Fail

Eligible Project Type Pass Fail

Project Identified in an Approved Plan Pass Fail

Project Objective Pass Fail

Anticipated Performance Improvement Pass Fail

Project Readiness Planning Completed to Date 5 ‐ Concept 10 ‐ 30%‐Design 20 ‐ Construction 

Ready

20

Project Schedule Pass Fail

Project Management Information Info

Utility Information Info

Maintenance Information/Funding Source Info

Detailed Cost Estimate/Financial Plan Pass Fail

Financial Certification of Matching Funds Pass Fail

Right‐of‐Way Acquisition Compliance Pass Fail

Reasonable Progress Certification Pass Fail

Notification of Title VI Requirements Pass Fail Subtotal 20

Project Design  Review of Alternative Design Options 10

Coordination with Neighbor Entities Pass Fail

OR Neighboring Segments Subtotal 10

Regional Transportation Goals Criteria Points

Safety and System Preservation Addresses known Safety Concerns 10

Project Design Reduces Number of Conflict Points ‐ Best Management Practices 10

Located within "Heavy Use" Area

Pedestrian ‐ Located in Area of High Residential Density 10

Bicycle ‐ Located On or Parallel to Major Thoroughfare 10

Part of Direct Route to School or Community Medical Facility/Pharmacy 10

Addresses known Maintenance Concerns 10

Timing of Construction is Coordinated with Utility Work 10 Subtotal 70

Economic Vitality Improves Accessibility to Regional Employment and Activity Centers

Points awarded based on number and significance of accessed destinations: 20

Trail/park/playground

Downtown area/restaurant/retail/entertainment

Community center/civic center/arts establishment

Grocery store/farmers market

Encourages Visually Attractive Streetscape and Context‐Sensitive Design 10

Supports Tourism: Connects destinations, benefits regional cycling, improves travel experience 10 Subtotal 40

Regional Connectivity  Closes an Infrastructure or Service Gap 12

and Continuity Improves Regionally Significant Corridors and Cross‐Jurisdictional Connectivity 10

Provides Utility as Stand‐Alone Project 10

Part of Designated Pedestrian or Bicycle Network 4 Subtotal 36

Funding for Improvements Funding Match/Overmatch 0 ‐ Minimum 1 point for every 

6% Overmatch

8

Prior Local Investments 0 ‐ 0% of Cost 4 ‐ 10% 8 ‐ 20%+ 8

Final Phase of a Multi‐Phase Project 0 ‐ No 8 ‐ Yes 8 Subtotal 24

Total Points 200

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

Appendix G - Current Performance Targets Safety Oregon’s Strategic Highway Safety Plan (SHSP) is the basis for setting targets in Oregon – with the goal of zero fatalities and serious injuries by 2035. The WWVMPO/SRTPO agreed to support the ODOT targets, shown here alongside the share of fatal and serious crashes in the WWVMPO/SRTPO area.

Oregon - "Vision Zero" by 2035 Refer to: https://safety.fhwa.dot.gov/hsip/reports/pdf/2017/or.pdf

OREGON STATEWIDE 2010 2011 2012 2013 2014 2015 2016

State Targets 2018

Annual VMT* (1000s) 33,774,106 33,373,398 33,172,937 33,705,846 34,610,071 35,998,505 Fatalities* (F) 317 331 337 313 356 445 Fatalities* (F)

5-year Rolling Average (F) 331 356 350.0 Fatality Rate 938.59 991.81 1015.89 928.62 1028.60 1236.16 Fatality Rate

5-year Rolling Average (FR) 980.70 1,040.22 0.890 Serious Injuries (A) 1,382 1,541 1,618 1,416 1,495 Serious Injuries (A)

5-year Rolling Average (A) 1,490 1461.0 Serious Injury Rate 4091.89 4617.45 4877.47 4201.05 4319.55 Serious Injury Rate

5-year Rolling Average (AR) 4,421.48 4.330 Nonmotorist (Ped/Bike) F&A 208 246 255 220 240 Nonmotorist F&A

5-year Rolling Average (N-FA) 234 229.0

MILTON-FREEWATER Urbanized Area (FAUB) 2010 2011 2012 2013 2014 2015 2016

MPO Portion of State Targets

2018 Annual VMT* (1000s) -- -- -- -- 37,783 40,318 Fatalities* (F) 0 0 0 0 0 0 Fatalities* (F)

5-year Rolling Average (F) 0 0 0.0 Fatality Rate -- -- -- -- 0.00 0.00 Fatality Rate

