Project Overview: Beginning this June, the City will be implemenng improvements along W. Mulberry St. between Overland Tr. and Jackson Ave. as recommended in the 2017 Old Town Neighborhoods Plan and 2014 Bicycle Master Plan. The W. Mulberry St. Project aims to address safety concerns and improve condions for corridor users through the addion of a center turn lane, crossing improvements, and protected bike lanes. The lower traffic volumes along this secon of W. Mulberry St. allow for one travel lane in each direcon, while the new center turn lane provides for safer and more convenient leſt turns to residenal driveways and local streets, and can help traffic flow by removing turning vehicles from the travel lane. Space gained from the reducon in lanes will be ulized to enhance bicycle mobility, while also increasing the buffer between the sidewalk and travel lanes. Crossing improvements are also planned at key locaons along the corridor as described below. W. MULBERRY STREET PROJECT COMING THIS SUMMER Dan Woodward 970.416.4203, [email protected] Planned Improvements: Mulberry from Rogers Park to Jackson: New center turn lane, one travel lane in each direcon, and protected bike lanes Mulberry at Impala / Ponderosa: New signal and enhanced bicycle and pedestrian crossing; 2-way protected bike lane on Impala Mulberry at City Park: Enhanced bicycle and pedestrian crossing Shields at Magnolia: New bicycle and pedestrian signals and crosswalk; Safer bicycle and pedestrian crossings by restricng exing vehicles on Magnolia to right only 1 2 3 4 CAMPUS WEST POUDRE SR HIGH CITY PARK NINE GOLF COURSE CITY PARK ROGERS PARK I M P A L A D R L I A R T D N A L R E V O SHIE L D S S T C IT Y P A R K A V E TAFT HILL RD W MULBERRY ST 1 2 3 MAGNOLIA PONDEROSA JACKSON AVE 4 Project Schedule: The project is ancipated to be constructed in phases over the course of a few weeks beginning in June through August 2018. W. Mulberry St. and Impala Dr. will be resurfaced and restriped, which will require 24-48 hour moving closures (ancipated to begin in mid-July). Addional construcon informaon will be provided to residents and the community in late Spring and early Summer. City staff and contractors will work with residents and businesses to coordinate access needs during the construcon. For more information and to sign up for project announcements: fcgov.com/fcbikes Tessa Greegor 970.416.2471, [email protected] Median Travel Lane Travel Lane Bike Lane Bike Lane k l a w e d i S k l a w e d i S Curb Curb PROPOSED (TYPICAL) EXISTING (TYPICAL) *No westbound bike lane between Jackson and Crestmore

Upload: others

Post on 10-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: W. MULBERRY STREET PROJECT Coming summer€¦ · W. Mulberry St. between Overland Tr. and Jackson Ave. as recommended in the 2017 Old Town Neighborhoods Plan and 2014 Bicycle Master

Project Overview: Beginning this June, the City will be implementing improvements along W. Mulberry St. between Overland Tr. and Jackson Ave. as recommended in the 2017 Old Town Neighborhoods Plan and 2014 Bicycle Master Plan. The W. Mulberry St. Project aims to address safety concerns and improve conditions for corridor users through the addition of a center turn lane, crossing improvements, and protected bike lanes. The lower traffic volumes along this section of W. Mulberry St. allow for one travel lane in each direction, while the new center turn lane provides for safer and more convenient left turns to residential driveways and local streets, and can help traffic flow by removing turning vehicles from the travel lane. Space gained from the reduction in lanes will be utilized to enhance bicycle mobility, while also increasing the buffer between the sidewalk and travel lanes. Crossing improvements are also planned at key locations along the corridor as described below.

