R A L L I Q U A Y SS A L F O R D C E N T R A L
W E L C O M E
WELCOMEWe are pleased to present our ideas for the Ralli Quays project, which completes an important piece
of the Salford Central Masterplan.
We have been developing our design to complement the surrounding buildings and uses, whilst looking to be progressive in our approach. We believe we have an exciting and vibrant design which
will enhance Salford and Manchester, bringing a new concept to the market.
Our concept is to combine an office and hotel in a contemporary way, which will support the adjacent buildings, and we hope, once complete, will be seen as a forward thinking, interesting and exciting
landmark project to be proud of.
Concept Visualisation of Ralli Quays
R A L L I Q U A Y SS A L F O R D C E N T R A L
T H E T E A M
LEGAL & GENERALLegal & General Investment Management is one of Europe’s largest asset managers, with development and regeneration programmes throughout the UK.In addition to owning a 50% interest in Media City, L&G have provided long term investment in the New Bailey District of Salford.
Central St Giles - L+G A 500,000 sq ft office, housing and retail development which completed in 2010. It has become one of the iconic buildings on the London skyline. The development won the BCO Best of Best award in 2011.
245 Hammersmith Road - L+G A major commercial office and retail development in the centre of West London The new development includes the creation of a new park and piazza, two restaurants, a business lounge for visiting guests. Completed 2019
The Lewis Building - L+G and EPR Architects The former Lewis’s Department Store, regarded as Birmingham’s answer to Harrods. The project involved a major reconfiguration of the ground floor and the addition of one floor of offices. Completed 2017
OTHER LEGAL & GENERAL PROJECTS
EPR ARCHITECTSBased in London, Manchester and Poland, EPR Architects is an award-winning practice with a well-established reputation for quality architecture, masterplanning and interior design thanks to an extensive experience delivering an array of building typologies across workplace, lifestyle and leisure sectors.
HANNAN ASSOCIATES (SERVICES CONSULTANT)Hannan Associates was established in 1983 as an engineering consultancy providing building services design solutions to the construction industry.Committed to creating successful buildings through attention to detail utilising their breadth of experience and technical skills.
DPP PLANNINGDPP is an independent national planning consultancy successfully delivering planning solutions to clients across the UK. DPP have an in-depth knowledge of the Salford Regeneration programme and more specifically the development of New Bailey. CLANCY CONSULTING (STRUCTURAL ENGINEER)Clancy Consulting draw upon their broad range of disciplines and expertise to work collaboratively with leading architects, contractors, developers, public bodies and property owners.
Client: Legal and GeneralProject Manager: Turner and TownsendLetting Agents: Colliers InternationalArchitect: EPR ArchitectsPlanning Consultant: DPP PlanningServices Consultant: Hannan AssociatesStructural Engineer: Clancy ConsultingTransport Consultant: WSP
Fire Engineer: Warrington FireLandscape Architect: Hyland Edgar DriverEnergy Sustainability: Verco Advisory ServicesBREEAM Assessor: Hannan AssociatesAcoustic Consultant: AEC Embodied Carbon Assessor: Hilson MoranSocial Value Assessor: The Social Value PortalCost Consultant: Walker Sime
COMPLETE PROJECT TEAM
The Qube - EPR Architects Downtown Manchester - Clancy ConsultingRiverside House - Hannan Associates + DPP
R A L L I Q U A Y SS A L F O R D C E N T R A L
T H E B R I E F
C O M P L E M E N T T H E C O M M U N I T Y
The Ned Hotel - EPR Architects Ram Brewery - EPR ArchitectsCentral St Giles - L+G
I N N O V A T I V E, B E S P O K E , S U S T A I N A B L E D E S I G N
Savile Row - EPR Architects Central St Giles - L+GThe Lewis Building - L+G and EPR Architects
THE BRIEF
“Unashamedly ambitious in its aspirations in terms of the quality of the product and design”
Core Project Targets and Values:
Engaging, Active, Vibrant Buildings which support the surrounding neighbourhood.Exemplary Sustainability Credentials with reduced energy demand and renewable energy sources.