5-year Rolling Average (FR) 0.00 0.00 0.000 Serious Injuries (A) 0 0 0 1 0 Serious Injuries (A)

5-year Rolling Average (A) 0.2 0.2 Serious Injury Rate -- -- -- -- 0.00 Serious Injury Rate

5-year Rolling Average (AR) 0.00 0.000 Nonmotorist (Ped/Bike) F&A 0 0 0 0 0 Nonmotorist F&A

5-year Rolling Average (N-FA) 0.0 0.0 * VMT: Highway Performance Monitoring System (HPMS) Estimates; Fatalities & Injuries: ODOT Crash Data System (CDS)

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

Washington State’s Target Zero Strategic Highway Safety Plan is the basis for setting targets in Washington State – with the goal of zero fatalities and serious injuries by 2030. Proposed targets were developed using a straight-line projection to a zero value at 2030. All Washington MPOs agreed to support the WSDOT targets and were provided a proportional share based on a percentage of fatal and serious crashes within their metropolitan planning area.

Washington State - Target Zero by 2030 Refer to: https://safety.fhwa.dot.gov/hsip/reports/pdf/2017/wa.pdf

WASHINGTON STATEWIDE 2010 2011 2012 2013 2014 2015 2016

State Targets 2018

Annual VMT* (1000s) 57,190,791 56,965,187 56,607,485 57,211,195 58,059,800 59,652,504 59,652,504 Fatalities* (F) 460 454 438 436 462 551 537 Fatalities* (F)

5-year Rolling Average (F) 450.0 468.2 484.8 415.5 Fatality Rate 0.804 0.797 0.774 0.762 0.796 0.924 0.900 Fatality Rate

5-year Rolling Average (FR) 0.787 0.810 0.831 0.709 Serious Injuries (A) 2478 2135 2199 1917 2005 2100 2209 Serious Injuries (A)

5-year Rolling Average (A) 2146.8 2071.2 2086.0 1,788.0 Serious Injury Rate 4.333 3.748 3.885 3.351 3.453 3.520 3.703 Serious Injury Rate

5-year Rolling Average (AR) 3.754 3.591 3.582 3.058 Nonmotorist (Ped/Bike) F&A 477 481 534 404 493 493 593 Nonmotorist F&A

5-year Rolling Average (N-FA) 477.8 481.0 503.4 431.5

WALLA WALLA COUNTY (pt) Metropolitan Planning Area

(MPA) 2010 2011 2012 2013 2014 2015 2016

MPO Portion of State Targets

2018 Annual VMT* (1000s) 421,056 429,986 433,214 431,642 441,333 448,256 456,563 Fatalities* (F) 3 5 4 4 11 7 5 Fatalities* (F)

5-year Rolling Average (F) 5.4 6.2 6.2 5.3 Fatality Rate 0.712 1.163 0.923 0.927 2.492 1.562 1.095 Fatality Rate

5-year Rolling Average (FR) 1.244 1.413 1.400 1.200 Serious Injuries (A) 20 14 20 16 12 13 20 Serious Injuries (A)

5-year Rolling Average (A) 16.4 15 16.2 13.9 Serious Injury Rate 4.750 3.256 4.617 3.707 2.719 2.900 4.381 Serious Injury Rate

5-year Rolling Average (AR) 3.810 3.440 3.665 3.141 Nonmotorist (Ped/Bike) F&A 5 2 4 4 3 6 2 Nonmotorist F&A

5-year Rolling Average (N-FA) 3.6 3.8 3.8 3.3 * 2016 VMT is not yet available and therefore assumed; 2016 Fatality data is preliminary ARF data (FARS is not available beyond 2014); Injury data: WSDOT Engineering Crash Database

Please note: At the time of the M/R TIP development, bridge, pavement, travel time reliability, and transit asset management targets had not yet been adopted.

