wagga wagga mu port cycling coomplex · appendix 1 multisport cycling complex survey questions ......

78
Mu ultis F Th Wa spor Feasibi his document ha agg rt C ility Stu as been produce ga W ycli udy Se ed in partnershi Wag ing eptemb p with the follow ga Co ber 201 wing organisatio omp 6 ons: plex

Upload: ngonhi

Post on 18-Aug-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Mu

ultis

F

Th

Wa

spor

Feasibi

his document ha

agg

rt C

ility Stu

as been produce

ga W

ycli

udy Se

ed in partnershi

Wag

ing

eptemb

p with the follow

ga

Co

ber 201

wing organisatio

omp

6

ons:

plex

Page 2: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Table of Contents

1.0  Executive Summary .................................................................................................. 2 

2.0   Introduction and Definition of Cycling Facilities ........................................................ 5 

3.0   Planning Context and Cycling Trends .................................................................... 10 

4.0   Consultation – Cycling Desires in Wagga Wagga .................................................. 20 

5.0   Facility Benchmarking ............................................................................................ 28 

6.0  Development Options ............................................................................................. 29 

7.0  Analysis of the Pomingalarna Reserve Option ....................................................... 44 

8.0  References ............................................................................................................. 57 

9.0  Appendices List ........................................................................................................ 1 

Appendix 1  Multisport Cycling Complex Survey Questions ......................................... 2 

Appendix 2  Details on Sites visited for Benchmarking ................................................ 5 

Appendix 3  Lifecycle Costs For Each Facility ........................................................... 10 

Appendix 4  Details On Economic Impact Calculations .............................................. 19 

Page 3: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

1.0

Backgr

In NoveCity of PomingCombinstudy isassistan

The Coclubs:

1. 2. 3. 4. 5.

Consul

In 2015needs areceivegroups are:

1. 2. 3. 4. 5. 6. 7. 8.

9. 10.

The Co

“Wagga

a)

b)

c)

d)

NationaIn additPark, w

Wagga Multisp

Executiv

round

ember 2013Wagga Wa

galarna Resned Cyclings the outcomnce from Co

ombined Cy

Bicycle WaWagga WaTolland CycMTB WaggWagga Tria

ltation and

5 the Comand gather d 472 respthe scope

BMX track Criterium trCycling eduJump/PumMountain BVelodrome Car parkingAmenities meeting rooBBQs and Fenced chi

ombined Cyc

a Wagga ha

Contains aattracts famContains PomingalarIs a compleurban areaIs a comple

al, State andtion, benchm

was also und

port Cycling Co

ve Summa

3 the Waggagga a concserve. In r

g Clubs in dme of the pouncil Office

cling Club g

agga Waggaagga Cyclingcling Club I

ga Inc. athlon Inc.

Research

bined Cyclresponses

ponses. Asof this stud

rack ucation areap track

Bike (MTB) with lights

g building witom, timing ashelters ldren’s play

cling Clubs

as a multisp

a unique comilies from amodern brna Reserveex that is we.

ex that is ow

d local cyclmarking of tdertaken.

omplex Feasib

ary

a Wagga Ccept for a Mresponse todeveloping planning woers.

group is ma

a Inc. g Club Inc.nc.

Undertake

ing Clubs to the prop

s a result oy was dete

a

playground

th toilets, carea and pu

yground.

also develo

port cycling

ombination oacross the nbuilt structue. ell connecte

wned and m

ing trends wtwo similar

bility Study

Combined CMultisport Co this presa process

ork undertak

ade up of a

en

conducted posed MSCof this survrmined. Th

change roomublic addres

oped a visio

complex th

of on/off ronation. tures that

ed both soc

maintained b

were reviewfacilities, th

Cycling ClubCycling Com

entation Cfor planningken by the

representa

a communCC at Pominvey and dise project el

ms, canteess space

on for the co

at is known

oad cycling

compleme

cially and ph

by an engag

wed during he Stromlo

bs presentemplex (MSC

ouncil resog the compCombined

tive from ea

nity survey ngalarna Rescussions wements ide

n, office sp

omplex, wh

n nationally b

and non-cy

ent the n

hysically to

ged local co

the developForest Park

ed to the CoCC) to be loolved to asplex. This fe

Cycling Clu

ach of the f

to identifyeserve. Thewith potent

entified for i

pace, storag

ich is:

because it:

ycling facili

natural bea

the Wagga

ommunity.”

pment of thk and Bathu

Page 2

ouncil of cated at

ssist the easibility ubs with

following

y cycling e survey tial user nclusion

ge area,

ities that

auty of

a Wagga

e study. urst Bike

Page 4: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

While Pstudy cPoming

Initial cundertaOffice oWagga site sub

Concep

Figure 1.

Wagga Multisp

Pomingalarnconsidered galarna Res

its appropriits availableits close proits existing

consultationaken with thof EnvironmCity Golf C

bject to the a

pt Layout

.1 Layout for

port Cycling Co

na Reserve18 altern

serve as the

iate land use space oximity to thuse and de

n on a prhe Departmment and HClub. All haadditional d

r the Propose

omplex Feasib

e was the pate sites.

e best site fo

se zoning

he city evelopment

roposed deent of Primeritage, Co

ave initially idetailed plan

ed Wagga Wa

bility Study

preferred sThe analy

or the deve

by a cyclin

evelopmentary Industri

ouncil’s Planidentified thnning steps

agga Multispo

site of the Cysis undertlopment be

g club.

t at Pominies – Crownnning Depahat the deves identified i

ort Cycling Co

Combined Ctaken of acause of:

ngalarna Rn Lands, Loartment andelopment mn the body

omplex.

Cycling Cluall sites co

Reserve haocal Land Sd the Lessemay be suite

of this stud

Page 3

ubs, this onfirmed

as been Services, ee of the ed to the y.

Page 5: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

Cost an

A quantIf constestimatkind co

The Coof comp

Subjectimplemsources

Recom

Given th

That Co

a cobe

b susuCpr

Wagga Multisp

nd Funding

tity survey etructed, theed net costntributions f

ombined Cypleting a Re

t to this reventation of s which cou

Federal GState GovCouncil Sporting gCommuniCorporate

mmendation

he evidence

ouncil,

ontribute $5e undertake

ubject to thuitable, en

Combined Croject.

port Cycling Co

g

estimate of e economic t to maintaifrom host c

cling Clubseview of Env

view confirmf the variouuld include:

Governmentvernment gr

groups ty

e sponsorsh

ns:

e presented

5,000 in paren for the pr

he Review ter into a

Cycling Club

omplex Feasib

the capital benefit to

n a fully bulubs).

are requesvironmenta

ming the suus stages w

grants rants

hip.

d in this rep

rtnership furoject

of EnvironMemoran

bs to partne

bility Study

cost of a Mthe City is

uilt facility is

sting that Cl Factors (R

uitability of would requi

ort it is reco

nding to all

mental Facdum of Uer in the fut

MSCC at Poestimated

s $50,183 p

ouncil contrREF) for the

f the proposre partners

ommended:

ow a Revie

ctors determnderstandinture plannin

mingalarnato be $11.7

per year (thi

ribute $5,00e project.

sed site, it ship funding

:

w of Enviro

mining the ng with thng and imp

a Reserve is78M annuais figure ref

00 towards

is anticipag from a va

onmental Fa

Pomingalahe Wagga plementation

Page 4

s $8.2M. ally. The flects in-

the cost

ated that ariety of

actors to

arna site Wagga

n of this

Page 6: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

2.0

2.1

In NoveconcepOrdinar That Co

a b

c

The cyc

6. 7.

8.

9. 10.

In May proposapreferreSurvey address

After ccompleof the s

Cycling

1. 2. 3. 4. 5. 6.

Suppor

1. 2.

3. 4. 5.

Wagga Multisp

Introduct

Introducti

ember 201t for a multry Meeting o

ouncil: receive andreceive anclubs note that scycling clupossible de

cling clubs i

Bicycle WaWagga Wa(www.waggTolland Cyc(http://nsw.MTB WaggWagga Tria

2015 the cal with 472 ed location

respondensed in Secti

consideratiote a feasibi

study.

g Facilities

BMX track Criterium trCycling eduJump/PumMountain BVelodrome

rting Infras

Car parkingAmenities meeting rooBBQs and Fenced chiSpectator f

port Cycling Co

tion and

ion

3 the Wagtisport cyclinof Council h

d note the red note the

staff will entbs to assis

evelopment

nvolved in t

agga Waggaagga Cyclinggacyclingclucling Club Icycling.org

ga Inc. – off athlon Inc. –

clubs condupeople comby 87% of nts also sion 6.1 of th

on of the slity study. T

s

rack ucation areap track

Bike (MTB) with lights.

structure

g building witom, timing ashelters ldren’s play

facilities.

omplex Feasib

Definition

ga Wagga ng complexheld Novem

eport correspon

ter into furtst them in t

of the prop

the combine

a Inc.– recreg Club Inc.ub.com) nc. – road c.au/Contactroad cyclin

– local triath

cted a commpleting therespondentuggested

his study.

survey resThe followin

a

Playground

th toilets, carea and pu

yground

bility Study

n of Cycli

Combinedx at Poming

mber 18 201

ndence from

ther discussthe implem

posal.

ed group in

eational roa– road and

cycling t/Club-Page

ng (www.mthlon (www.w

mmunity surve survey. Pots who answ18 other p

ults the Cng facility el

d.

change roomublic addres

ing Facili

d Cycling Cgalarna Res3:

m the comb

sions with tentation of

ncludes:

ad cycling (wtrack cyclin

es/Tolland-Cbwagga.asnwaggatriclu

vey (Appenomingalarnwered the qpotential si

Combined Cements we

ms, canteess space

ties

Clubs preseserve. Coun

bined Wagg

the combinf a long ter

www.bww.ong

CC) n.au) b.org).

ndix 1) to gaa Reserve

question regites. These

Cycling Clure to be inc

n, office sp

ented to Concil resolve

ga Wagga

ned Wagga rm process

org.au)

auge interewas chosegarding sitee suggestio

ubs determcluded in th

pace, storag

Page 5

ouncil a d at the

cycling

Wagga for the

st in the n as the

e choice. ons are

mined to e scope

ge area,

Page 7: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

It was d

1. 2. 3. 4.

The bikunnecefor the n

2.2

BMX –children2008 STrails abuilt dir

Figure 2.

Wagga Multisp

determined

Bike shop Coffee shoDam for triaAnything el

ke shop andessary as a neighbourin

Definition

– is an abbn began racummer Oly

and Flatlandrt track and

.1: Karratha B

port Cycling Co

that the foll

p athlons lse not liste

d dam weremobile unit

ng golf club

n of Cyclin

breviation fcing their biympics in Bed. This studdirt jumps.

BMX - Examp

omplex Feasib

owing were

d in the sco

e considerecould be pto be a pro

ng Terms

for bicycle cycles on deijing. The dy is focussAn example

ple of a track

bility Study

e out of the

ope above.

ed cost prohrovided for

ovider of foo

motocross.dirt tracks. Bfive disciplising on Trae of a track

only layout.

scope of th

hibitive. Theevents and

od and beve

. BMX begBMX racingnes of BMX

ails BMX wlayout can

e project:

e coffee shod that there erages.

gan in the g became a X riding areith the provbe seen in

op was conwas an opp

early 1970 medal spo

e Street, Pavision of a Figure 2.1.

Page 6

nsidered portunity

0s when ort at the rk, Vert, purpose .

Page 8: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

Criteriumultiplecriteriumconfigu

Figure 2.

Jump Tthey areJumps metres.

Figure 2.

Wagga Multisp

um (Crit Tre laps arounm track tharation optio

.2: Toowomb

Track (Dirt e constructecover an ar. They are lo

.3: Yerrabi Di

port Cycling Co

rack) – is and a closedat included ons, the long

ba Criterium T

Jumps) – ed on a rearea of 60m ocated at G

irt Jumps in N

omplex Feasib

a track that circuit ranghills. The l

gest being 1

Track Layouts

are used msonably flatx 60m for d

Gungahlin in

North Canber

bility Study

caters for rging from 1layout of th1760m.

ts.

mainly by BMt site with adirt jumpingn North Can

rra.

road bike ra to 2km. In he track is

MX and dirt a series of cg with heighnberra.

acing where2015 Toowshown in F

jump mounonsecutive

hts ranging f

e cyclists cwoomba buiFigure 2.2

ntain bikes.jumps. Yerfrom 600m

Page 7

complete ilt a new with six

Usually rrabi Dirt m to 1.8

Page 9: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

Pump heightsRiders cand lownew pu

Figure 2.

Multispand off-to, runn

MTB – commosuspenlighter arange o

Wagga Multisp

track – are. A typical fcan roll aro

wer body asmp track am

.4: Pump Tra

port Cyclin-road cyclin

ning, walking

Mountain on forms aresion movemand have a

of terrains.

port Cycling Co

e usually sfootprint is 3und the fac

s they ride amongst the

ack at Majura

g Complexng that can g and skatin

Bikes are be downhill ament to enaapproximate

omplex Feasib

smaller than30m x 30m

cility withoutaround the pine forest

Pines Canbe

x (MSCC) –also be us

ng.

bicycles whand cross coable quick dely 100mm

bility Study

n a dirt jum. It is a loopt pedalling btrack. Maju(Figure 2.4

erra.

– is an activsed for non-

hich are deountry. Dowdescents ov

m of suspen

mp area boping trail syby using a pura Pines in4).

ve recreation-cycling act

signed for wnhill bikes ver rough tension move

oth in footpstem of dirt

pumping mon Canberra

n area that ivities such

off-road ridare heavy w

errain. Crossment and a

print size ant berms andotion with this the locat

has facilitieh as, but no

ding. The twwith 200mms country bare designe

Page 8

nd jump d rollers. he upper tion of a

es for on ot limited

wo most m plus of bikes are ed for a

Page 10: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

MTB Pfeaturesand biapproxiPlaygro

Figures

Wagga Multisp

Playgrounds such as ske handlinmately 100

ound feature

2.5: Typical f

port Cycling Co

– is a sksee saws, long techniq0m x 50m ces.

features of a M

omplex Feasib

ills developog rides, baues. Stromalled ‘The P

MTB Playgro

bility Study

pment areaanks and slomlo ForestPlayground

ound.

a for mountopes to hel

Park in ’. Figures 2

tain bikes tp riders impCanberra

2.5 highlight

that would prove their

has an t some typic

Page 9

include balance area of cal MTB

Page 11: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

Velodroconnecmost coaround standar

The Bafootprinevents. slope athe trac

Figure 2.

3.0

3.1

3.1.1

The Co

“That W

a)

b)

c)

d)

Wagga Multisp

omes – arted by two ommon. The45 degrees

rd velodrom

thurst Bike nt of approx Any rainw

and the cornck is 7m.

.6: Bathurst V

Planning

Policy and

Multisport

ombined Cyc

Wagga Wag

Contains a attracts famContains mPomingalarIs a compleurban areaIs a comple

port Cycling Co

re an arenstraights. Te shorter ths, while a 3

mes are usua

Park velodximately 100

water drainsners having

Velodrome –

g Context

d Plannin

Cycling C

cling Clubs

gga has a m

unique commilies from amodern builtrna Reserveex that is we and

ex that is ow

omplex Feasib

a for trackThey range he track the 333m track ally indoors

rome (Figu0m x 160m to the cen

g a maximu

southern end

and Cyc

g

omplex Vis

developed

multisport cyc

mbination ofacross the nt structures e. ell connecte

wned and m

bility Study

k cycling. Tin length fr

steeper thecan have a

s, while mos

re 2.6) is a m. Lighting hntre, with thum slope of

d.

cling Tren

sion

a vision for

ycling compl

f on/off roadnation. that comple

ed both soc

maintained b

They consisrom 150m te banks area slope of ust grassroot

333m long has also behe straightsf 9 degrees

nds

r the propos

lex that is k

d cycling an

ement the n

cially and ph

by an engag

st of two 1to 500m, we. A 250m tup to 32 degts facilities a

outdoor veeen includeds having a 5 (16%). Th

sed comple

nown nation

nd non-cycli

natural beau

hysically to t

ged local co

180 degreewith 333m btrack has a grees. Interare outdoor

elodrome thd to allow f5.7 degreee average

ex. It is:

nally becau

ing facilities

uty of

the Wagga

ommunity.”

Page 10

e bends eing the slope of

rnational rs.

at has a for night s (10%) width of

use it:

s that

Wagga

Page 12: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

3.1.2

Draft R

This Rivand Enva netwo

The Pocyclists

Wagga

Wagga would a

Draft W

In SepteStrategtranspoWagga considehealthy

A sepaplan wakey cyctravellin

Recrea

The Restrategy(strateg10 half-could, apump/ju

Wagga

The puworks rrecreatitrip genReserveHighwa

Wagga Multisp

Relevant P

Riverina Mu

verina Murrvironment Dork of liveab

omingalarna by providin

a View (Dra

View is Coassist Coun

Recreation We create We promotWe promot

We are a fa

Wagga Wag

ember 2015y (WWITS

ort planningWagga val

ers how we community

rable portioas adopted cling corridong to recrea

ation and O

ecreation ay found thagic objective-court baskeat any time,ump track o

a Wagga Bi

urpose of threquired to ional riding nerator. Ape through

ay. Bagley D

port Cycling Co

Planning Do

urray Regio

ray RegionaDepartmentble towns an

a MSCC wng a safe ve

ft Commun

ouncil’s draftcil in achiev

is a part ofsafe spaceste participatte our city a

amily friend

gga Integra

5 Council c). This doc

g and infrasues as a cocan foster

y.

on of the Wby Council ors within t

ational venu

Open Space

nd Open Sat Wagga We number 5etball courts, ride skatebor BMX circu

cycle Plan

his plan waconstruct cat Poming

pendix B4 Silverlite R

Drive is the

omplex Feasib

ocuments

onal Plan

al plan is bt. Goal Thrend villages t

ill be a regenue for the

nity Strateg

t Communitving the follo

f our everyds and placetion across nd villages

ly city.

ated Transp

ommencedcument, whstructure prommunity aa prospero

WWITS is that the Octohe city to ees such as

e Strategy 2

Space StratWagga requ1). As a ress. The MSCboards or suit, or challe

2011

as to identicycle paths,galarna Res

of the planReserve. Thmain acces

bility Study

being deliveee in the plathat meet th

gional facilie whole fam

gic Plan)

ty Strategicowing objec

day life es a variety of

port Strateg

developinghen complrovision for and how we us econom

e Wagga Wober 312016enable ridePomingala

2005-2015

tegy is curruires more sult, Counc

CC could fuscooters at enge each o

ify preferre on or off r

serve. It don proposes his does coss road to P

ered by the an is, ‘Stronhe commun

ty that will mily to ride, r

c Plan. The ctives from

f sports and

gy

g the Waggeted will gthe City. Twould like y, together

Wagga Activ6 Council mer safety wharna Reserv

rently beingunstructure

cil has consrther fulfill tthe criteriumother at the

d cycling rroad. The poes mention

a cycle paonnect to B

Pomingalarn

NSW Goveng regional nity’s chang

assist meerun or walk.

developmenthe plan:

recreation

a Wagga Inguide the fThe WWITSthe City to lwith a soci

ve Travel Pmeeting. Thishen commuve.

g renewed.ed facilities

structed threthis objectivm track, rideMTB playg

routes and lan has no

n Pomingalaath adjacenBagley Drivna Reserve.

ernment’s Pcities supping needs’.

eting the n

nt of a MSC

ntegrated Tfuture direcS will includlook in the fially connec

Plan - Cyclis plan identuting. This

Research s for youngee skate pave as younge BMX bike

ground.

plan infrasdirect refer

arna Resernt to Pominve under th.

