Vulcan™ BarrierSystem (CEN)Product DescriptionAssembly Manual
Revision B November 2011Part No. 617902B
wwwwww
V
This prod+1 (2
The iinformBarriereserv
.energyabso
.highwaygua
Vulca
IMPORasseminstrucauthorrequireenginerepres
Manual muuct at all tim
214) 589-814
nstructions cmation, illustraer System infve the right to
orption.com ardrail.com
an™
A
Trinit
RTANT: Thembly, maintenctions are fority only. In thes or involveseer. Energy sentatives are
ust be avaimes. For ad40 or downl
ontained in tations, and sformation avao make chang
Barr
AsseAnchor
ty Highway
2525 SteDallas
ese instructionance, and or standard he event the s special circu
Absorption e available for
ilable to thdditional coload from w
this Manual sspecificationsailable to Eneges at any tim
1
ier S
mbly aring Ma
y Products
emmons Frees, Texas 7520
ons are to brepair of t
assembliesspecified sy
umstances, cSystems (
r consultation
e worker oopies, contawebsites bel
supersede alls in this Manergy Absorpti
me.
ReAll rig
Syste
and anual
s, LLC d.b.
eway 07
be used onlthe VulcanTM
specified byystem assembcontact the ap(a Trinity Iwith the engi
overseeing act Energy low.
l previous infnual are basion Systems
Part evision B Noghts in copyr
em (C
a.
y in conjuncM Barrier Syy the appropbly, maintena
ppropriate higndustries, Inineer, if need
and/or assAbsorption
formation andsed on the laat the time o
No. 617902ovember 201right reserve
CEN)
ction with thystem. Thes
priate highwaance, or repahway authorinc. companyed.
sembling thn Systems a
d manuals. Aatest VulcanT
of printing. W
B 1
ed
he se ay air ty y)
he at
All TM
We
www.energyabsorption.com Revision B November 2011 www.highwayguardrail.com 2 All rights in copyright reserved
Table of Contents Customer Service Contacts .............................................................................................. 3 Important Introductory Notes ............................................................................................. 3 System Overview .............................................................................................................. 4 Recommended Safety Rules for Assembly ....................................................................... 4 Safety Symbols ................................................................................................................. 5 Warnings and Cautions ..................................................................................................... 5 Know your Vulcan™ Barrier System ................................................................................. 6
Application ................................................................................................................... 6 Anchoring Instructions ..................................................................................................... 11
Recommended Tools ................................................................................................ 11 Anchored VulcanTM Foundations ............................................................................... 11 Position the VulcanTM Barrier Sections ...................................................................... 13
MP-3 Polyester Anchoring System ................................................................................. 14 Alternative Anchoring Options ......................................................................................... 16
Concrete: ................................................................................................................... 16 Asphalt: ..................................................................................................................... 16 Inspection Notice ....................................................................................................... 17
VULCAN™ 12M Drawings .............................................................................................. 18 VULCAN™ 4M Drawings ................................................................................................ 22
www.energyabsorption.com Revision B November 2011 www.highwayguardrail.com 3 All rights in copyright reserved
Customer Service Contacts Energy Absorption Systems (a Trinity Industries, Inc. company) is committed to the highest level of customer service. Feedback regarding the VulcanTM Barrier System, its assembly procedures, Manual content, and in-field performance is always welcome. Our goal is to assist highway authorities in making their highways safer. Additional information can be obtained by calling the telephone numbers below:
Energy Absorption Systems: Telephone: +1 (214) 589-8140 E-mail: [email protected] Internet: Energy Absorption Systems Trinity Highway Products, LLC Trinity Industries, Inc.
http://www.energyabsorption.com/ http://www.highwayguardrail.com/ http://www.trin.net/
Important Introductory Notes Proper assembly of the VulcanTM Barrier System is essential for the system to perform as tested and accepted per EN 1317. These instructions should be read in their entirety and understood BEFORE assembling the VulcanTM Barrier. These instructions are to be used only in conjunction with the assembly of the VulcanTM Barrier System and are for standard assemblies only as specified by the applicable highway authority. In the event your system assembly requires or involves special circumstances or, during the assembly process, a question arises regarding a particular assembly step, contact the design engineer for the highway authority before proceeding. If you proceed with an assembly that deviates from that specified and approved by the applicable highway authority, you negate the system’s accepted performance standards.
