walk bridge program overview · 2017-08-20 · 2. preliminary walk bridge design phase (30% level)...
TRANSCRIPT
![Page 1: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/1.jpg)
www.walkbridgect.comwww.walkbridgect.com
Walk Bridge Program OverviewNorwalk Harbor Management Committee Coordination Meeting
March 29, 2016
![Page 2: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/2.jpg)
www.walkbridgect.comwww.walkbridgect.com
Meeting Agenda
1. Welcome & Introductions James Fallon, CTDOT2. Program Overview John Hanifin, CTDOT3. Recap and Design Update Christian Brown, HNTB4. Open Discussion James Fallon, CTDOT
![Page 3: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/3.jpg)
www.walkbridgect.comwww.walkbridgect.com
Project TeamFederal Transit Administration
(Federal Agency)
CT Department of Transportation(Owner)
Metro‐North Railroad(Rail Operators) City of Norwalk
HNTB(Design Consultant)
Cianbro Middlesex Joint Venture(Construction Manager/General Contractor)
Parsons Brinckerhoff(Program Management)
![Page 4: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/4.jpg)
www.walkbridgect.com
Program OverviewJohn Hanifin, CTDOT
![Page 5: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/5.jpg)
www.walkbridgect.comwww.walkbridgect.com
Purpose and NeedThe purpose of the Walk Bridge Project is to replace the existing deteriorated bridge with a resilient bridge structure which will:• Enhance the safety and reliability of rail service• Offer operational flexibility and ease of maintenance• Provide for increased efficiencies of rail transportation along the New Haven Line/Northeast Corridor
• Maintain and improve navigational capacity and dependability for marine traffic in the Norwalk River
• Increase bridge reliability, incorporate bridge redundancy, and provide a sustainable bridge for significant weather events, thereby accommodating current and future rail and marine traffic
![Page 6: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/6.jpg)
www.walkbridgect.comwww.walkbridgect.com
Consultation Process
Preferred Solution
Public Scoping
Environmental Assessment & Mitigation
Agency & Stakeholder Coordination
Engineering Analysis & Design
Stakeholder input to help shape this project and its outcomes through your participation in key activities and milestones
![Page 7: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/7.jpg)
www.walkbridgect.com
![Page 8: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/8.jpg)
www.walkbridgect.com
Program Contracts and Environmental Documents
HNTB (CTDOT)• Emergency Fender Repair (COP)• Danbury Branch Dockyard (Cat Ex.)• CP243 Interlocking (Cat Ex.)• Walk Bridge/Fort Point Street (EA/EIE)
HNTB (CTDOT)• Emergency Fender Repair (COP)• Danbury Branch Dockyard (Cat Ex.)• CP243 Interlocking (Cat Ex.)• Walk Bridge/Fort Point Street (EA/EIE)
Lochner (CTDOT)• Osborne Avenue (Cat Ex.)Lochner (CTDOT)• Osborne Avenue (Cat Ex.)
McLaren (CTDOT)• East Avenue Bridge (Cat Ex.)McLaren (CTDOT)• East Avenue Bridge (Cat Ex.)
A. Discesare & Associates (CTDOT)• East Avenue Roadway (Cat Ex.)A. Discesare & Associates (CTDOT)• East Avenue Roadway (Cat Ex.)
• Emergency Fender Repair• Emergency Fender Repair
• Danbury Branch Dockyard• Danbury Branch Dockyard
• CP243 Interlocking• CP243 Interlocking
• Walk Bridge/Fort Point Street• Osborne Avenue• East Avenue Bridge• East Avenue Roadway
• Walk Bridge/Fort Point Street• Osborne Avenue• East Avenue Bridge• East Avenue Roadway
Design Contracts Construction Contracts
COP: Certificate of Permission EA/EIE: Environmental Assessment/Environmental Impact Evaluation Cat Ex.: Categorical Exclusion
![Page 9: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/9.jpg)
www.walkbridgect.comwww.walkbridgect.com
CM/GC Project Delivery Method
• Contractor acts as Construction Manager during design
• Advises CTDOT on schedule, phasing, constructability, materials availability, risk, and cost.
• Reduces construction duration and potential impacts• Improves construction sequencing• Reduces risk • Construction phased to maintain rail service throughout construction and reduce impacts to the community.