Page 11

Planning orted by

needs of

CC

ransport ction for de what future. It cted and

ng. This tifies the includes

for this g people arks and g people es at the

structure rence to rve as a ngalarna he Sturt

Page 13: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

Plan of

Pomingcommustaff an

3.2

This Separticipwhen e

3.2.1

Figure 3populareasternTable 3much hThe mabe one

Figure 3.

Wagga Multisp

f Managem

galarna Resnity land. Ad is expecte

Cycling S

ection revieant and spestimating th

Bicycle Ne

3.1 shows Brity of cyclinn states with3.1 shows igher propo

ajor cities hof the contr

.1: Bicycle Ne

port Cycling Co

ment for Pom

serve is owA plan of med to be co

Sports Tre

ews cyclingectator numhe economic

etwork

Bicycle Netwng generallyh 1.45% of that Melbo

ortion of comhave better ributing fact

etwork statis

omplex Feasib

mingalarna

wned by themanagemenmpleted in

nds

trends frombers. The dc benefit ge

work’s datay by state apeople usi

urne (3.92%mmuters riddeveloped tors to the lo

stics on comm

bility Study

a Reserve

e Crown (Snt for this searly 2017.

m both natdata from thenerated for

a on cyclingand region. ing a bike t%), Sydney

ding to workcycling net

ower partic

muter cycling

tate Goverite is curren

tional and lhis Sectionr Wagga W

participatioVictoria is

to get to woy (3.3%) a

k compared tworks thanipation leve

g.

nment) andntly being u

local levelswill be useagga by a M

on. It gives leading the

ork comparnd Canberrto Wagga W

n Wagga Wel in Wagga

d is categoupdated by

s. It consideed later in thMSCC.

an indicatioe way for thred to NSWra (2.76%) Wagga with

Wagga, whic Wagga.

Page 12

rized as Council

ers both his study

on of the he south

W at 1%. have a

h 1.04%. ch could

Page 14: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

Table 3.1

Commefrom the

a) A

b)

c)

Wagga Multisp

1: Percent of

Loca

ACT

Arm

Albu

Bath

Coot

Griff

Graft

Leet

Melb

Oran

Sydn

Tamw

Tum

Wag

Wod

ents in regae Bicycle N

Road CyclAdelaide, BRoad cyclinDay and chroads, som

BMX is stillocated BMdominant. Olympic sp

Criterium rais gaining aauthorities has been sevents bec

port Cycling Co

f Commuters

al Governm

– Canberr

idale

ury

hurst

tamundra

fith

fton

on

bourne City

nge

ney City

worth

ut

ga Wagga

donga

ard to State etwork duri

ling is on Brisbane anng events ahallenge rid

metimes dirt

ll strong, alMX facilitieCompetitiv

port.

acing is biga high profilreluctant to

some succeome an attr

omplex Feasib

Riding to Wo

ment Area (

ra

y

and Nationng a consu

the up gend some regare growingdes. A new t

or gravel, w

lthough mas are gette BMX is

g in some ple. Again, fi

o close off sess from horaction and

bility Study

ork in NSW LG

(LGA) % C

nal cycling tltation sess

enerally, esgional centr

g, e.g. Bicyctrend is ‘gra

well away fr

ay be losingting good part of th

places — thfinding apprsuitable roadolding twiligh

activator fo

GAs.

Commuters

2

1

1

0

1

0

1

1

3

0

3

0

0

1

1

trends that wsion in Octo

specially fores – Bendicle Networkavel grindinrom most ve

g it (sic) apuse, but se Cycling

e summer ropriate circds if locals ht crits in ‘dor retail distr

s riding to

2.76

.29

.46

0.69

.53

0.64

.91

.00

3.92

0.66

3.30

0.54

0.25

.04

.20

were receivber 2015 w

or recreatioigo, Canber

k events sucg’ — road b

ehicular traf

ppeal to theskate boardAustralia p

series aroucuits has becomplain. In

downtown’ loricts.

work

ved by Counwere:

on, e.g. Merra and Byrch as Ride biking on litffic.

e very younrds (sic) arportfolio an

und Port Pheen a probleInternationalocations wh

Page 13

ncil staff

elbourne ron Bay. to Work

ttle used

ng. Well re often

nd is an

hillip Bay em, with

ally there here the

Page 15: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

d)

e)

f)

g)

3.2.2

The Narepeateof the selected

The NCof particeach stpreviou

Measur2011 tosignifica2015.

When mdecline

It is intesales hAustrali

Wagga Multisp

Mountain ba number obecause ofremote andfor more Warburton.resorts aninterested concern.

Track cyclindeclining. TNorthern Tthe culture.

Cycle Tourand rail trai

Commutersmore benenumber of meeting ph

The Nation

ational Cycled bienniallyyear to ridd and interv

CPS providecipation for tate and ters week, mo

red over theo 16.5% inant change

measured oin Australia

Cycling parin 2015 Cycling par2015.

eresting thahave increaian Bicyclin

Fewer childRoads are With increaMore bikes

port Cycling Co

biking has bof states, bf increasedd require lonaccessible Downhill d MTB pain coverage

ng may be There is said

Tasmania wh

rism – a laril tourism is

s – from a efit than maf people cohysical activ

nal Cycling

ing Participy since Mar

de. The surviewed via t

es data on ceach state

rritory. Cyclonth and ye

e previous wn 2013 ande in particip

over the pran cycling p

rticipation o

rticipation o

at cycling pased. Baseg Council s

dren are ridgetting bus

ased home es are sitting

omplex Feasib

enefited frout the numb

d number ofng car trips

facilities tcourses h

arks. Big ee of the thr

suffering sod to be a lahere many

rge numberbig in Victo

physical acany sportingommuting bvity guideline

g Participat

pation Surverch/April 20rvey coverstelephone.

cycling partand territoring participar.

week the cyd 17.4% inpation meas

revious moparticipation

over the pas

over the pas

participationed on a c

staff membe

ing to apposier entertainmein the shed

bility Study

om the consbers in comf events. Sand overnigthat can bave been

events mayrills and sp

omewhat asck of coachsmall town

r of Australoria and oth

ctivity perspg activities.by bike anes by suppo

tion Survey

ey (NCPS) 11. March/As approxim

ticipation atry, and the pation rates

ycling particn 2015. Nasured over

nth and yen since 2011

st month ha

st year has

n has declinconsultationer, some of

intments be

ent options,d.

struction of hmpetitive evSome of theght accommbe reachedsuccessfull

y be sustapills. Insura

s its profile hes and facis have trac

lians are traher states ar

pective, a 3. There ared LGAs caorting this tr

y

is a standApril is con

mately 25,00

t a national capital citieacross Au

cipation ratationally ther the previo

ear there ap1:

as declined

declined fro

ned between completethe reasons

ecause of “s

families ar

high grade vents have de new facilimodation. Td by bike ly impleme

ainable becnce and lia

as an Olymilities for tra

cks and raci

avelling intere starting t

30 minute be now a laran contriburend.

ardised sursidered the00 people

level and as and non-cstralia are m

e has chanere has beous week b

ppears to h

from 27.1%

om 40.2% i

n 2011 andd in Januas for this co

stranger dan

e less activ

facilities redropped – ities are so

There is nowor bike-tra

ented at socause televability issue

mpic sport haining. It is sing is embe

ernationallyto invest.

bike commurge and inc

ute to comm

rvey that hae most popuwho are ra

allows for escapital areameasured o

nged from 1een no stabetween 20

have been

% in 2011 to

n 2011 to 3

d 2015, yetary 2016

ould be:

nger”

ve

Page 14

cently in possibly

omewhat w a push ain, eg. ome ski vision is es are a

as been strong in edded in

y to ride,

ute is of creasing munities

as been ular time andomly

stimates as within over the

18.2% in atistically 011 and

a slight

o 24.3%

36.3% in

t bicycle with an

Page 16: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

3.2.3

BMX Au

A phonAustraliparent tof peopperiod. conduconly a svolunte

BMX Achampidemons

Table 3.2

Wagga grass gnot builcontribu

MorganClub. It of a cluChamp

The neamembebeen detrack.

Wagga Multisp

BMX Trend

ustralia’s 20

MembershiMembershiQueenslan81% of parFinancially

ne conversia and a Coto athlete ra

ple to a city.The 2014 t over the ssmall club wers to run th

Australia ponships eastrating that

2: Total Ride

Ye

Lo

To

Wagga hagrowing ovelt to standaute to their l

n Street Cyis likely a g

ub starting.ionships wi

arest BMX ers. Their mependent o

port Cycling Co

ds

014 Annual

ip over the ip grew 15%d has 36%

rticipants arethe organis

ation took ouncil Officeatio involve. A nationalNational Cseven dayswith 60 memhe National

produces aach year. Nt numbers i

ers at BMX Na

ear

ocation

otal Riders

as seven Ber the tracksrd, and thelow use.

ycles have good track b Bathurst, th 1500 ride

Club to Wamembershipon willing ad

omplex Feasib

Report stat

last eight ye% between 2of membere male and sation is stro

place on er. The Presment in eve series evehampionsh

s. It attractembers, rece Champion

a report oNumbers frncreased b

ational Champ

2014

Sheppa

1,362

MX tracks s and little

e lack of ap

received fobuilt to stanfor examplers in March

agga Waggp has been dults to guid

bility Study

tes that BM

ears has gr2013 and 2

rship followe 80% of rideong with a 2

August 21sident stateents. A seri

ent could attips event in

ed $10.85 meived assistships.

on the nurom the lasetween 201

mpionships.

4

rton B

2

that get litttyre wear mpropriate m

our enquiriendard woulde, built a th 2016.

a is Bordergrowing ov

de the club.

MX is in exci

own from 62014 ed by WA aers are und2014 surplu

2015 betd that BMXes or chamtract approxn Sheppartomillion reventance from

umber of st three yea14 and 2016

2015

risbane

1,437

tle to no usmarks on thmaintenance

es in the lasd attract ridetrack in 201

r BMX at Alver the last. They have

ting times.

,800 to 17,0

nd NSW wier 20

us of $345,6

ween the is a sport t

mpionship evximately $3on, Victorianue to the the Counci

participantsars are reco6.

2016

Bathurs

1,500

se. Evidenche tread pate to these f

st 10 yearsers and incr15 and attr

bury-Wodot five yearse a state co

It also state

000

ith 19%

614.

President that has a vvent can drM over a th

a, cost $100city. Sheppl and attrac

s in the orded in Ta

st

ce for this iths. The trafacilities wo

s regardingrease the likracted the

onga. They s. Membersompetition s

Page 15

es that:

of BMX very high raw a lot hree day 0,000 to parton is cted 100

national able 3.2

is in the acks are ould also

a BMX kelihood National

have 56 ship has standard

Page 17: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

3.2.4

CyclingEach scycling

3.2.5 Lo

Cyclingthree bsteady Anaconthe samwagga/ Table 3.3

During cycling

a) b)

c) d) e) f)

g)

h)

Wagga Multisp

Cycling Au

Australia state has a

are (Source

Over 3M Au1.5M peopl104,000 perepresentedCycling Aucompared 28% of totaNSW has t

ocal Cyclin

generally ike shops ibetween 20

nda, online me period 2population-

3: Bicycles s

consultatioin Wagga W

Wagga WaFamilies calike organisPurchasingThere are nUsually all Bike technpurchase. General cudesirable. There are s

Bicycle Ty

BMX

Cross CouMTB

Downhill /AMountain

Road Bike

Grand Tot

port Cycling Co

ustralia

seeks to bcycling bo

e: Cycling N

ustralians ple cycle at leeople cycled 1% of the

ustralia in 2to the prev

al membershe largest m

ng Trends

is growing increased o013 and 20and private2009-2013 -forecast-20

sold at the thr

on with locaWagga can

agga havingan ride anytsed team spg a bike canno annual fethe family cology has

ulture is c

strong clubs

ype 20

24

untry 91

All MTB

19

es 79

tal 214

omplex Feasib

e the key ody under tNSW 2014 a

participated east once p

ed to work e working po2014 has avious year. hip membership

in Wagga Wover the fiv15. These n

ely. (PopulaSource: w

031)

ree bike shop

al bike storbe mostly a

g a relativelytime. You aports. n equal buyiees for ridincan participaimproved d

hanging w

s and social

09 2010

41 273

19 969

90 204

93 855

43 2301

bility Study

lobby grouthe Cyclingand ABS):

in cycling inper week, w

in 2011 aopulation ina membersRecreation

p with 8,004

Wagga. Tabve year perinumbers do

ation growthwww.wagga.

ps in Wagga b

re owners attributed to

y good climare not pige

ing into an ang. ate. It is a bdramatically

where cyclin

l groups tha

0 2011

267

1026

213

897

2403

p for cycling Australia

n the last 12which is 6%

nd 90,000 that year. Chip of 24,2al members

4 followed b

ble 3.3 shoiod 2009 too not includh of Wagga .nsw.gov.au

between 2009

in 2015, tho:

ate to ride ion holed in

adventure.

broad, versay meaning

ng is beco

at support n

2012 2

255

1040 1

226

951 1

2472 2

ng generallyumbrella. S

2 months of the popuin 2006. B

Cars repres269 nationaship grew 6

by Victoria w

ws the como 2013 by 2e bikes soldWagga inc

u/city-of-wag

9 to 2015.

hey sugges

n. to specific t

atile marketit is an at

oming more

new and dev

2013 201

299 28

1132 118

250 25

1027 103

2708 276

y across ASome stati

ulation Both these sent 60% ally which is6% and rep

with 5,722.

mbined sale26% and red at K-Martcreased by gga-wagga

sted the gr

times to pa

t. ttractive pro

e fashiona

veloping rid

14 2015

88 271

83 1139

50 251

39 1033

60 2694

Page 16

Australia. stics on

Figures

s stable presents

es of the emained t, Big W, 9.5% in /wagga-

rowth of

articipate

oduct to

ble and

ders.

Page 18: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

There a3.4.

Table 3.4

Club

Bicy

Tolla

Wag

Wag

Wag

On the 2015. H

Each wgroups ride eac

The Strindicateof the mriders uNorth (J

Wagga Multisp

are five cycl

4: Membersh

b

ycle Wagga

and Cyclin

gga Mounta

gga Triathlo

gga Wagga

whole bicyHowever, as

week there would ave

ch week. M

rava app foes hundredsmore populause Strava June 2015)

port Cycling Co

ing clubs in

hip numbers

a Wagga In

g Club Inc

ain Bike Cl

on Club Inc

Cycling C

ycle club ms demonstra

are aroundrage 20 ridany riders w

r smart phos of rides inar routes boin Wagga estimated

omplex Feasib

n Wagga Wa

of Bicycle Cl

c.

.

ub Inc.

c.

lub Inc.

embership ated below,

d 10 organders, meaniwould on av

ones is popn the Waggoth on and oWagga. Thbetween 40

bility Study

agga. Their

lubs in Wagg

2001

105

30

-

-

140

in Wagga cycling par

nised grouping 200 ridverage ride

pular in Wagga Wagga loff road are he Busines0 to 80% of

r membersh

a Wagga.

2003 2

160

30

-

-

140

Wagga hasrticipation h

p rides for ers participthree times

gga Waggaocal governlisted in Ta

s Case for riders use S

hip numbers

2005 2

NA 1

30

180 1

-

N/A N

s declined as increase

both on anpate in at les per week.

. Looking anment area able 3.5. It is

Mountain Strava.

s are listed

2010 20

155 1

30 4

120 1

37 5

N/A 1

between 20ed.

nd off roadeast one or

at activity on each weeks estimatedBiking in S

Page 17

in Table

015

36

45

28

58

29

001 and

. These rganised

n Strava k. Some d 50% of Sydney’s

Page 19: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

Table 3.5

Strav

Cartw

Edwa

Elizab

Gap R

Grega

Grega

Inglew

Kinca

Koori

Lake

Lloyd

Mitch

Pomi

Post

SMW

Third

Wagg

Wagg

In 2014challengThe finiat the Bfestival.riders a

Wagga Multisp

5 Strava rider

va Segment

wrights Hill

ard St West

beth Avenu

Rd Flats No

adoo Hill fr

adoo Rd Ea

wood climb

aid Sprint –

ingal Rd –

Albert Rd

d to Bridge

hell Road –

6hr track a

Pomi Burn

C spring fi

boxcar, m

ga Cycle tra

ga Rambo 2

4 the Rotage. The focish line was

Beer and Ci. In 2015 th

and 3500 fes

port Cycling Co

r counts in th

t

– Hampde

t

ue Climb

orthbound

rom Elizab

ast bound

b from Bak

– Kincaid S

Lake Alber

(north – do

– Red Hill

– Inglewood

as of 10/06

n – Edward

nish – Our

midnight tra

ack – Gran

2013

ary Club ofcus was coms at Victory der Festiva

here were 7stival attend

omplex Feasib

he Wagga are

en Ave

eth Side

kers Lane

St

rt to Kulgo

ownhill)

Rd

d to Gregad

6/2013

St

ra Rd

ain – Riverw

ndstand Sta

f Wollundrymmunity par

Memorial Gl. In 2014 a00 riders aders.

bility Study

ea.

R

oa Flat

doo

walk

art

y started trticipation aGardens wh

about 300 pend 2000 fes

iders Jan/F

82

61

68

129

85

169

135

77

80

97

48

53

117

28

151

56

28

29

the Gears and getting there live eneople rode stival attend

Feb 2016

and Beersthe whole fantertainmenand 1500 pders. In 201

Riders All

331

225

372

398

424

492

507

302

384

378

296

306

698

305

481

254

165

190

s communitfamily out font could be people atten16 there we

Page 18

l Time

ty cycle or a ride. enjoyed

nded the ere 1102

Page 20: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

On the Run &runnersriders rnumberriders hincreas

Table 3.6

The WPomingobserva Figure 3.

Wagga Multisp

second Su& Ride. Ths/walkers usregistering ir of riders has steadilyed number

6: Number of

Wagga MTBgalarna Resations that

.2: Average r

port Cycling Co

unday of Sehis event se the sameinto this freparticipatingy decreaseof alternativ

f Riders regis

Y

2

2

2

2

2

2

B Club hasserve sincet MTB rid

rider counts p

0

10

20

30

40

50

60

Number of Riders

P

omplex Feasib

eptember ehas been

e 10km couee event is g on the d

ed over theve events in

stering for the

Year

2011

2012

2013

2014

2015

2016

s been rece 2010. Thding has

per day at Po

14

26

0

0

0

0

0

0

0

July to Dec…

Jan to Jun 2011

PomingaDa

bility Study

each year thn conducteurse around

listed in Fiay is doub

e last five yn the region

e Wagga Lake

Total reg

cording numhe results increased

omingalarna R

51

35

2012

Aug to Dec…

Jan to Jun 2014

arlarna aily Ride

he communed annualld the Lake Aigure 3.6. Ele those reyears. Onen during ear

e Run & Ride

istered cyc

439

525

437

357

324

289

mber of ridin Figure significant

Reserve main

4539

49

July to Dec…

Jan to June…

July to Dec…

Averageers

nity organisy since 1Albert preciEvent organegistered. Ae reason forly spring.

e

clists

ders using 3.2 suppor

tly in the

n trail.

se the Wagg1972. Ridenct. The nunisers estimAlso the nuor this may

the main rt MTB Au

last five

Page 19

ga Lake ers and umber of mate the mber of

y be the

trail at ustralia’s

years.

