wag mid review
DESCRIPTION
Studio Mid Review for the Inuit Art and Learning Centre addition to the Winnepeg Art Gallery.TRANSCRIPT
SITE PLAN1/64” = 1’-0”
EAST ELEVATION1/16” = 1’-0”
SOUTH ELEVATION1/16” = 1’-0”
BASEMENT FLOOR PLAN1/16” = 1’-0”
STORAGE
CLASSROOM STUDIO
CLAY STUDIO
CLASSROOMSTUDIO
CLASSROOMSTUDIO
UP
FIRST FLOOR PLAN1/16” = 1’-0”
CLASSROOMSTUDIO
YOUTH STUDIO
LUNCH/MULTI PURPOSE
ENTRYLOBBY
DN
UP
SECOND FLOOR PLAN1/16” = 1’-0”
CLASSROOMSTUDIO
CLASSROOM STUDIO
OFFICE
OPENOFFICE
DN
THIRD FLOOR PLAN1/16” = 1’-0”
TEMPORARYGALLERY
PRINTS AND DRAWINGGALLERY
UP
UP
FOURTH FLOOR PLAN1/16” = 1’-0”
TEMPORARYGALLERY
DN
DN
FIFTH FLOOR PLAN1/16” = 1’-0”
RESEARCHCENTER
EAST-WEST SECTION1/16” = 1’-0”
RESEARCHCENTER
PERMANENT GALLERY
TEMPORARY GALLERY
CLASSROOMSTUDIO
CLASSROOMSTUDIO
CLASSROOMSTUDIO
ENTRYLOBBY
CLASSROOMSTUDIO
PERMANENTGALLERY
TEMPORARY GALLERY
CLASSROOMSTUDIO
CLASSROOMSTUDIO
CLASSROOMSTUDIO
CLASSROOMSTUDIO
YOUTH STUDIO
CLAY STUDIOSTORAGE
NORTH-SOUTH SECTION1/16” = 1’-0”