A set of product and project shop drawings will be supplied by Energy Absorption Systems. The shop drawings will be for each section of the assembly. These drawings should be reviewed and studied thoroughly by a qualified individual who understands their content before the start of any deployment.
wwwwww
SysVulcabarrie
• • • • • •
VulcaVulcalongit
Rec* ImThis assemManuby e-Systethe V
AlwaychemGlove
Safetperso
.energyabso
.highwaygua
stem OvanTM Barrier ers, or other
Energy-absQuick and eLightweightEconomicaEasily repaVariety of d
anTM BarrieranTM Barrier tudinal safet
Imporpracticefollow bystandthese in
Warnistatemespecifiesystem highwaythe eve
commenmportant S
Manual mumble, maintual are availmail at custo
ems if you hVulcanTM Bar
ys use appmicals; and wes, safety go
ty measuresonnel while a
orption.com ardrail.com
verview provides sestyles of po
sorbing wheneasy deployt l ired after mo
deployment a
r and has has achieve
ty barrier for
rtant: Read es before assthis warningders, as well nstructions foing: Ensure ents within thed parts. The
unacceptably system. Fa
ent of a collisio
nded SaSafety Insust be kept tain, or repalable from Eomerservicehave any qurrier System
ropriate safwhen movinoggles, and
s incorporatiat the assem
veral uniqueortable safety
n impacted pment and re
ost impacts and end term
been thoroed N2 and Hr speeds up t
safety instrsembly, main can result as drivers wr later use. that all of thehe VulcanTM
e use of nonle to the appilure to followon.
fety Rulstructionin a locatioair the Vulc
Energy Absoe@energyabuestions con.
fety precautng heavy eqback protect
ng traffic combly, mainte
4
e advantagey barriers:
pursuant to aetrieval
minal options
ughly testedH2 containmeto 100 km/h
ructions thorontaining, or re
in serious who may impa
e VulcanTM BaBarrier man
n-specified papropriate highw this warning
les for As *
on where it canTM Barrieorption Systebsorption.comncerning the
ions when quipment ortion should b
ntrol devicenance, or re
ReAll rig
es over tradit
accepted cri
s
d to EN 13ent level acc [62 mph].
oughly and fepairing the Vinjury or deact a system
arrier Warningnual are comarts is not ahway authorit could result
Assembl
is readily aer System. Aems by callim. Please co information
operating pr the Vulcanbe used.
s must be uepair site.
evision B Noghts in copyr
tional portab
iteria
317 testingceptance as
follow the suVulcanTM Barath to the wso deployed
gs, Cautions, mpletely follow
uthorized anty for use onin serious inj
ly
available to Additional cng +1 (214)ontact Energn in this Man
power equipnTM Barrier
used to prov
ovember 201right reserve
ble concrete
proceduress a redirectin
uggested safrrier. Failure tworker and/o
d. Please kee
and Importanwed. Use ond renders th
n the specifieury or death i
persons whcopies of th) 589-8140 ogy Absorptionual or abou
ment, mixincomponents
vide safety fo
1
ed
s. ng
fe to or ep
nt ly
he ed in
ho is or on ut
ng s.
or
wwwwww
SafThis Manurepai Symb
WaReadSyste
.energyabso
.highwaygua
fety Symsection des
ual. Read tr, and servic
bol Meanin
Safety IndicateWarningworkers
rnings ad all instructem.