Page 21: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

Given tthat witWagga

3.2.6

The Pregave a article increasand typ

Some o

The MTthree evwas onlthe lastmembewho buthe moume”.

4.0

4.1 Co

In 2015concepcapture

Figure 4are reqyou wisrespondout of tconstru

Wagga Multisp

the strong gth improved.

MTB Trend

esident of Msummary owas that ing. The re

pes of riding

of the comm

Cross CounCross Cou(RAMBO) sCyclocrossWomen onDownhill evFour-cross Gravity End

TBA presidvents you cly one 24-ht five years ership, MTBuild some ofuntain bike

Consulta

ommunity

5 the Combt. A copy o

ed thoughts

4.1 shows tuired to besh”. The reding to this the scope bction and m

port Cycling Co

growth in cyd infrastruc

ds

Mountain Bof the statusnumbers a

easons he g for people

mon events

ntry 3-hour,untry sprintseries s – road bikely MTB evevents (4X) – four

duro – hybr

ent stated could do withour race in we have se

BA clubs, cluf them) andspace is o

ation – Cy

Survey

ined Cyclinof the survefrom the cy

the results fe developedesults demoquestion. T

because it maintenance

omplex Feasib

ycling salescture, cyclin

ike Australis of MTB raat individuagave for theto choose f

now availab

6-hour, 12t races su

es modifiedents

r bikes race id between

“on any wethin a few hAustralia o

een increasub memberd events runne worthy o

ycling De

ng Clubs coey questionycling comm

from Questd or improveonstrate a The Combinhad a low e. Access t

bility Study

s and stronng participa

ia (MTBA), cing and pa

al events ae increase ifrom. Also,

ble are:

2-hour and 2uch as the

d for off-road

together todownhill an

eekend nowhours of wheor you had tses in mounrship, trails n by privateof their inve

esires in W

onducted a s are prese

munity.

tion 4 “Whaed in Waggdemand fo

ned Cycling demand anto an ongoin

g growth ination would

in the memarticipation are declininincluded thamore peop

24-hour eve Riverina

d riding

o the bottomnd cross co

w you probere you liveto wait six wntain bike sabeing built

e promotersestment and

Wagga W

survey focuented in Ap

at types of cga Wagga?or all types

Clubs decind one of thng water su

n participatio continue t

mber newsletrends. Theng, but totat there arele are riding

ents Alpine Mo

m of the hill untry racing

ably have e. Remembeweeks betwales, numbe(and profes

s. These bud that is a p

Wagga

using on theppendix 1. T

cycling facili? Please tic

of facilitieded to makhe highest

upply would

on, it is conto grow in

etter July 2e message ftal participe now moreg recreation

ountain Bik

g.

a choice oer back whe

ween other rer of eventsssional trail usinesses thpositive ind

e multisportThis survey

ities do youck more thaes with 425ke the triathexpected c also be diff

Page 20

nsidered Wagga

24 2015, from the

pation is e events nally.

e Open

of two or en there races. In s, MTBA builders

hink that dicator to

t cycling y largely

u believe an one if 5 people lon dam

costs for ficult.

Page 22: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

Questiorequest

Item 1 alreadyClub is facilitiesOwnersThe res

Figure 4.

Wagga Multisp

on 4 in the ts received

Downhill MFlow ll MouCyclo-crossTiming faciPublic addrDog facilitieCamping/aLighting forSite for moBike wash Recovery r

- Downhill y provided a

already des - was not s however cst of the item

.1: Survey re

port Cycling Co

survey alsothat are rele

TB trails untain Bike s area whiclities ress area es ccommodar night evenbile bike mefacilities

room.

MTB trailsat Willans Heveloping thincluded ascan and doms are inclu

sponse to cy

omplex Feasib

o allowed reevant to the

tracks that ch could be

tion optionsnts echanic ins

s - was notHill. Item 2 -his type of s there are ao currently wuded in the s

ycling facility

bility Study

espondentse Multisport

could caterincorporate

s

tead of full

t included - Flow tractrail that walready numwalk their dscope of th

y needs in Wa

s to specifyt Cycling Co

r for gravity ed with a cri

on bike sho

in the scopk - was not

will complemmerous dogdogs on leais study.

agga Wagga.

other faciliomplex are:

enduro eveterium circu

op

pe of this st included a

ment the MS parks arou

ash at Pom

ities desired

ents uit

study becauas the WagSCC. Item und Wagga ingalarna R

Page 21

d. Other

use it is ga MTB 6 - Dog Wagga.

Reserve.

Page 23: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

4.2 Bic

Bicycle want to1997 anof BWWwww.bw

BWW h

On the cycling track atstreets

Howevecycling and wo

During providebe storethe mapeople

4.3 Wa

The Wacentral used foincludedspectat

The CluOctobeuntil Se

As the fat any ocyclists

The Clu200 comclosed locationnon-eve

The WWteach c

Wagga Multisp

cycle Wag

Wagga Wo promote cnd has worW were onww.org.au).

have regula

Each SundCoffee GrinA “fat tyredA long ride

October 1complex wt the Crickeand roads.

er, one of complex wuld be of be

a consultate bikes for loed on site arket for usecould partic

agga Wagg

agga WaggWagga Wa

or cricket in d in the facor facilities

ub has activr until mid-M

eptember. A

facility is beone time for.

ub holds a mmpetitors frat a cost of

n for attractent commun

WCC presidchildren how

port Cycling Co

gga Wagga

agga Inc. iscycling as arked to advan the comm

r rides throu

ay a 2-hournds ride on ” off road riabout 100k

13 2015 thewould be. Shet Ground

BWW’s aimwere availabenefit to the

tion sessionower socioeand then boers and procipate in rec

ga Cycling

ga Cycling Cagga. The the summe

cility are amand twin ro

vities througMarch. Trac

At this time t

eing shared r safety rea

major track rom all ovef $5,500 forting spectatnity would n

dent statedw to ride in a

omplex Feasib

a Inc. (BW

s a group oa safe and ance cyclingmittee to d

ughout the y

r road ride tWednesdayde on the fikm on the s

e BWW prehe respondfor example

ms is to fole, it would

eir club”.

n it was alsoeconomic faorrowed byovide furthecreational a

g Club Inc

Club Inc. istrack surro

er and rugbymenities, toioller door sto

ghout the wck racing is the velodrom

by cycling,asons, for ex

carnival aner the stater traffic contors. A dedinot be disru

that “at tha safe envir

bility Study

WW)

of cyclists wresponsibleg facilities a

develop the

year. They

that finishesy mornings irst Sunday

second Sun

esident waed saying “e. Our acti

oster new pprovide a s

o suggestedamilies. A ray families toer social beactivities.

c. (WWCC

s based at tounds the Wy league trailets, changorage shed

whole year, on each W

me is in use

cricket andxample, bal

nd two road . Each of ttrol. These icated crite

upted for the

he proposedronment aw

who enjoy e mode of tand participe Wagga W

are:

s at a caféfrom 9amof each moday of each

as asked w“they do novities focus

people into safe environ

d the cyclinange of unu

o ride at theenefits to W

)

the WaggaWagga Wagaining in thege rooms, t.

particularlyWednesday n

e for training

d football it lls entering

carnivals ethe road catake place

rium track aese types of

d MSCC cyway from veh

riding as a transport. T

pation. For eWagga Bicy

onth h month.

hat their likot use the cs around so

cycling. Thnment to lea

g complex used secone complex. T

Wagga Wag

Velodromegga Crickete winter. Otrack lighting

y training. Tnight. The rg.

can only beonto the tra

ach year. Tarnivals req

in the CBDat the MSCf events.

yclists couldhicles any ti

social actiThe Club stexample, mycle Plan (

kely demancurrent Wagocial rides o

herefore, if arn necessa

could be a d hand bikeThis would

gga as more

e in Kincaidt Ground, wther assets g, boundar

The track seroad season

e used by oack are a h

These attracquires streeD, providingCC would m

d train and ime of the w

Page 22

vity and tarted in

members (Source:

nd for a gga Bike on quiet

f such a ary skills

base to es could expand

e young

d Street, which is that are

ry fence,

eason is n is April

ne sport azard to

ct 100 to ts to be

g a good mean the

families week”.

Page 24: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

The WWDistrict locationat this lo

1. 2. 3. 4. 5. 6.

4.4 Wa

The WaRiverinaJanuarySturt Uparticip

The Wasubject usually

Off roahttp://trePomingexcellen

4.5 Tol

The Toinductefor bike

The Cluthe Toll

Wagga Multisp

WCC presidKart Racin

n. This trackocation are

Working arThe track isHaving to bThe track isThe surfaceIt is flat so

agga Triat

agga Triatha Triathlon y to March.

University inants (Sourc

agga Triathto Lake Alblocated at A

d adventure-x.com.au

galarna Resnt venue fo

lland Cycl

lland Cycline, Barry O’

e riders to en

ub organiseand Interclu

port Cycling Co

dent also indng Club offk is hotmix, :

round the Kas locked thubook througs marginallye is in averathere are no

hlon Club

hlon Club ISeries whThe first ev

n Wagga Wce: www.wa

lon Club Inbert being sApex Park,

re racing is). Triathlonserve, alonr adventure

ling Club

ng Club was’Hagan. Thenjoy their sp

es local roadub Road Ra

omplex Feasib

dicated “theff Tasman r

is 7.5m wid

art Club actus cannot bgh the Kart Cy short at 85age conditioo hill challen

b Inc.

nc. was eshich has sixvent of this Wagga. Thaggatriclub.o

c. organisesuitable for Lake Alber

a growingn Club memg with cros

e events.

Inc.

s establishee Club’s mport among

d racing eaace in Febru

bility Study

e Club holdsroad. Theyde and 850m

tivities. e used for aClub for ins50m (1200mon with cracnges”.

stablished x events in series was

he 2016 evorg).

es monthly eswimming

rt where the

g sport (seembers havess country

ed in 1988ission is to st like-mind

ach Sundayuary and th

s twilight criy hold aboum long. The

adhoc trainiurance purpm minimumcks (it is in a

in 1994. Thn different s the ‘Comevent was o

events in Win) during th

eir storage s

e www. httpe commenMTB or tra

by Wagga provide a

ded people.

throughoute Tolland O

iterium evenut 10 evente challenges

ing. poses. would be b

a flood zone

he Club hetowns in th

e and Try Ton January

Wagga Wagghe warmer shed is loca

p://adventurted that a ail running,

Wagga Sposafe and fr

t the year. TOpen in Apri

nts at the Wts per years of running

better). e).

elped estabhe Riverina

Triathlon’ at y 31 and h

ga (tri or dumonths. Th

ated.

rerace.comcriterium

would pro

orting Hall oriendly envi

They also oil.

Page 23

Wagga & r at this g events

blish the a during Charles

had 182

uathlons hese are

m.au and track at

ovide an

of Fame ronment

organise

Page 25: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

4.6 MT

In July 2since itsPomingPuddingthrough

MTB Wthe 3.5dramati

The MTamenitiwomen and punumber

The twohour in Victoria2015 thbetweewould bhold 24children

Downhibetweefor thesdevelopside of but wou

Pomingwith 23align wInternatenviron

Wagga Multisp

TB Wagga

2005 MTB Ws inception.

galarna Resg Reserve a

h native bus

Wagga runs 5km green ically increa

TB Waggaies and BB

and junior ump track wr of visitors”

o regional eSeptember

a. The RAMhe 6-hour n 150 and be necessa4-hour eventn.

ill MTB andn downhill ase types of ped with jumPomingala

uld complem

galarna Reskm of singl

with the ‘Trational Mounmentally su

port Cycling Co

Inc.

Wagga was. The Club serve, Willaand the Tumshland.

two regionaloop in 20

ased.

a PresidentBQ sheltersr categorieswould incre”.

events at Por. These tw

MBO has arevent joine220. To kee

ary to have ts, also hav

Gravity Enand cross cevents at

mps, bermsrna Reserv

ment it by fin

serve is the e track andail Solutionntain Bike Austainable.

omplex Feasib

s formed anhas been inans Hill, Livmut bike tra

al events an013 the nu

t stated “ths is increass. Also consease Wagg

omingalarnawo events atround 60 rided the Evoep growing an amenitie

ve formal ca

duros are gcountry racinPomingalar

s and drop ve could be nishing at a

home for thd 12.3km ofns – IMBA’Association

bility Study

nd has expenvolved in dvingstone N

ack. Many o

nd 10 local umber of w

he need fosing. Particstructing othga Wagga’s

a Reserve attract ridersders while

ocities serie these evenes building.ar parking, B

growing spong, blendingrna Reservoffs. Appro a suitable

an appropria

he MTB Waf fire trails (s Guide to

n). The Club

erienced condeveloping National Pa

of these area

events per women and

for user sucipation is her types os ability to

are the RAMs from as fa

the 6-hour es and thents and exp. Sites suchBBQ shelte

orts in Austrg gravity an

ve, machineximately 2klocation. T

ate location

agga. It has (Figure 4.2)o Building Sb aims to b

nsistent grotrails and/oark, the Wias offer gre

year. With t children u

upport infraincreasing

of MTB tracattract a g

MBO 3-hour as Canbehas aroun rider num

pand into 24h as Stromlrs and a pla

ralia. Gravitynd enduro ce built trailskm of new this is not in.

a well-deve). The trailsSweet Singbuild interes

owth in partor running eiradjuri Tra

eat single tra

the developusing the s

astructure sparticularly

cks such asgreater ran

ur in July anerra and Nod 100. How

mbers incre4-hour disco Forest Paayground fo

y Enduro ishallenges. T

s would neetrail on the n the MSCC

eloped trail s have beengle Track’ sting trails

Page 24

icipation events at ail, Plum ail riding

pment of site has

such as y in the s a jump nge and

nd the 6-orth East wever in ased to iplines it ark, that or young

s a cross To cater ed to be Eastern

C scope

network n built to (IMBA - that are

Page 26: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

Figure 4.

Police

PCYC Wis a Bimaintaiuses th

In a phothey arewould uone bec

Wagga Multisp

.2: Pomingala

Citizens Y

Wagga Wagcycle Educned by Couis area for c

one convere planning use the curcause it is n

port Cycling Co

arna Reserve

Youth Clu

gga is locatcation Areauncil. PCYCchildren to i

rsation on Mon moving

rrent BEA (next door to

omplex Feasib

e Trail Networ

ub (PCYC W

ted in Gurwa (BEA) whC Wagga, anformally ri

March 10 20to a new s

(or one at Po their venue

bility Study

rk.

Wagga W

wood Streethich faces as part of tide their bik

016 with thesite in the fuPomingalare.

agga)

Central WaSpring Streheir vacatio

kes.

e PCYC Cluuture. Whenna Reserve

agga. Adjaceet. The Bon care pro

ub Managern they move). They on

cent to their BEA is ownogram, occa

r, it was stave it is unliknly use the

Page 25

4.7

building ned and asionally

ated that kely they

existing

Page 27: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

4.8 No

The des

Table 4.1

Group

Road Ru

Wagga VCar Clubabout sixcar clubsthrough each yea

Sport anRecreatBorambo

WaggaROrientee

Wagga Multisp

on-Cycling

sires of non

1: Desires of

C

unners 1

Vintage b. Also x other s come Wagga ar

1

nd ion - ola

1

Roos ers

1

port Cycling Co

g User Gro

n-cycling us

f Non-Cycling

Date Contacted

0/3/16

1/3/16

1/3/16

1/3/16

omplex Feasib

oups

er groups th

g User Group

CurreActivitie

Pominga

Trail runninweekly

Nil.

Nil

2-3 events year. Club members atraining

bility Study

hat were co

ps

ent es at alarna

D

ng Tr

ViAnhe3,Ca

If thutwo

per

ad hoc

In simincgrorPowo

onsulted are

esired ActiPominga

rail running w

ntage Car Cnnual rally (celd at Downs000 people aar shows

a group appem to run a ilising MSCCould be supp

the immediamilar use. Evcrease as throws. A permrienteering coomingalarna ould be desir

e detailed T

ivities at larna

weekly

lub currently side Hall - attend).

roached program

C they portive

ate future vents will e club

manent ourse at Reserve

rable

Table 4.1.

Facilities D

Toilets, shelwater

Carpark, toilmeeting rooshelters, BBMay get morpeople than Downside gPomingalarnReserve is ctown

Subject to gdesired activOpen to travfrom BorambPomingalarnReserve

Orienteers ato events beconducted inforested arewhere there facilities andcome prepaaccordingly.

For major evWaggaRoosPortaloos. Ablock could this necessitdepending oaccess arrangemen

For local evecurrent car pfacilities are suitable. Forevents parki50-100 cars be required

Page 26

Desired

ters and

lets, m,

BQs. re

iven na closer to

roups vities. velling bola to na

are used eing n as are no

d hence red

vents s hire A toilet obviate ty on

nts.

ents parking

r major ing for would

Page 28: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

Questioproposerespond

Table 4.2

No.

1

2

3

4

5

6

7

8

9

10

11

These activitieactivitiesuggesdiverse

All of thproposecontrollkarting)go kartcontroll

Wagga Multisp

on 10 of theed site be dents with a

2: Non-Cyclin

Activity

Running, w

School fete

Traditionalkarting

Conference

Skating, sk

Camping, f

Photograp

Learn to rid

Horse ridin

Crossfit, Fr

Radio cont

have been es receivedes already ted multiple range of us

he activitiesed infrastrued boats. ) there wouting would ed boats wo

port Cycling Co

e communiused for if

a total of 37

ng activities

walking, ori

es, fairs, ex

sports –

es, convent

kateboardin

family picnic

hy, bird wat

de or drive t

ng

risbee, outd

trolled cars,

grouped ind the higheoccur regue times ranses possible

s suggesteducture deveFor the trald not be en

also be could be pos

omplex Feasib

ty survey af facilities a3 suggestio

suggested in

enteering, s

hibitions, co

soccer, foo

tions, sports

g, roller bla

cs, parties,

tching and n

training

door gym an

, planes and

nto 11 activest numberlarly at Ponging frome for the pro

d are consielopment eaditional spnough usabconsidered ssible, howe

bility Study

asked ‘Otheare providedons. The res

n the Commu

school cros

oncerts, car

otball, arch

s club meet

ading

alfresco din

nature awa

nd boot cam

d boats

vity themesr of sugge

omingalarna 34 to 3. oposed dev

idered feasexcept for ports (soccble flat grou

a dangerever dam co

er than cycd’. This qusults are in

unity Survey

s country a

r shows, ma

hery, athlet

tings, coach

ning, weddi

reness edu

mp

s. Theme nestions witha Reserve. Overall the

velopment.

sible at Pomthe three

cer, footbalund for a larr amongst onstruction

cling activitieestion was Table 4.2.

nd duathlon

arkets

tics, golf a

hing clinics

ngs

cation

umber 1 ruh 155. Run

The remaie responses

mingalarna traditional

l, archery, rge sportingcycling acnot in the p

es, what cos answered

N

n

and go

unning and nning and ining themes demonst

Reserve gsports anathletics,

g field. Archctivities. Thproject scop

Page 27

ould the by 276

umber

155

34

33

32

31

31

20

12

12

10

3

walking walking

es were rate the

iven the nd radio golf, go

hery and he radio pe.