A progressive building type, which is dynamic, and forward thinking. A strong emphasis on Social Value Initiatives.
R A L L I Q U A Y SS A L F O R D C E N T R A L
T H E S I T E
THE SITE + LOCATION• The existing site comprises two purpose-
built office blocks of circa. 80,000 sq. ft. built almost 30 yrs ago, including basement storage and car parking.
• The site is approx. 1.06 acres in size and is prominently located on the Salford waterside of the Irwell overlooking Spinningfields.
• It is adjacent to the new office population centre of the New Bailey development and very close to Salford Central rail station.
Ralli Quays Site Location
Ralli Quays
Ordsall Chord
SURROUNDING BUILDINGS• The site is surrounded by an evolving
context, with numerous proposals under way.
• The site plan reflects the developments that are complete, and those we expect will progress in the next few years.
• The existing Ralli Quays buildings are underwhelming and redevelopment of the site will complement the scale and quality of the completed or planned new buildings.
LOADING ONLY
STOPBUS
STOPBUS
STOP BUS
STOP BUS
G
F
E
D
C
B
C2
IRWELL STREET
ONE NEW BAILEY
TWO NEW BAILEY
RIVER IRWELL
STANLEY STREET
HOTEL
SALFORD CENTRALRAILWAY STATION
HARDMANSQUARE
RAILWAY LINES
RIVERVIEWAPARTMENTS
MANCHESTERCJC
NCPCAR PARK
NCPCAR PARK
ST JOHN'SDEVELOPMENT
PLOT B2 + B3
PLOT B7
LEFT BANKAPARTMENTS
1 HARDMAN BOULEVARD
3 HARDMANSQUARE
GORE STREETDEVELOPMENT
BRIDGE STREET
NEW QUAY STREET
N
Notes:1. Do not scale2. Contractor to Check all dimensions and report omissions and errors to the Architect3. EPR Architects accepts no liability for use of this drawing by parties other than the party for
whom it was prepared or for purposes other than those for which it was prepared. 4. This drawing is issued in dwg/dgn format as an uncontrolled version to enable the recipient to
prepare their own documents/drawings/models for which they are solely responsible. This drawing is based on project information current at the time of issue. EPR Architects Limited accepts no liability for any alterations or additions to or discrepancies arising out of any change to such project information that occurs to the information after it is issued by EPR Architects Limited.
5. This drawing does not contain shared coordinates and is not issued for coordination purposes.
30 MillbankLondon SW1P 4DU
+44 (0) 20 7932 7600www.epr.co.uk
Keyplan North
RevProject No Originator
EPR-Volume
-Level
-Type
-Role Number
architects
Preliminary
- -AClass.
S2 - For information
01/02/2019 08:38:39C:\Revit2018\10909-EPR-01-ZZ-M3-A-Central_scottp.rvt
P1
1 : 1000 @ A1
10909 00 00 01-0001
Ralli QuaysRalli Quays, SalfordSite, M60 9HL
Site PlanExisting
SKNo. Revision Date Initial Chk'dP1 For Information xx.02.19 YI SRP
N
Notes:1. Do not scale2. Contractor to Check all dimensions and report omissions and errors to the Architect3. EPR Architects accepts no liability for use of this drawing by parties other than the party for
whom it was prepared or for purposes other than those for which it was prepared. 4. This drawing is issued in dwg/dgn format as an uncontrolled version to enable the recipient to
prepare their own documents/drawings/models for which they are solely responsible. This drawing is based on project information current at the time of issue. EPR Architects Limited accepts no liability for any alterations or additions to or discrepancies arising out of any change to such project information that occurs to the information after it is issued by EPR Architects Limited.
5. This drawing does not contain shared coordinates and is not issued for coordination purposes.
30 MillbankLondon SW1P 4DU
+44 (0) 20 7932 7600www.epr.co.uk
Keyplan North
RevProject No Originator
EPR-Volume
-Level
-Type
-Role Number
architects
Preliminary
- -AClass.