![Page 10: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/10.jpg)
www.walkbridgect.comwww.walkbridgect.com
Environmental Phase • National Environmental Policy Act (NEPA) and the Connecticut Environmental Policy Act (CEPA) environmental review
• Combined Environmental Assessment/Environmental Impact Evaluation (EA/EIE)
• Promote informed decision‐making by considering a range of reasonable alternatives leading to selection of the preferred alternative
• Public review and comment on the Draft EA/EIE
![Page 11: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/11.jpg)
www.walkbridgect.com
Program ProjectsJohn Hanifin, CTDOT
![Page 12: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/12.jpg)
www.walkbridgect.com
Fender Repair Project
The U.S. Coast Guard has determined that the condition of the existing fender system at the center (pivot) pier of the Walk Bridge is a public safety issue, due to the condition at the east channel, and has mandated that repairs be completed. The fender system protects both the bridge and maritime traffic from damage in the event of a collision.
![Page 13: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/13.jpg)
www.walkbridgect.com
Fender Repair Project (con’t)
• Ensure safety of train traffic & waterway users• USCG requirements• Replace deteriorated portions of the existing fender system
• New vertical timber support piles on the east side • New horizontal timber walers
Anticipated Start: 2016
Anticipated Duration: 5‐6 months
![Page 14: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/14.jpg)
www.walkbridgect.com
CP243 Interlocking
• To allow for two‐track Metro‐North Railroad (MNR) operations during reconstruction of the Walk Bridge and maintain satisfactory rail service.
• Construct a new four‐track interlocking
• Minimal impact to the local roadway network
An "interlocking" allows a train to switch tracks
![Page 15: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/15.jpg)
www.walkbridgect.com
CP243 Interlocking (con’t)This work will consists of:• Track realignment• Installation of switches and turnouts with crossover tracks
• New signals and signal houses • Overhead catenary modifications (including new crossover wiring throughout the interlocking)
Anticipated Start: Early 2017Anticipated Duration: 2 years
![Page 16: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/16.jpg)
www.walkbridgect.com
Danbury Branch Dockyard
• To facilitate rail operations during construction of the Walk Bridge
• Minimal impact to the local roadway network
![Page 17: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/17.jpg)
www.walkbridgect.com
Danbury Branch Dockyard (con’t)
This work will consist of:• Adding track sidings• Signal work and electrification to the southern end of the Danbury Branch
• New bridge over Ann Street
Anticipated Start: Early 2017Anticipated Duration: 2 years
![Page 18: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/18.jpg)
www.walkbridgect.com
Replacement of the Walk Bridge Project
![Page 19: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/19.jpg)
www.walkbridgect.com
Replacement of the Walk Bridge Project
![Page 20: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/20.jpg)
www.walkbridgect.com
Replacement of the Walk Bridge
• Installation and commissioning of 2 new movable spans and fixed approaches
• Replacement of bridge piers• Installation of new overhead contact system (OCS) and modifications to existing OCS
• Track relocations
![Page 21: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/21.jpg)
www.walkbridgect.com
Replacement of the Walk Bridge Project• Retaining wall and civil‐related construction, including utility relocations
• High tower and transmission line removal/relocation
• Overall construction phasing to limit impacts to rail, waterway traffic, and communityAnticipated Start: Mid 2018
Anticipated Duration: 4‐5 years
![Page 22: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/22.jpg)
www.walkbridgect.com
Replacement of the Walk Bridge– Fort Point Street
Rehabilitation of Metro‐North Railroad Bridge over Fort Point Street is included in the Walk Bridge Replacement• Single‐span structure carrying four railroad tracks
• Now in deteriorated condition
![Page 23: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/23.jpg)
www.walkbridgect.com
Additional Projects – Currently In Design
Osborne Avenue Bridge East Avenue Bridge
![Page 24: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/24.jpg)
www.walkbridgect.com
RECAP:Public Scoping Meeting Feb 2015Christian Brown, HNTB
![Page 25: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/25.jpg)
www.walkbridgect.com
Existing Walk Bridge
![Page 26: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/26.jpg)
www.walkbridgect.comwww.walkbridgect.com
What We Examined - Bridge and Rail • Rehabilitation Needs• Movable Span Types• Track Alignments• High Tower Needs• Geotechnical Screening• Traffic Impacts• Right‐of‐way Property Needs• Utility Impacts• Construction Staging
![Page 27: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/27.jpg)
www.walkbridgect.comwww.walkbridgect.com
What We Examined - Navigation • Navigation Needs – clearance and alignment• Opening Requirements• Vessel Collision Data• Maritime User Needs• Channel Hydraulics • All options increase the horizontal
clearance• All options increase the span‐down
vertical clearance• All options improve channel
alignment
![Page 28: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/28.jpg)
www.walkbridgect.comwww.walkbridgect.com
What We Examined - Construction • Overall construction staging and railroad operations; rail and maritime operations
• Construction access and staging areas• Construction adjacent to operating tracks• Construction adjacent to existing bridge piers• Construction adjacent to buildings/properties• Seasonal limitations on in‐water construction
![Page 29: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/29.jpg)
www.walkbridgect.comwww.walkbridgect.com29
Narrowing Bridge Replacement Options
• Movable Span Types• Navigation Clearances• Counterweight Configuration• Approach Span Types• Substructure Types• Mechanical Systems• Electrical Systems• Architectural Requirements• Resiliency• Redundancy
• Track Alignment
![Page 30: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/30.jpg)
www.walkbridgect.com
Alternatives Analysis
![Page 31: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/31.jpg)
www.walkbridgect.com
UPDATE:Design StatusChristian Brown, HNTB
![Page 32: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/32.jpg)
www.walkbridgect.comwww.walkbridgect.com
Project Overview1. Conceptual Engineering Phase
• Developed Feasible Alternatives• On‐going Agency Coordination
2. Preliminary Walk Bridge Design Phase (30% level)• Advancing 2 Alternatives• On‐going Environmental Documentation and Permitting
3. Constructability and Sequencing Refinement4. CMGC Delivery5. Public Involvement Program: www.walkbridgect.com
![Page 33: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/33.jpg)
www.walkbridgect.com
Structure Type Study
The final design and actual look of a selected bridge replacement option will evolve over time.
