WA Commercial Building Energy Performance Standards –Revised EUI Means & Draft Targets
June 18, 2020
Presented at: webinar
Prepared by: SBW Consulting Team
![Page 2: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/2.jpg)
Agenda:
EUI Target Development Process
Revised Draft Mean EUIs
Normalization Factor Analysis
Draft EUI Targets Continuum
Target Setting Considerations
2
![Page 3: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/3.jpg)
EUI Target Development Process
Fall 2019
Winter 2020
Spring 2020
Fall 2020
12/10 Workshop
1/30 Workshop
2/26 Workshop
July Workshop
Summer 2020
CR101 Pre-rulemaking
CR102 Rulemaking
Public Hearings
Publish CR103Final Rules
Nov 1
Gather Input
Develop Methodology
Construct EUI Targets
Calculate Mean EUIs
3
Comments due
July 2, 2020
6/18Webinar
5/21Webinar
![Page 4: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/4.jpg)
REVISED DRAFT MEAN EUIS
4
![Page 5: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/5.jpg)
Recap of Public Input on Draft Means Climate zone ratios for hospitals
Only ASHRAE building type with 5b ratio < 4c ratio causing 5b mean < 4c mean
Judgement/data indicate this does not make sense so recommending same target for 4c and 5b
Operating shifts normalization factors for hospitals No data for <168 operations, develop weighted target and use factors for clinics, etc
Medical office EUI mean Medical Office (Diagnostic) corrected itself with other revisions and is what will be
assigned to Energy Star Portfolio Manager Property Type Medical Office
Refrigerated warehouses No data to support factor for lower temp vs. higher temp warehouses
Exclusion of sub 10k SF restaurants and grocery Added these back in to inform targets for convenience store and fast food which building owners
may use for developing weighted targets5
![Page 6: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/6.jpg)
Overview of Updated Methodology for Establishing Mean EUIs
Calculate individual CBECS building EUIs
Assign an ASHRAE climate ratio to each building to convert from current climate zone to 4C and 5B
Calculate Each building’s 4C and 5B EUI (and energy use)
Calculate mean EUIs for buildings in Washington’s climate zones
Calculate Mean CBSA EUIs
Use data from 2009, 2014, 2019 to determine an average for Washington State
Formulaically determine that a CBSA, or a CBECS Mean EUI should be used based on relative errors of each mean
Updated memo on Methodology for Establishing Mean EUIS6
![Page 7: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/7.jpg)
Make Climate Adjustments to Derive Zonal CBECS Mean EUIs
ASHRAE climate zone factors
Use proportions established in ASHRAE 100 (IE. Office in 4C has EUI 40/39 higher than 1A)
Apply factors to each 2012 CBECS Buildings.
Can also be applied in reverse to get 4C/5B from statewide means
7
![Page 8: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/8.jpg)
8
![Page 9: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/9.jpg)
Develop Regionally-Adjusted Mean EUIs
9
Examples of
Adjustments
![Page 10: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/10.jpg)
10
![Page 11: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/11.jpg)
11
![Page 12: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/12.jpg)
12
![Page 13: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/13.jpg)
13
![Page 14: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/14.jpg)
14
![Page 15: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/15.jpg)
15
![Page 16: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/16.jpg)
16
![Page 17: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/17.jpg)
17
![Page 18: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/18.jpg)
18
![Page 19: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/19.jpg)
19
![Page 20: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/20.jpg)
Multifamily Mean EUIs
RBSA 2011 and City of Seattle Benchmarking data
Must be have at least 50,000 sq feet of floor area
Must have at least 6 floors
Population of buildings all in Climate zone 4C
32 kBTU/sqft average EUI (4C)
32 kBTU/sqft average EUI (5B, climate ratio increases by 2%)
Distinct from ASHRAE 100 definition (5+ units)
20
![Page 21: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/21.jpg)
NORMALIZATION FACTOR ANALYSIS
21
![Page 22: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/22.jpg)
Normalizations Considered
Public input informed search for available data
Robust publicly available studies required
Ensure data quality
Ensure fairness
Occupancy and Operating shift had sufficient supporting data to derive normalizations
Supported by CBECS 2012 public microdata
Supported by Portfolio Manager Predicted Energy Estimator
22
![Page 23: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/23.jpg)
Operating Hours
Calculate CBECS 2012 Mean operating hours for each building Category in ASHRAE 100
50 or less, 51-167, 168
Calculate ratio relative to mean of the whole category.
If there was not sufficient CBECS 2012 data to support a change, recommend sticking with to Ratio in ASHRAE100
23
![Page 24: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/24.jpg)
Occupancy
Use Portfolio Manager regressions for occupancy
Metrics vary (FTE, # of Computers, # of Beds, etc.)