W. MULBERRY STREET PROJECTComing this summer

Dan Woodward970.416.4203, [email protected]

Planned Improvements:Mulberry from Rogers Park to Jackson: New center turn

lane, one travel lane in each direction, and protected bike

lanes

Mulberry at Impala / Ponderosa: New signal and

enhanced bicycle and pedestrian crossing; 2-way

protected bike lane on Impala

Mulberry at City Park: Enhanced bicycle and pedestrian

crossing

Shields at Magnolia: New bicycle and pedestrian signals

and crosswalk; Safer bicycle and pedestrian crossings by

restricting exiting vehicles on Magnolia to right only

1

2

3

4

Cambios a W. Mulberry Street

PUTNAMELEMENTARY

POUDRECOMMUNI TY

ACADEMY

TARY

CAMPUSWEST

POUDRE

SR HIGH

IRISHELEMENTARY

LINCOLN

MIDDLE

SCHOOL

FREEDOMSQUARE

PARK

GRANDVIEWCEM ETERY

CITY PARKNINE GOLF

COURSE

CITY

PARK

ROGERSPARK

IMPA

LA D

R

LIART DNALREV

O SH

IELD

S ST

TAIN AVE

LAPORTE AVE

CITY

PAR

K AV

E

W VINE DR

TAFT

HIL

L RD

W MULBERRY ST1 2 3

MAGNOLIA

• New center turn lane, one travel lane in each direction

Mulberry at Impala / Ponderosa

Mulberry at City Park• Enhanced bicycle and pedestrian crossing

Shields at Magnolia• New bicycle/pedestrian signals and crosswalk• Safer bicycle and pedestrian crossings by restricting

exiting vehicles on Magnolia to right only

1

2

3

4

• Enhanced bicycle and pedestrian crossing

Mulberry from Overland Trail to Jackson Mulberry con Overland Trail a JacksonNuevo carril central de vuelta, un carril agregado en cada sentido

Mulberry con City ParkMejor paso peatonal y para gente en bicicleta

Shields con Magnolia

peatones y gente Paso peatonal nuevo con señales para en bicicleta Más seguro pasos peatonales (y para gente en bicicleta)

de la mediante la restricción de los vehículos que salen Magnolia solo a derecha

1

2

3

4

Mejor paso peatonal y para gente en bicicleta

• Vías ciclistas, protegidas y con espacioMulberry con Impala / Ponderosa•

Los cambios propuestos:

Stop by the Open House on March 1 to learn more! ¡Visítenos el 1 de marzo para conocer más!

PON

DERO

SA

W.Mulberry Street ImprovementsProposed Improvements:

JACK

SON

AVE

4

Project Schedule: The project is anticipated to be constructed in phases over the course of a few weeks beginning in June through August 2018. W. Mulberry St. and Impala Dr. will be resurfaced and restriped, which will require 24-48 hour moving closures (anticipated to begin in mid-July). Additional construction information will be provided to residents and the community in late Spring and early Summer. City staff and contractors will work with residents and businesses to coordinate access needs during the construction.

For more information and to sign up for project announcements: fcgov.com/fcbikesTessa Greegor970.416.2471, [email protected]

SHEET NO.

Fort Collins Bike ImprovementsDESIGNED:

REVIEWED:

DRAWN:

PROJECT NO. DATE00-2016-199

OF

REVISIONS

NO DATE ITEM

www.altaplanning.com10/16/17

p:720.524.7831Denver, CO 80202

1836 Blake St., Suite 100

Fort Collins, CO

C:\B

OX

SYN

C\F

C A

DD

ITIO

NAL

SER

VIC

ES\C

AD\S

HEE

T FI

LES\

00-2

016-

199

PLAN

- ST

UAR

T &

TAFT

HIL

L_AL

T 1.

DW

G

SCALE:

TJN

CRW

TYPICAL SECTION

JG

1:20

W MULBERRY ST

EXISTING SECTION PROPOSED SECTION

Median11 ft

Travel Lane11 ft

Travel Lane11 ft

Bike Lane6 ft

Bike Lane6 ft

klawediSklawediS Curb Bu�er

2.5-3 ft

Curb Bu�er

2.5-3 ft

Sidewalk SidewalkBike Lane5-6 ft

Travel Lane11 ft

Travel Lane11 ft

Travel Lane11 ft

Travel Lane11 ft

Bike Lane5-6 ft

SHEET NO.