![Page 34: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/34.jpg)
www.walkbridgect.com
Preliminary Engineering Design: 2 AlternativesTrunnion Bascule Through Plate Girder
Rolling Bascule Through TrussNon‐parallel track alignment
CMGC Process
On‐going Environmental
![Page 35: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/35.jpg)
www.walkbridgect.com
Bridge Replacement Challenges• Physical Constraints • Overall Constructability• Construction Schedule• Rail Traffic Impacts• Waterway User Impacts• What we’ve learned…
• West Approach geometry• High Tower coordination and replacement• Retaining walls• Fort Point Street bridge• Coordination with adjacent bridges• Contractor means and methods
![Page 36: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/36.jpg)
www.walkbridgect.com
Preliminary Design Refinement Through Truss Vertical Lift Span• West Approach Rebuild and Updated High Tower sequence
• Parallel track alignment
• Improved constructability
• Reduced retaining wall requirement
• Reduced impacts at Fort Point Street
• Reduced disruptions to rail and marine traffic
![Page 37: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/37.jpg)
www.walkbridgect.com
Design Status and ConsultationDetail Design (Public Outreach)
Construction Staging and Refinement (CMGC)
• Main Span Configuration• Piers/Abutments/Walls configuration• Finishes and colors• High Towers• Historic and Public Input
• Main Span Configuration• Track Alignment • West Approach Rebuild• High Towers• Construction Staging
![Page 38: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/38.jpg)
www.walkbridgect.com
1. Main Span Superstructure
2. Overall Constructability
3. Construction Schedule Reduction
4. Rail Traffic Impacts
5. Waterway User Impacts
6. Final Site Context
Main Span Configuration: Movable Span Type
![Page 39: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/39.jpg)
www.walkbridgect.com
Replacement of the Walk Bridge Project
![Page 40: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/40.jpg)
www.walkbridgect.com
Design Elements: Main Span Superstructure
![Page 41: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/41.jpg)
www.walkbridgect.com
Through Truss Rolling Bascule
![Page 42: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/42.jpg)
www.walkbridgect.com
Through Truss Rolling Bascule
![Page 43: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/43.jpg)
www.walkbridgect.com
Through Truss Moveable Lift Span
![Page 44: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/44.jpg)
www.walkbridgect.com
Through Truss Moveable Lift Span
![Page 45: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/45.jpg)
www.walkbridgect.com
Channel Alignment
![Page 46: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/46.jpg)
www.walkbridgect.com
Channel Alignment
![Page 47: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/47.jpg)
www.walkbridgect.com
Channel Alignment
![Page 48: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/48.jpg)
www.walkbridgect.com
Span Color
![Page 49: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/49.jpg)
www.walkbridgect.com
Design Elements: Control House
![Page 50: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/50.jpg)
www.walkbridgect.com
Bridge Approach Spans
![Page 51: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/51.jpg)
www.walkbridgect.com
Open DiscussionReview of December Letter
![Page 52: Walk Bridge Program Overview · 2017-08-20 · 2. Preliminary Walk Bridge Design Phase (30% level) • Advancing 2 Alternatives • On‐going Environmental Documentation and Permitting](https://reader033.vdocuments.us/reader033/viewer/2022043000/5f74bbffa1bf8772455979cb/html5/thumbnails/52.jpg)
www.walkbridgect.comwww.walkbridgect.com
Stay Involved
Additional information about the project can be viewed at
www.walkbridgect.com
or in person between 8:30 am and 4:30 pm Monday through Friday atCTDOT Office of Engineering
2800 Berlin TurnpikeNewington, CT 06131