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

Appendix H - Project Funding Source Overview Federal Funding The following are descriptions of the most common federal transportation funding sources for which the WWVMPO/SRTPO area is eligible. Please note that the list is not inclusive of all funding programs authorized under the most recent surface transportation law – Fixing America’s Surface Transportation (FAST) Act, which was adopted in December 2015:

• Surface Transportation Block Grant (STBG): This program replaces the Moving Ahead for Progress in the 21st Century (MAP-21) Act’s Surface Transportation Program (STP). The STBG continues to provide flexible funding that may be used by state DOTs, counties, and cities for projects to preserve and improve the condition and performance on any Federal-aid highway, bridge, and tunnel project on any public road; pedestrian and bicycle infrastructure; and transit capital projects, including intercity bus terminals. The STBG program includes sub-allocated funds based on population and flexible funds for use anywhere. In line with previous STP categories, funds are divided as follows:

The Bridge STBG (BR) funds replacement, rehabilitation, preservation, and protection of “off-system” local bridges and tunnels on public roads of all functional classifications. The state prioritizes and programs bridges for funding.

The Regional STBG (U), (US), (R), etc. provides funding to MPOs, RTPOs, and county lead agencies through allocated STBG funds for prioritization and selection according upon their established procedures. The allocations are based on population as follows: Urbanized areas with more than 200,000 people (U = Urban); areas greater than 5,000 but no more than 200,000 (US = Urban Small); areas of 5,000 or less (R = Rural); and “any area” for use anywhere in the state.

A portion of State DOTs’ STBG funds that can be applied anywhere, are used for state highway system preservation and interstate reconstruction. State DOTs prioritize and program these projects.

The Transportation Alternatives Program (TA) is now a set-aside under the STBG program. Unchanged from MAP-21 with its separate Transportation Alternatives Program (TAP), the TA program provides funding for projects defined as transportation alternatives, including on- and off-road pedestrian and bicycle facilities; infrastructure projects for improving non-driver access to public transportation and enhanced mobility; community improvement activities and environmental mitigation; recreational trail program projects; safe routes to school projects; and projects for the planning, design or construction of boulevards and other roadways largely in the right-of-way of former Interstate System routes or other divided highways. As with STBG funds, TA allocations are also based on population (U = Urban, US = Urban Small, R = Rural, and “any area”).

A set-aside for the Recreational Trails Program (RTP) is also provided.

• National Highway Performance Program (NHPP): If located on the National Highway System (NHS), projects eligible for NHPP funding include construction, reconstruction, resurfacing, restoration, rehabilitation, and preservation of highways and bridges; bridge and tunnel inspection and evaluation; safety projects; environmental restoration and mitigation; intelligent transportation systems (ITS); and bicycle and pedestrian infrastructure.

• Highway Safety Improvement Program (HSIP): HSIP provides funding to implement engineering countermeasures to reduce fatal and serious injury collisions to achieve a significant reduction in traffic fatalities and serious injuries on all public roads. These funds are made available to all state and local agencies and tribal nations and can be applied to all public roadways. State DOTs prioritize and program state and local projects based upon the respective Strategic Highway Safety Plan – Oregon’s Transportation Safety Action Plan (TSAP) and Washington State’s Target Zero. The HSIP program has a set-aside for the railway/highway crossing program.

• The National Highway Freight Program (NHFP) is a new formula-based, surface transportation program that provides states with funding to bolster the movement of goods on roads. The program was created through the FAST Act.

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

• The Nationally Significant Freight and Highway Projects (NSFHP) is also a new program under the FAST Act. NSHFP is a competitive grant program that provides funding to address large-scale projects of regional and national importance.

• Transportation Infrastructure Finance and Innovation Act (TIFIA): The TIFIA program provides Federal credit assistance in the form of direct loans, loan guarantees, and standby lines of credit to finance surface transportation projects of regional and national significance.

• Federal Lands Access Program (FLAP): The Federal Lands Access Program was established in 23 U.S.C. 204 to improve transportation facilities that provide access to, are adjacent to, or are located within Federal lands. The Access Program supplements State and local resources for public roads, transit systems, and other transportation facilities, with an emphasis on high-use recreation sites and economic generators.

• Federal Lands Transportation Program (FLTP): FLTP funds projects that improve access within Federal lands, such as national forests and national recreation areas, on infrastructure owned by the Federal government. This program combines the former Park Roads and Refuge Roads programs, and adds three new Federal Land Management Agency (FLMA) partners. Funding for projects in the WWVMPO/SRTPO area are administered by the Western Federal Lands (WFL) Highway Division, located in Vancouver, WA.

• Tribal Transportation Program (TTP): TTP funds projects that improve access to and within Tribal lands. This program has set asides for tribal bridge projects and tribal safety projects.