Fort Collins Bike ImprovementsDESIGNED:

REVIEWED:

DRAWN:

PROJECT NO. DATE00-2016-199

OF

REVISIONS

NO DATE ITEM

www.altaplanning.com10/16/17

p:720.524.7831Denver, CO 80202

1836 Blake St., Suite 100

Fort Collins, CO

C:\B

OX

SYN

C\F

C A

DD

ITIO

NAL

SER

VIC

ES\C

AD\S

HEE

T FI

LES\

00-2

016-

199

PLAN

- ST

UAR

T &

TAFT

HIL

L_AL

T 1.

DW

G

SCALE:

TJN

CRW

TYPICAL SECTION

JG

1:20

W MULBERRY ST

EXISTING SECTION PROPOSED SECTION

Median11 ft

Travel Lane11 ft

Travel Lane11 ft

Bike Lane6 ft

Bike Lane6 ft

klawediSklawediS Curb Bu�er

2.5-3 ft

Curb Bu�er

2.5-3 ft

Sidewalk SidewalkBike Lane5-6 ft

Travel Lane11 ft

Travel Lane11 ft

Travel Lane11 ft

Travel Lane11 ft

Bike Lane5-6 ft

PROPOSED(TYPICAL)

EXISTING(TYPICAL)

SHEET NO.

Fort Collins Bike ImprovementsDESIGNED:

REVIEWED:

DRAWN:

PROJECT NO. DATE00-2016-199

OF

REVISIONS

NO DATE ITEM

www.altaplanning.com10/16/17

p:720.524.7831Denver, CO 80202

1836 Blake St., Suite 100

Fort Collins, CO

C:\B

OX

SYN

C\F

C A

DD

ITIO

NAL

SER

VIC

ES\C

AD\S

HEE

T FI

LES\

00-2

016-

199

PLAN

- ST

UAR

T &

TAFT

HIL

L_AL

T 1.

DW

G

SCALE:

TJN

CRW

TYPICAL SECTION

JG

1:20

W MULBERRY ST

EXISTING SECTION PROPOSED SECTION

Median11 ft

Travel Lane11 ft

Travel Lane11 ft

Bike Lane6 ft

Bike Lane6 ft

klawediSklawediS Curb Bu�er

2.5-3 ft

Curb Bu�er

2.5-3 ft

Sidewalk SidewalkBike Lane5-6 ft

Travel Lane11 ft

Travel Lane11 ft

Travel Lane11 ft

Travel Lane11 ft

Bike Lane5-6 ft

SHEET NO.

Fort Collins Bike ImprovementsDESIGNED:

REVIEWED:

DRAWN:

PROJECT NO. DATE00-2016-199

OF

REVISIONS

NO DATE ITEM

www.altaplanning.com10/16/17

p:720.524.7831Denver, CO 80202

1836 Blake St., Suite 100

Fort Collins, CO

C:\B

OX

SYN

C\F

C A

DD

ITIO

NAL

SER

VIC

ES\C

AD\S

HEE

T FI

LES\

00-2

016-

199

PLAN

- ST

UAR

T &

TAFT

HIL

L_AL

T 1.

DW

G

SCALE:

TJN

CRW

TYPICAL SECTION

JG

1:20

W MULBERRY ST

EXISTING SECTION PROPOSED SECTION

Median11 ft

Travel Lane11 ft

Travel Lane11 ft

Bike Lane6 ft

Bike Lane6 ft

klawediSklawediS Curb Bu�er

2.5-3 ft

Curb Bu�er

2.5-3 ft

Sidewalk SidewalkBike Lane5-6 ft

Travel Lane11 ft

Travel Lane11 ft

Travel Lane11 ft

Travel Lane11 ft

Bike Lane5-6 ft

*No westbound bike lane between Jackson and Crestmore