Warnifor the Barrier.of a col
WarniVulcanT
result in
Warnior repafollow th
Warniread thAbsorptinstructevent o
Warnior repaunaccein seriosystem
Warniwarning
Warniagency injury o
Warnito follow
Warnias dictaserious
orption.com ardrail.com
mbols cribes safetthe Manual ce informatio
ng Alert Symbo
es Danger, Wg, Safety, or Cs and/or bysta
and Cautions before
ing: Read thVulcanTM Ba Failure to follision. ng: Ensure
TM Barrier man serious injuring: Be sureair before beghis warning cng: Do not
his Manual ttion Systemsions. Failure f a collision. ng: Use onairing the Vpted accesso
ous injury or .
ing: DO NOg could result
ng: Ensureand local sp
r death in the
ng: Ensure w this warning
ng: Ensureated by the sinjury or dea
y symbols tfor comple
on.
ol: Warning, or Ca
Caution noticanders.
tions assembling
he instructionarrier before llow this warn
e that all Waranual are comry or death in e adequate tiginning the aould result in assemble, m
thoroughly as at +1 (214)to follow this
nly Energy AbVulcanTM Baories is strictly
death in the
OT modify thin serious inj
e that the Vulcpecifications. e event of a co
that your assg could result
e that there isspecifying agth in the even
5
hat may appete safety,
aution; failure es could resu
g, maintainin
ns carefully. Bassembling,
ning could res
rnings, Cautiompletely follow
the event of me is availabssembly, maserious injury
maintain, or reand complete) 589-8140 ifwarning cou
bsorption Sysarrier. Assemy prohibited. Fe event of a
e VulcanTM Bury or death
canTM Barrier Failure to fol
ollision.
sembly meetsin serious inj
s proper site gency. Failurent of a collisio
ReAll rig
pear in the assembly,
to read and fult in serious i
ng, or repair
Be familiar witmaintaining,
sult in serious
ons and Impowed. Failure ta collision.
ble for compleintenance, ory or death in epair the Vulcely understanf you do notld result in se
stems parts fombly, mainteFailure to follovehicle impa
Barrier in anyin the event o
and delineatillow this warn
s all approprijury or death
grading for Ve to follow th
on.
evision B Noghts in copyr
VulcanTM Baoperating, m
follow the Daninjury or deat
ring the Vulc
th the comple or repairing
s injury or dea
ortant statemeto follow this
ete assembly,r repair procethe event of a
canTM Barrier nd it. Pleaset understand erious injury o
or assemblingenance, or ow this warninact with an U
y way. Failureof a collision.
ion used meening could re
ate local stanin the event o
VulcanTM Barhis warning c
ovember 201right reserve
arrier Systemmaintenance
nger, h to the
canTM Barrie
ete instructiong the VulcanT
ath in the even
ents within thwarning cou
, maintenanceess. Failure ta collision. until you hav
e call Energthe assemb
or death in th
g, maintainingrepairs usinng could resu
UNACCEPTE
e to follow th
et all specifyinesult in seriou
ndards. Failurof a collision.
rrier placemencould result
1
ed
m e,
er
ns TM nt
he ld
e, to
ve gy ly
he
g, ng ult D
is
ng us
re
nt in
www.energyabsorption.com Revision B November 2011 www.highwayguardrail.com 6 All rights in copyright reserved
Know your Vulcan™ Barrier System Application The VulcanTM Barrier can be used in many applications specified by the appropriate highway authority such as:
• General road maintenance performed by road authorities, contractors, local municipalities, etc.
• Road construction • Lane closures • Toll plazas • Road Resurfacing • Excavation or culvert protection • Detours or diversions • Bridge repairs • Temporary or permanent assemblies • Median or verge assemblies • A variety of approved end terminals available or option to "Taper Through Clear
Zone" In order to select the most appropriate VulcanTM Barrier System for a given site, this manual helps the appropriate highway authority answer the following questions:
• Is the VulcanTM Barrier appropriate for my site? • What is the application? What indicates the use of the VulcanTM Barrier? • How long must the barrier be? Refer to the length of need and beginning of length
of need for VulcanTM Barrier assembly options. • How much clear zone is available, and how much is required for the correct
functioning of the System? • Are there curves, slopes or curbs present which may not suit the VulcanTM Barrier? • Is an end treatment, which has been accepted by the appropriate highway
authority, available to suit my particular requirement? Refer to end terminal section of this manual.
The purpose of this manual is to supply some basic application information about the VulcanTM Barrier and to detail its performance when tested to EN 1317 criteria.
