R A L L I Q U A Y S S A L F O R D C E N T R A L W E L C O M E WELCOME We are pleased to present our ideas for the Ralli Quays project, which completes an important piece of the Salford Central Masterplan. We have been developing our design to complement the surrounding buildings and uses, whilst looking to be progressive in our approach. We believe we have an exciting and vibrant design which will enhance Salford and Manchester, bringing a new concept to the market. Our concept is to combine an office and hotel in a contemporary way, which will support the adjacent buildings, and we hope, once complete, will be seen as a forward thinking, interesting and exciting landmark project to be proud of. Concept Visualisation of Ralli Quays

Upload: others

Post on 07-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: W E L C O M E [dppukltd.com]dppukltd.com/wp-content/uploads/2020/04/ralli-quays-final.pdf · landmark project to be proud of. Concept Visualisation of Ralli Quays. R A L L I U A S

R A L L I Q U A Y SS A L F O R D C E N T R A L

W E L C O M E

WELCOMEWe are pleased to present our ideas for the Ralli Quays project, which completes an important piece

of the Salford Central Masterplan.

We have been developing our design to complement the surrounding buildings and uses, whilst looking to be progressive in our approach. We believe we have an exciting and vibrant design which

will enhance Salford and Manchester, bringing a new concept to the market.

Our concept is to combine an office and hotel in a contemporary way, which will support the adjacent buildings, and we hope, once complete, will be seen as a forward thinking, interesting and exciting

landmark project to be proud of.

Concept Visualisation of Ralli Quays

Page 2: W E L C O M E [dppukltd.com]dppukltd.com/wp-content/uploads/2020/04/ralli-quays-final.pdf · landmark project to be proud of. Concept Visualisation of Ralli Quays. R A L L I U A S

R A L L I Q U A Y SS A L F O R D C E N T R A L

T H E T E A M

LEGAL & GENERALLegal & General Investment Management is one of Europe’s largest asset managers, with development and regeneration programmes throughout the UK.In addition to owning a 50% interest in Media City, L&G have provided long term investment in the New Bailey District of Salford.

Central St Giles - L+G A 500,000 sq ft office, housing and retail development which completed in 2010. It has become one of the iconic buildings on the London skyline. The development won the BCO Best of Best award in 2011.

245 Hammersmith Road - L+G A major commercial office and retail development in the centre of West London The new development includes the creation of a new park and piazza, two restaurants, a business lounge for visiting guests. Completed 2019

The Lewis Building - L+G and EPR Architects The former Lewis’s Department Store, regarded as Birmingham’s answer to Harrods. The project involved a major reconfiguration of the ground floor and the addition of one floor of offices. Completed 2017

OTHER LEGAL & GENERAL PROJECTS

EPR ARCHITECTSBased in London, Manchester and Poland, EPR Architects is an award-winning practice with a well-established reputation for quality architecture, masterplanning and interior design thanks to an extensive experience delivering an array of building typologies across workplace, lifestyle and leisure sectors.

HANNAN ASSOCIATES (SERVICES CONSULTANT)Hannan Associates was established in 1983 as an engineering consultancy providing building services design solutions to the construction industry.Committed to creating successful buildings through attention to detail utilising their breadth of experience and technical skills.

DPP PLANNINGDPP is an independent national planning consultancy successfully delivering planning solutions to clients across the UK. DPP have an in-depth knowledge of the Salford Regeneration programme and more specifically the development of New Bailey. CLANCY CONSULTING (STRUCTURAL ENGINEER)Clancy Consulting draw upon their broad range of disciplines and expertise to work collaboratively with leading architects, contractors, developers, public bodies and property owners.

Client: Legal and GeneralProject Manager: Turner and TownsendLetting Agents: Colliers InternationalArchitect: EPR ArchitectsPlanning Consultant: DPP PlanningServices Consultant: Hannan AssociatesStructural Engineer: Clancy ConsultingTransport Consultant: WSP

Fire Engineer: Warrington FireLandscape Architect: Hyland Edgar DriverEnergy Sustainability: Verco Advisory ServicesBREEAM Assessor: Hannan AssociatesAcoustic Consultant: AEC Embodied Carbon Assessor: Hilson MoranSocial Value Assessor: The Social Value PortalCost Consultant: Walker Sime

COMPLETE PROJECT TEAM

The Qube - EPR Architects Downtown Manchester - Clancy ConsultingRiverside House - Hannan Associates + DPP