Page 29: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

5.0

A literafacilitiesCanberand Yemembe

The feaFurther Stromloroad cyfrom bo

Table 5.Proposa

Featu

EstimSpent

Whole

MainteRequi

Mount

Criteri

Velod

BMX T

FormaFacilit

Eques

Amen

ChildrplaygrBBQ

Wagga Multisp

Facility B

ature reviews. On Fridarra. The threerrabi Dirt ers visiting t

atures of Sr details ono Forest Paycling facilitioth inside an

1: Featuresal.

ures

ated Capitat

e site area

enance irements

tain Bikes

ium Circuit

rome

Track

al Running ties

strian Trails

nities Block

ren’s’ round and

port Cycling Co

Benchma

w and site ay July 10 2ee sites visJumps. Thhe Bathurst

Stromlo Fore these par

ark is uniquies on the ond outside t

s of Stromlo

Stromlo

al $8 millio

1,200 h

$800,00ACT Gomaintencontrac

50km ctrails, dojump tra

1.2km

No

No

2.5km iloop

s Yes

Yes - $8

Yes

omplex Feasib

rking

visits were2015 a Cousited were Shis was follt Bike Park

est Park anks, Majura e to Austra

one site. Bethe ACT.

Forest and

o Forest Pa

on

ectares

00. 1 FTE wovernment. nance ts

ross countrownhill tracack

rrigated gra

800,000

bility Study

e carried ouncil OfficerStromlo Forlowed by aon Wednes

nd BathursPines and

alia becausecause of th

Bathurst Bi

ark Bath

$9 m

79 he

with 7

Not asite hopen

ry ck,

12kmtrails

Prop

Yes -

Yes istand

ass No

No

Yes -

No

out to provr and threerest Park, Ma Council sday July 30

t Bike Parkd Yerrabi De it has on

hese feature

ike Parks co

hurst Bike P

million

ectares

available ashas only jusned

m cross cou

osed 1.5km

- $1.4 millio

internationadard $1.5M

- $550,000

vide a benccycling clu

Majura PineOfficer and0 2015

k are compirt Jumps a-road (critees it draws

ompared to W

Park Pr

Esmi

22

s the st been

Es$1

ntry 25tra

m PrEs

on Pr$0

al Pr$1

No

Inf

Pr$0

Pr$1

chmark forub memberses Recreatid two cycli

pared in Taare in Appe

erium track)events and

Wagga Wagg

roposed W

stimated $1illion

25 hectares

stimated 160,521

5km cross cails

roposed 1.8st.: $0.8M

roposed Est0.7M

roposed Est1.1M

o

formal fire t

roposed Est0.7M

roposed Est139K

Page 28

r cycling s visited on Area ing club

able 5.1. endix 2. ) and off d visitors

ga MSCC

Wagga

1.5

country

8km

t.

t.

trails

t.

t.

Page 30: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

6.0

6.1

The like30% mo

Table 6.1

Ame

BBQ

BMX

Bicy

Carp

Carp

Crit

Jum

MTB

Pum

Velo

The WReservequestio

A companalysiswould Voluntedevelop

Wagga Multisp

Developm

Site Optio

ely footprintovement sp

1: Area requir

enities

Q Shelters

X Track

ycle Educa

park - seal

park - gras

erium Trac

mp track

B Playgrou

mp track

odrome

Wagga Cyclie was sugn, 258 (87%

plete list ofs was undebe the mo

eers from thped trials.

port Cycling Co

ment Opt

ons

t of the MSpace as per

red for multis

ation Area

ed

ss

ck

und

ing Surveyggested as %) agreed P

f the sites sertaken on ost suitablehe club have

omplex Feasib

tions

CC is 8.7 hTable 6.1.

sport cycling

Length

31

10

120

40

50

600

1910

40

60

30

160

Allow in b

Total Area

y Questionone poten

Pomingalarn

submitted ieach of the site. Pome spent thou

bility Study

hectares. T

g complex ele

h Wid

14

5

80

40

20

20

10

40

30

30

10

between m

Total Area

a of MSCC

7 asked antial site. Ona Reserve

n the surveese sites w

mingalarna usands of h

his includes

ements.

dth N

4

5

0

0

0

0

0

0

0

0

00

movement s

a of MSCC

Footprint (

about the Of the 296 was the pr

ey is recordwhich determReserve is

hours devel

s all the cyc

Number

1

4

1

1

1

1

1

1

3

1

1

Total

space 30%

Footprint

(Hectares)

preferred s6 people teferred site

ded in Tabmined Poms home of oping the 2

ycling eleme

Area

9

1

1

12

19

1

5

16

66

20

86

site. Pominhat answe

e.

ble 6.2. Premingalarna R

the MTB 23km of sus

Page 29

ents and

a m2

434

200

9,600

,600

,000

2,000

9,100

,600

5,400

900

6,000

6,734

0,020

6,754

8.7

ngalarna red this

eliminary Reserve Wagga.

stainably

Page 31: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

W

T

Wagga Wagga Multi

Table 6.2: Sites su

Nam

Pomingalarna R

Equex

Wagga Wagga C

Charles Sturt U

Rocky Hill

Lake Albert

Old Leagues Cl

Willans Hill

Jubilee Park

Botanic Garden

isport Cycling Comp

uggested for a Mul

me

Reserve S

A

C

Cricket Ground K

niversity (CSU) E

N

L

ub C

C

B

ns T

plex Feasibility Stud

tisport Cycling Co

Location

Sturt Hwy

Ashmont

Copland St East Wa

Kincaid St Central

Estella

North Kooringal

Lake Albert

Central

Central/South Wagg

Bourkelands

Turvey Park

dy

omplex in the Wagg

Votes Z

258

agga 9

4

4

3

3

2

ga 2

1

1

ga Cycling Survey

Zoning Availa

Land (

RE1 17.8

RE1 27.0

RE1 0.26

SP2 1500.

RE1 33.4

RE1 15.0

RE3 3.3

RE1 93.0

RE1 32.0

RE1 14.0

y

ble

ha)

Feasible

0

Comments i

“Home” of MTB WLand is on the eatrees.

Used by footbaInsufficient usable

Site has a sealedground. Insufficien

CSU is open torecreation facilities

Hilly and heavily available * See no

Long and narrow, residents do not w

No longer availabl

Given the steep gusable land availa

Used by hockey, union. Insufficient

Used by botanic and zoo. Insufficie

ncluding existi

Wagga. It has 23kstern side of the re

all, netball and ee land available.

cycle track aroundnt usable land availa

o community use s.

wooded. Insufficotes following.

development is inawant views impeded

le – housing by priv

grades of the hill thable.

touch football, athusable land availab

gardens, music bent usable land ava

Page 3

ing facilities

km of MTB trails. eserve with limited

equine activities.

d cricket / football able

of their existing

cient usable land

appropriate. Local .

vate developer.

here is insufficient

hletics and rugby ble.

owl, parks depot ailable.

30

Page 32: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

W

Wagga Wagga Multi

Nam

Silverlite Reserv

Gumly Reserve

Riverside

Showground

Murrumbidgee T

Livingstone

Wiradjuri Reser

Borambola

North Wagga

isport Cycling Comp

me

ve A

G

C

T

Turf Club C

M

rve C

S

N

plex Feasibility Stud

Location

Ashmont

Gumly Gumly

Central

Turvey Park

Central

Mangoplah

Central

Sturt Hwy Borambo

North Wagga

dy

Votes Z

1

1

1

1

1

1

1

ola 1

1

Zoning Availa

Land (

E2 62.0

RE1 40.0

RE1 80.0

RE2 16.8

RE2 61.7

E1 1244.

RE1 24.0

RU1 8.7

RE1 37.6

ble

ha)

Feasible

0

Comments i

Mostly bushland.development.

This site is in a Considered unava

This site is in a owned or leased.

Used for showggreyhound racinunavailable

Used for horseunavailable

Heavily forested unsuitable

This site is in a flo

Site has numeroutrack. Owned by Considered unsuit

Most of the avConsidered unsuit

ncluding existi

. Not currently z

flood zone and is ailable.

flood zone and paConsidered unavail

ground activities ing and exhibitio

e racing activities

and 20km from

ood zone. Consider

s sporting facilities,State Governmenttable

ailable land is intable

Page 3

ing facilities

oned for facility

privately owned.

arts are privately lable.

ncluding soccer, ons. Considered

s. Considered

city. Considered

ed unsuitable

, including a BMX . 20km from city.

n a flood zone.

31

Page 33: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

*Rocky (1%). Rboundenorth, nsection trees su

The sitedevelopnot con

6.2

6.2.1

BMX AguidelinChamplong, haas park

Wagga requiredbe at lereplace

In SeptWagga the Mayfor an buildingdifferenversus Wagga 8m.

Wagga Multisp

Hill ReservRocky Hill ed by Koorinnorth Koorin

of this landuch as Kurr

e was inspepment potensidered fea

The flat lanStreet inteoperationalThere is a rSouth of thThe large prohibitive

Cycling F

Options fo

Australia hanes outlineionship leveave a starti

king and gra

currently hd by BMX Aeast 2.5m he some of th

tember 201should aim

y 17 2016 Internationa

g many of nce betweenfive metresWagga be

port Cycling Co

ve, includinReserve, inngal Road tngal residend is quite atrajongs and

ected by Contial for act

asible for a m

nd north of trsection wol land also hrailway ease railway eaamount ofto develop

Facilities O

or BMX

as producee the requel. All trackng hill, min

andstands.

has seven Australia. Fhigh and 8mhe current s

15 the presm for, at a Brett Barneal Champio

the recentn national as. This extraecause there

omplex Feasib

ng flats runncluding tho the East

nts to the wettractive withCypress P

ouncil staff oivities suchmultisport c

he railway eould be nehas a high cement runnasement is f exposed any infrastr

Options fo

ed a best irements f

ks need to himum three

BMX tracksor example

m wide. Havites that are

sident of Bminimum, a

es from Dirtonship levet BMX trac

and internata height wile are a num

bility Study

ning down he flats, is (near Monuest and Simh great viewine.

on July 22 2h as walkingcycling comp

easement aeeded for tcommercialning throughvery low angranite roc

ructure.

or Pominga

practice dofor a trackhave at mine turns and

s. None aree, the heighving a dedie degrading

MX Austraa National tz Designs l track. Dirtcks aroundtional standll increase tmber of trac

to Coplandowned by

umental Cemmkin Street ws, large gr

2015. It is cog, running aplex becaus

and adjacenhe velodro value to Co

h the centrend is subjecck in the h

alarna Res

ocument cak from Clunimum thre have certa

e built to tht and widthcated track

g.

lia, Barry KChampionsand Constrtz have be

d Australiadard is the ethe chancecks with 5m

d Street, reCouncil (s

metery), Coresidents toranite bould

onsidered toand riding. Hse:

nt the Koorinme and crouncil

e of the flat act to overlanhill area w

serve

alled ‘Trackub level ue straights,

ain support

he minimum of the star

k that is we

Knight, recoships level tructions recen involvedincluding

eight metre s of getting

m starting ra

eceived thresince 2001)opland Streo the south.ders and po

o have recrHowever th

ngal Road/Criterium trac

area nd flows

would make

k Guidelineup to Inter, be 280m tinfrastructu

m club stanrting ramp nell maintaine

ommended track. Howecommendedd in designBathurst. T

e high starting national eamps, but le

Page 32

ee votes ) and is et to the The hill

ockets of

reational he site is

Copland ck. This

e it cost

es’. The rnational to 450m ure such

ndard as needs to ed could

Wagga ever, on d aiming ning and The key ng ramp vents to ess with

Page 34: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

The key

The exTrack GBathursis on a 6.1). Th Figure 6.

Wagga Multisp

y design ele

Starting HilLength of trWidth of traMinimum oMinimum oStarting gaFirst straighTranspondeFencing onTwo covereGrandstandcan be a grFloodlightsParking spaarea along Drug testin

pected footGuidelines st Bike Parkvery steep

he Pominga

.1: Bathurst I

port Cycling Co

ements for a

l needs to brack 300m tack 8m first of four straigof three turnte 7.3m widht length of er cable at

n straights med staging ad available rassed hill s – minimumace availabthe side of g area.

tprint of sucwhich allow

k has an intsite (about

alarna Rese

International

omplex Feasib

an Internatio

be at least 8to 400m straight, re

ghts s

de, 50cm hig70m start hill and

minimum twarea of 10mfor 3000 p

side and/or m 150 lux buble for 1000

Bagley Driv

ch a facilityws for fourernational s30% grade

erve site wou

BMX track bu

bility Study

onal Champ

8m high and

est 6m inclu

gh and slip

d finish linewo metres from x 8m people. This

marqueesut proposing0 vehicles. Tve

y would be r straights astandard trae) and the euld be on a

uilt in 2015/1

pionship lev

d 8m wide

ding turns

resistant

e om track

s does not

g 500 lux foThis can be

120m x 80around 100ack which cearthworks e 10% grade

6 for $1.5 mil

vel track are

have to be

r Wagga We informal su

0m. (Sourc0m long eaost approxiexpense wae.

llion.

e:

formal sea

Wagga uch as the

ce = BMX Aach and wimately $1.5as high (see

Page 33

ating but

grassed

Australia dth 6m) 5M. This e Figure

Page 35: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

The cosDirtz Deweeks f

Dirtz reclay loatranspo

Additionto be in

Details in Sectispectatconcep

Figure 6North.

Wagga Multisp

st of a BMXesign and Cfor $90,000

ecommendeam soil avaonder netwo

nally the cocluded for a

on the costion 7.2. Whor moundst BMX track

6.2: View ove

port Cycling Co

X track canConstruction0. Another in

ed budgetinailable onsitork and hotm

ost of 500 lua BMX facil

ts proposedhen detaileds be no mok proposed

er proposed I

omplex Feasib

vary greatns in 2016 n Casey, Me

g $250,000te. This incmix corners

ux lighting, ity at Pomin

d for the Intd design is ore than 20for Poming

International

bility Study

tly dependinbuilt the Oaelbourne, w

0 for Waggacludes 3D d.

two coverengalarna Re

ternational Bcompleted 0% so they

galarna Res

BMX Track

ng on the sakleigh Sou

was built for

a Wagga gdrafted des

ed staging aeserve.

BMX Track for the BMXy can be aerve is pres

at Pomingala

slope and suth track in

$250,000.

iven the 10ign, earthw

areas and w

at PomingaX track it is appropriatelsented in Fi

arna Reserve

soil type of Melbourne

0% slope anworks, starte

water conne

alarna Reses recommenly maintainigure 6.2.

e looking tow

Page 34

the site. in three

nd deep er ramp,

ection is

erve are nded the ed. The

wards the

Page 36: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

6.2.2

The purriders to

The cuWagga1991 asServicetraffic lipath an

Figure 6.

This facit and mstandarmost da

This Bicbeen clof the pthe Bicy

Wagga Multisp

Options fo

rpose of a bo improve th

urrent facilit, has a foots a joint pro

es, PCYC aights, one r

nd 12m of g

.3: Wagga Bi

cility is showmany of thrds, discussays by fami

cycle Educassified op

proposed Mycle Educat

port Cycling Co

or Bicycle E

bicycle educheir skills a

ty at the Ptprint of 40oject betweand Waggarailway crosravel path.

ike Education

wing signs ohe signs arsion with a lies.

cation Area erational so

Multi-Purpostion Area w

omplex Feasib

Education A

cation area nd become

Police Citizem x 40m (F

een then Ro Wagga Cssing, 120mThe averag

n Area at PCY

of aging as e faded. Aneighbour

is proposeo it can be se Stadiumill be require

bility Study

Area

is to provid aware of ro

ens & YouFigure 6.3).oads and Tity Council.

m of asphalge width of t

YC, Spring St

AC path isAlthough the

on August

ed to be mosold. This wand PCYC

ed.

de a safe pload riding r

uth Club, S Now 25 ye

Traffic Autho. It has 35 ltic concretethe paths is

treet Central W

s cracking ae facility is t 20 2015 in

oved in thewas resolve

C projects.

ace for childules.

Spring Streeears old, it ority now Rroad signs

e (AC) paths 2.5m.

Wagga.

nd has grasaging and

ndicates the

future. Theed by CounIf this occu

dren and ne

et, Central was constr

Roads and Ms (actual sizh, 20m of c

ss growing d not up toe area is s

e land has ncil in consirs a new h

Page 35

ew adult

Wagga ructed in Maritime ze), two concrete

through current

still used

already deration

home for

Page 37: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

The newgiven thfacility activitieArea at

Figure 6.

6.2.3

Criteriucycling Wollundroads.

Phil Ayebe a stawork werollers talways difficult

For a d2015 a release

Wagga Multisp

w facility cohe number close to the

es and aid Pomingala

.4: Example o

Options fo

m tracks vaevents. Fo

dry Lagoon

es, CEO foandard vehell. A flat arto warm upheld in cato get com

dedicated olength of 1

ed a feasibil

port Cycling Co

ould be simof roundab

e amenitiesin supervis

arna Reserv

of a Bicycle E

or a Criteriu

ary greatly or example precinct. In

or Cycling Nhicle lane plrea for stagp, and therepital cities. petitors to t

off-road circ.8km to 2kmity study on

omplex Feasib

milar to the obouts in Ws building, sion. Detailsve are in Se

Education Are

um Track

in both len, in Waggan Orange e

NSW, recomus shoulde

ging is requiefore requiGiven race

ravel very f

cuit the Wam and a widn a Criterium

bility Study

one in FiguWagga Wagg

playgrounds on the co

ection 7.2.

rea.

ngth and wia Wagga tevents are h

mmended oer (about 5mired to set ure a flat ares usually far. Some ju

agga Waggadth of 3.5mm Cycling F

ure 6.4. It shga. It would and pumposts propos

dth. Streetshis takes pheld in the

n May 9 20m). Length vup shade terea. State aonly last a

unior events

a Cycling Cto 5m. Humacility.

hould also d be prefer

p track to psed for the

s may be cplace in theindustrial a

016 the minvaries but lents. Cyclistand Nationapproximate

s are held in

Club recomme City Cou

have a rourable to loc

promote joinBicycle Ed

closed for we CBD aro

area on 4-la

nimum widthoops of abts set up stal adult eveely 40 minun regional a

mmended inuncil in Mar

Page 36

ndabout cate this nt family ducation

weekend ound the ane wide

h should out 1km tationary ents are utes it is areas.

August rch 2015

Page 38: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

The sco

The Toothis tracline. It amenitiThe trac

BathursIt will raissues.

The speof 6m w1100m hills ansimilar fthat a nTrack a

Figure 6.