If you would like further assistance, please contact Energy Absorption Systems Customer Service Department at +1 (214) 589-8140.
wwwwww
.energyabso
.highwayguaorption.com ardrail.com
Figure 1 - Frees
(Not H2)
7
standing C
ReAll rig
onfiguratio
evision B Noghts in copyr
on
ovember 201right reserve
1
ed
wwwwww
.energyabso
.highwayguaorption.com ardrail.com
Figuure 2 - Anc
8
chored Con
ReAll rig
nfiguration
evision B Noghts in copyr
n
ovember 201right reserve
1
ed
wwwwww
.energyabso
.highwayguaorption.com ardrail.com
Figuure 3 - Anc
9
chored Con
ReAll rig
nfiguration
evision B Noghts in copyr
n
ovember 201right reserve
1
ed
wwwwww
.energyabso
.highwayguaorption.com ardrail.com
Figuree 4 - Freest
10
tanding En
ReAll rig
nd Treatme
evision B Noghts in copyr
ent
ovember 201right reserve
1
ed
www.energyabsorption.com Revision B November 2011 www.highwayguardrail.com 11 All rights in copyright reserved
Anchoring Instructions Recommended Tools 1. VulcanTM Barrier Product Description / Instructional Manual 2. Traffic Control Plan and Approval (as required) 3. Traffic Control Equipment (as required) 4. Rebar Cutting Bit 5. 22 mm (7/8") Concrete Drill Bit (Two-Fluted*)
* Energy Absorption Systems recommends using two-fluted drills to achieve optimum tensile strength when applying the MP-3® anchoring system.
6. Grinder, Hacksaw or Torch (optional) 7. Drill Motor 8. 1/2" Drive Sockets: 1 1/8", 1 1/4" 9. Ratchet for the Above Sockets 10. Torque Wrench: 200 ft-lbs. 11. Safety Glasses 12. Gloves 13. Nylon Bottle Brush For Cleaning 7/8" Drilled Holes 14. Rags, Water, and Solvent for Touch-Up
Note: The above list of tools is a general recommendation. Depending on specific site conditions and the complexity of the assembly specified by the appropriate highway authority, additional or fewer tools may be required. Decisions as to what tools are needed to perform the job are entirely within the discretion of the specifying highway authority and the authority’s selected contractor performing the assembly of the system at the authority’s specified assembly site.
Anchored VulcanTM Foundations The VulcanTM Barrier may be assembled on any of the following foundations using the specified anchorage: Note: MP-3 is Energy Absorption Systems available anchoring system. Other options are acceptable if they provide identical (or better) anchoring properties. Foundation A: Concrete Pad or Roadway
Foundation: 150 mm [6"] minimum depth Portland Cement Concrete (P.C.C.)
Anchorage: MP-3® with 180 mm [7"] studs 140 mm [5.5"] embedment
Foundation B: Asphalt over Portland Cement Concrete
Foundation: Minimum anchor embedment depth is 140 mm [5.5"] Anchorage: Length of anchor required is 180 mm [7"] stud + asphalt thickness.
Foundation C: Asphalt over Sub-base
Foundation: 150 mm [6"] minimum (A.C.) over 150 mm [6"] minimum Compacted Sub-base (C.S.)
Anchorage: MP-3® with 460 mm [18"] studs 420 mm [16.5"] embedment
www.energyabsorption.com Revision B November 2011 www.highwayguardrail.com 12 All rights in copyright reserved
Foundation D: Asphalt Only Foundation: 200 mm [8"] minimum Asphalt Concrete (A.C.) Anchorage: MP-3® with 460 mm [18"] studs – 420 mm [16.5"] embedment
Foundation Specifications for Foundations A, B, C and D Note: Walk-up inspections are recommended at least once every six months for assemblies on asphalt. Asphalt Concrete (A. C.) AR-4000 A.C. (per ASTM D3381 '83) .75" Maximum, Medium (Type A or B) aggregate
Sieve Size Operating Range (%) Passing
1" 100 3/4" 95 to 100 3/8" 65 to 80 No. 4 49 to 54 No. 8 36 to 40 No. 30 18 to 21 No. 200 3 to 8
Portland Cement Concrete (P.C.C.) Stone aggregate concrete mix 4000 psi [28MPa] minimum compressive strength (Sampling per ASTM C31-84 or ASTM C42-84a, testing per ASTM C39-84) Compacted Sub-base (C.S.) 150 mm [6"] minimum depth 95% compaction Class 2 aggregate
VulcanTM Barrier Sections assembled on asphalt must be inspected by the appropriate authority to ensure the anchors are still properly set following each impact. Re-anchor as necessary.
