Siesta Beach Low Impact Development (LID) Design
Approach
2013 APWAAnnual Meeting & Trade Show
April 24, 2013
![Page 2: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/2.jpg)
History of Siesta Beach
![Page 3: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/3.jpg)
Goals and Objectives Met• Improve appearance and aesthetics of this world
class beach Updated restroom and new concession facilities Increased landscaping throughout New entrance/gateway design for the park
• Improve environmental quality of the park Improved stormwater treatment providing better
water quality Low Impact Development (LID) features
Pervious parking areas Bioswales in paved parking area
Phased removal of exotic plants and enhanced natural plantings
Energy efficient buildings and fixtures
![Page 4: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/4.jpg)
4
BOCC Approved Project - $21,500,000
(Includes $16,700,000 for construction)
![Page 5: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/5.jpg)
5
Beach Road Aerial Site Plan
![Page 6: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/6.jpg)
6
Beach Road Paving Grading And Drainage Plan
![Page 7: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/7.jpg)
7
Hydraulic Schematic Profile
![Page 8: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/8.jpg)
8
Stormwater Vault Site Plan
![Page 9: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/9.jpg)
9
Contech Stormwater Vault
![Page 10: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/10.jpg)
10
Stormwater Lift Station
![Page 11: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/11.jpg)
11
Aquionics UV Reactor
![Page 12: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/12.jpg)
Halma UV Group Background
• Over 300,000 installations
• In house MP Lamp R&D and Manufacturing
• Part of Halma Group (photonics & water measurement tech.)
Industrial Municipal
Est. 1929 Est. 1983 Est. 1972
![Page 13: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/13.jpg)
Virus Disinfection
Chlorine Reduction
TOC Reduction
Bacteria Disinfection
Chloramine Reduction
SRB Control
Ozone Reduction
Syrup/Brine Disinfection
EDC Reduction
Core business is understanding the science associated with diverse applications and delivering solutions
Aquionics Background
![Page 14: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/14.jpg)
14
InLine+ Series
A trusted solution for over 15 years
• Small footprint/compact design
• Medium pressure lamps
• Vertical or horizontal flow design
• Proven more effective for preventing photo-reactivation
• Proven for non-filtered applications with low UV-T
• USEPA/DVGW/NWRI/NSF 61 validation & certifications
![Page 15: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/15.jpg)
Optional single sided model with easy access
![Page 16: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/16.jpg)
16
Automatic Cleaning
• High torque drive mechanism
• Long life Viton rings
• Chemical assisted option
• Field adjustable wiper frequency
• Wiped sensor window
![Page 17: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/17.jpg)
17
Reference: Disk Filters
Insert AQX site photo………
Thomasville, NC InLine 16000+
UVT 65% 15 MGD
![Page 18: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/18.jpg)
18
BOCC Approved Project - $21,500,000
(Includes $16,700,000 for construction)
![Page 19: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/19.jpg)
19
Siesta Beach Park Aerial
![Page 20: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/20.jpg)
20
Siesta Beach Park Pavement Plan
![Page 21: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/21.jpg)
West Parking Area
![Page 22: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/22.jpg)
22
Western Park PGD Plan
![Page 23: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/23.jpg)
23
Western Park PGD Plan
![Page 24: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/24.jpg)
24
Bioswale Typical Cross Section
![Page 25: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/25.jpg)
25
Landscaped Bioswale
![Page 26: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/26.jpg)
East Parking Area (Pervious pavement)
![Page 27: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/27.jpg)
27
Seepage Analysis byLeggette, Grashears & Graham, Inc.