Applies to:
Office
Hospital
Hospital (MRI)
Hotel
Residence Hall
Senior Care
K-1224
![Page 25: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/25.jpg)
Example 1
Consider an administrative office open 8 hours per day, 5 days per week
50 thousand square feet
178 Full time employees per shift 0.00356 workers/sqft
290 computers 0.00580 computer/sqft
High occupancy, low operating hours
Target EUI 87 kbtu/sqft 0.8*1.5*78=87
25
5B MeanAdmin/professional office 78
ASHRAE 100 Building Type
Building Type 50 or less 51 to 167 168
Admin/professional office 0.8 1.0 1.5
Proposed Shift Ratios
Building Type Low Mean High
Office 0.9 1.0 1.4
Occupancy Ratio
All metrics are less than these
values
Anything not in the high or low
occupancy category is in the
mean category
All metrics are higher than
these values
Low Mean High
0.001561 workers per sqft
0.002278 computers per sqft
0.002056 workers per sqft
0.003028 computers per sqft
0.00354 workers per sqft
0.005786 computers per sqft
![Page 26: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/26.jpg)
Example 2
Consider an administrative office open 24 hours per day, 7 days per week
50 thousand square feet
178 Full time employees per shift 0.00356 workers/sqft
290 computers 0.00580 computer/sqft
High occupancy, high operating hours
Target EUI 164 kbtu/sqft 1.4*1.5*78=164
26
5B MeanAdmin/professional office 78
ASHRAE 100 Building Type
Building Type 50 or less 51 to 167 168
Admin/professional office 0.8 1.0 1.5
Proposed Shift Ratios
Building Type Low Mean High
Office 0.9 1.0 1.4
Occupancy Ratio
All metrics are less than these
values
Anything not in the high or low
occupancy category is in the
mean category
All metrics are higher than
these values
Low Mean High
0.001561 workers per sqft
0.002278 computers per sqft
0.002056 workers per sqft
0.003028 computers per sqft
0.00354 workers per sqft
0.005786 computers per sqft
![Page 27: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/27.jpg)
The Matrix
Determinants of Energy Use (DEU)
How Key Determinants of Energy Use Were Addressed:Normalization
FactorsWeighted
Average EUItExempt from
HB1257Built in to Mean EUI
New(er) Construction EUIt
How Addressed
Buildings w/ multiple activities (Mixed Use) x PolicySmall % of floor area driving bldg energy use (servers, labs, restaurants, laundry)
x * Policy
Vacancy x * x Policy
Occupancy Density x Possible Factor
Operating Shift x x Normalization Factor
Building Type x Mean EUI
Building Size x Mean EUI/Policy
Standard Loads * x Mean EUI
Unique Loads * Policy
Climate/Weather x Mean EUICampus (master metered, central plant) x x Policy
Industrial/Manufacturing x Policy
Vintage x Newer ConstructionHeating Fuel Type/Conditioned area x Mean EUI
Onsite Renewables x Mean EUI 27
![Page 28: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/28.jpg)
DRAFT EUI TARGETS CONTINUUM
28
![Page 29: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/29.jpg)
Goals and Directives from HB 1257
Maximize GHG reductions in the building sector
Use ASHRAE Standard 100 as an initial model
Establish EUI targets that are no greater than the average energy use intensity for the covered commercial building type
Consider adjustments for unique energy using features
Update the standard by July 1, 2029, and every five years thereafter
Consider lower EUI targets for newer construction based on the state energy code in place when the buildings were constructed
29
![Page 30: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/30.jpg)
Draft EUI Targets Continuum
WA EUI means included for reference
Continuum of targets from mean to ASHRAE 100 targets
5% less than mean
10% less than mean
15% less than mean
25% less than mean
ASHRAE 100 Targets
30
![Page 31: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/31.jpg)
31
![Page 32: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/32.jpg)
32
![Page 33: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/33.jpg)
33
![Page 34: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/34.jpg)
34
![Page 35: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/35.jpg)
35
![Page 36: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/36.jpg)
36
![Page 37: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/37.jpg)
37
![Page 38: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/38.jpg)
38
![Page 39: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/39.jpg)
39
![Page 40: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/40.jpg)
40
![Page 41: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/41.jpg)
Tabular Form of EUI Target Continuum by Climate Zone
https://www.commerce.wa.gov/wp-content/uploads/2020/06/WA-Targets.xlsx
Workbook includes crosswalk to Energy Star Portfolio Manager Property Types
41
![Page 42: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/42.jpg)
TARGET SETTING CONSIDERATIONS
42
![Page 43: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/43.jpg)
Recap of Public Input on EUI Targets
Establish long-term targets aligned with statutory 2030 and 2050 GHG reduction goals.
