Wake-field Monitor Development Partners: CERN, PSI + others ? lliders and X-ray Free Electron Lasers require good control of wake e wakes suppressed by HOM damping and detuning (CLIC). ge wakes driven by beam to structure alignment. can be determined by coupling to the wakes. Wake Field Monitor. developing prototype X-band structures for wake-field experiments o ST/CERN developing X-band structure for longitudinal beam dynamics f ssFEL and Trieste FEL. -field monitor under design at CEA. proposal for a task within RF work-package of EuCA

Upload: cardea

Post on 08-Jan-2016

40 views

Category:

Documents


0 download

DESCRIPTION

Draft proposal for a task within RF work-package of EuCARD-II. Wake-field Monitor Development. Partners: CERN, PSI + others ?. Linear colliders and X-ray Free Electron Lasers require good control of wake-fields. Long range wakes suppressed by HOM damping and detuning (CLIC). - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Wake-field Monitor Development

Wake-field Monitor Development

Partners: CERN, PSI + others ?

Linear colliders and X-ray Free Electron Lasers require good control of wake-fields.Long range wakes suppressed by HOM damping and detuning (CLIC).Short range wakes driven by beam to structure alignment.Alignment can be determined by coupling to the wakes.

→ Wake Field Monitor.

1. CERN developing prototype X-band structures for wake-field experiments on FACET2. PSI/ST/CERN developing X-band structure for longitudinal beam dynamics for SwissFEL and Trieste FEL.3. Wake-field monitor under design at CEA.

Draft proposal for a task within RF work-package of EuCARD-II

Page 2: Wake-field Monitor Development

WP tasks1. Design and fabricate multi-purpose RF Front Ends for WFM. Should be easily adaptable to different frequencies; 15 GHz, 18 GHz, 24 GHz Build hard-ware for CTF3 and SwissFEL injector.

2. Design and fabricate alternative WFM(s) for other structures (collaboration with CERN).

3. Test and commission the different RFFE and pick-ups with beam at CTF3 and SwissFEL injector.

Resources: Hardware: 6 RFFE ~ 120 kE; WFM ~ 80 kE.Manpower (PSI): Scientist/engineer 6 months, post-doc 2 years, technician ~ 2 years.+ CERN manpower (?)