Wagga Multisp

ope they us

Length rangWidth minimCapacity toSome unduLinkage wit

owoomba Cck is 8m bewas openees buildingck is on a s

st Regional ange from Their high

ecifications wide (see and the fin

nd flats, tighfacilities. Conon-symmeat Pomingala

.5: Aerial view

port Cycling Co

sed around

ge 800m tomum 6m exo include shulations th shared p

Criterium traetween the wed in 2014 , fencing, a

sloping site a

Council is p5m to 6m level cost e

recommenFigure 6.5)

nal 1800m. ht and sweomments fr

etrical coursarna Reser

w of propose

omplex Feasib

layout was:

3km xcept for finiorter loops

ath network

ack has sixwhite edge and cost $

a bike trackat the Toow

planning to wide, asph

estimate is $

nded for Po). This circThe Pomin

eeping bendrom professse is attractve are in Se

ed Criterium T

bility Study

ishing straig

k and roads

circuit optiolines with 3

$2.34M. Thk leading towomba show

construct ahaltic concr$1M for the

omingalarnacuit has thrgalarna Reds; howeve

sional cyclistive. Detailsection 7.2.

Track at Pom

ght minimum

s.

ons ranging300mm to 5his cost inco the site, cwgrounds.

a 2000m critrete on a strack only.

a Reserve iree loops, oeserve tracker it is not st Brad McGs on the cos

mingalarna Re

m of 8m

g from 350 t500mm on tcluded the tcivil drainag

terium tracksloping site

s 1.8km lonone being k is propose

symmetricGee on Maysts propose

eserve.

to 1760m. Wthe outside track, landsge and eart

k at their Bithat has d

ng and an 700m, the

ed to have cal like somy 25 2016 ined for the C

Page 37

Width of of each

scaping, thworks.

ke Park. drainage

average second

a mix of me other ndicated Criterium

Page 39: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

6.2.4 O

The keyunlikelycarpark

Wagga pop up tempora

For mabatters maximis

Details 7.2. Thcompac

Figure 6main am

Wagga Multisp

Options for

y purpose y a club wok so they are

Wagga cuoccasional

ary in natur

intenance pcan be damses grip for

on the cosese costs hcted gravel/

6.6: Aerial viemenities and t

port Cycling Co

Jump Trac

for the Jumould use the easily acc

urrently haslly such as re due to the

purposes it mpened, par riders.

sts proposehave been /clay. A prop

w of proposethe criterium

omplex Feasib

ck

mp Track ise area for

cessed.

no formal in Wilks Pa

eir location

needs a rearticularly in

d for the Jubased on uposed layou

ed Jump Tractrack is abov

bility Study

s to providean event.

Jump Tracark on the rand quality

eadily accen dry month

ump Track using 1000m

ut can be se

ck at Pomingve.

e a recreatiIt should b

ck. Informariver. These

y of construc

ssible watehs. This min

at Pomingam3 of importeen in Figur

galarna Reser

ion site for be close to

l areas buile tracks arection.

er supply sonimises dus

alarna Reseted fill cappre 6.6.

rve. The build

casual usethe amenit

lt by younge usually sm

o the face ast and crack

erve are in ped with 10

ding to the rig

Page 38

ers. It is ties and

g people mall and

and side king and

Section 00mm of

ght is the

Page 40: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

6.2.5 O

Similar for casuthe amPoming

Wagga up occatempora

For mabe damgrip for

Details 7.2. Th7mm AC

Figure 6Reserve

Wagga Multisp

Options for

to the Jumpual users. I

menities angalarna Res

Wagga curasionally suary in natur

intenance pmpened, par

riders.

on the cosese costs C surface. T

6.7: Proposedlooking sout

port Cycling Co

Pump Trac

p Track, thet is unlikely

nd carpark serve is sho

rrently has nuch as in Wre due to the

purposes it rticularly in

sts proposedhave been Total length

d Pump Tracth.

omplex Feasib

ck

e key purpoy a club wo

so they aow in Figure

no formal pWilks Park eir location

needs a readry months

d for the Pubased on

h of the trac

ck between A

bility Study

ose for the Pould use theare easily

e 6.7.

pump track. k on the riv

and quality

adily accesss. This min

ump Track using com

ck would be

Amenities Blo

Pump Tracke area for a

accessed.

Informal arver. These y of construc

sible water imises dust

at Pomingapacted earapproxima

ock and Bike

k is to providan event. It The prop

reas built bytracks are

ction.

supply so tt and crack

alarna Reserth from onstely 300m.

e Education A

de a recreashould be

posed loca

y young peousually sm

the side batking and ma

erve are in site capped

Area at Pom

Page 39

ation site close to

ation for

ople pop mall and

tters can aximises

Section d with a

ingalarna

Page 41: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

6.2.6

The purroad ridcorner o

Cost essaws acompacPlaygro

Figure 6Golf Club

6.2.7

Phil Ayeshould Coffs Hevents countryWagganight st

Wagga 450m lohave redeterior

Wagga Multisp

Options fo

rpose of a Mding skills. of Pominga

stimates forand log ridected gravelound at Pom

6.8: Proposedb.

Options fo

es, CEO fobe 333m in

Harbour, haare held in

y champions. These usuay.

Wagga curong. The seeopened allorating due to

port Cycling Co

or MTB Play

MTB PlaygrThe propos

alarna Rese

r the MTB es on and l/clay conn

mingalarna R

d MTB Playgr

or Velodrom

or Cycling Nn length. Thas been prondoor and ships held oually attract

rrently has eal is in aveowing wateo water ing

omplex Feasib

yground

round is to psed locationrve, as show

Playgroundaround th

necting pathReserve are

round at Pom

me

NSW, recomhe Bathurst oven to woroccur in thon outdoor t around 15

a velodromerage condr into the paress and po

bility Study

provide a sen for this faw in Figure

d have beehe old rifle hs. Detailse in Section

mingalarna Re

mmended onBike Park d

rk well for he large cit

facilities. C0 competito

me which is ition. It wasavement. Toor drainage

eries of funacility is rec 6.8.

n based onrange con

s on the cn 7.2.

eserve lookin

n May 9 20design, whiregional areies that ha

Currently thors, bringing

an outdoors crack sea

The pavemee.

obstacles tcommended

n building ancrete canycosts propo

ng South East

016 that an ch is basedeas. State

ave these faere is one g their famil

r AC track thaled in 2012ent is in ave

to help devd at the no

a wall ride ayon. Costs osed for th

t towards the

outdoor ved on one loand Nationacilities. Thper year inlies for abo

hat is 7m w2 but most erage condi

Page 40

elop off-orth east

and see include

he MTB

e existing

lodrome cated at

nal track here are Wagga ut a two

wide and of these tion and

Page 42: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

These c12mm wand fallallowingwide enout of c

In Mayinvestigpavemeis becacompar

While thon the tcracks

If crackanotherwith apwould nexisting

CostingSurveyotrack coon the cin Figur

Figure 6Educatio

Wagga Multisp

cracks are swide and rul adjacent tg a state evnough for ccones.

y 2016 Mgations. In ent of sand,use of the trison, but ar

he track is top edges nneed to be

k sealing is dr 10 years. propriate dneed to beg facility app

g for the nor’s estimaonstruction,costs propore 6.9.

6.9: Proposeon Area and A

port Cycling Co

starting to buns at 110pto the crackvent to proccone work. T

McMahon Esummary

, silt and clathickness ore built on a

mostly holdnear the cofilled over t

done withinIf the track

rainage ins completely

proaches th

new velodrte dated S 500 lux flo

osed for Po

d VelodromeAmenities Blo

omplex Feasib

become a spsi. The craks, can cauceed becauThis is whe

Earth Sciethe results

ay. The reasof the asphaa strong pav

ding its shancrete wallhe next 12

n 12 monthsk were to btalled. Givey replaced.e end of its

rome at PSeptember 2oodlights, wmingalarna

e track at Poock.

bility Study

safety issueacks, which use wheel dse of these

ere cyclists

ence drilleds showed 6son the tracalt. Many revement.

ape, there is. In total themonths to p

s it is expecbe replaceden the poor A velodro

s useful life.

Pomingalarn26 2016. T

water conne Reserve a

omingalarna

e for the tracare about 5

deviation. Ce cracks. A

develop ba

d seven t65mm thickck is holdingesidential st

s a large amere is 500 lprotect the w

cted the pav it would nquality of t

me project

na ReserveThe main cection and cre in Sectio

Reserve loo

ck cyclists. 5mm wide,

Cycling NSWlso the curr

alancing ski

test holes k asphalt og up well onreets are o

mount of crineal metreweak pavem

vement woueed to be cthe paveme

should not

e was basecost activitiecovered staon 7.2 and t

oking South

A track bikalong with

W was closrent 7m tracills by riding

for geoteon top of n a weak panly 30 to 50

racking, pares of cracksment.

uld then hocompletely ent materialot proceed

ed on a Qes are eart

aging areasthe layout is

towards the

Page 41

ke tyre is the rise

se to not ck is not g in and

echnical a weak

avement 0mm for

rticularly s. These

ld up for dug out s, these until the

Quantity thworks, . Details s shown

e Bicycle

Page 43: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

6.2.8

The foll

Infrast

Ameni

Carpa

Carpa

BBQs

FencePlaygr

Details Section6.10). H

The ma

Wagga Multisp

Options fo

owing supp

tructure

ties Buildin

rk - Sealed

rk - Grass

and shelter

d round

on the cosn 7.2. The aHow this lay

ain items on

Sound fit oCCTV systeCarparks, fSealed accLocked secInternal graSite drainagSheltered BFenced plaConnectingand bicycle

port Cycling Co

or Support

port infrastru

Purpos

g Toiletscanteeoffice sroom, toutdoospace.

Space park on

Overfloeventsvehicle

rs Picnic nstainlesshelter

Play aryoung t

ts of the pramenities syout would l

n the suppor

ut em with 30 formal (sealcess road frocurity gate oavel servicege and deteBBQs x twoayground g services te wash dow

omplex Feasib

Infrastruct

ucture is rec

se

, change ron, storage a

space, meettiming area r public add

for 30 vehicn a sealed s

ow parking f, up to 1000

es.

node – douss steel BBQand picnic

rea for childto ride.

oposed supstyle is baseook at Pom

rt infrastruc

cameras led) and infoom the Golfon Bagley D roads

ention basin

o the site –n bays) and

bility Study

ture

commende

oom, area, ting and

dress

cles to surface.

for large 0

ble Q with tables.

dren too

pport infrasted on the S

mingalarna R

cture costing

formal (grasf Club entra

Drive near G

n

– communicd sewer.

d for the co

Comments

Similar desSet into the360 degreerooms unde

Needs to bbuilding another facilit

Allowing 3m400 cars wWest. The between thcontainer.

Adjacent facarers can

Close to ameducation a

tructure for Stromlo ForReserve is s

g sheet in S

ss) ance to ameGolf Club en

cations (Wi-

mplex:

s

sign to the Se side of thee viewing onerneath. Se

e adjacent d centrally ies.

m widths anould fit on Bother 600 we velodrom

acilities like watch child

menities andarea.

Pomingalarest Park bshown in Fig

Section 7.2 a

enities ntrance

-Fi), power,

Stromlo strue hill, excelln top level aee Figure 6.

to the amenlocated to t

nd 20m for 2Bagley Drivwould be loc

me and the M

pump trackdren in com

d bicycle

arna Reservbuilding (seegure 6.11.

are:

water (for

Page 42

ucture. ent and .

nities he

2 rows, e cated MTB

k so fort.

ve are in e Figure

building

Page 44: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

Figure 6.

Figure 6towards

Wagga Multisp

.10: Amenitie

6.11: Proposethe Sturt Hig

port Cycling Co

es Building at

ed Amenitiesghway.

omplex Feasib

t Stromlo For

s Building (ri

bility Study

rest Park, Ca

ight) at Pom

nberra.

mingalarna Reeserve lookinng to the So

Page 43

uth West

Page 45: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

7.0

7.1

One of PomingexistingbushlanThe co(Cootambe addr

Wagga Multisp

Analysis

Preferred

the importagalarna Resg vegetationnd. It wouldomplex ovemundra Waressed in a

port Cycling Co

of the Po

Pominga

ant goals ofserve (Figun. The MTBd be built amerall would

attle and CyREF.

omplex Feasib

omingala

larna Res

f the layout ure 7.1). ThB Playgrounmongst treed have sopress Pine

bility Study

arna Rese

serve Layo

is to utilisehe preferrednd is the oes so it wouome impac

suckers). T

erve Optio

out

e the open ad layout wonly componuld not requt on nativ

This is one c

on

area on theould have nent of the uire any tre

ve grasses component

e south easminimal imcomplex th

ees to be res and sma

that would

Page 44

t side of mpact on

hat is in emoved. all trees

need to

Page 46: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

W

F

Wagga Wagga Multi

Figure 7.1: Poming

isport Cycling Comp

galarna Reserve sh

plex Feasibility Stud

howing context of

dy

Multisport Cyclingg Complex.

Page 445

Page 47: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

In Septprinted.groups The Colayout (

Many sretainedinterestmotorbi

The premultispofacility. occasioinfrastruevents.

Figure 7.

Wagga Multisp

tember 201. Scaled cutan opportu

ombined Cy(see Figure

stakeholderd. For exat is that theikes be kep

eferred layoort elementOne elem

onally useducture for ca

7.2: Preferred

port Cycling Co

5 an aerial touts of eac

unity to suggcling Clubs 7.2).

rs have reqmple, the W

e bushland pt out”.

out uses thts. Section

ment that wd for largeramping. Mo

layout of Mu

omplex Feasib

image mapch of the progest a layoand Counc

quested thaWaggaRoobe retained

he footprint6 of this st

was not adr events aobile facilitie

ultisport Cycli

bility Study

p of the easoposed facut at Pomincil then used

at the naturos (Orienteed as uncha

t dimensiontudy addresddressed isand therefoes such as t

ing Complex

stern side oilities were ngalarna Red these as

ral beauty ering Club)anged as p

ns listed in ssed the lays a campinore it is notoilets woul

at Pomingala

of Pomingathen used teserve. Fiftea guide to d

of Pominga) President ossible and

Table 6.1:yout specificng area. Thot proposed be brough

arna Reserve

alarna Reseto give Stakeen were redevelop a p

alarna Ressaid “our

d that vehic

: Area requcs for eachhis would

ed to deveht in as req

e.

Page 46

erve was keholder eceived.

preferred

serve be primary

cles and

uired for h cycling only be lop any uired for

Page 48: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

7.2

Estimat

Tables The key

a) b) c) d)

7.2.1 Es

A summelemen Table 7.2

Wagga Multisp

Asset Ma

ted lifecycle

Amenities BMX TrackCriterium TBicycle EduJump TrackPump TracMountain BVelodromeSupport Inf

7.2.1 to 7.2y financial e

Capital CosAnnual opeRenewal coAnnual esti

stimated C

mary of thet are in App

2.1: Summar

Cap

Am

BM

Bic

Crit

Jum

Pum

MT

Vel

Sup

Rev

Det

Pre

Leg

Pro

Con

Tot

port Cycling Co

nagement

e costs for th

k Track ucation Arek

ck Bike (MTB) frastructure

2.3 are a sestimate sum

sts for all elerational incosts to replaimated econ

Capital Cos

e capital copendix 3.

ry of whole si

pital Cost I

menities

MX

cycle Educa

terium Trac

mp Track

mp Track

TB Playgrou

odrome

pport Infras

view of Env

tailed Desig

eliminaries (

gal Advice

oject manag

ntingencies

tal Capital

omplex Feasib

t – 30 Yea

he following

a

Playground

.

summary ofmmaries dis

ements of tcome and exace assets nomic bene

ts

osts are in

ite capital cos

Item

tion Area

ck

nd

tructure

vironmental

gns and Cos

(install of sit

gement (10%

s 10%

Costs

bility Study

r Lifecycle

g elements

d

f the key finsplayed are

the developxpenses what the end o

efit to the W

table 7.2.1

sts.

Factors

stings 8%

te services)

%) & procur

e Costs an

are present

nancial resue:

pment. hich producof their usef

Wagga Wagg

. Finer det

)

rement (1%

nd Income

ted in Appe

ults using t

ces an annuful life. ga Local Go

ails on cap

Cost – E

$666,

$1,103,

$152,

$823,

$64,

$115,

$45,

$718,

$2,186,

$10,

$470,

$333,

$50,

%) $741,

$748,

$8,230,

e

endix 3:

the life cycl

ual loss.

overnment A

pital costs f

Est.

,235

,596

,681

,455

,600

,600

,400

,503

,200

,015

,903

,291

,000

,453

,193

,124

Page 47

e costs.

Area.

for each

Page 49: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

7.2.2 A

Table 7is baseevents season

Maintenbookingmowingwear anrates. D

Table 7.2

Wagga Multisp

nnual Ope

7.2.2 showsed on Counand annuaal charge fo

nance expegs and orgag, security ind tear. UtilDetails on th

2.2: Summary

Income

Trade sh

Floodlig

Floodlig

Floodlig

Charge

Venue S

Cycling

Operati

Site Man

Amenitie

BMX Tra

Criterium

Bicycle

Jump Tr

Pump T

MTB Pla

Velodro

Support

TOTAL

Annual

port Cycling Co

rational Inc

s the MSCCncil’s fees l user fees or sports us

enses allowanising maiinspectionsity charges

hese costs a

y of whole of

Operation

hows, car s

ht user fees

ht user fees

ht user fees

for incident

Sponsorship

Clubs Hom

onal and M

nagement -

es

ack

m Track

Education A

rack

Track

ayground

me

t Infrastructu

Operation

Operating

omplex Feasib

come and

C operationsand chargefor cycling

sers which is

w for a perntenance a, sweepingare also in

are present

f site operatio

nal

shows, exhib

s - BMX Ho

s - Criterium

s - Velodrom

tal users

p

me Status An

Maintenanc

- user booki

Area

ure

and Maint

Loss

bility Study

Expenses

s, maintenaes which aclub membs $21 per s

rson to speand repairs. of tracks acluded for eted in Appen

onal income a

bitions, mar

ours

m Hours

me Hours

nnual User

ce Costs

ings and org

tenance Co

ance and rere cost rec

bers. This iseason or $4

end eight h Maintenanand generaelectricity, wndix 3.

and expenses

rkets

Fee

ganising re

osts

enewal costcovery. Oths based on 42 per year

hours per wnce activitieal repairs frwater, gas, s

s.

Tota

pairs

-

ts. Lightingher income

Council’s sr.

week on mes include crom vandalsewer and g

al

$675

$7,230

$7,230

$7,230

$4,200

$10,000

$12,600

$44,965

$/Year

$4,160

$26,263

$10,773

$10,283

$9,680

$1,613

$1,613

$7,200

$10,283

$13,280

$95,148

-$50,183

Page 48

income is from

standard

anaging cleaning, ism and garbage

Page 50: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

7.2.3 Es

Renewaor refurpaintingof the reAppend

Table 7.2

Wagga Multisp

stimated R

al costs havrbishment og, replacingenewal cosdix 3.