Page 3: W E L C O M E [dppukltd.com]dppukltd.com/wp-content/uploads/2020/04/ralli-quays-final.pdf · landmark project to be proud of. Concept Visualisation of Ralli Quays. R A L L I U A S

R A L L I Q U A Y SS A L F O R D C E N T R A L

T H E B R I E F

C O M P L E M E N T T H E C O M M U N I T Y

The Ned Hotel - EPR Architects Ram Brewery - EPR ArchitectsCentral St Giles - L+G

I N N O V A T I V E, B E S P O K E , S U S T A I N A B L E D E S I G N

Savile Row - EPR Architects Central St Giles - L+GThe Lewis Building - L+G and EPR Architects

THE BRIEF

“Unashamedly ambitious in its aspirations in terms of the quality of the product and design”

Core Project Targets and Values:

Engaging, Active, Vibrant Buildings which support the surrounding neighbourhood.Exemplary Sustainability Credentials with reduced energy demand and renewable energy sources.

A progressive building type, which is dynamic, and forward thinking. A strong emphasis on Social Value Initiatives.

Page 4: W E L C O M E [dppukltd.com]dppukltd.com/wp-content/uploads/2020/04/ralli-quays-final.pdf · landmark project to be proud of. Concept Visualisation of Ralli Quays. R A L L I U A S

R A L L I Q U A Y SS A L F O R D C E N T R A L

T H E S I T E

THE SITE + LOCATION• The existing site comprises two purpose-

built office blocks of circa. 80,000 sq. ft. built almost 30 yrs ago, including basement storage and car parking.

• The site is approx. 1.06 acres in size and is prominently located on the Salford waterside of the Irwell overlooking Spinningfields.

• It is adjacent to the new office population centre of the New Bailey development and very close to Salford Central rail station.

Ralli Quays Site Location

Ralli Quays

Ordsall Chord

SURROUNDING BUILDINGS• The site is surrounded by an evolving

context, with numerous proposals under way.

• The site plan reflects the developments that are complete, and those we expect will progress in the next few years.

• The existing Ralli Quays buildings are underwhelming and redevelopment of the site will complement the scale and quality of the completed or planned new buildings.

LOADING ONLY

STOPBUS

STOPBUS

STOP BUS

STOP BUS

G

F

E

D

C

B

C2

IRWELL STREET

ONE NEW BAILEY

TWO NEW BAILEY

RIVER IRWELL

STANLEY STREET

HOTEL

SALFORD CENTRALRAILWAY STATION

HARDMANSQUARE

RAILWAY LINES

RIVERVIEWAPARTMENTS

MANCHESTERCJC

NCPCAR PARK

NCPCAR PARK

ST JOHN'SDEVELOPMENT

PLOT B2 + B3

PLOT B7

LEFT BANKAPARTMENTS

1 HARDMAN BOULEVARD

3 HARDMANSQUARE

GORE STREETDEVELOPMENT

BRIDGE STREET

NEW QUAY STREET

N

Notes:1. Do not scale2. Contractor to Check all dimensions and report omissions and errors to the Architect3. EPR Architects accepts no liability for use of this drawing by parties other than the party for

whom it was prepared or for purposes other than those for which it was prepared. 4. This drawing is issued in dwg/dgn format as an uncontrolled version to enable the recipient to

prepare their own documents/drawings/models for which they are solely responsible. This drawing is based on project information current at the time of issue. EPR Architects Limited accepts no liability for any alterations or additions to or discrepancies arising out of any change to such project information that occurs to the information after it is issued by EPR Architects Limited.

5. This drawing does not contain shared coordinates and is not issued for coordination purposes.

30 MillbankLondon SW1P 4DU

+44 (0) 20 7932 7600www.epr.co.uk

Keyplan North

RevProject No Originator

EPR-Volume

-Level

-Type

-Role Number

architects

Preliminary

- -AClass.

S2 - For information

01/02/2019 08:38:39C:\Revit2018\10909-EPR-01-ZZ-M3-A-Central_scottp.rvt

P1

1 : 1000 @ A1

10909 00 00 01-0001

Ralli QuaysRalli Quays, SalfordSite, M60 9HL

Site PlanExisting

SKNo. Revision Date Initial Chk'dP1 For Information xx.02.19 YI SRP

N

Notes:1. Do not scale2. Contractor to Check all dimensions and report omissions and errors to the Architect3. EPR Architects accepts no liability for use of this drawing by parties other than the party for

whom it was prepared or for purposes other than those for which it was prepared. 4. This drawing is issued in dwg/dgn format as an uncontrolled version to enable the recipient to

prepare their own documents/drawings/models for which they are solely responsible. This drawing is based on project information current at the time of issue. EPR Architects Limited accepts no liability for any alterations or additions to or discrepancies arising out of any change to such project information that occurs to the information after it is issued by EPR Architects Limited.