S1 - For co-ordination
31/01/2019 08:49:36C:\Revit2018\10909-EPR-01-ZZ-M3-A-Central_scottp.rvt
@ A1
10909 XX 00 99-0007
Ralli QuaysRalli Quays, SalfordSite, M60 9HL
3D View- Refurbishment-Option R1
SKNo. Revision Date Initial Chk'd
Site Plan3D Context with Proposed surrounding development
Salford Central Rail Station Entrance
New Bailey Development
Ralli Quays Site
Spinningfields
Ralli Quays Buildings
R A L L I Q U A Y SS A L F O R D C E N T R A L
E X I S T I N G B U I L D I N G S
EXISTING BUILDINGS• Ralli Quays as we see it today has existed since circa
1991 - 1993 and was constructed to replace original brick buildings which contained the Irwell Foundry and Irwell Marble Works dating from the 19th Century.
• As can be seen below, the original buildings were of a prominent scale, and built up to the Irwell River, which was an important route for trade at that time.
• The name Ralli Quay may derive from the famous Ralli Brothers, merchant traders who had their headquarters in Manchester. The brothers traded in a wide variety of cargo, shipping it to and from bases in Europe.
Original Ralli Buildings and Surrounding Site, 1844 Current Ralli Quays BuildingsOriginal Ralli Buildings
Tall Buildings
Hotels
Salford Central Station Entrance
Defined Public Spaces
Ralli Quays
Strong Pedestrian routes & viewing corridorsHardman Square
Ralli Quays to ‘Address’ the viewing corridors
Stanley Square
SITE POTENTIAL• Strong axis are created within the Salford
Central and Spinningfields masterplans, which are orientated north-south, and converge at the Ralli Quays site.
• These axis help to direct views and pedestrian flow towards the site, and give greater emphasis on the Ralli Quays project for a scheme of high quality.
• Planning potential is available for office, residential or hotel led redevelopment of the site with ground floor commercial / retail / food & drink uses or ancillary uses.
St John’s Place
One Spinningfields
Proposed pedestrian link and retail units within railway arches
Manchester Spinningfields
A3
OSA
TFR B4
TFR B4
TFR B4
TFR B4
TFR B4
TFR B4
TFR B4
POOR GPR TRACE B3
POOR GPR TRACE B3
TFR B4
TFR B4
TFR B4
TFR B4
TFR B4
TFR B4
27.41GV
IRWELL STREET
ONE NEW BAILEY
TWO NEW BAILEY
RIVER IRWELL
Boundary alignment tosuit access provision between Riverside House and Ralli Quays
Approximate location of Substation and cable route.
Heritage wall -Constraints and Ownership to be established
FOOT
BRID
GE
STANLEY STREET
RIVERSIDEHOUSE
2.100m dia. Main Sewer line crossing the site.
STANLEYSQUARE
HOTEL
sewer
sewer
sewer
3m sewer easement
3m sewer easement
3m sewer easement
3m exclusion zone fromedge of main sewer.
Underground Electrical Cables to be relocated
Gas Mains to be relocated
Gas Line
Surface Water Sewer
Underground Electrical Cable (s)
N
Notes:1. Do not scale2. Contractor to Check all dimensions and report omissions and errors to the Architect3. EPR Architects accepts no liability for use of this drawing by parties other than the party for
whom it was prepared or for purposes other than those for which it was prepared. 4. This drawing is issued in dwg/dgn format as an uncontrolled version to enable the recipient to
prepare their own documents/drawings/models for which they are solely responsible. This drawing is based on project information current at the time of issue. EPR Architects Limited accepts no liability for any alterations or additions to or discrepancies arising out of any change to such project information that occurs to the information after it is issued by EPR Architects Limited.
5. This drawing does not contain shared coordinates and is not issued for coordination purposes.
30 MillbankLondon SW1P 4DU
+44 (0) 20 7932 7600www.epr.co.uk
Keyplan North
RevProject No Originator
EPR-Volume
-Level
-Type
-Role Number
architects
Preliminary
- -AClass.