2.3: Summar

port Cycling Co

Renewal Co

ve been caof an existin the AC onts are in tab

ry of whole si

Renew

Amenitie

BMX Tra

Criterium

Bicycle

Jump Tr

Pump T

MTB Pla

Velodrom

Support

Total Re

omplex Feasib

osts

alculated forng asset th the criteriuble 7.2.3. Fi

ite renewal co

wal/Refurbis

es

ack

m Track

Education A

rack

rack

ayground

me

Infrastructu

enewal Cos

bility Study

r each cyclat is in poo

um track or iner details

osts.

shment Co

Area

ure

sts

ing facility. or conditionresealing ton renewa

osts A

A renewal n. Exampleshe entrancel costs for e

Av $/Year

$10,659

$2,439

$24,513

$1,852

$1,280

$1,210

$2,653

$3,782

$17,768

$66,156

is the replas at the MSe road. A seach eleme

Page 49

acement SCC are ummary nt are in

Page 51: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

7.2.4 Es

The ecocoming to partiaccomp

Table 7.2

Sport

BMX

BMX

BMX

MTB CroCountryMTB CroCountryMTB CroCountryMTB CroCountry

Road Cy

Road Cy

Road Cy

Running

Running

Cycling RunningCycling Running

Tourism

Trade sh

Using ththat coueconomis preserecorde

* Economeconomic

Wagga Multisp

stimated E

onomic ben to Wagga icipant visipanying the

2.4 Annual ev

oss y oss y oss y oss y

ycling

ycling

ycling

g

g

/ g /

g

m

hows

hese event uld be attrib

mic benefit vented in tabed in Appen

my ID is a wec analysis.

port Cycling Co

Economic B

nefit to Wagfor events tors, the e participant

vents at MSC

Event / Ac

National C

State even

Regional e

Worlds – 2CC Evocities 6participant

RAMBO -

NSW SchoChampionTrack Opeextras

Regional e

Regional schampions

Regional s

Orienteeri

Sports trai

Trail duath

Cycling to

Cars, bikemarkets

TOTALS

figures the buted to thevia the use ble 7.2.5. Fdix 4.

eb based pack

omplex Feasib

Benefit to W

ga Wagga at the MSC

economic imand numbe

CC and associ

ctivity

Championsh

nts

events

24-hour or N

6-hour - extts

extra partic

ools MTB nships ens (Velodro

events (Crit

schools ships

schools cros

ng nationals

ining camps

hlons

urist

es, exhibition

total numbe MSCC is of Economurther expla

kage officially

bility Study

Wagga Wag

has been cCC. These empact calcer of days s

iated visitors

hips

National

tra

cipants

ome) -

t) - extras

ss country

s or state

s

ns,

ber of extra v38,744. Th

my ID*. The anation of h

y adopted by W

gga

alculated baevents are lculations alstaying.

s numbers.

Number per year

0.1

1

3

1

1

3

1

2

2

2

2

1

3

6

1

4

33.1

visitor nightis figure watotal econo

how the eco

Wagga Wagg

ased on theisted in tabso include

r

Participfrom Wagga

30

50

100

30

50

40

50

100

100

100

300

50

30

50

0

1000

2080

ts generatedas then useomic impactonomic ben

ga City Counc

e number ofble 7.2.4. Ad

estimated

pants PartOutTow

0

0

0

0

0

0

0

d in Waggaed to determt on Wagganefit is calcu

cil for demogra

Page 50

f visitors dditional

people

ticipants t of wn

2989

500

200

600

50

30

400

50

50

300

300

100

30

100

2000

1000

8699

a Wagga mine the a Wagga ulated is

aphic and

Page 52: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

Table 7.2

7.3

On Febmet at PLands ain princ

a) b)

c)

ConsultPresideCouncilobjectiofacilitiesfor the straying

The neBMX traand a hsaid reresiden

7.4

7.4.1

In May full repoIn summThe becorrosio

Wagga Multisp

2.5 Estimated

Ben

Econ

Econ

Econ

Tota

Land Own

bruary 2 20Pomingalarand Local Liple suppor

A REF incluStandard aunder trusteThe Local Lan emergean informal

tation with tent of the Col Officers aon to the cos where the

golf driving golf balls a

arest resideack is approhillside and egarding Sats be comp

Technical

Geotechni

2016 McMaort titled ‘Pomary the rearing capacon and are f

port Cycling Co

d Annual Eco

efit

nomic Bene

nomic Bene

nomic Bene

al Annual B

ners and N

16 the Charna ReserveLand Servicrt of the proj

uding consiapprovals areeship to thLand Servicncy. The lal carpark wo

the Lesseeombined Cy

and the Coomplex proere is a winng range. Hand riders t

ential area oximately 8impact on

an Isidore pleted during

l Assessm

cal Assess

ahon Earth omingalarnaesults showcities and Cfavourable

omplex Feasib

onomic Benef

efit - Direct s

efit - Industr

efit - Consum

Benefits

Neighbour

airperson ofe with Officeces and Offject subject

deration of re obtained he Crown. ces requestast time it would be ade

of the Wagycling Clubsmbined Cy

oposal. He for both pa

He did undhat would h

is Rivervie850m. Thes

these residresidents.

g the REF s

ment of Po

sment

Science dra Reserve Ged the site CBR are goto supportin

bility Study

fit to Wagga W

spend impa

rial Impact

mption Imp

r Conside

f the Combers from thefice of Envirt to:

Aboriginal from Crow

ted the travewas officiallyequate.

gga City Gos, and agai

ycling Clubsindicated aarties. He dderstand thhave to be m

ew Drive. Te houses a

dents is likeIt is reco

stage of the

omingalarn

rilled five boGeotechnicais moderat

ood indicatng built infra

Wagga.

Am

act $7,5

$3,4

act $79

$11

rations

bined Cycline Departmeronment an

Heritage anwn Lands giv

elling stock y used was

olf Club occn on June 2s Presidentan opennesdid request hough theremanaged.

The distanceare bufferedely to be miommended e project.

na Reserv

ore holes acal Investigately reactiveing stiff soiastructure.

ount

500,838

489,008

96,932

,786,778

ng Clubs annt of Primad Heritage.

nd impact oven Council

route be pas in the 197

curred in M21 2016 andt. Overall thss to negotthat, if poss

e could be

e from Rive by the golfinimal, if at that consu

ve

cross the Mtion May 20

e which is ‘nls with a lo

nd Council ry Industry . They indic

on fauna andl manages

assable for 74 floods; th

March 2016 d July 15 20he Lessee tiate sharedsible, space conflicts b

erview Drivf course ve all. Similarultation wit

MSCC footpr016’ was prnormal’ for ow risk of c

Page 51

Officers - Crown

cated an

d flora. the land

cattle in herefore

with the 016 with had no

d use of e be left between

e to the getation r can be h these

rint. The roduced. Wagga.

concrete

Page 53: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

7.4.2

A formaoverflowhave a Effects intersecEnginee

ManagithroughChamp

EmergeSturt HRoad inReservegravel s

7.4.3

Based oReservebecausits use Develop

Wagga do not Infrastru

A condbe donapproxiproject

The key

Wagga Multisp

Traffic Con

al sealed caw grassed clocked gateof casual u

ctions (Sturer and of si

ng vehiclesh Council’s Dionships co

ency vehicuighway. In

ntersection. e. This hasservice road

Developme

on advice fe will not be, while thewill be by

pment Appl

Wagga Citrequire devucture Clau

ition of the e through mately $10elements.

y environme

MaintainingEffects on fHeritage inEffects of bTraffic and ManagemeNoise Dust Effects of cManagemeVisual impaWaste man

port Cycling Co

nsideration

arpark has carpark for e and low c

user traffic, art Highway milar chara

s for eventDevelopme

ould have up

ular accesstimes of hIn these tim

s been allowd.

ent Applica

from Councbe considee BMX tracklocal day tication may

ty Council wvelopment ause 65 and 6

SEPP is tha REF. A

0,000. The

ental issues

g biodiversitflora and facluding Abo

built infrastruaccess

ent of run-of

camping ent of large acts nagement.

omplex Feasib

ns

been plann1,000 vehi

cable fencinat an averagand Bagleycter to curre

ts however nt Applicatip to 1,000 v

s needs to igh floods

mes residenwed for in

ation (Coun

cil’s Planninred as a mk or MTB trato day visitoy need to be

will be the oapproval. U66) 2007 de

hat Council quote has REF would

s the REF w

ty and naturuna original Heructure

ff and poten

events

bility Study

ned for 30 cles has be

ng adjacent ge daily est

y Drive) is cent use by t

r needs to ion processvehicles req

be maintaRoche Roa

nts require ethe MSCC

ncil DA)

ng Directoramajor recrearails could aors and clue submitted

owners of tUnder the Sevelopment

consider thbeen obtai

d consider t

will need to

ral characte

ritage

ntial impact

vehicles toeen planneto entries t

timate of 10considered the Golf Clu

be assesss. Some evequiring parki

ined betwead goes unemergency design wit

ate, the MSation facility

attract a maubs. If a mad at that time

the proposetate Envirot can occur

he impacts oined from athe effects

consider ar

er of Poming

on nearby w

o cover dailyd for eventsto prohibit il00 vehicles,negligible b

ub.

ed on a caents such asing.

een Riverviender water access throth the inclu

CC proposay. This hasjor recreatioajor event we.

ed infrastrucnment Planas complyin

of the devea local provon the env

re:

galarna Res

watercourse

y casual uss. It is propllegal vehic, on McNickby Council’

ase by cass the BMX

ew Estate near the M

ough Pominusion of an

al at Pomins been detonal event, were to ha

cture and thnning Policyng develop

elopment. Tvider for a vironment o

serve

es

Page 52

sers. An posed to le entry.

kle Road s Traffic

se basis National

and the McNickle ngalarna

internal

ngalarna ermined most of

appen, a

herefore y (SEPP ment.

This can REF at

of all the

Page 54: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

An impotree plalandscaconcepcurrent large trnative gof the R

7.4.4

The neaThis woAdvice 32mm s

Providinwith 12systemsa 4G bo

The neathe Golmanholsewer m

Figure 7.

Wagga Multisp

ortant consanting betwaped gardet drawings site landsc

ree removagrasses woREF.

Services

arest waterould requirereceived fro

service to P

ng power w250 amps s. For commooster and f

arest sewerf Club. Thee access e

main therefo

7.3: Location

port Cycling Co

sideration ofween the cen beds wi

is to show cape has noals within thuld be distu

r is a 150mme an under om Riverina

Pomingalarn

will be expenper phase.municationsfree Wi-Fi a

r main is ape current seevery 80m or the trenc

of Water and

omplex Feasib

f the REF wcycling facill be plantehow the cyo trees whehe complexurbed and t

m main on bore of the

a Water in Jna Reserve.

nsive as it w This wou

s it is propoaccess.

pproximatelwer connec(3 off). Thehing depth

d Sewer servi

bility Study

will be that,lities, it is ed within tycling facilitere the facx footprint. the impact o

the southee highway. June 2016 .

would requild supply e

osed to utilis

ly 300m to ction estimaere is goodwill not nee

ices near Pom

while the cproposed

the completies fit withiilities are pSome smaof this will n

rn side of thThis has bis that the

ire the instaenough pose mobile te

the east of ate is basedd fall from ed to be sign

mingalarna R

concept drathat native

ex. The man the existi

proposed whall Cypress need to be

he Sturt Higbeen includmain has c

allation of a wer to runechnology.

the site. Thd on using 1Pomingalarnificant.

Reserve.

awings do ne trees andain purposeing landscahich will enPine suckconsidered

ghway. (Figded in the ccapacity to s

power trann the flood

This would

his is the se150mm PVCrna Reserve

Page 53

not show d native e of the ape. The nsure no kers and d as part

gure 7.3) costings. supply a

nsformer lighting

d include

ervice to C with a e to the

Page 55: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

7.5

If the Mconsidefinanciaconside

7.5.1 C

The foll

a)

b)

c)

d)

e)

f) g) h)

i)

7.5.2 O

a)

b)

c)

d)

7.5.3 R

Operatinominaseasonfull cost

The bigevent inWagga

Wagga Multisp

Financial

MSCC were ered during al figures prerations hav

apital Cost

owing chan

Remove thmake it toureduced coThe overheMTB tracksThe buildinsmall meetfootprint is Not providelit. Build the BThis could range to thCap the PuLeave the vBuild limiteentrance onNot build aCity Counc

Operations,

Clubs provsurfaces, oResourcingand CouncCouncil alrefrom other Savings wiclose a numconstructed

eturn on In

onal incomal user fee al charges.t recovery.

ggest returnncome andwould be $

port Cycling Co

Variables

to proceedthe detaile

resented in ve been gro

t

nges to the

he crisscrosuch at this lost. ead bridge s rather thanng footprint ting room, based on Be lighting on

Bicycle Educfree the a

is area beloump Track wvelodrome a

ed internal fn Bagley Dr fenced pla

cil’s Playgro

Maintenan

vide in kindorganising ag of operatioil. eady has asources likell be made mber of cycd.

nvestment

me is predicthas been

Charges fo

n on investmd cycling to$11.78M pe

omplex Feasib

s for Futur

d, the followed design a

this feasibouped below

scope of th

ss bridge olocation. Th

on the SWn over. of the amestorage an

Bathurst whin the criteri

cation Area rea up to m

ow the Pumwith compacat Kincaid Sfencing andrive

ayground. Tund Strateg

nce and Re

d resourcend implemeon and mai

renewal ine grants, spfor mainte

cling related

ted to be m applied thor lights pe

ment will beourism it har year.

bility Study

re Conside

wing scope cand costingility study d

w.

e project co

on the critehis would a

W corner of

enities blocnd showersich has a laium track (7

in town; hemove the M

mp Track. cted clay raStreet. d instead ha

This was nogy.

enewal Cos

es for cleanenting minointenance n

nfrastructureponsorship anance and

d facilities w

minimal givehat is comr hour have

e the econas been es

eration

changes an phase to a

do not inclu

ould signific

erium track achieve a si

the BMX tr

k could be s/toilets sim

arge meeting700m circui

ence it wouMTB playgr

ather than a

ave a locke

ot identified

sts

ning of amor building reneeds to be

e back log sand in kind renewal co

when the Po

en the natummensuratee also been

omic beneftimated the

nd operationallow for prde these sc

cantly reduc

near the Mmilar aligne

rack to go

decreasedmilar to Strg room andt) given the

ld not be a round down

sphalt.

d gate adja

as required

menities, repepairs. e shared be

so this may support.

osts as Couomingalarna

re of the si with othe

n included w

fit for Wagge economic

nal issues croject savincope chang

ce the capita

MTB contaied track at

under the

d so there isromlo. The d a kitchen/ke velodrome

cost to then from the

acent the G

d in Wagga

pairs of di

etween user

y have to be

uncil will bea Reserve f

ite and actier sporting which are b

ga Wagga, c benefit to

Page 54

could be ngs. The ges. The

al costs:

ner and a much

Crit and

s only a current

kiosk. e will be

e MSCC. old rifle

Golf Club

a Wagga

rt riding

r groups

e funded

e able to facility is

vities. A groups’

ased on

through Wagga

Page 56: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

In addiWagga Econom

Possibland useassist wFederalare:

Under made tocultural (Source

This coParliamMTB W

Loans cwould rto perpe

Businesconsidenatural Signage

Wagga Multisp

tion the ecWagga wo

my.id).

e income ser group fuwith sourcinl Governme

Local Sporthttps://sporSocial HouNational StClub GrantCommunityStronger CRMS and SPublic Rese

the NSW Go release $ infrastructu

e:www.infra

ould be a soment Daryl MWagga.

could be aprequire a roetual mainte

ss sponsorered as largbeauty of t

e Strategy a

port Cycling Co

conomic imould produce

ources for tndraising. Png grants aent run annu

t Grant Progrtandrecreasing Grantstronger Regs Category

y Developmommunities

Service Cluberve Manag

Governmen$300M for reure.

astructure.ns

ource of incMaguire wa

pplied for wbust busineenance.

rship is a ge bill boardthe reserveand Crown

omplex Feasib

mpact of coe boost the

the capital Peak bodiesand possibual program

gram (NSWtion.nsw.go

s given proxgions Fund

3 – Liquor ment Grants s Program bs for the Bgement Fun

nt State Infegional tou

sw.gov.au/m

come for thas briefed o

with Counciess case, a

possibility ds at Pomin

e. Signage wLand policie

bility Study

nstructing ae Wagga W

costs are gs such as Bly providing

ms that coul

W Office of Sov.au/clubs/ximity to As

& Gaming NProgram w

Bicycle Educnd with Crow

frastructure rism and b

media/4296

e MSCC. Inon this proj

l and Crowddressing a

however angalarna Rwould also es on adve

an $8.2M agga City e

grants, loansBMX Austrag resourcesd be a sour

Sport - /grants) hmont and

NSW with Departm

cation Areawn Lands.

Strategy, etween $50

66/inf_j14_8

n preparatioject in Aug

wn Lands. Sasset tenure

advertising Reserve wou

need to cortising.

multisport ceconomy by

s, cash, busalia and Cycs themselverce of grant

Tolland

ment of Infra

recommend00M and $1

871_sis_rep

on, the locaust 2016 b

Sourcing fune and ident

would havuld not be iomply with

cycling comy $14.38M (

siness sponcling Austraes. The Stfunding. Ex

astructure

dations hav1.2B for spo

port_ch09_w

al State Meby the Pres

nding from tify who will

ve to be cin keeping the Sports

Page 55

mplex in (Source:

nsorship alia may tate and xamples

ve been orts and

web.pdf)

ember of sident of

Council commit

carefully with the Ground

Page 57: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

7.6

This feidentifie

a) b) c) d) e)

f)

It is rec

That Co

a cobe

b susuCpr

7.7

Based build thelemen

Stage 1there ar

If it is ddesignsready” s

Stage 3

Wagga Multisp

Conclusio

easibility stued that:

There is suThe site topA facility coNo developA Review oAboriginal HThe proposgreater tha

ommended

ouncil,

ontribute $5e undertake

ubject to thuitable, e

Combine Cyroject

Recomme

on the expe MSCC ists.

1 is to carryre any envir

determined s, drawingsstatus and a

3 and beyon

port Cycling Co

on and Re

udy into a

ufficient phypography aould providepment applicof EnvironmHeritage sed facility cn the lifecyc

d:

5,000 in paren for the pr

he Review enter into aycling Clubs

ended Sta

perience of s approxima

y out a Revronmental f

the develops and costiallow for the

nd are flexib

omplex Feasib

ecommend

Multisport

sical spacend soil geol

e the servicecation woul

mental Facto

could providcle costs.

rtnership furoject

of Environa Memorans to partner

aging of W

other Couately 10 yea

view of Envfactors that

pment is apngs. This we bidding fo

ble given the

bility Study

dations

t Cycling C

e at the site.logy is suitae level desild be requirors is requir

de an econ

nding to all

mental Facndum of Ur in the fut

Works

ncils such ars. Table 7

vironmental would proh

ppropriate, would ensu

or capital fun

ey are depe

Complex at

able for the red by on aed. red to asses

omic benef

ow a Revie

ctors determUnderstandiure plannin

as Bathurs7.5 has an o

Factors. Thibit the proj

the secondure the pronds.

endent on fu

t Pomingala

developmeand off-road

ss impacts

fit to the Wa

w of Enviro

mining the ing with thng and imp

st, the expeorder of pri

his is requiect from pro

stage is deoject eleme

unding avai

arna Rese

ent. d cyclists.

on flora, fa

agga Wagg

onmental Fa

Pomingalahe Wagga plementation

ected timefority for the

ired to deteroceeding.

etailed engents are at

ilability.