5. This drawing does not contain shared coordinates and is not issued for coordination purposes.

30 MillbankLondon SW1P 4DU

+44 (0) 20 7932 7600www.epr.co.uk

Keyplan North

RevProject No Originator

EPR-Volume

-Level

-Type

-Role Number

architects

Preliminary

- -AClass.

S1 - For co-ordination

31/01/2019 08:49:36C:\Revit2018\10909-EPR-01-ZZ-M3-A-Central_scottp.rvt

@ A1

10909 XX 00 99-0007

Ralli QuaysRalli Quays, SalfordSite, M60 9HL

3D View- Refurbishment-Option R1

SKNo. Revision Date Initial Chk'd

Site Plan3D Context with Proposed surrounding development

Salford Central Rail Station Entrance

New Bailey Development

Ralli Quays Site

Spinningfields

Ralli Quays Buildings

Page 5: W E L C O M E [dppukltd.com]dppukltd.com/wp-content/uploads/2020/04/ralli-quays-final.pdf · landmark project to be proud of. Concept Visualisation of Ralli Quays. R A L L I U A S

R A L L I Q U A Y SS A L F O R D C E N T R A L

E X I S T I N G B U I L D I N G S

EXISTING BUILDINGS• Ralli Quays as we see it today has existed since circa

1991 - 1993 and was constructed to replace original brick buildings which contained the Irwell Foundry and Irwell Marble Works dating from the 19th Century.

• As can be seen below, the original buildings were of a prominent scale, and built up to the Irwell River, which was an important route for trade at that time.

• The name Ralli Quay may derive from the famous Ralli Brothers, merchant traders who had their headquarters in Manchester. The brothers traded in a wide variety of cargo, shipping it to and from bases in Europe.

Original Ralli Buildings and Surrounding Site, 1844 Current Ralli Quays BuildingsOriginal Ralli Buildings

Tall Buildings

Hotels

Salford Central Station Entrance

Defined Public Spaces

Ralli Quays

Strong Pedestrian routes & viewing corridorsHardman Square

Ralli Quays to ‘Address’ the viewing corridors

Stanley Square

SITE POTENTIAL• Strong axis are created within the Salford

Central and Spinningfields masterplans, which are orientated north-south, and converge at the Ralli Quays site.

• These axis help to direct views and pedestrian flow towards the site, and give greater emphasis on the Ralli Quays project for a scheme of high quality.

• Planning potential is available for office, residential or hotel led redevelopment of the site with ground floor commercial / retail / food & drink uses or ancillary uses.

St John’s Place

One Spinningfields

Proposed pedestrian link and retail units within railway arches

Manchester Spinningfields

A3

OSA

TFR B4

TFR B4

TFR B4

TFR B4

TFR B4

TFR B4

TFR B4

POOR GPR TRACE B3

POOR GPR TRACE B3

TFR B4

TFR B4

TFR B4

TFR B4

TFR B4

TFR B4

27.41GV

IRWELL STREET

ONE NEW BAILEY

TWO NEW BAILEY

RIVER IRWELL

Boundary alignment tosuit access provision between Riverside House and Ralli Quays

Approximate location of Substation and cable route.

Heritage wall -Constraints and Ownership to be established

FOOT

BRID

GE

STANLEY STREET

RIVERSIDEHOUSE

2.100m dia. Main Sewer line crossing the site.

STANLEYSQUARE

HOTEL

sewer

sewer

sewer

3m sewer easement

3m sewer easement

3m sewer easement

3m exclusion zone fromedge of main sewer.

Underground Electrical Cables to be relocated

Gas Mains to be relocated

Gas Line

Surface Water Sewer

Underground Electrical Cable (s)

N

Notes:1. Do not scale2. Contractor to Check all dimensions and report omissions and errors to the Architect3. EPR Architects accepts no liability for use of this drawing by parties other than the party for

whom it was prepared or for purposes other than those for which it was prepared. 4. This drawing is issued in dwg/dgn format as an uncontrolled version to enable the recipient to

prepare their own documents/drawings/models for which they are solely responsible. This drawing is based on project information current at the time of issue. EPR Architects Limited accepts no liability for any alterations or additions to or discrepancies arising out of any change to such project information that occurs to the information after it is issued by EPR Architects Limited.