• Community Development Block Grant (CDBG): CDBG program funds are primarily for low and moderate-income communities, to partially pay for projects advocating for the interests of a low-income neighborhood, such as providing new street infrastructure and supporting neighborhood revitalization. These grants are either directly allocated to eligible cities or awarded through the Oregon Business Development Department and the Washington State Department of Commerce.

• FTA Section 5303 and 5304 – Transportation Planning: These formula funds are apportioned to each state for metropolitan and statewide planning that supports cooperative, continuous, and comprehensive planning and other technical assistance activities for making transportation investment decisions. States are direct recipients of Section 5303 and 5304 funds, and subsequently allocate 5303 funds to Metropolitan Planning Organizations by formula.

• FTA Section 5307 – Urbanized Area Formula Grants: These funds are apportioned by a formula to each urbanized area, and are available for planning, capital and operating assistance. Job Access and Reverse Commute (JARC) program activities, which focused on providing services to low income individuals to access jobs, became eligible activities under the Urbanized Area Formula program following the adoption of MAP-21. This includes operating assistance with a 50 percent local match for job access and reverse commute services. In addition, the urbanized area formula for distributing funds includes the number of low-income individuals as a factor.

• FTA Section 5309 – Fixed Guideway Capital Investment Grants (New Starts): The program provides grants for new and expanded rail, bus rapid transit, and ferry systems that reflect local priorities to improve transportation options in key corridors. This includes core capacity projects, which expand capacity by at least 10% in existing fixed-guideway transit corridors that are already at or above capacity today, or are expected to be at or above capacity within five years. The program also includes provisions for streamlining aspects of the New Starts process to increase efficiency and reduce the time required to meet critical milestones. This discretionary program requires project sponsors to undergo a multi-step, multi-year process to be eligible for funding. Typically, projects receive these funds through a full funding grant agreement (FFGA) that defines the project scope and specifies the total multi-year Federal commitment to the project.

• FTA Section 5310 - Enhanced Mobility of Seniors and Individuals with Disabilities: This program is intended to enhance mobility for seniors and persons with disabilities by providing funds for programs to serve the special needs of transit-dependent populations beyond traditional public transportation services and Americans with Disabilities Act (ADA) complementary paratransit services. It consolidates the New Freedom Program and Elderly and Disabled Program. Projects selected for funding must be included in a locally developed Coordinated Public Transit-Human Services Transportation Plan and included in the

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

RTPO program in their respective area. State DOTs administer these funds through a competitive grant program.

• FTA Section 5311 – Rural Area Formula Grants: These formula funds are apportioned to each state, and eligible activities include planning, Rural Transit Assistance Program (RTAP), intercity bus programs, state administration, and both capital and operating assistance. State DOTs administer these funds through a competitive grant program serving the general public in rural areas of the state. Following the adoption of MAP-21, activities eligible under the former Job Access and Reverse Commute (JARC) program, which provided services to low-income individuals to access jobs, became eligible under the Rural Area Formula program. In addition, the formula includes the number of low income individuals as a factor.

• FTA Section 5329 – Transit Safety & Oversight: This program establishes a comprehensive framework to oversee the safety of public transportation as it pertains to heavy rail, light rail, buses, ferries, and streetcars. The program also includes important safety provisions for bus-only operators.

• FTA Section 5337 – State of Good Repair: Established in MAP-21, this program is dedicated to repairing and upgrading the nation’s rail transit systems along with high-intensity motor bus systems that use high-occupancy vehicle lanes, including bus rapid transit (BRT). Projects are limited to replacement and rehabilitation, or capital projects required to maintain public transportation systems in a state of good repair. Grantees are required to establish and use an asset management system to develop capital asset inventories and condition assessments, and report on the condition of their system as a whole.

• FTA Section 5339 – Bus and Bus Facilities: The program provides formula-based and competitive grants for capital funding to replace, rehabilitate, and purchase buses and related equipment and to construct bus-related facilities.

State Funding

• Oregon and Washington State Departments of Transportation (ODOT and WSDOT): Both state DOTs provide funding for DOT-managed projects.

Oregon Additional Funding Sources • ConnectOregon: Created by the Oregon Legislature in 2005, ConnectOregon is a lottery-backed bond

program, which provides for investments into air, marine, rail, and public transportation infrastructure. It is important to note that funds are reserved for those projects which are not eligible for funding from fuel tax revenues. To date, six ConnectOregon programs have been authorized (2005, 2007, 2009, 2011, 2013, and 2015) by the Oregon Legislature.

