W912L7-16-B-0002Project # PSXE102033 134th
ARW Repair Building 406
PRE-BID CONFERENCEAugust 16
McGhee Tyson Airbase, Louisville, TN
INTRODUCTION
• Contracting Officer (KO) Randal Halbrooks
• Contracting Specialist SFC Jonathan Forren
• Contracting Officer Representative (COR)1st Lt Travis Vaughn
• Deputy Base Civil Engineer Maj David Barrett
INTRODUCTION
• Your Name• Company• Your Position in Company• Are you a Prime or a Subcontractor
SYNOPSIS
• Project # PSXE102033 Repair of Building 406
• Magnitude is between $1,000,000 and $5,000,000
• A firm-fixed price contract will be awarded • Award will be A SMALL BUSINESS SET-
ASIDE• The contract will be awarded using Sealed
Bidding Procedures described in the Federal Acquisition Regulation (FAR) part 14
• Evaluation-Lowest responsible bidder inclusive of evaluated ABI’s
SOLICITATION, PLANS& SPECIFICATIONS
•On The Web - https://www.fbo.gov•Solicitation
•Questions & Answers Document•Amendments
•Check Regularly & Refresh Web Page
Period of Performance
Construction Period Is 365 Calendar Days After Receiving The Notice To
Proceed
Offerors Are Strongly Cautioned To Carefully Read The Requirements Of
The Solicitation And Comply Accordingly
WHAT YOU MUST SUBMIT
•Price – In Accordance With The Bid Schedule In The Solicitation.
•The Successful Bidder Will Respond To A Responsibility Questionnaire.
BID DUE DATE
•Bids Are Due September 6, 2016 By 1:00PM Central Time
•Bid Opening Will Be At 3041 Sidco Drive Nashville, TN 37204. Please Arrive Early To Allow For Ample Time To Access Base.
How Questions Will Be Handled
• Questions Must Be Submitted In Accordance With Section 00010 Of The Solicitation
• Submit Questions NLT COB August 30, 2016• Questions Received After COB August 30, 2016 May
Be Held And Addressed After Bid Opening With The Successful Offeror
• Do Not Call Technical Personnel Or A&E- This Will Delay Getting An Answer
Answers To Questions
•All Questions, On A Non-Attribution Basis, And The Answers Will Be Posted To The Web Site https://www.fbo.gov/
•If Necessary Addendums, Issued By An Amendment, Will Also Be Posted
•Check Web Site Regularly And Don’t Forget To Refresh Web Page
Websites
•www.fbo.gov (to download RFP, plans and specs)
•www.sam.gov (be sure you are registered)
Brief of Requirements
• Chris Soro (A&E) to provide a brief synopsis of requirement• After brief, proceed to do walkthrough of the site
Questions
Pre-Bid Meeting W912L7-16-B-0002
August 16, 2016
9:00 AM Eastern
McGhee Tyson Air Base, Knoxville, TN
Meeting called by: Jonathan Forren Type of meeting: Pre-Bid Meeting W912L7-16-B-0002
Facilitator: Jonathan Forren Note taker: Jonathan Forren
Timekeeper: NA
Attendees: See attached site visit roster at https://www.fbo.gov/
Please read: Invitation for Bid W912L7-16-B-0002
Please bring:
Minutes Agenda item: Pre-Bid Slides Presenter: Jonathan Forren
Discussion: Jonathan Forren and Paula Sales held a joint site visit for two (2) separate projects. Jonathan Forren covered his part of the pre-bid slides, and Paula Sales covered her portion. Majority of the contractors that attended the joint visit were interested in both projected.
Action items Person responsible Deadline
All questions concerning the solicitation must be submitted in writing. Any perspective bidder August 30, 2016
Agenda item: Plans and Specifications/ Walkthrough Presenter: Maj David Barrett
Chris Soro, A&E C2RL
Discussion: Maj David Barrett kicked off the plans and specifications presentation, and handed it off to Chris Soro to introduce himself and discuss that this project is a LEED Silver Project, with 50 rooms total for building 406. Mentioned that tinsel requirements and the shear strengths are covered in the structural drawings in S. 2.2. Discussed the mechanical systems (4 Pipe System) and replacing the chillers and boilers. He also mentioned that all the finishes are being replaced. (doors). Bathrooms will be gutted. Essentially this is a full renovation. During the walkthrough one floor was viewed by attendees as all the other floors are identical. Was also shown the mechanical room. Was stated that all furniture will be removed by government.