5. This drawing does not contain shared coordinates and is not issued for coordination purposes.

30 MillbankLondon SW1P 4DU

+44 (0) 20 7932 7600www.epr.co.uk

Keyplan North

RevProject No Originator

EPR-Volume

-Level

-Type

-Role Number

architects

Preliminary

- -AClass.

S2 - For information

01/02/2019 12:05:40C:\Revit2018\10909-EPR-01-ZZ-M3-A-Central_scottp.rvt

P1

1 : 250 @ A1

10909 00 00 01-0009

Ralli QuaysRalli Quays, SalfordSite, M60 9HL

Existing Utility PlanExisting

SKNo. Revision Date Initial Chk'dP1 For Information xx.02.19 YI SRP

Page 6: W E L C O M E [dppukltd.com]dppukltd.com/wp-content/uploads/2020/04/ralli-quays-final.pdf · landmark project to be proud of. Concept Visualisation of Ralli Quays. R A L L I U A S

R A L L I Q U A Y SS A L F O R D C E N T R A L

Notes:1. Do not scale2. Contractor to Check all dimensions and report omissions and errors to the Architect3. EPR Architects accepts no liability for use of this drawing by parties other than the party for

whom it was prepared or for purposes other than those for which it was prepared. 4. This drawing is issued in dwg/dgn format as an uncontrolled version to enable the recipient to

prepare their own documents/drawings/models for which they are solely responsible. This drawing is based on project information current at the time of issue. EPR Architects Limited accepts no liability for any alterations or additions to or discrepancies arising out of any change to such project information that occurs to the information after it is issued by EPR Architects Limited.

5. This drawing does not contain shared coordinates and is not issued for coordination purposes.

Keyplan North

EPR

Preliminary S1Project Code Originator Zone Level Type Role Class. Number

Status RevisionScale @A1 Suitability

- - - - - -

-

A25/03/2020 22:06:15C:\Revit2019\10909-EPR-ZZ-ZZ-M3-A-0001_Central_scottp.rvt

1 : 500

XX

Ralli QuaysRalli Quays, SalfordSite, M60 9HL

3D Diagrams

XX SK 99-002010909No. Revision Date Initial Chk'd

Notes:1. Do not scale2. Contractor to Check all dimensions and report omissions and errors to the Architect3. EPR Architects accepts no liability for use of this drawing by parties other than the party for

whom it was prepared or for purposes other than those for which it was prepared. 4. This drawing is issued in dwg/dgn format as an uncontrolled version to enable the recipient to

prepare their own documents/drawings/models for which they are solely responsible. This drawing is based on project information current at the time of issue. EPR Architects Limited accepts no liability for any alterations or additions to or discrepancies arising out of any change to such project information that occurs to the information after it is issued by EPR Architects Limited.

5. This drawing does not contain shared coordinates and is not issued for coordination purposes.

Keyplan North

EPR

Preliminary S1Project Code Originator Zone Level Type Role Class. Number

Status RevisionScale @A1 Suitability

- - - - - -

-

A25/03/2020 22:06:15C:\Revit2019\10909-EPR-ZZ-ZZ-M3-A-0001_Central_scottp.rvt

1 : 500

XX

Ralli QuaysRalli Quays, SalfordSite, M60 9HL

3D Diagrams

XX SK 99-002010909No. Revision Date Initial Chk'd

T H E C O N C E P T

Employment + Demand

BLEND COMPLEMENTARY USES

Concierge + Service

THE CONCEPT Our concept looks to maximise the potential of the site.

We do this in a number of ways which are:

• Build to the River wall, as the original Ralli Buildings did• Open up the ground floor, with transparent, active spaces • Add floor space through taller buildings• Link uses at ground floor with a connected link• Create river terraces and landscaped spaces• Use as much of the existing basement as possible• Ensure the building form addresses key views• Use quality materials throughout• Integrate enhanced sustainability measures

LONG SECTION CROSS SECTION

GROUND FLOOR PLAN

Notes:1. Do not scale2. Contractor to Check all dimensions and report omissions and errors to the Architect3. EPR Architects accepts no liability for use of this drawing by parties other than the party for

whom it was prepared or for purposes other than those for which it was prepared. 4. This drawing is issued in dwg/dgn format as an uncontrolled version to enable the recipient to

prepare their own documents/drawings/models for which they are solely responsible. This drawing is based on project information current at the time of issue. EPR Architects Limited accepts no liability for any alterations or additions to or discrepancies arising out of any change to such project information that occurs to the information after it is issued by EPR Architects Limited.