Sieve Size Moving Average % Passing
3" 100 2 1/2" 90 to 100 No. 4 40 to 90 No. 200 0 to 25
wwwwww
PosLocateach
Use instruequiv
.energyabso
.highwaygua
sition the te anchor stbarrier sect
the Anchoructions contavalent ancho
ANCH
orption.com ardrail.com
VulcanTM
traps at pantion.
r Straps asained in the
oring options
Figu
Fig
OR
M Barrier nel connectio
templates e MP-3® Polys) for detailed
ure 5 - Anc
gure 6 - An
13
Sectionson points as
to drill ancyester Anchd anchoring
chor Strap
choring th
ReAll rig
s s shown in F
chor holes. hor box supp
instructions
Locations
he System
evision B Noghts in copyr
Figure 5 wh
Refer to Fplied with ths.
s
ovember 201right reserve
en anchorin
Figure 6 anhe system (o
1
ed
ng
nd or
wwwwww
MPAss
1. Door eventiopen
4. Wsafetfrom Part Pourvigorform stud
.energyabso
.highwaygua
-3 Polyeembly and
Imporprocee
o not allow coneyes. Use onlated area. Do
n flame.
While wearingty goggles, rethe MP-3 Par
B-Hardener r Part B into Prously for 30
MP-3 grout.may serve as
orption.com ardrail.com
ester And Safety I
rtant: Reeding.
ntact with skin ly in a well-
o not use near
gloves and move the lids rt A-Resin and
containers. art A and mix seconds to . (An anchor a stirring rod.)
choringnstruction
ead all ins
2. Wear possible, uanchored aDrill the hothe stud recommendtwo fluted roFull strengthif a diamondto be sure athe proper with the par
5. For fasteweather, PrDo not usetemperaturAdd the enPromoter cogrout and m30 secondsthe MP-3 quickly.
14
g Systemns
structions a
safety gogguse the part as a drilling temoles 1/8" large
diameter toded depth, usotary percussivh will not be acd drill is used. all holes are dr
depth and rt to be anchore
er hardening romoter may bee Promoter whre is above ntire contents ontainer to themix for an ads. Use imme
grout will
ReAll rig
m
and materi
les. If to be
mplate. er than o the sing a ve drill. chieved Check rilled to aligned ed.
3. Wblowholeair. with thenis wwateit com
in cold e used. hen the
60°F. of the
e MP-3 dditional ediately, thicken
6. anchCrimformgrouthrouholethe h
evision B Noghts in copyr
ials thoroug
While wearing sw the concrete e, using oil-fre
Thoroughly ca stiff-bristle
n blow it out agwet, completelyer while brushi
clean usmpressed air.
Position the hored over the
mp the mouth m a spout and ut mixture dowugh the part.
e. Do not ovehole.
ovember 201right reserve
ghly before
safety glasses dust from thee compressed
clean the holeed brush, andgain. If the holey flush it withing. Then blow
sing oil-free
part to bee clean holesof the can topour the MP-3n into the holeFill 1/3 of ther- or under-fil
1
ed
e
, e d e d e h w e
e . o 3 e e l
wwwwww
7. Pthe pthe hstud and sevethe th
In coMate Energkind i Energto pro3 Pol EnergsuppnatioDepa
.energyabso
.highwaygua
ush the stud part to be anchhole. Leave eexposed to awasher. Tw
eral turns in thehreads.
ompliance wrial Safety D
gy Absorptioin connectio
gy Absorptiooperty resultyester Anch
gy Absorptiolying high qn’s highway
artment at +1
orption.com ardrail.com
down through
hored and into enough of the attach the nut
wist the stud e grout to wet
with the US Data Sheets
on Systems n with the us
on Systems ting from fai
horing Syste
on Systems uality, safe ys. If you h1 (214) 589-
8. Place a stud and this flush withseated agadisturb or lomaterial has
Departmenare availabl
expressly dse of the MP
expressly dlure to followm.
is committedproducts to ave any qu8140.