S2 - For information
01/02/2019 12:05:40C:\Revit2018\10909-EPR-01-ZZ-M3-A-Central_scottp.rvt
P1
1 : 250 @ A1
10909 00 00 01-0009
Ralli QuaysRalli Quays, SalfordSite, M60 9HL
Existing Utility PlanExisting
SKNo. Revision Date Initial Chk'dP1 For Information xx.02.19 YI SRP
R A L L I Q U A Y SS A L F O R D C E N T R A L
Notes:1. Do not scale2. Contractor to Check all dimensions and report omissions and errors to the Architect3. EPR Architects accepts no liability for use of this drawing by parties other than the party for
whom it was prepared or for purposes other than those for which it was prepared. 4. This drawing is issued in dwg/dgn format as an uncontrolled version to enable the recipient to
prepare their own documents/drawings/models for which they are solely responsible. This drawing is based on project information current at the time of issue. EPR Architects Limited accepts no liability for any alterations or additions to or discrepancies arising out of any change to such project information that occurs to the information after it is issued by EPR Architects Limited.
5. This drawing does not contain shared coordinates and is not issued for coordination purposes.
Keyplan North
EPR
Preliminary S1Project Code Originator Zone Level Type Role Class. Number
Status RevisionScale @A1 Suitability
- - - - - -
-
A25/03/2020 22:06:15C:\Revit2019\10909-EPR-ZZ-ZZ-M3-A-0001_Central_scottp.rvt
1 : 500
XX
Ralli QuaysRalli Quays, SalfordSite, M60 9HL
3D Diagrams
XX SK 99-002010909No. Revision Date Initial Chk'd
Notes:1. Do not scale2. Contractor to Check all dimensions and report omissions and errors to the Architect3. EPR Architects accepts no liability for use of this drawing by parties other than the party for
whom it was prepared or for purposes other than those for which it was prepared. 4. This drawing is issued in dwg/dgn format as an uncontrolled version to enable the recipient to
prepare their own documents/drawings/models for which they are solely responsible. This drawing is based on project information current at the time of issue. EPR Architects Limited accepts no liability for any alterations or additions to or discrepancies arising out of any change to such project information that occurs to the information after it is issued by EPR Architects Limited.
5. This drawing does not contain shared coordinates and is not issued for coordination purposes.
Keyplan North
EPR
Preliminary S1Project Code Originator Zone Level Type Role Class. Number
Status RevisionScale @A1 Suitability
- - - - - -
-
A25/03/2020 22:06:15C:\Revit2019\10909-EPR-ZZ-ZZ-M3-A-0001_Central_scottp.rvt
1 : 500
XX
Ralli QuaysRalli Quays, SalfordSite, M60 9HL
3D Diagrams
XX SK 99-002010909No. Revision Date Initial Chk'd
T H E C O N C E P T
Employment + Demand
BLEND COMPLEMENTARY USES
Concierge + Service
THE CONCEPT Our concept looks to maximise the potential of the site.
We do this in a number of ways which are:
• Build to the River wall, as the original Ralli Buildings did• Open up the ground floor, with transparent, active spaces • Add floor space through taller buildings• Link uses at ground floor with a connected link• Create river terraces and landscaped spaces• Use as much of the existing basement as possible• Ensure the building form addresses key views• Use quality materials throughout• Integrate enhanced sustainability measures
LONG SECTION CROSS SECTION
GROUND FLOOR PLAN
Notes:1. Do not scale2. Contractor to Check all dimensions and report omissions and errors to the Architect3. EPR Architects accepts no liability for use of this drawing by parties other than the party for
whom it was prepared or for purposes other than those for which it was prepared. 4. This drawing is issued in dwg/dgn format as an uncontrolled version to enable the recipient to
prepare their own documents/drawings/models for which they are solely responsible. This drawing is based on project information current at the time of issue. EPR Architects Limited accepts no liability for any alterations or additions to or discrepancies arising out of any change to such project information that occurs to the information after it is issued by EPR Architects Limited.