5. This drawing does not contain shared coordinates and is not issued for coordination purposes.

Keyplan North

EPR

Preliminary S1Project Code Originator Zone Level Type Role Class. Number

Status RevisionScale @A1 Suitability

- - - - - -

-

A25/03/2020 22:06:15C:\Revit2019\10909-EPR-ZZ-ZZ-M3-A-0001_Central_scottp.rvt

1 : 500

XX

Ralli QuaysRalli Quays, SalfordSite, M60 9HL

3D Diagrams

XX SK 99-002010909No. Revision Date Initial Chk'd

Notes:1. Do not scale2. Contractor to Check all dimensions and report omissions and errors to the Architect3. EPR Architects accepts no liability for use of this drawing by parties other than the party for

whom it was prepared or for purposes other than those for which it was prepared. 4. This drawing is issued in dwg/dgn format as an uncontrolled version to enable the recipient to

prepare their own documents/drawings/models for which they are solely responsible. This drawing is based on project information current at the time of issue. EPR Architects Limited accepts no liability for any alterations or additions to or discrepancies arising out of any change to such project information that occurs to the information after it is issued by EPR Architects Limited.

5. This drawing does not contain shared coordinates and is not issued for coordination purposes.

Keyplan North

EPR

Preliminary S1Project Code Originator Zone Level Type Role Class. Number

Status RevisionScale @A1 Suitability

- - - - - -

-

A25/03/2020 22:06:15C:\Revit2019\10909-EPR-ZZ-ZZ-M3-A-0001_Central_scottp.rvt

1 : 500

XX

Ralli QuaysRalli Quays, SalfordSite, M60 9HL

3D Diagrams

XX SK 99-002010909No. Revision Date Initial Chk'd

Pedestrian + Visual Connection

Connection to Public Realm

Strong relationshipto the RiverRiver Irwell

Notes:1. Do not scale2. Contractor to Check all dimensions and report omissions and errors to the Architect3. EPR Architects accepts no liability for use of this drawing by parties other than the party for

whom it was prepared or for purposes other than those for which it was prepared. 4. This drawing is issued in dwg/dgn format as an uncontrolled version to enable the recipient to

prepare their own documents/drawings/models for which they are solely responsible. This drawing is based on project information current at the time of issue. EPR Architects Limited accepts no liability for any alterations or additions to or discrepancies arising out of any change to such project information that occurs to the information after it is issued by EPR Architects Limited.

5. This drawing does not contain shared coordinates and is not issued for coordination purposes.

Keyplan North

EPR

Preliminary S1Project Code Originator Zone Level Type Role Class. Number

Status RevisionScale @A1 Suitability

- - - - - -

-

A25/03/2020 22:06:15C:\Revit2019\10909-EPR-ZZ-ZZ-M3-A-0001_Central_scottp.rvt

1 : 500

XX

Ralli QuaysRalli Quays, SalfordSite, M60 9HL

3D Diagrams

XX SK 99-002010909No. Revision Date Initial Chk'd

Views across the City

Linking Space

Views across the City

Office Hotel

Pedestrian + Visual Connection

Discrete servicing

Discrete servicing

Strong relationshipto the River

Retain Existing Basement

Office

Hotel

River Irwell

Linking Space

Connection to Public Realm

Page 7: W E L C O M E [dppukltd.com]dppukltd.com/wp-content/uploads/2020/04/ralli-quays-final.pdf · landmark project to be proud of. Concept Visualisation of Ralli Quays. R A L L I U A S

R A L L I Q U A Y SS A L F O R D C E N T R A L

T H E D E S I G N

Discrete Shared Service Bay

CREATE ACTIVE STREETS + CONNECTIONS

Strong relationshipto the River

Pedestrian Friendly Streets

River Irwell

Outdoor Dining

THE DESIGN PRINCIPLES

• Establish a new building type, blending an office with a hotel

• Create a strong ground floor presence• Open up the site for better engagement with its

surroundings

BUILDING FORM

• Consider the original building form, with it’s prominent base and connection to the river as a good basis for the proposed design.

• Ensure a clear language, with simple, clean geometry.

• The uses within each space are legible and engage with their surroundings.