• Keep Oregon Moving (House Bill 2017): Created in 2017 by the Oregon Legislature, HB 2017 is funded through increased gas tax, vehicle registration, and title fees. HB 2017 funds road maintenance and preservation, congestion reduction, safe walking and biking projects, improvements to rail and ports, and electric vehicle incentives. Direct funding is provided to 43 select state and local road projects. HB 2017 also establishes a new, dedicated source of funding for expanded public transportation services.

• ODOT Fix-it and Enhance Program: To distribute state (and federal) gas tax revenue, ODOT funds “Fix-it” projects, which maintain or preserve existing infrastructure and are typically identified via an infrastructure management system, and “Enhance” projects, which enhance, expand, or improve the transportation system and are selected via a competitive process.

• Transportation and Growth Management Program (TMG): Oregon's Transportation and Growth Management Program supports community planning efforts to expand transportation choices. Local governments can use TMG funds for the development of transportation system plans and other plans that integrate land use and transportation planning in support of mixed-use development and improved pedestrian, bicycle, transit, and multi-modal street facilities.

• Created in 1989, the Special Transportation Fund (STF) is administered by ODOT’s Rail and Public Transit Division and provides supplementary support for selected transit-related projects to counties, transit districts, and Tribal governments. The funds are awarded using a population-based formula and are designated for any transit operator serving seniors and people with disabilities. The revenue for the program primarily comes from the State’s cigarette tax.

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

Washington State Additional Funding Sources • Connecting Washington (CWA): The program provides earmarked funding for select projects included in

the State’s transportation funding package approved by the Washington State Legislature in 2015. • County Road Administration Board (CRAB): As an independent state agency, the CRAB provides state

funding for county roadway projects and the county-owned ferry system through a share of the statewide gas tax. The Rural Arterial Program (RAP) funds improvements on a county’s existing rural arterial road

network. The County Arterial Preservation Program (CAPP) funds pavement preservation projects of a county’s

existing paved arterial road network. • Transportation Improvement Board (TIB): As an independent state agency, the TIB provides state funding

for street construction and maintenance to cities and counties through a share of the statewide gas tax. The Urban Arterial Program (UAP) funds county or city (over 5,000 population) roadway projects that

improve safety, support growth, improve condition and mobility; the program requires sidewalks whenever consistent with local plans.

The Urban Corridor Program (UCP) funds roadway projects that expand capacity and involve multiple funding partners.

The Urban and Small City Sidewalk Program (USP or SCSP) funds non-recreational pedestrian projects that improve safety and connectivity.

The Arterial Preservation Program (AAP) funds overlay projects of federally classified arterials streets within cities (over 5,000 population).

The Small City Arterial Program (SCAP) funds small city (under 5,000 population) projects that improve safety and roadway conditions; it also supports the construction of multimodal features.

The Small City Preservation Program (SCPP) funds small city (under 5,000 population) projects for pavement rehabilitation; in some cases, projects are partnered with WSDOT or county paving projects.

• Public Works Trust Fund (PWTF): The low-interest loan program for local governments funds infrastructure improvements and is administered by the Public Works Board of the State Department of Commerce.

• Freight Mobility Strategic Investment Board (FMSIB): The independent state agency provides state or federal STBG flexible funds, combined with partnership funding, for freight mobility and freight mitigation projects along strategic freight corridors as approved by the legislature and the Governor.

• Other State Funding Sources (OTHER): All other unidentified state fund sources, including but not limited to tolling, pedestrian/bike safety, and safe routes to school funds administered by WSDOT.

• Regional Mobility Grant Program • Public Transportation Consolidated Grant Program • Vanpool Investment Program • Community Economic Revitalization Board • Public Works Board – Construction Loan Program

Local Funding • State Motor Vehicle Fuel Tax - Local Distribution • Local Option (County) Fuel Tax • County Road Property Tax • Transportation Benefit District • Local Improvement District • General Obligation Bond • Payment in Lieu of Taxes - City-provided Utility Service • Property Tax • Sales Tax

WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program

Appendix I - Public Comments Public Comment Period September 4, 2018 through September 17, 2018 The public comment period for the WWVMPO/SRTPO 2019-2024 Metropolitan and Regional Transportation Improvement Program (M/RTIP) was provided from September 4, 2018 through September 17, 2018.

No public comments were received.