5. This drawing does not contain shared coordinates and is not issued for coordination purposes.
Keyplan North
EPR
Preliminary S1Project Code Originator Zone Level Type Role Class. Number
Status RevisionScale @A1 Suitability
- - - - - -
-
A25/03/2020 22:06:15C:\Revit2019\10909-EPR-ZZ-ZZ-M3-A-0001_Central_scottp.rvt
1 : 500
XX
Ralli QuaysRalli Quays, SalfordSite, M60 9HL
3D Diagrams
XX SK 99-002010909No. Revision Date Initial Chk'd
Notes:1. Do not scale2. Contractor to Check all dimensions and report omissions and errors to the Architect3. EPR Architects accepts no liability for use of this drawing by parties other than the party for
whom it was prepared or for purposes other than those for which it was prepared. 4. This drawing is issued in dwg/dgn format as an uncontrolled version to enable the recipient to
prepare their own documents/drawings/models for which they are solely responsible. This drawing is based on project information current at the time of issue. EPR Architects Limited accepts no liability for any alterations or additions to or discrepancies arising out of any change to such project information that occurs to the information after it is issued by EPR Architects Limited.
5. This drawing does not contain shared coordinates and is not issued for coordination purposes.
Keyplan North
EPR
Preliminary S1Project Code Originator Zone Level Type Role Class. Number
Status RevisionScale @A1 Suitability
- - - - - -
-
A25/03/2020 22:06:15C:\Revit2019\10909-EPR-ZZ-ZZ-M3-A-0001_Central_scottp.rvt
1 : 500
XX
Ralli QuaysRalli Quays, SalfordSite, M60 9HL
3D Diagrams
XX SK 99-002010909No. Revision Date Initial Chk'd
Pedestrian + Visual Connection
Connection to Public Realm
Strong relationshipto the RiverRiver Irwell
Notes:1. Do not scale2. Contractor to Check all dimensions and report omissions and errors to the Architect3. EPR Architects accepts no liability for use of this drawing by parties other than the party for
whom it was prepared or for purposes other than those for which it was prepared. 4. This drawing is issued in dwg/dgn format as an uncontrolled version to enable the recipient to
prepare their own documents/drawings/models for which they are solely responsible. This drawing is based on project information current at the time of issue. EPR Architects Limited accepts no liability for any alterations or additions to or discrepancies arising out of any change to such project information that occurs to the information after it is issued by EPR Architects Limited.
5. This drawing does not contain shared coordinates and is not issued for coordination purposes.
Keyplan North
EPR
Preliminary S1Project Code Originator Zone Level Type Role Class. Number
Status RevisionScale @A1 Suitability
- - - - - -
-
A25/03/2020 22:06:15C:\Revit2019\10909-EPR-ZZ-ZZ-M3-A-0001_Central_scottp.rvt
1 : 500
XX
Ralli QuaysRalli Quays, SalfordSite, M60 9HL
3D Diagrams
XX SK 99-002010909No. Revision Date Initial Chk'd
Views across the City
Linking Space
Views across the City
Office Hotel
Pedestrian + Visual Connection
Discrete servicing
Discrete servicing
Strong relationshipto the River
Retain Existing Basement
Office
Hotel
River Irwell
Linking Space
Connection to Public Realm
R A L L I Q U A Y SS A L F O R D C E N T R A L
T H E D E S I G N
Discrete Shared Service Bay
CREATE ACTIVE STREETS + CONNECTIONS
Strong relationshipto the River
Pedestrian Friendly Streets
River Irwell
Outdoor Dining
THE DESIGN PRINCIPLES
• Establish a new building type, blending an office with a hotel
• Create a strong ground floor presence• Open up the site for better engagement with its
surroundings
BUILDING FORM
• Consider the original building form, with it’s prominent base and connection to the river as a good basis for the proposed design.
• Ensure a clear language, with simple, clean geometry.
• The uses within each space are legible and engage with their surroundings.