Original Ralli Building

Base

Middle

Top

Arch vernacular

Base

Middle

Top

Arch vernacular

Top

Middle

Original Ralli Building - Massing Proposed Building - Massing Facade and Arch Sketches

Gas Offices, Salford

Riverside House, New Bailey Development

Salford Central StationManchester Town Hall, Colonnade

Salford Central Viaduct

SALFORD & MANCHESTER VERNACULAR

Direct engagement with the river

Arch vernacular

Page 8: W E L C O M E [dppukltd.com]dppukltd.com/wp-content/uploads/2020/04/ralli-quays-final.pdf · landmark project to be proud of. Concept Visualisation of Ralli Quays. R A L L I U A S

R A L L I Q U A Y SS A L F O R D C E N T R A L

Office Accommodation

BUILDING LAYOUT - GROUND FLOOR

DN UP

UP UP

DN

UP

CYCLISTS

VEHICLES

OFFICE ENTRANCE

HOTEL ENTRANCE

OfficeReception

Link Bar

Flexible Workspaces

HotelReception Ralli

Restaurant

HotelLounge

River Terrace

Stanley SquareTerrace

Ralli Bar

Kitchen

Superloos

Lounge

Riverside Studio

Balcony

Sub-Station 1

Security

Store

PL 1 FF

PL 3

PL 2

GL

H Stair 1 Fire

Control

Fire

Cur

tain

Sub-station 2

Service Bay

Office Goods Lift

PL 1

PL 2

PL 5

PL 4

PL 3

FFL

Hotel Deliveries

and Refuse Staging

O Stair 2

O Stair 1

Office

OfficePL 4

Grab & Go HSV

E10

DR

WR

M21

M22

N

Notes:1. Do not scale2. Contractor to Check all dimensions and report omissions and errors to the Architect3. EPR Architects accepts no liability for use of this drawing by parties other than the party for

whom it was prepared or for purposes other than those for which it was prepared. 4. This drawing is issued in dwg/dgn format as an uncontrolled version to enable the recipient to

prepare their own documents/drawings/models for which they are solely responsible. This drawing is based on project information current at the time of issue. EPR Architects Limited accepts no liability for any alterations or additions to or discrepancies arising out of any change to such project information that occurs to the information after it is issued by EPR Architects Limited.

5. This drawing does not contain shared coordinates and is not issued for coordination purposes.

Keyplan North

EPR

Preliminary S1Project Code Originator Zone Level Type Role Class. Number

Status RevisionScale @A1 Suitability

- - - - - -

-

A18/03/2020 16:58:21C:\Revit2019\10909-EPR-ZZ-ZZ-M3-A-0001_Central_jenny.anderson.rvt

1 : 200 03

00

Ralli QuaysRalli Quays, SalfordSite, M60 9HL

ProposedGround Floor Presentation Plan

00 SK -024010909

RIVER IRWELL

No. Revision Date Initial Chk'd1 Issue to Colliers 29/10/2019 JA SP2 Presentation GA Plans to Collier 15/11/2019 JA SP3 Updated for public consultation 17/03/2020 JA SP

River Terrace

Roof Terrace

Hotel Restaurant

Restaurant with access to outside spaces

Hotel Rooftop Bar

Office Rooftop Terrace

Strong relationshipto the River

Discrete Service bay within the building

New footpaths to finish the masterplan

Link bar to bring all spaces together

Active Public space (Stanley Square)

Flexible space facing the River Irwell

BUILDING MASSING

T H E D E S I G N

Page 9: W E L C O M E [dppukltd.com]dppukltd.com/wp-content/uploads/2020/04/ralli-quays-final.pdf · landmark project to be proud of. Concept Visualisation of Ralli Quays. R A L L I U A S

R A L L I Q U A Y SS A L F O R D C E N T R A L

N E X T S T E P S

August 2019

March 2020

March / April 2020

April 2020

Mid 2020

September 2020

December 2020

Q4 2021

Commence Concept Design

Finalise Concept

Public Consultation

Adjustments to design and complete planning documentation

Planning Application

Developed Design

Technical Design

Vacant Possession (date TBC)

Start on Site (approx 3 years Construction incl demolition)

Link Bar Concept - Where The Hotel meets The Office

NEXT STEPSFollowing the public consultation and further design development, we intend to submit a planning application in the middle of 2020.

FEEDBACKWe would appreciate any comments and thoughts you have on our proposals so we may consider these as part of the ongoing design of the scheme.