Page 56

rve has

una and

a that is

actors to

arna site Wagga

n of this

frame to e project

ermine if

ineering “shovel

Page 58: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Wagga W

Table 7.5

Stag

Stage

Stage

Stage

Stage

Stage

Stage

8.0

Wagga Multisp

5 Recommen

e

e 1

e 2

e 3

e 4

e 5

e 6

Referenc

BMX AustraBMX TrackBikes ParksAssociationHume City Council, Vic

port Cycling Co

nded Project P

Item

FeasibilitEnvironm

Detailed

Criteriumand Dirt A

BMX TraPlaygrou

Large Am

Velodrom

ces

alia (2013).k Guide (201s IMBA’s Gn, Boulder, CCouncil (20ctoria Austr

omplex Feasib

Priorities.

ty Study, Prmental Facto

designs an

m track, SmaAccess upg

ck, Jump/Pnd.

menities, Fo

me and Bicy

BMX Austr14). Union Cuide to NewColorado U015) Criteriuralia.

bility Study

roject Adoptors.

d costings.

all Amenitiegraded.

Pump Track

ormal Carpa

ycle Educat

ralia Track Cycliste Intew School Tr

USA. um Cycling

ted by Coun

Funding bi

es, BBQ & s

s, BBQ & S

ark and MTB

ion Area.

Guidelines.ernationalerails (2014).

Facility Fea

ncil and Rev

ds.

helter, Infor

Shelter and

B Playgroun

BMX Aust(UCI)

. Internation

asibility Stud

view of

rmal Carpa

Fenced

nd.

tralia

nal Mountai

dy, Hume C

Page 57

rk

n Biking

City

Page 59: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Multispor

9.0

Append

Append

Append

Append

rt Cycling Com

Appendic

dix 1 Mul

dix 2 Det

dix 3 Life

dix 4 Det

mplex Feasibil

ces List

tisport Cycl

ails On Site

ecycle Costs

ails On Eco

ity Study

ling Comple

e Visits For

s For Each

onomic Impa

ex Survey Q

Benchmark

Cycling Fac

act Calcula

Questions

king

cility

tions

Page A1

Page 60: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Multispor

Appen

Launch

Survey

CyclingcommuCycle Ctogethefacilities

One prcombinmultipurunners

To viewtheme d

Your timoffering

For famcyclists

The Wa

1.

2.

3.

rt Cycling Com

ndix 1

ed by the W

was open f

, in its manity. All WaClub, Moun

er with Wags.

roposal puted cycling frpose and o

s, roller blad

w images odo a Google

me taken tog a $500 luc

milies each and non-cy

agga Comb

Do you par Yes What type o(Please tick

Rec Fam Alte Roa Dow Mou BMX Trac Soc Tria Cyc Oth

Do you thin Yes

mplex Feasibil

Multis

Wagga Com

for four wee

ny differentagga Waggntain Bike

gga Wagga

t forward isfacilities aloopen for usders, bushw

of the typese images se

o completecky draw pri

individual isyclists are e

ined Cyclin

rticipate in c

of cycling ak more thancreationally mily riding toernate transad racing wnhill moununtain BikinX ck Racing

cially with a athlon cling educater (Please

nk that feelin

ity Study

sport Cyc

mbined Cycl

eks, closing

t forms, is a cycling cWagga, BCity Counc

s a multispong with ame by other g

walkers and

s of facilitiesearch on 'cr

this surveyze to some

s encouragencouraged

g Clubs rep

cycling activ

No

ctivities do n one if appfor persona

ogether port to drivi

ntain bikingng

club

tion for childspecify) ___

ng unsafe o

No

cling Com

ing Clubs –

Wednesda

becoming clubs includicycle Wag

cil are cons

port complemenities and

groups, notsmall child

s that occuriterium trac

y will beneeone who co

ged to compd to complet

presentative

vities?

(If no, p

you participropriate) al fitness

ing eg. com

dren _________

on the roads

mplex Sur

– March 18

ay April 15 2

more and ing Wagga gga Waggaidering the

ex that wod car parkingt just the cyren learning

ur at a multcks and mtb

efit the planompletes th

plete their ote the surve

es would lik

roceed to q

pate in?

mmuting to w

__________

s is a deterr

rvey Ques

2015.

2015.

more popuWagga Cy

a and Wagfuture deve

uld be on g. This facil

ycling commg to ride.

tisport comb parks'.

ning proceis survey.

own surveyey.

e to thank y

uestion 3)

work and oth

__________

rent to your

stions

ular to manycling Club, gga Triathloelopment of

a single slity is plann

munity, for e

plex with a

ess. The cl

. Cyclists, p

you for your

her appoint

__________

r cycle expe

Page A2

y in our Tolland

on Club f cycling

site with ed to be

example,

a cycling

lubs are

potential

r time.

tments

_

erience?

Page 61: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Multispor

4.

5.

6.

7.

8.

rt Cycling Com

What typesimproved in(Please tick

BMX Crit Cyc Mou Off On Velo Tria Oth

Other than one site? Yes Comment w If a single swould be b(1 = Highes

Support Fa

Toilets

Change roo

Car parking

Shelters

BBQs

Playground

Spectator f

Bike shop

Coffee sho

Office spac

Meeting roo

Other (plea

Where cou__________________ (One potenSturt Highw

mplex Feasibil

s of cyclinn Wagga Wk more thanX Track erium Track

cling educatuntain Bike road sharedroad cycle odrome

athlon Facilier (please s

the shared

why? _____

site was debeneficial tost priority do

acility

oms

g

d

facilities

p

ce

om

ase specify)

uld this pro____________________

ntial site thaway just on

ity Study

g facilities Wagga? n one if you

k tion area Tracks d paths lanes

ties specify) ___

paths and

No

__________

veloped, who have? Selown to 3 low

Yes

)

posed site ____________________

at has beenthe western

do you be

wish.)

__________

cycle lanes

__________

hich of the ect yes or west priority

s / No

be and co____________________

n previouslyn outskirts o

elieve are

_________

s, should the

_________

following suno. If you sy).

omment wh__________________

y identified of Wagga W

required to

__________

ese facilities

__________

upport faciliselect yes g

Priority

y you sele____________________

is the PomWagga.)

o be develo

__________

s be locate

__________

ities do yougive a priori

ected this lo____________________

ingalarna R

Page A3

oped or

_

d on the

_

u believe ty rating

ocation? _ _

Reserve,

Page 62: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Multispor

9.

Briefly s

10.

11.

12.

13.

These aeligible

Name:

City/Tow

Postcod

Email A

Phone

rt Cycling Com

Do you seeWagga?

Yes

state why?

If the cyclinaffect how

Average r

Average r

Other than provided? _________ Do you hav_________ Contact De

are optionafor the $50

wn:

de:

Address:

Number:

mplex Feasibil

e a multisp

No

ng facilitiesoften on av

ides per we

ides per we

cycling act

__________

ve any othe__________

etails _____

al; however 00 lucky dra

ity Study

port cycling

s you think verage you r

eek NOW

eek after fac

tivities, wha

__________

r comments__________

__________

you need tw prize.

complex b

are necessride per we

cility is prov

at could the

__________

s, questions__________

__________

to at least p

being an as

sary in Wagek?

ided

proposed s

_________

s, or concer_________

__________

put a first n

sset into the

gga were d

Nu

site be used

__________

rns? __________

__________

ame and p

e future for

developed,

umber

d for if facil

__________

__________

__________

phone conta

Page A4

r Wagga

would it

ities are

_

_

_

act to be

Page 63: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Multispor

Appen

Stromlo

Facilitie

a)

b) c) d) e)

f) g) h)

Figure (WaggaVan Aa

rt Cycling Com

ndix 2

o Forest Pa

es

Mountain Bskills playgRoad BikesCross CounEquestrian Support Infroom), playTotal cost $Amenities bThere are p

9.1: Stroma Wagga Calst from A

mplex Feasibil

Detail

ark

Bikes - 50kmround. s – 1.2km cntry RunninTrails – fire

frastructureyground, BB$6 million inbuilding $80power bolla

mlo Visit Cycling CluCT Govern

ity Study

s on Site

m of signed

riterium circng – 2.5km ie trails with – amenitie

BQ, carparknitially, with 00k. It has frds adjacen

July 2015ub), Paul Jnment Terri

es visited

cross coun

cuit. irrigated gradirectional

es block (wk. $2 million c

free 250-ment to event t

5. Ronan BJohanson itory Venue

for Benc

ntry trails, do

ass loop. signage. ith hot show

capital speneg Wi-Fi petransition ar

Burke (MT(MTB Wages and Eve

chmarking

ownhill trac

wers, store

nt since oper month. Hareas.

TB Wagga)gga), Rod Fents Sectio

g

ck, jump trac

room and

ening. as fibre opti

), James Florence a

on

Page A5

ck and a

meeting

c cable.

Vickers and Jeff

Page 64: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Multispor

Genera

a) b)

c) d) e) f) g)

h) i) j) k) l)

m) n) o)

p) q) r)

Mainten

a) b)

c)

d)

e) f) g) h) i) j) k) l)

m)

StromloFigure 9

rt Cycling Com

al Comment

The site is Original coDeCastellaOpening hoThe downhAll MTB traUsers haveDesign errotrack. There are cAbout 20 scThe four cyGroup bookThe site ovelodrome Canberra hStromlo haPlanning isthe NW sidNo campingLittle user gAbout 12 msolo 24-hou

nance

One FTE eMaintenancasset buildTrail inspecday to writeInspection damage, ovAnnual maAnnual capIrrigation wOccasionalGates and Users are qVandalism Entrances by 4WDs. Dumped ca

o Forest Pa9.2 below.

mplex Feasibil

ts

1200 hectaoncept desiga. ours in sumhill track takeails are one e requestedor - runners

counters onchool cross

ycling clubs kings are choriginally pis sufficient

has two BMXs a website

s in motion e of the entg is allowedgroup confli

major eventsur champion

employed byce contracting, horticuctions everye up report. reports incvergrowth, cintenance b

pital budget water supply

l volunteer dtoilets are l

quite vocal ais low. Theare big “thu

ars were a p

ark in Canb

ity Study

res. It has tgn driven b

mer is 6ames about 2.way. Riders lights for ths have to c

n the cross cs country ev

each use tharged $2 pplanned tot to service X tracks. De

e. The Facefor an indo

trance gated except forct except os occur eacnships.

y ACT Govet for MTB tltural, weedy two month

clude trail ncomments, budget of apof $200k.

y is dam pludays for traocked overand keep aamenities a

umping” gat

problem but

berra has

three emergby Canberra

m to 9pm; wi5 minutes fs are to keehe criteriumcross the cr

country trailvents are hehe criteriumper head. Mo have a

Canberra. ecided not tbook site isoor swim ce.

r major evenccasionally

ch year, som

ernment Tetrail inspec

ds and secuhs by Jarro

name, lengtwork need

pproximatel

s bore. Towil maintena

rnight by sen eye on thare alarmedtes worth ab

t due to are

a 1.2km cr

gency phona Off-Road

nter is 6amfor the goodep on desig

m track. riterium trac

ls – about 8eld per yearm track one Meeting room

velodromeRecently hato build one

s used moreentre and b

nts such asy with horsesme at intern

rritory Venuctions, MTBurity. d Rando. 1

th, last upded, and safy $800k.

wn water asnce. Thesecurity contra

hings. d. bout $10k e

ea growth it

riterium cou

es. Cyclists (C

m to 6pm. d riders to gnated trails

ck to get to

80,000 passr. evening pe

m hire is $5. Decided ad $700k spe at Stromloe however. bunk style a

the Scott 2s. ational leve

ues and EveB trail main

.5 days for

ate, conditfety concern

a backup oare poorly

actors.

each. Canno

rarely occu

urse. The l

CORC) and

et down. s.

o the cross

ses per yea

er week. 50.

the Narrapent on it. o.

accommoda

24-hour in O

el such as th

ents. ntenance, c

inspecting

tion, wear, ns.

only. attended.

ot be knock

urs now.

layout is s

Page A6

d Robert

country

r.

abundah

ation on

October.

he world

cleaning,

and 0.5

weather

ked over

hown in

Page 65: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Multispor

Figure 9.

Majura

Majura Pines athese trwas comany o

In earlyTrail Alrecoverhave be

The jumThe jumsteeper

rt Cycling Com

.2: Stromlo F

Pines Rec

Pines is imare some trails were cnstructed a

of the old tra

y 2015 Jindalliance contred existingeen signed,

mp track is ump track rer jumps.

mplex Feasibil

Forest Park C

creation Ar

mproved anhe oldest aclosed for tand extensiails were de

abyne Landtributed aro

g trails, a pu mapped an

used by expequires mor

ity Study

riterium Trac

ea - Canbe

d maintaineand most ftwo years bve thinning

estroyed or v

dscaping weound 1000 ump track and were off

perienced rre maintena

ck.

erra

ed by ‘The famous mobetween 20g of the pinvery well hi

ere engagedhours of v

area and aficially open

riders. The ance than a

Majura Pinuntain bike

012 and 201es was unddden.

d to build 7volunteer w

a high qualited in May 2

pump tracka pump trac

nes Trail Alle trails in C14 whilst thdertaken. D

km of new twork to addty dirt jump2015.

is used by ck because

liance’. TheCanberra. Hhe Majura PDue to thes

trails. Majud 8km of np park. The

y riders of ane it has hig

Page A7

e Majura However Parkway e works

ra Pines new and se trails

ny level. her and

Page 66: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Multispor

Yerrab

a) b)

c)

d) e) f)

Figure 9.

rt Cycling Com

i Dirt Jump

Yerrabi DirtInitiative of Lions Club,Has jumpsriders (up toJumps are UnauthorisWater from

.3: Bathurst B

mplex Feasibil

ps at Yerra

t Jumps waf Canberra O, Rotary Clu

s for beginno 1.8m). closed duried modifica

m Yerrabi Po

Bicycle Park

ity Study

bi Ponds -

as built in 20Off Road Cub, and Dirt ners (up to

ng wet weaation of jumponds Lake is

Canberra

014. Cyclists (COt Art Trail Deo 0.6m), int

ather. ps is strictlys used for m

RC) with suesigners. termediate

y prohibitedmaintenance

upport from

(up to 1.2

. e works.

m ACT Gove

2m), and ad

Page A8

ernment,

dvanced

Page 67: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Multispor

Bathur

Designs

a)

b)

c)

d)

e)

f)

g)

h)

i)

j)

k)

l)

m)

n)

o)

rt Cycling Com

rst Bike Par

s of the Bat

Bathurst is are hospitaTotal appro

Velo Ame Inte MTB Ker Bicy Civi Cou Con

All funded visitor numindustry acVelodrome for pavemeDrainage wdraining waCentral aresteward areLesson leauntil the amAmenities bsewer systeBMX track steep slopegranite 100polymer staMTB trails valued at cmake the trCriterium trthe amenitiThe velodrracing) eveRenewal pManagemeThe Bathu(BAD) BMXSite masternow.

mplex Feasibil

rk

thurst Bike P

a growing ality (racing)oximate expodrome $1.enities $0.5

ernational BB Cross Cormesse/Criteycle educatil infrastructuncil staff wntingencies by Bathurs

mbers outsiross the cabudget wa

ent with 50mwas not a bater to the eea of velodeas and staarnt – velodmenities’ bublock budgeem requiredwas half b

e. Built to in0mm thick fabilizer. have been

close to $1Mrails quite inrack not yees building rome and

ents. lanning for

ent Plans. rst Cycling

X Club orgarplan was d

ity Study

Park, BMX

community ), manufactupenditure is 4M

5M, MX track $1

ountry trails erium $1Mion facility $ture $2.0M

wages for de$0.5M. t Council frde of motolendar. s $1.2M. En

mm AC finisbig cost – teast near radrome has anding zonedrome was ilding was fet was $350d because tbuilt. It will nternational finish. The

n constructeM. About 12nteresting tot built. Propand headincriterium tr

the bicycle

Club (Roanised the b

done by Bat

track and v

with a curruring and a$9 million o

1.5M $1M (in kin

$0.1M

esign and pr

rom sub-divor race se

nded up arosh. track and i

ailway line.a 2-coat

e for competbuilt first b

finished. AC0k. Ended uthey were ube huge wstandard wreturn path

ed by the B2km of singlo ride. posed 1500ng south. rack with a

e park has

ad and MTbike park feathurst Coun

velodrome c

rent populatgriculture. Ion the bicyc

nd)

roject mana

vision profitsasons and

ound $1.5M

nternals all

aggregate titors. ut could no

C becoming up around $nable to co

with massivewith 8-perso up the hill

Bicycle Clube trails with

0m track wit

also cater

been incor

TB) along wasibility studncil. They ar

can be seen

tion of 40,0t has three

cle park. Bre

agement (in

s. Part of s thus supp

M. Has 250m

slope to th

seal finish

ot be officiabrittle beca

$550k. Big vnnect into t

e earthworkon wide trac

will be of d

b - MTB ridh numerous

th 50mm A

for Kermes

rporated int

with the Bady. re revising t

n in Figure 9

00. Main inbike shops

eakdown is

n kind) $1M

strategy to iport the ho

mm DGB ro

he centre w

. Will be u

ally used foause of lackvariation watown sewerks on the sck and 5-7mdeco granit

ders. In kins natural fea

AC finish, sta

sse (Frenc

to Bathurst

athurst and

their busine

Page A9

9.3.

ndustries s. :

ncrease ospitality

ad base

with pits

used for

r events k of use. as onsite .

side of a mm deco e with a

d works atures to

arting at

h street

’s Asset

District

ess case

Page 68: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Multispor

Appen

Lifec

Capit

Desig

Lands

Opera

Buildi

Clean

Secur

Electr

Wate

Gas

Sewe

Garba

Insura

Reha

Iron R

Rene

Repla

Repla

Refur

Kiosk

Painti

rt Cycling Com

ndix 3

cycle Co

tal Constru

gn and cons

scaping inc

ational and

ing repairs a

ning (Toilets

rity

ricity

r

er Rates

age Rates

ance

T

abilitation/R

Roof Replac

w vinyl floo

ace gas inst

ace 4 x reve

rbish wet ar

k - replace a

ing internal

mplex Feasibil

Lifecy

osts - MS

uction

struction 31

luding flat c

d Maintena

and mainte

s only. Rest

TOTAL Op

Renewal Co

ce/Upgrade

r coverings

tant hot wat

erse cycle a

reas - mainl

appliances

and extern

A

ity Study

ycle Costs

SCC Ame

m x 14m sim

concreted st

T

ance Costs

nance

t of building

peration and

osts

ter units x 3

air-condition

y tiling (Kitc

al (minimal

TO

Average Re

s For Eac

enities

milar to Bat

taging area

TOTAL Ca

cleaned by

d Maintena

3

ners

chen, toilets

)