![Page 28: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/28.jpg)
28
Pervious Pavement Underdrain Plan
![Page 29: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/29.jpg)
29
Eastern Park PGD Plan
![Page 30: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/30.jpg)
30
Eastern Park PGD Plan
![Page 31: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/31.jpg)
31
Eastern Park PGD Plan
![Page 32: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/32.jpg)
32
Pervious Concrete Typical Section
![Page 33: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/33.jpg)
33
Tierra Geotechnical Engineering Recommendation
![Page 34: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/34.jpg)
34
Geotechnical Recommended Pervious Concrete Section
![Page 35: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/35.jpg)
35
Engineer Recommended Section for Main Drive Isle
![Page 36: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/36.jpg)
36
Detail for Abutting Sections
![Page 37: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/37.jpg)
37
Permeable Pavers for Cross Walks
![Page 38: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/38.jpg)
Overview – Pervious Concrete
• Pervious or no-fines Concrete – mixture of Coarse Aggregate, Portland Cement, Admixtures and Water
• Increased/Enhanced Porosity due to limited fines
• Can be placed directly on parent soils with no aggregate sub-base (rigid pavement type)
![Page 39: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/39.jpg)
I-4 TRUCK STOP (Shoulder application)
![Page 40: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/40.jpg)
FCPA – Florida Concrete Products Association BUILDING (Orlando)
![Page 41: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/41.jpg)
Overview – Permeable Pavers
• Expanded openings at the sides/edges encouraging water to infiltrate
• Openings are filled with small size stone
• Many different styles/patterns
![Page 42: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/42.jpg)
Permeable Pavers studied at UCF
![Page 43: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/43.jpg)
ERIK TESTING
E.R.I.K. Embedded Ring Infiltrometer Kit
-In-situ, nondestructive, replicable
- Constant head test @ 1” above surface
- Measures rate of water “upstream” of sample
- Infiltrometers can be embedded from surface of pavement down into parent soil, in order to monitor where clogging is taking place (ie. near the surface or deeper in the pore structure)
![Page 44: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/44.jpg)
PARENT EARTH SOIL
SUB-BASE LAYER(S)
PAVEMENT LAYER(S)
1.5 "
1.5 "
3.0 "2 " - 12 "
0 " - 24 "
4.0 "
ELEVATION VIEW
PLAN VIEW
6" ID PVC COUPLING FITTING(SCHED 80)
INSTALLATION INSERT COLLAR
PAVEMENT SURFACE LAYER
INSTALLATION INSERT COLLAR
PERMANENT INSERT COLLAR
6 " PVC COUPLING FITTING (SCHED 80)
6 " ID PVC PIPE (SCHED 80)
FILTER FABRIC(NON-WOVEN)
0.3 "
6.0 "6.85"7.53"
STORMWATER MANAGEMENT ACADEMY
UNIVERSITY OF CENTRAL FLORIDA
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PAGE
3 OF 4
DATE:
ERIK STUART, E.I.
DR. MARTY WANIELISTA, P.E.
ERIK STUART, E.I.
01-26-10NOTESDRAWINGS NOT TO SCALE.
DR. MANOJ CHOPRA, P.E.
![Page 45: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/45.jpg)
18.0 "
18.0 "
73.0 "
58.75 "
4.5 "9.0 "
10.75 "
PLAN VIEW
ELEVATION VIEW
3/4 " ID (CLEAR) VINYL TUBING
1/8 " VALVE (BRASS)
3/4" VALVE (BRASS)
2" ID (CLEAR) PVC PIPE
2" PVC TEE FITTING
2" PVC 45 DEGREE FITTING
2" PVC TEE FITTING
2" PVC 45 DEGREE FITTING
2" PVC CAP FITTING
25.75 "
2" PVC CAP FITTING
2" PVC 45 DEGREE FITTING
2" PVC TEE FITTING
2" PVC 45 DEGREE FITTING
2" PVC TEE FITTING
2" PVC PIPE
2" (CLEAR) PVC PIPE
2.0 "
2 " PVC PIPE
STORMWATER MANAGEMENT ACADEMY
UNIVERSITY OF CENTRAL FLORIDA
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PAGE
1 OF 4
DATE:
ERIK STUART, E.I.
DR. MARTY WANIELISTA, P.E.
ERIK STUART, E.I.
01-26-10NOTESDRAWINGS NOT TO SCALE.
DR. MANOJ CHOPRA, P.E.
![Page 46: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/46.jpg)
SEDIMENTS INTENTIONALY LOADED AND COMPACTED INTO SURFACE PORES *for clogging and rejuvenation studies
![Page 47: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/47.jpg)
PREVACUUMED ERIK TESTING
![Page 48: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/48.jpg)
REJUVENATION WITH VACUUM TRUCK
![Page 49: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/49.jpg)
SEDIMENTS REMOVED
SANDY SEDIMENTS FINE GRAINED SEDIMENTS
Pervious Pavements are a “DOOR MAT” to sensitive ecosystems that allows for easy removal of sediments(maintenance) with vac truck before they get carried downstream to receiving waters.
![Page 50: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/50.jpg)
SUSTAINABLE VOID SPACE (POROSITY) TESTING OF PAVEMENT AND AGGREGATES
![Page 51: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/51.jpg)
FWD- Falling Weight Deflectometer
![Page 52: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/52.jpg)
Heavy Vehicle Loading
![Page 53: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/53.jpg)
The Rainfall/Runoff Simulator*Up to 12 in/hr rainfall
- Hydrographs- Fertilizer/erosion testing- Rainfall/Runoff
World’s largest RAINFALL SIMULATOR
of its kind
![Page 54: W06 siesta beach low impact development-strum](https://reader038.vdocuments.us/reader038/viewer/2022103001/558e95561a28ab4b108b47a6/html5/thumbnails/54.jpg)
54
Questions?