15
flat washer ohread a nut on the top of the inst the part. oad the stud us hardened.
nt of Labor e upon requ
disclaims anyP-3 Polyeste
disclaims liabw instruction
d to meetingthe request
uestions, ple
D
ReAll rig
nto the n until it
stud or Do not
until the
9. Otorquvalu
Hazard Comuest.
y express oer Anchoring
bility for injuns or improp
g our customting highwayease contac
Document No. 27
evision B Noghts in copyr
Once the grout ue the nut to es.
mmunication
r implied wag System.
ry to personper applicatio
mer’s requirey authority foct our Custo
35041-0000, Sh
ovember 201right reserve
has hardenedrecommended
n 1910.1200
arranty of an
ns or damagon of the MP
ements and tor use on thomer Servic
eet 1/2 Revision
1
ed
, d
0,
ny
ge P-
to he ce
B
wwwwww
AlteTheresucceAbsoalternour mshearepreherei
Con
Mode
HHR
Asp
Mode
NK
.energyabso
.highwaygua
ernativee are numessfully anc
orption Systenative anchominimum reqr strength
esentations an.
Cautiomanufamanufafinalizin
ncrete:
els [Epoxy-bHVU M20 x 1HY 150 RE 500
phalt:
el [Epoxy-baN/A Kelken "LKeligrout epo
• Kelken • 3/4-1
for re• Mate
Grad• Galv• Inclu
• 1KS12Q• 1KG101
orption.com ardrail.com
e Anchorerous man
chor the Vuems has pors. The follquirements
of 109kNas to the pe
on: All anacturer’s speacturer be conng your ancho
ased ancho70
ased anchoriLefty" ancho
oxy “Lefty” anch10 threads aemaining anerial per ASTde 5 vanized for cudes 3/4 inchQ (Kelislip bo1T (Keligrou
ring Optufacturers ulcan™ Barerformed alowing list s(i.e. min. pu [24,500lbsrformance o
nchors must ecific requirensulted to dis
or selection.
ring systems
ng system]:or coated wit
hors (3/4 inchat top 2 inchenchor length TM A449 Ty
corrosion resh galvanizedond release t epoxy)
16
tions of anchors rrier CEN Snchor perfo
states whichull out strens]. Energy of anchors th
be assembements. It scuss your sp
http://ww
s]:
h
th Kelislip bo
h diameter xes of anchor(~16 inches
ype 1 or AST
sistance d washers aagent)
ReAll rig
that proviSystem to
ormance tesh anchors hangth of 82.3
Absorptionhat it has no
led strictly ais recomm
pecific assem
ww.hilti.com
http://www.k
ond release
x 18 inch lonr, 3/4 inch “Ls) TM A193 Gra
nd 3/4-10 ga
evision B Noghts in copyr
ide a prodthe founda
sts on seveave satisfac
3kN [18,500ln Systems ot tested and
according to mended that mbly site cond
m
kelken.com
agent and a
ng) Lefty” remov
ade B7 or SA
alvanized nu
ovember 201right reserve
uct that wation. Energeral of thesctorily passelbs] and min
makes nd is not liste
each anchothe ancho
ditions prior t
anchored wit
vable thread
AE J429
uts
1
ed
will gy se ed n. no ed
or or to
th
wwwwww
Mode
TT
Mode
InspFor pEnergpersothe P
1
2
.energyabso
.highwaygua
el [MechanicTHD75812HMTHD75100HM
el [Epoxy-baTSM B 22
pection Npermanent gy Absorptioonnel accord
Product Manu
. Increase thof once eve
. After eachremained those founreplaced. Imay be repthe system
orption.com ardrail.com
cal anchoringMG (3/4 inchMG (3/4 inch
ased anchori2 X 155 IM 1
Notice applicationson Systemsding to the gual, with the
he frequencyery 12 mont
impact, chefirmly ancho
nd to be loof the systemplaced if dam
m shall be rel
g systems]:h diameter xh diameter x
ng system]:16 ASPHALT
s on asphals recommenguidelines see following ad
y of Walk-Uths for concr
eck to see tored in the ose, broken
m is anchoremaged. If moocated and
17
h
x 8.5 inches x 10 inches lo
http://tog
T
t, using altends that theet forth in thedditions:
p Inspectionrete applicat
hat all Anchroadway s
n, or showind to asphaltore than 20%reassemble
ReAll rig
http://www.s
long; mechaong; mecha
ge-road.de
ernative ance system bee Maintenan
ns to once eions).