OTAL Rene

newal Cos

ch Facility

thurst

pital Costs

y users)

ance Costs

s, showers)

ewal Costs

ts per year

y

Cos20

$636

$30

s $666

Ovey

$177

$63

$270

$129

$5

$20

$20

$24

$75

s $787

Ovey

$20

$46

$6

$49

$60

$17

$119

s $319

r $10

sts in 016 $

6,038

0,197

6,235

er 30 years

A

7,000 $

3,300 $

0,390 $

9,870 $

5,190

0,790

0,880

4,960

5,510 $

7,890 $2

er 30 years

0,089 $2

6,221 $1

6,750 $

9,728 $2

0,000 $6

7,280 $1

9,700 $3

9,768

0,659

Page A10

Annual

$5,900

$2,110

$9,013

$4,329

$173

$693

$696

$832

$2,517

26,263

Each

20,089

18,488

$4,500

24,864

60,000

14,400

39,900

Page 69: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Multispor

Lifec

Capita

Earthw

Starte

Start g

Trans

7mm aconstr

Lightin

Two c

Conne

Opera

Repaisurfac

Crack

Electr

Water

Rehab

Shelte

Repla

Repla

rt Cycling Com

cycle Co

al Construc

works and t

er ramp and

gates

ponder netw

asphalt 30mruct)

ng 8 poles 4

covered stag

ection to Wa

ational and

rs and mainces (half in k

k sealing of a

icity for floo

r for track m

bilitation/R

ers iron roof

cing/re-com

ce asphalt s

mplex Feasibil

sts - BM

ction

track constr

pad

work

mm deep fo

40 lamps 15

ging areas 7

ater

d Maintenan

ntenance inkind from us

asphalt cor

odlight use a

maintenance

TOTAL Op

Renewal Co

f replace/up

mpacting of

surface - pr

A

ity Study

X Track

ruction

r corners (la

500 Watt 2

7m x 5m co

TOTAL

nce Costs

cluding erosers)

ners

and power f

e / preparati

peration an

osts

pgrade

gravel capp

rofile out an

T

Average Re

ay 1 year af

phase meta

olourbond s

L Capital Co

osion repairs

for events

ion

nd Mainten

ping

nd relay

TOTAL Ren

enewal Cos

fter

al halide

helters

onstruction

s of dirt

ance Costs

newal Costs

sts per yea

Cos20

$579

$53

$40

$20

$70

$300

$30

$11

n $1,103

Ovey

$86

$14

$216

$5

s $323

Ovey

$10

$47

$15

s $73

r $2

sts in 016 $

9,046

3,550

0,000

0,000

0,000

0,000

0,000

1,000

3,596

ver 30 years

A

6,400 $

4,700

6,900 $

5,190

3,190 $

ver 30 years

0,173 $

7,040 $4

5,960 $

3,173

2,439

Page A11

Annual

$2,880

$490

$7,230

$173

10,773

Each

10,173

47,040

15,960

Page 70: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Multispor

Lifec

Capita

Desig

Concr

Two c

Lightin

Opera

Generclearin

Electr

Water

Rehab

Shelte

Crack

Repla

Repla

rt Cycling Com

cycle Co

al Construc

n and insta

rete culvert

covered stag

ng of short c

ational and

ral maintenang drains (h

icity for floo

r for track m

bilitation/R

ers Iron Roo

k sealing of a

cing/re-com

ce asphalt s

mplex Feasibil

sts - Crit

ction

llation

underpass

ging areas 7

circuit 700m

d Maintenan

ance includhalf in kind f

odlight use a

maintenance

TOTAL Op

Renewal Co

of Replace/U

asphalt cor

mpacting of

surface - pr

A

ity Study

terium T

7m x 5m co

m on southe

TOTAL

nce Costs

ing erosionfrom users)

and power f

e/preparatio

peration an

osts

Upgrade

ners

gravel capp

rofile out an

T

Average Re

rack

olourbond s

ern end

L Capital Co

n repairs of

for events

on

nd Mainten

ping

nd relay

TOTAL Ren

enewal Cos

helters

onstruction

batters &

ance Costs

newal Costs

sts per yea

Cos20

$505

$84

$30

$202

n $823

Ovey

$86

$216

$5

s $308

Ovey

$10

$14

$275

$435

s $735

r $24

sts in 016 $

5,070

4,840

0,870

2,675

3,455

ver 30 years

A

6,400 $

6,900 $

5,190

8,490 $

ver 30 years

0,173 $

4,700 $

5,040 $27

5,480 $43

5,393

4,513

Page A12

Annual

$2,880

$7,230

$173

10,283

Each

10,173

$4,900

75,040

35,480

Page 71: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Multispor

Lifec

Capita

35 roa

5 traff

360m2

150 m

90 m2

Kerb a

Pallisa

Site es

Opera

Repailights

Electr

Rehab

Shelte

Crack

Renew

Renew

Renew

rt Cycling Com

cycle Co

al Construc

ad signs at $

ic lights at $

2 of Asphalt

m2 of concre

of compact

and gutter e

ade fence 2

stablishmen

ational and

rs and main

icity for traff

bilitation/R

ers iron roof

k sealing of a

w signs

w gravel su

w asphalt su

mplex Feasibil

sts - Bic

ction

$200 each

$6K each. A

t path at $52

te path at $

ted gravel p

each side of

2.1m high an

nt + Bobcat

d Maintenan

ntenance in

fic lights

TOTAL Op

Renewal Co

f replace/up

asphalt

rface

urface

A

ity Study

cycle Edu

installed

Allow 100m

2.27 per m2

$81.93 per m

path at $31

f path 400m

nd 160m lo

t 2 days for

TOTAL

nce Costs

cluding van

peration an

osts

pgrade

T

Average Re

ucation A

trenching f

2

m2

per m2

m total @ $9

ng

site levellin

L Capital Co

ndalism of s

nd Mainten

TOTAL Ren

enewal Cos

Area

for power

99.66/m

ng

onstruction

signs and

ance Costs

newal Costs

sts per yea

Cos20

$7

$31

$18

$12

$2

$39

$33

$6

n $152

Ovey

$260

$30

s $290

Ovey

$10

$14

$3

$8

$18

s $55

r $1

sts in 016 $

7,000

1,400

8,817

2,290

2,790

9,864

3,600

6,920

2,681

ver 30 years

A

0,400 $

0,000 $

0,400 $

ver 30 years

0,173 $

4,700 $

3,500 $

8,370 $

8,817 $

5,560

1,852

Page A13

Annual

$8,680

$1,000

$9,680

Each

10,173

$4,900

$3,500

$2,790

18,817

Page 72: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Multispor

Lifec

Capita

Lands

100mm

1000 m

Allow

Bobca

Opera

Repaisurfac

Water

Rehab

Repla

rt Cycling Com

cycle Co

al Construc

scaping quo

m gravel/cla

m3 metres o

$9 m3cost t

at to finish o

ational and

rs and mainces (half in k

r for track m

bilitation/R

cing/re-com

mplex Feasibil

sts - Jum

ction

ote to constr

ay capping

of fill deliver

to purchase

off and lands

d Maintenan

ntenance inkind from us

maintenance

TOTAL Op

Renewal Co

mpacting of

A

ity Study

mp Track

ruct jump tra

material de

red to site

e fill 1000 m

scaping

TOTAL

nce Costs

cluding erosers)

e/preparatio

peration an

osts

earthen tra

T

Average Re

k

acks

elivered to s

m3 fill

L Capital Co

osion repairs

on

nd Mainten

ck area

TOTAL Ren

enewal Cos

site

onstruction

s of dirt

ance Costs

newal Costs

sts per yea

Cos20

$31

$3

$10

$9

$11

n $64

Ovey

$43

$5

s $48

Ovey

$38

s $38

r $1

sts in 016 $

1,000

3,000

0,000

9,000

1,600

4,600

ver 30 years

A

3,200 $

5,190

8,390 $

ver 30 years

8,400 $3

8,400

1,280

Page A14

Annual

$1,440

$173

$1,613

Each

38,400

Page 73: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Multispor

Lifec

Capita

Pump

600 m

Lands

Opera

Repaisurfac

Water

Rehab

Crack

Repla

rt Cycling Com

cycle Co

al Construc

Track cons

m2 asphalt su

scaping

ational and

rs and mainces

r for track m

bilitation/R

k sealing of a

cing/re-com

mplex Feasibil

sts - Pum

ction

struction

urface capp

d Maintenan

ntenance in

maintenance

TOTAL Op

Renewal Co

asphalt surf

mpacting of

A

ity Study

mp Track

ping AC7mm

TOTAL

nce Costs

cluding ero

e / preparati

peration an

osts

face - 1 cre

gravel batte

T

Average Re

k

m at 40mm

L Capital Co

osion repairs

ion

nd Mainten

ew visit each

ers

TOTAL Ren

enewal Cos

depth

onstruction

s of dirt

ance Costs

h 10 years

newal Costs

sts per yea

Cos20

$90

$15

$10

n $115

Ovey

$43

$5

s $48

Ovey

$14

$21

s $36

r $1

sts in 016 $

0,000

5,600

0,000

5,600

ver 30 years

A

3,200 $

5,190

8,390 $

ver 30 years

4,700 $

1,600 $2

6,300

1,210

Page A15

Annual

$1,440

$173

$1,613

Each

$4,900

21,600

Page 74: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Multispor

Lifec

Capita

Mater

Labou

100mm

500 m

Bobca

TOTA

Opera

Repaisurfac

Repai

Rehab

Repla

Repla

rt Cycling Com

cycle Co

al Construc

ials cost for

ur to build w

m gravel/cla

m3 metres of

at, roller and

AL Capital C

ational and

rs and mainces

rs to PG ele

bilitation/R

cing/re-com

ce and rene

mplex Feasibil

sts - MT

ction

r Stromlo M

wall ride, see

ay capping

f fill moved

d water cart

Constructio

d Maintenan

ntenance in

ements wea

TOTAL Op

Renewal Co

mpacting of

ew playgrou

A

ity Study

B Playgr

TB Playgro

e saws and

material de

t to shape a

on

nce Costs

cluding ero

ar and tear

peration an

osts

gravel conn

und elemen

T

Average Re

round

ound

log rides

elivered to s

and compac

osion repairs

and vandal

nd Mainten

necting path

nts

TOTAL Ren

enewal Cos

site

ct paths

s of dirt

ism

ance Costs

hs

newal Costs

sts per yea

Cos20

$15

$19

$3

$5

$3

$45

Ovey

$43

$172

s $216

Ovey

$11

$68

s $79

r $2

sts in 016 $

5,000

9,200

3,000

5,000

3,200

5,400

ver 30 years

A

3,200 $

2,800 $

6,000 $

ver 30 years

1,200 $

8,400 $3

9,600

2,653

Page A16

Annual

$1,440

$5,760

$7,200

Each

11,200

34,200

Page 75: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Multispor

Lifec

Capita

Const

LightinKincai

Two c

Conne

Opera

Repai(half in

Electr

Water

Rehab

Shelte

Crack

Repla

Avera

rt Cycling Com

cycle Co

al Construc

truct Velodro

ng 400w sinid Street

covered stag

ection to wa

ational and

rs and mainn kind from

icity for floo

r charges

bilitation/R

ers iron roof

k sealing of a

ce asphalt s

age Renewa

mplex Feasibil

sts - Vel

ction

ome earthw

ngle phase

ging areas 7

ater

d Maintenan

ntenance inusers)

odlights for e

TOTAL Op

Renewal Co

f replace/up

asphalt

surface - pr

al Costs pe

ity Study

odrome

works, asph

metal halide

7m x 5m co

TOTAL

nce Costs

cluding swe

events and

peration an

osts

pgrade

rofile out an

T

er year

alt surface

e - 30 poles

olourbond s

L Capital Co

eeping and

training

nd Mainten

nd relay

TOTAL Ren

and fencing

s from

helters

onstruction

vandalism

ance Costs

newal Costs

Cos20

g $482

$204

$20

$11

n $718

Ovey

$86

$216

$5

s $308

Ovey

$10,17

$14

$88

s $113

$3

sts in 016 $

2,923

4,000

0,580

1,000

8,503

ver 30 years

A

6,400 $

6,900 $

5,190

8,490 $

ver 30 years

72.80 $

4,700 $

8,578 $8

3,451

3,782

Page A17

Annual

$2,880

$7,230

$173

10,283

Each

10,173

$4,900

88,578

Page 76: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Multispor

Lifec

Capita

Sound

Carpa

Interna

Site D

Shelte

Closed

Secur

Fence

Servic

Servic

Servic

Servic

Opera

Cleanarea (

Playgr

Rehab

Shelte

Resea

Crack

Re-sh

Repla

Repla

Avera

rt Cycling Com

cycle Co

al Construc

d fit out for a

ark – asphal

al gravel se

Drainage and

ered BBQs x

d Circuit TV

rity gate and

ed junior (ba

ces to site -

ces to site -

ces to site -

ces to site -

ational and

ing of BBQshalf in kind

round inspe

bilitation/R

ers iron roof

aling of acce

sealing of c

eet internal

ce CCTV sy

ce asphalt c

age Renewa

mplex Feasibil

sts - Sup

ction

amenities b

lt and seale

ervice roads

d detention

x 2

V (CCTV) fo

d fencing

alance bikes

communica

power inclu

water

sewer 830m

d Maintenan

s, mowing afrom users

ections and

TOTAL Op

Renewal Co

f replace/up

ess road

carpark - 0.

l gravel serv

ystem

carpark - pr

al Costs pe

ity Study

pport Inf

building and

ed aggregat

s and concre

basin

or security

s) playgrou

ations Wi-F

uding transf

m to neares

TOTAL

nce Costs

and whippe)

repairs

peration an

osts

pgrade

.5 day for se

vice roads

rofile out an

T

er year

frastructu

site genera

te access ro

ete paths

nd with a bi

i or 4G boo

former

st existing li

L Capital Co

er snipping o

nd Mainten

ealing crew

nd relay

TOTAL Ren

ure

ally

oad

ike theme

oster

ine

onstruction

of small

ance Costs

w

newal Costs

Cos20

$21

$783

$154

$428

$86

$91

$97

$53

$30

$263

$20

$159

n $2,186

Ovey

$374

$24

s $398

Ovey

$10

$42

$7

$308

$154

$10

s $533

$17

sts in 016 $

1,500

3,100

4,000

8,100

6,000

1,000

7,500

3,000

0,000

3,000

0,000

9,000

6,200

ver 30 years

A

4,400 $

4,000

8,400 $

ver 30 years

0,173 $

2,480 $

7,350 $

8,000 $15

4,500 $10

0,530 $

3,033

7,768

Page A18

Annual

12,480

$800

13,280

Each

10,173

14,160

$2,450

54,000

03,000

10,530

Page 77: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Multispor

Appen

The proand is espend pto this chave th

Impact

The totComplefrom theand serestimat

There wconsumeconom

The coestimat

Impact

The impevents correspadded w

There consumeconom$431,68

The comaddition

Value-a(GRP). equivale

In summ

rt Cycling Com

ndix 4

oposed Mulestimated toper person complex. Ae following

on Output

tal visitor spex would leae economy rvices acrosed to be an

would be amption effecmy. It is estim

ombination ed rise in o

on Value-a

pact of an aat the M

ponding direwould be ge

would be mption effecmy. It is es88.

mbination on in Value-a

added by inThe impacent to the c

mary, GRP

mplex Feasibil

Detail

tisport Cyclo attract 38per day is

Assuming thpotential im

t

pend of $9,ad to a direwould also

ss related in additional

an additioncts as corremated that

of all direutput of $11

add and GR

additional oMultisport Cect increaseenerated fro

an additiocts as correstimated tha

of all direct, added of $5

ndustry repct on Waggahange in Va

in Wagga W

ity Study

s On Eco

ing Comple8,744 extra $242. This e events w

mpact:

,376,048 atect impact oo lead to anndustry sec$3,489,008

nal contribuespondinglythis would r

ect, industri1,786,778 in

RP

f $9,376,04Cycling Come in Value-aom related i

onal contribespondinglyat this wou

industrial a,754,521 in

presents tha Wagga Calue-added

Wagga City

onomic Im

ex will holdvisitor daysequals a to

will be held

ttributed to on output ofn increase inctors. Thes8 in output.

ution to they more waresult in a fu

ial and conn the Wagg

48 spend tomplex in Wadded of $3intermediate

bution to Wy more wauld result i

and consumn Wagga Wa

e industry ity’s GRP a outlined ab

y is estimate

mpact Ca

events of Ns spent in Wotal visitor sin Wagga W

staging evf $7,500,838n indirect dee indirect in

e Wagga Wges and saurther incre

nsumption ga Wagga C

the local eWagga Wa3,455,413. Ae industries

Wagga Wages and san a further

mption effectagga City e

componenas a result obove.

ed to increas

lculations

National andWagga Wagspend of $9Wagga City

ents at the8. This addemand for industrial im

Wagga City alaries are ase in outp

effects woCity econom

conomy asagga City A further $1s.

agga City alaries are r increase

ts would resconomy.

t of Gross of staging th

se by $5,75

s

d State signgga. Their

9,376,048 ay, it is calcu

e Multisport itional direcintermediat

mpacts (Typ

economy spent in t

put of $796,9

ould result my.

s a result of would lea

1,867,419 in

economy spent in tin Value-a

sult in an es

s Regional his event is

54,521.

Page A19

nificance average ttributed

ulated to

Cycling ct output e goods e 1) are

through he local 932.

in total

running ad to a n Value-

through he local dded of

stimated

Product s directly

Page 78: Wagga Wagga Mu port Cycling Coomplex · Appendix 1 Multisport Cycling Complex Survey Questions ... mplex Feasib owing were d in the sco considere could be p to be a pro g Terms or

Multispor

Impact

The emexampltime wo

The direthe Mucorresprange owould bemploy

This adwages creating

The coestimatWagga

Source

rt Cycling Com

on Employ

mployment ie, an event

ork in total),

ect additionultisport Cyponding direof industriesbe flow on ment equiv

ddition of emand salarie

g a further i

ombination ed increaseCity.

: http://econ

mplex Feasibil

yment (job

impact of at that gener would have

n of $9,376,ycling Comect increases. From thieffects into

alent to 9.4

mployment ies, a proponcrease eq

of all direce of emplo

nomy.id.com

ity Study

bs, 12mth F

an event is ates four we an employ

048 spend mplex in We of employs direct exo other rela annual FT

in the local ortion of whuivalent to 3

ct, industriayment equ

m.au/wagga

FTE)

expressed weeks of full

yment impa

to the localWagga Wayment equivxpansion in ated intermE jobs.

economy which would 3.7 annual

al and consivalent to 3

a-wagga

in Full Timtime work f

act equivale

economy aagga City valent to 18the econom

mediate indu

would lead tbe spent

FTE jobs th

sumption e31.3 annua

me Equivalefor 13 peop

ent to 1.0 an

as a result ois estimat

8.2 annual my it is antustries, crea

to a correspon local go

hrough cons

effects woull FTE jobs

ent (FTE) jople (52 weeknnual FTE jo

of staging eted to leaFTE jobs aticipated thating an ad

ponding incoods and ssumption im

ld result inlocated in

Page A20

obs. For ks of full ob.

events at ad to a across a at there dditional

crease in services, mpacts.

n a total Wagga