Require steeper reductions early, then taper.
Include more stringent scenarios as “stretch goal targets” for jurisdictions.
Add GHG intensity requirements.
Address on-site gas for heating in targets.
Include lower targets for newer construction.
Treat recently constructed and permitted buildings as existing and apply newer construction targets to buildings built to future codes.
Align future codes with BPS newer construction targets.43
![Page 44: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/44.jpg)
Target Design Context
Statutory economywide GHG reduction targets (HB 2311):
By 2030, 45% below 1990 levels
By 2050, 95% below 1990 levels
Long-term planning horizon: BPS compliance date is 10-20 years later than building stock data available to develop mean EUIs for the targets.
Compliance years are 2026-2028
Means data used for target development is from 2008-2019
Target development mean EUIs may be higher than mean EUIs now or in 2026.
Other Std 100 requirements can help lower EUIs: Building performance standard also includes energy management plan, operations and maintenance program, etc. which will help reduce EUIs.
Net-energy EUI targets: EUI targets are net-energy, inclusive of onsite renewables.
44
![Page 45: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/45.jpg)
Target Design Context, Cont.
Normalizations and exceptions: Applying normalization factors and exceptions may increase or decrease EUI targets for individual buildings.
Technologies
High performance technologies and design practices can significantly reduce energy use, often at low incremental costs:
LEDs, heat pumps, dedicated outside air systems (DOAS)
Energy management systems and submetering
Need to leverage opportunities for equipment replacements prior to 2026
Benefits/Costs
Efficiency measure costs are often incremental to scheduled replacements.
Net benefit over life of measures; cost-effectiveness ”back stop” in audit process helps ensure measure ROIs.
Access to State and utility incentive programs 45
![Page 46: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/46.jpg)
Target Design Context, Cont.
Impacts: amount of buildings or floor area affected and overall energy and greenhouse gas reductions increases with each percent reduction in the EUI targets
Catalog of buildings in WA required to comply with 1257 is not available yet
Example of estimated floor area impacts using CBECS data for select building types shown in following chart
46
![Page 47: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/47.jpg)
47
59%
35% 62%
61%
46% 69%
63%
48% 74%
66%
53% 79%
70%
61% 92%
84% 80% 81%0
20
40
60
80
100
120
140
0
20
40
60
80
100
120
140
College/university Elementary/middle school High school
Mea
n E
UI (
kBtu
/sf)
Education
WA Mean EUI WA Mean (-%5) WA Mean (-%10) WA Mean (-%15) WA Mean (-%25) ASHRAE-100 (WA Avg)
%values indicate percent of population Impacted by target
![Page 48: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/48.jpg)
48
Distribution of Climate-Adjusted CBECS EUIs
Elementary/middle school
Buildings with EUIs to right of
line need to reduce energy use
![Page 49: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/49.jpg)
Newer Construction Considerations
WSEC mandate requires 70% below 2006 baseline by 2031
Building characteristics and EUIs changing in new construction:
Energy code
Technology improvements
Establish code cycle cutoff for applying lower targets:
2015 WSEC or later?
2021 WSEC or later?
Establish magnitude of reduction compared to base targets
WSEC is on a path to achieve incremental improvements to meet 70% goals by 2031
49
![Page 50: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/50.jpg)
Energy Code Incremental Improvements as Context for Setting BPS Newer Construction EUI Targets
50
![Page 51: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/51.jpg)
Possible Newer Construction Compliance Path
Establish targets based on some portion of savings projected in WSEC path to 2031 70% reduction.
Possible compliance structure:
If building EUI is higher than newer construction target, require retro commissioning
If building EUI is higher than base target, require Std 100 Sections 8 and 9
51
![Page 52: WA Commercial Building Energy Performance Standards ... · 6/18/2020 · Workbook includes crosswalk to Energy Star Portfolio Manager Property Types 41. TARGET SETTING CONSIDERATIONS](https://reader033.vdocuments.us/reader033/viewer/2022050404/5f8195a067a668207b7fdb98/html5/thumbnails/52.jpg)
EUI Target Development Process
Fall 2019
Winter 2020
Spring 2020
Fall 2020
12/10 Workshop
1/30 Workshop
2/26 Workshop
July Workshop
Summer 2020
CR101 Pre-rulemaking
CR102 Rulemaking
Public Hearings
Publish CR103Final Rules
Nov 1
Gather Input
Develop Methodology
Construct EUI Targets
Calculate Mean EUIs
52
Comments due
July 2, 2020
6/18Webinar
5/21Webinar