hor Bolts aresurface. Damng signs of t, then up to % of the anc
ed onto new
evision B Noghts in copyr
simpsonanch
anically galvanically galva
chor optionse inspectednce and Rep
every six mo
e not damagmaged anch
pull out an20% of the
chors are daand undistu
ovember 201right reserve
hors.com
anized) anized)
s (like Toge by qualifie
pair section i
onths (instea
ged and havhor bolts arnd are to btotal anchor
amaged, therbed asphal
1
ed
e); ed in
ad
ve re be rs
en lt.
wwwwww
.energyabso
.highwaygua
A
orption.com ardrail.com
Assembly Drawing 6
18
16960 (She
ReAll rig
eet 1) Vulc
evision B Noghts in copyr
can 12m
ovember 201right reserve
VULC
AN
™12
MD
raw
ings
1
ed
VULC
AN
™ 1
2M D
raw
ings
wwwwww
.energyabso
.highwaygua
A
orption.com ardrail.com
Assembly Drawing 6
19
16960 (She
ReAll rig
eet 2) Vulc
evision B Noghts in copyr
can 12m
ovember 201right reserve
1
ed
wwwwww
.energyabso
.highwaygua
A
orption.com ardrail.com
Assembly Drawing 6
20
16960 (She
ReAll rig
eet 3) Vulc
evision B Noghts in copyr
can 12m
ovember 201right reserve
1
ed
wwwwww
.energyabso
.highwaygua
A
orption.com ardrail.com
Assembly Drawing 6
21
16960 (She
ReAll rig
eet 4) Vulc
evision B Noghts in copyr
can 12m
ovember 201right reserve
1
ed
wwwwww
.energyabso
.highwayguaorption.com ardrail.com
Assembly Drawing 6
22
616961 (Sh
ReAll rig
heet 1) Vulc
evision B Noghts in copyr
can 4m
ovember 201right reserve
VULC
AN
™4M
Di
1
ed
VULC
AN
™ 4
M D
raw
ings
wwwwww
.energyabso
.highwayguaorption.com ardrail.com
Assembly Drawing 6
23
616961 (Sh
ReAll rig
heet 2) Vulc
evision B Noghts in copyr
can 4m
ovember 201right reserve
1
ed
wwwwww
.energyabso
.highwayguaorption.com ardrail.com
Assembly Drawing 6
24
616961 (Sh
ReAll rig
heet 3) Vulc
evision B Noghts in copyr
can 4m
ovember 201right reserve
1
ed
www.energyabsorption.com Revision B November 2011 www.highwayguardrail.com 25 All rights in copyright reserved
Notes:
www.energyabsorption.com Revision B November 2011 www.highwayguardrail.com 26 All rights in copyright reserved
Notes:
Trinity Highway Products International2525 North Stemmons Freeway
Dallas, Texas 75207 USATel: +1-214-589-8140Fax: +1-214-589-8423
www.highwayguardrail.com www.energyabsorption.com
Trinity Highway Products International1170 North State Street
Girard, Ohio 44420 USATel: +1-330-545-4373Fax: +1-330-545-0538
Trinity Highway Products InternationalStorgatan 56 B
S-262 32 Ängelholm, SwedenTel: +46 431 41 51 58Fax: +46 431 41 21 59
Trinity Highway Products InternationalCrown House, Crown Street, Ipswich,
IP1 3HS, United KingdomTel: +44 1473 221105Fax: +44 1473 221106
Trinity Highway Products International15 Jalan Kilang Barat #01-01
Fontech CentreSingapore 159357
Tel: +65 62 76 3398Fax: +65 62 76 6218