Original Ralli Building
Base
Middle
Top
Arch vernacular
Base
Middle
Top
Arch vernacular
Top
Middle
Original Ralli Building - Massing Proposed Building - Massing Facade and Arch Sketches
Gas Offices, Salford
Riverside House, New Bailey Development
Salford Central StationManchester Town Hall, Colonnade
Salford Central Viaduct
SALFORD & MANCHESTER VERNACULAR
Direct engagement with the river
Arch vernacular
R A L L I Q U A Y SS A L F O R D C E N T R A L
Office Accommodation
BUILDING LAYOUT - GROUND FLOOR
DN UP
UP UP
DN
UP
CYCLISTS
VEHICLES
OFFICE ENTRANCE
HOTEL ENTRANCE
OfficeReception
Link Bar
Flexible Workspaces
HotelReception Ralli
Restaurant
HotelLounge
River Terrace
Stanley SquareTerrace
Ralli Bar
Kitchen
Superloos
Lounge
Riverside Studio
Balcony
Sub-Station 1
Security
Store
PL 1 FF
PL 3
PL 2
GL
H Stair 1 Fire
Control
Fire
Cur
tain
Sub-station 2
Service Bay
Office Goods Lift
PL 1
PL 2
PL 5
PL 4
PL 3
FFL
Hotel Deliveries
and Refuse Staging
O Stair 2
O Stair 1
Office
OfficePL 4
Grab & Go HSV
E10
DR
WR
M21
M22
N
Notes:1. Do not scale2. Contractor to Check all dimensions and report omissions and errors to the Architect3. EPR Architects accepts no liability for use of this drawing by parties other than the party for
whom it was prepared or for purposes other than those for which it was prepared. 4. This drawing is issued in dwg/dgn format as an uncontrolled version to enable the recipient to
prepare their own documents/drawings/models for which they are solely responsible. This drawing is based on project information current at the time of issue. EPR Architects Limited accepts no liability for any alterations or additions to or discrepancies arising out of any change to such project information that occurs to the information after it is issued by EPR Architects Limited.
5. This drawing does not contain shared coordinates and is not issued for coordination purposes.
Keyplan North
EPR
Preliminary S1Project Code Originator Zone Level Type Role Class. Number
Status RevisionScale @A1 Suitability
- - - - - -
-
A18/03/2020 16:58:21C:\Revit2019\10909-EPR-ZZ-ZZ-M3-A-0001_Central_jenny.anderson.rvt
1 : 200 03
00
Ralli QuaysRalli Quays, SalfordSite, M60 9HL
ProposedGround Floor Presentation Plan
00 SK -024010909
RIVER IRWELL
No. Revision Date Initial Chk'd1 Issue to Colliers 29/10/2019 JA SP2 Presentation GA Plans to Collier 15/11/2019 JA SP3 Updated for public consultation 17/03/2020 JA SP
River Terrace
Roof Terrace
Hotel Restaurant
Restaurant with access to outside spaces
Hotel Rooftop Bar
Office Rooftop Terrace
Strong relationshipto the River
Discrete Service bay within the building
New footpaths to finish the masterplan
Link bar to bring all spaces together
Active Public space (Stanley Square)
Flexible space facing the River Irwell
BUILDING MASSING
T H E D E S I G N
R A L L I Q U A Y SS A L F O R D C E N T R A L
N E X T S T E P S
August 2019
March 2020
March / April 2020
April 2020
Mid 2020
September 2020
December 2020
Q4 2021
Commence Concept Design
Finalise Concept
Public Consultation
Adjustments to design and complete planning documentation
Planning Application
Developed Design
Technical Design
Vacant Possession (date TBC)
Start on Site (approx 3 years Construction incl demolition)
Link Bar Concept - Where The Hotel meets The Office
NEXT STEPSFollowing the public consultation and further design development, we intend to submit a planning application in the middle of 2020.
FEEDBACKWe would appreciate any comments and thoughts you have on our proposals so we may consider these as part of the ongoing design of the scheme.
•