WESTBOROUGH PUBLIC LIBRARYSpace Plan Presentation
February 2014
![Page 2: W ESTBOROUGH P UBLIC L IBRARY Space Plan Presentation February 2014](https://reader036.vdocuments.us/reader036/viewer/2022062407/56649d895503460f94a6ef65/html5/thumbnails/2.jpg)
A LITTLE HISTORYo The Westborough Public Library began in
1777 as a lending library that was located in the Parkman Store.
o 1807: Union Library Society formed.
o 1857: Ownership of the library transferred to the town.
o 1868: Moved to Town Hall. The library stayed in the old Parkman Store until 1868, when it was moved to the Town Hall.
o 1908: Land purchased, building constructed & opened.
o 1980: Building expanded.
![Page 3: W ESTBOROUGH P UBLIC L IBRARY Space Plan Presentation February 2014](https://reader036.vdocuments.us/reader036/viewer/2022062407/56649d895503460f94a6ef65/html5/thumbnails/3.jpg)
SPACE CHALLENGES
Shifts in the way people use the space Furniture/fixtures old and worn Space is not flexible Insufficient meeting space Some structure-related issues
![Page 4: W ESTBOROUGH P UBLIC L IBRARY Space Plan Presentation February 2014](https://reader036.vdocuments.us/reader036/viewer/2022062407/56649d895503460f94a6ef65/html5/thumbnails/4.jpg)
TECHNOLOGY INFRASTRUCTURE Power & data infrastructure are insufficient
for a 21st century library. Over a century’s worth of wiring/cables inside
the walls.
![Page 5: W ESTBOROUGH P UBLIC L IBRARY Space Plan Presentation February 2014](https://reader036.vdocuments.us/reader036/viewer/2022062407/56649d895503460f94a6ef65/html5/thumbnails/5.jpg)
Overall, undersized for future population Staffing level below national standards Circulation on an upward trend over 10
years.
FUTURE PROJECTIONS
![Page 6: W ESTBOROUGH P UBLIC L IBRARY Space Plan Presentation February 2014](https://reader036.vdocuments.us/reader036/viewer/2022062407/56649d895503460f94a6ef65/html5/thumbnails/6.jpg)
CONCLUSIONS
Staffing & technology are at 2003 levels Insufficient parking, study space, computers Long range plan goals
![Page 7: W ESTBOROUGH P UBLIC L IBRARY Space Plan Presentation February 2014](https://reader036.vdocuments.us/reader036/viewer/2022062407/56649d895503460f94a6ef65/html5/thumbnails/7.jpg)
POSSIBLE SOLUTIONS
![Page 8: W ESTBOROUGH P UBLIC L IBRARY Space Plan Presentation February 2014](https://reader036.vdocuments.us/reader036/viewer/2022062407/56649d895503460f94a6ef65/html5/thumbnails/8.jpg)
MAIN FLOOR
![Page 9: W ESTBOROUGH P UBLIC L IBRARY Space Plan Presentation February 2014](https://reader036.vdocuments.us/reader036/viewer/2022062407/56649d895503460f94a6ef65/html5/thumbnails/9.jpg)
LOWER LEVEL
![Page 10: W ESTBOROUGH P UBLIC L IBRARY Space Plan Presentation February 2014](https://reader036.vdocuments.us/reader036/viewer/2022062407/56649d895503460f94a6ef65/html5/thumbnails/10.jpg)
FUNDING THE IMPROVEMENTS
Planning and Design grant (July 2014) Construction grant round expected in FY2015 First projects would begin around FY2017 Excluded items Staffing improvements